M190131, GE Hitachi Nuclear Energy License Amendment Request - Revision to Radiological Emergency Plan (REP) Public

From kanterella
(Redirected from ML19198A298)
Jump to navigation Jump to search

GE Hitachi Nuclear Energy License Amendment Request - Revision to Radiological Emergency Plan (REP) Public
ML19198A298
Person / Time
Site: Vallecitos, Vallecitos Nuclear Center
Issue date: 07/17/2019
From: Murray S
GE Hitachi Nuclear Energy
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML19182A197 List:
References
M190131
Download: ML19198A298 (1)


Text

  • HITACHI GE Hitachi Nuclear Energy Scott P. Murray Manager, Facility Licensing 3901 Castle Hayne Road M190131 P.O. Box780 Wilmington, NC 28402 July 17, 2019 USA T (910) 819-5950 Director of the Office of Nuclear Reactor Regulation scott.murray@ge.com U.S. Nuclear Regulatory Commission Washington, D.C. 20555-001 Attn: Document Control Desk

Subject:

License Amendment Request - Revision to Radiological Emergency Plan {REP) Public

References:

1) NRC License R-33, Docket 50-73
2) NRC License DPR-1, Vallecitos Boiling Water Reactor {VBWR), Docket 50-18
3) NRC License DR-1 0, ESADA Vallecitos Experimental Superheat Reactor

{EVESR), Docket 50-183,

4) NRC License TR-1, General Electric Test Reactor (GETR), Docket 50-70
5) GEH/NRC Telecom, 5/28/19
6) Letter, S. P. Murray {GEH) to NRC NRR, "License Amendment Request-Revision to Radiological Emergency Plan {REP), 7/1/19

Dear Sir or Madam:

Attached are redacted {public) versions of the Vallecitos Nuclear Center {VNC) Radiological Emergency Plan {REP) and supporting documents that were submitted on July 1, 2019

{Reference 6).

Please contact me at 910-819-5950 if you have any questions or would like to discuss this matter further.

Sincerely, s!~1!2~

Facility Licensing n (/

Attachment 1: VNC Current to Proposed Emergency Plan Review Attachment 2: VNC REP Reduction in Effectiveness Evaluation Attachment 3: VNC NUREG 0849 Standard Review Plan Assessment Attachment 4: VNC REP dated June 2019 cc: D. Hardesty, NRC NRR J. Parrott, NRC NMSS SPM 19-015