ML19206A457
| ML19206A457 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 03/14/1975 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | John Miller METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19206A458 | List: |
| References | |
| NUDOCS 7904200048 | |
| Download: ML19206A457 (1) | |
Text
%
UNITED STATE 3
.UCLEAR REGULATORY COMMISSION REcloN I 6 31 P A R K AVINVE KtNG O F P A USSI A, PE N m 7 f V ANI A 19406 March 14, 1975 Metropolitan Edison Co=pany Docket No.Q0-320 Attention:
J. G. Miller Vice President PC Eo:t 542 Reeding, Pennsylvania 19603 Gentle =en:
Enclosed is 17 Bulletin No. 75-03 which requires action by you with regard to your pcwer reactor f acility(ies) with :perating license or construction per=it.
Should you have questions regarding this Bulletin or the action required of you, please contact this office.
Sincerely,
-,-- ---J Cs*-d/ N James P. O'Reilly Director
Enclosure:
IE 3u11etin No. 75-03 Approved by GAO, 3-180225 (RC072), clearance expires 7-31-77.
Approval was given under a blanket clearance cpecifically for identified generic problems.
cc:
R. L. Wayne. QA Manager, Design & Construction T.
M.
Cri= mins, Jr., Safety & Licensing Manager
'. llevard, Jr., Proj ect Manager R.
w*. A. Verrochi, Vice President, Design & Construction Cerald Charnoff, Eaquire 3ce:
IE Files
[0RCentralFiles
- PDR Local PDR REG:I Reading Ec "
t State of Pennsylvania oGC 6
=
u m,os 7.90420 Z $.
^
s' G;3