VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 79-07 FOR THE MONTH OF JULY, 1979 7 90814 et ^sa o~=
f) s O UCJ
OPERATING DATA REPORT DOCKET NO. 50-271 DATE 790810 COh!PLETED BY DX Siocren TELEPHONE (617) 366-9011 X"/81 OPERATING STATUS Notes
- l. Unit Name:
Ve ront Yankee
- 2. Reposting Period:
Julv 1979
- 3. Licensed Thermal Power (31Wt):
1,593 540
- 4. Nameplate Rating (Gross 31We?.
514 ( Pe cycle) 504 (closed cycle)
- 5. Design Electrical Rating (Nec 31We):
535
- 6. Sfaximum Dependable Capacity (Gross SIWE):
- 7. Slaximum Dependable tapacity (Net SIWE):
504 S. If Changes Occer n Capacity Ratings (Items Number 3 Through 7) Sinc :.ast Report, Give Reasons.
- 9. Power Level To Which Restricted !f Any (Net SIWE):
- 10. Reasons for Restrictions. lf Any:
(
\\
This alonth Yr..to.Date Cumulative
- 11. Hours in Reporting Period 744 5,087
~
- 12. Number Of Hours Reactor Was Critical 744 4,679.3 48,569.1
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On.Line 744 4.665.8 46.798.8
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gmss Thermal Energy Generated (SIWH) 1.1 ? S.100.L 7.162.433.2
_65,549,250.7 17 Gross Electrical Energy Generated (5tWH; 364./i 3 2,403,865 21,743,333
- 18. Net Electrical Energy Generated (5tWH)
'L'
'6' 2.285.7R6 20.605,309
- 19. Unit Senice Factor 100 91.7 77.8
- 20. Unit Ava~iability Factor 100 91.7 77.8
- 21. Unit Capacity Factor (Using.\\ LLC Net) 91 89.2 68.0
- 22. Unit Capacity Factor (Using DER Net) 89.2 87.4 66.7
- 23. Unit Forced Outage Rate 0.0 0.0 6.6
- 24. Shutdowns Scheduled Over Next 6 Stonths (Type. Date,and Duration of Each):
Refueline September 22, 1979 6 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startu; :
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICA LITY INITIA L ELEC TRICITY CO\\l.\\tERCIAL CPERATION (9/77) i=7
' I)
((. )
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-271 UNIT Vermont DATE 700R10 COVPLETED BY R.M. Sjogren TELEPHONE (617) 366-4011 X2281 SiONTH July 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (31We-Net)
(31we-Net) 465 1
463 37 2
475 13 466 465 3
476 g9 458 4
480 20 5
481
- g 361 42 9 6
473 7
406 23 474 S
4 6 ')
24 467 9
467 25 463 10 472 26 464 11 467 27 466 465 12 427
,3 13 470 451
,9 14 AA9 30 465 15 465 3;
449 16 464 INSTRUCTIONS On this for:nat. list the average ca:!y unit power level in MWe-Net for e: h day in tl.e reportinz month. Compute to the nearest whole megawatt.
(0/77) r7 o;;
o
/
N.
UNITSil01 DOWNS AND POWER REDUCTIONS DO( KET NO 50-271 UNIT N Ah!E Vermont CO DATE 790810
{.]
U COhlPLEll:D i;Y
_R.M.
Sjocren ItEPORT hl0N111 Juiv 1979 TELI PflONE (617) 366-9011 X2281 v,
(~t ')
C c_
cs 3 v. :
ti
.2 e g
,.s X Lkensee c 8,,
c t,
Cause & corecctive No.
Date g.
gg
_g g 5 Event
=y
$1 Atijon in c$ E 5
j di Itcport #
NU yU P4cvent Itecorrence o
79-11
- 79070, S
0 11 4
RA CONROD 11 - Control Rod Pattern Adjustment (Power Reducti an) 79-12 790711 F
0 11 4
CB PUMPXX 11
' A' Recirc Pump Speed Oscillation.
(Power Tachometer was replaced.
Reducti on) 79-13 790720 S
0 11 4
RA CONROD 11 - Control Rod Pattern Adjustment (Power Reducti on) 79-14 790731 F
0 A
4 WA VALVEXX A - Packing leak on the
'A' Recirc 11G (Power set lube oil cooler service water Reduct on) outlet valve. Valve was repacked and backseated.
I 2
3 4
17: l'ois ed Iteason:
Elethoil:
1:xinbit G - Instinctions S. Stlicilnied A l'quipment Failure (lixplain) l-h! annat for Picp.iration of Dat
!! hiaintenai<ce oi Test 7-htanual Scrain.
Enity Sncets Ior iacensee C-Itcluctinr.
3 Antomatic Scram.
Event Itepint (l.I:lti lite INtfill.G-D Rc;;ntatory itesisittion 4-Ollier (lixrlain) 0161)
I Opciator Isaining & License lixamination F Ailmini.teative 5
G Opciational i esor (1.xpl.on)
I'ninliit I Same Sousse Pr/17) 11 Ollici (limplain)
C' DOCKliT NO.
50-271 rJ UNIT Vermont DATE 790810 c
y, COIIPLETED liY R. M. Sjogren C
TELEPllONE (617) 366-9011 X2281 SAFliTY l'ELAllID flAINTENANCli NAlVitti UI' Llill Ull UUI AGli MA!,1-UNC~1 I ON EQUII'lltiflT
?!AINTENANCli NUIIBER CAUSL
~
1:LSUL1 COI RECTIVli AClION Reactor Building Vent Duct Corrective NA Unknown Initial false mid Rechecked calibration Ibnitor (17-452B)
MR 79-373 range values
DOCKET NO.
50-271 UNIT Ve rmont DATE 790810 COMPLETED BY R. M. Sjogren TELEPHONE (617) 366-9011 X2281 REPORT MONTH July 1979 SU't!ARY OF OPERATING EXPERIENCES Highlights Ver=ont Yankee operated at 95.2% of rated ther=al power for the month of July, 1979. Gross electrical generation for the month was 364,443 K4He, or 90.7% of design electrical capacity.
Operations Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
7-1 At the beginning of the report period. the plant was operating at S3% of rated thermal power.
7-7 At 2200 houts power was reduced to 78% to effect a con-trol rod pattern adjustment. Power increase to 98%
co _enced at 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br />.
7-11 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> power was reduced to 45% to perform main-tenance on the 'A' Recirc pump to correct pump speed oscillations. Power increase to 98% commenced at 0205 hours0.00237 days <br />0.0569 hours <br />3.38955e-4 weeks <br />7.80025e-5 months <br /> on 7-12.
7-20 At 2230 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.48515e-4 months <br /> power was reduced to 67% to effect a con-trol rod pattern adjustment. Power increase to 99%
commenced at 0430 on 7-21.
7-31 At the conclusion of this report period, the plant had reduced power at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> to 50% to correct a valve packing leak on the 'A' Recirc MG set Lube Oil Cooler.
- - /
P~P f). b UdJ
&