|
---|
Category:Letter
MONTHYEARML24022A2262024-01-22022 January 2024 (PBAPS) Unit 3 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 24th Refueling Outage for Unit 3 ML23346A2412024-01-17017 January 2024 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information (EPID L-2019-PMP-0061) - Letter IR 05000277/20234022024-01-11011 January 2024 Security Baseline Inspection Report 05000277/2023402 and 05000278/2023402 and Independent Spent Fuel Storage Installation Security Inspection 07200029/2023401 ML23354A1922024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML23355A0622023-12-18018 December 2023 Independent Spent Fuel Storage Installation (Isfsi), Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) IR 05000277/20230032023-10-30030 October 2023 Integrated Inspection Report 05000277/2023003 and 05000278/2023003 and Exercise of Enforcement Discretion ML23286A0012023-10-13013 October 2023 Reply to a Notice of Violation (NOV) - NOV 05000277, 05000278/2023010-01 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23271A1342023-10-11011 October 2023 Dtf Analysis Letter IR 05000277/20244012023-10-0505 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 ML23265A1502023-09-22022 September 2023 License Amendment Request Revise a License Condition and Certain Technical Specifications to Remove Restrictions in Support of Decommissioning Activities ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L IR 05000277/20230102023-09-15015 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000277/2023010 and 05000278/2023010 and Notice of Violation ML23251A2022023-09-11011 September 2023 Cover Letter W/Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement IR 05000277/20230052023-08-31031 August 2023 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 IR 05000277/20230112023-08-15015 August 2023 Comprehensive Engineering Team Inspection Report 05000277/2023011 and 05000278/2023011 ML23226A1112023-08-14014 August 2023 10 CFR 50.46 Annual Report IR 05000277/20230022023-08-0808 August 2023 Integrated Inspection Report 05000277/2023002 and 05000278/2023002 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000277/20230402023-07-17017 July 2023 95001 Inspection Supplemental Report 05000277/2023040 and Follow-Up Assessment Letter ML23188A0532023-07-0707 July 2023 Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks ML23186A1272023-07-0606 July 2023 Response to Disputed Non-Cited Violation Documented in Peach Bottom Atomic Power Station, Units 2 and 3, Inspection Report 05000277/2022004 and 05000278/2022004 ML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML23150A2052023-05-30030 May 2023 Independent Spent Fuel Storage Installation (Isfsi), Annual Radiological Environmental Operating Report 80 January 1, 2022 Through December 31, 2022 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23142A1602023-05-23023 May 2023 Summary of April 11, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re Proposed Exemption Request from Work Hour Requirements ML23132A1582023-05-18018 May 2023 Correction to Technical Specification 3.4.7 (Page 3.4-16) Issued in Amendment No. 337 ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) IR 05000277/20230012023-05-0808 May 2023 Integrated Inspection Report 05000277/2023001 and 05000278/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI 2024-01-05
[Table view] |
Text
August 7, 2019 Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC 20001-2637
SUBJECT:
NOTICE OF AVAILABILITY FOR PUBLIC COMMENT OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR SUBSEQUENT LICENSE RENEWAL OF PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3
Dear Mr. Nelson:
The U.S. Nuclear Regulatory Commission (NRC) is conducting a review of the environmental effects of renewing the operating licenses for Peach Bottom Atomic Power Station, Units 2 and
- 3. Peach Bottom Atomic Power Station, Units 2 and 3 are operated by Exelon Generation Company, LLC (Exelon) and are located in Peach Bottom Township, York County Pennsylvania. As part of its review, the NRC has prepared a draft site-specific Supplemental Environmental Impact Statement (SEIS) to its Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437. The draft SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archaeological and cultural resources from activities associated with license renewal.
As stated in our letter to your office dated September 10, 2018, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in Title 36 of the Code of Federal Regulations (36 CFR) Section 800.8(c). The NRC has determined that the area of potential effects for this subsequent license renewal is the area at the power plant site and its immediate environs that may be impacted by ongoing routine maintenance and operational activities during the subsequent license renewal term.
As discussed in the draft SEIS, the NRC staffs preliminary determination is that subsequent license renewal would not adversely affect any known historic properties. Further, the NRCs preliminary recommendation is that the adverse environmental impacts of subsequent license renewal for Peach Bottom Atomic Power Station, Units 2 and 3 are not so great that preserving the option of license renewal for energy-planning decision-makers would be unreasonable. In support of these conclusions, the NRC conducted an environmental site audit and performed an independent analysis and review of historic and archeological records. The NRC also initiated consultation with 15 Federally-recognized American Indian Tribes, notifying them of the proposed action and requesting comments on the scope of the environmental analysis.
Documentation of Tribal consultation is presented in Appendix C of the draft SEIS.
R. Nelson A copy of the draft SEIS is enclosed. The draft SEIS is also available through the web-based version of the NRCs Agencywide Documents Access and Management System (ADAMS) at https://www.nrc.gov/reading-rm/adams.html under ADAMS Accession No. ML19210D453.
Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft SEIS and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2018-0130. Written comments should be submitted by mail to the NRC at:
ATTN: Program Management, Announcements and Editing Staff Office of Administration Mail Stop: TWFN-7A60M U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on September 23, 2019.
The NRC plans to hold a public meeting to discuss the findings of the draft SEIS on September 12, 2019, at the Peach Bottom Inn, 6085 Delta Road, Delta, PA 17314. The meeting will begin with an open house at 5:00 p.m., followed by an NRC staff presentation and opportunity for public comments at 6:00 p.m. A Notice of Availability of the draft SEIS will be placed in the Federal Register and will provide more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Nancy Martinez, Physical Scientist, at 630-829-9734 or by e-mail at Nancy.Martinez@nrc.gov.
Sincerely,
/RA Kevin Folk for/
Benjamin Beasley, Chief Environmental Review and NEPA Branch Division of Materials and License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278
Enclosure:
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 10, Second Renewal cc: Listserv
ML19205A209 (Package)
ADAMS Accession No. ML19205A210 (SHPO Letter)
ADAMS Accession No. ML19205A211 (Tribal Letter)
ADAMS Accession No. ML19205A212 (ACHP Letter) *concurred via email OFFICE LA:DMLR: MRPB* PM:DMLR:MRPB PS:DMLR:MENB BC:DMLR:MENB NAME SLent DDrucker NMartinez BBeasley (KFolk) for DATE 7/25/2019 7/30/2019 7/30/2019 8/7/2019