ML19199A386
| ML19199A386 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 11/08/1973 |
| From: | Oleary J US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Creitz W METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19199A385 | List: |
| References | |
| NUDOCS 7905020007 | |
| Download: ML19199A386 (1) | |
Text
.
DISTRIBUTION:
Files OPS Reading
'.E
- DR Reading L Reading EGCase 2cc.2 t :o. 5 3-32.,
JF0 Leary RSBoyd JMHendrie AEC POR Mr. W.
d.. Crelt, President L0 cal PDR
, etropolltan tdiscn Ccepany B. Washburn Post Ofrice Jox 042 Reading, Pennsylvania 19603
Dear Mr. Creitz:
As you are aware, it is our objective to ccmplete the AEC licensing revie:s, including any public hearing, of an application for an operating license for a nuclear pc'eter plant in tine to permit a licensing cecisica to be acce at or cefore the time the plant is ready for fuel loading.
In order to aciieve this objective, it is essential that the application for an operating license be prepared and accepted for AEC review well in advance of the scheduled date of plant completion in order to perait our review to ce cor.ipletea in an orderly fashicn.
On the basis of past exDerience and currently projected staffing levels, I expect that a licensing decision at tne cperating licensing stage for an average uncontested case can be made about 1G months after acceptance of the applicatien, and in about 21 months for an average contested csse.
Sased on taese consideraticns, we urge you to senecule preparaticn of tae operating licer.se applicatior. 24 centns before the scheculed fuel locci69 uate for Inc plant.
It is cur understanding that ycur schedule for Threc ?.ile Island 2 allcws at least E4 montns ber een subiaission of t.u.
applicaticr. fcr an cperating license anc plant coi..pletien, and appears to be censistent with the guidelines outlined above.
I urge that every effort be made to maintain these current schedules.
If any cnange develops, you are recuested to infom us prcr:ptly.
Sinc rely, IS4:ed) Jcht 7. u :.euy I't, 4,,.
, u.
7 9 0 5 0 2 0 00~(
Jchn F. C' Leary Director of Licensing L/.
L:0PS WP cmcr > p....
.. f.,.rp..
i..... L....
R 1
I L:0PS 1
.i l
c PHayward/1pc WGMcDcnald l MGraff RSB'oyd l EGC'ase J F0 ' Leary S U K 'e A M E >
1
- g f.y DATE >
Form dC.nis An 9-R AECM 0240 o*o
. 4-a- n ec-'
.. s-a