July 8, 2019 Post Fukushima Order Implementation Status Mitigating Strategies (MS) Order (EA-12-049) Compliance Status

- As of June 18, 2018, all operating power reactor units are in compliance with Order EA-12-049.

- The NRC staff performs inspections in accordance with NRC Inspection Manual Temporary Instruction 2515/191 (TI-191) after all units at a site are in compliance to verify that required FLEX equipment and connections are in place.

- As of June 28, 2019, the staff has completed TI-191 inspections at all operating power reactor sites.

Spent Fuel Pool Instrumentation (SFPI) Order (EA-12-051) Compliance Status

- As of June 30, 2017, all operating power reactor units are in compliance with Order EA-12-051.

- The NRC staff inspects for compliance with the SFPI Order in conjunction with the inspections for Order EA-12-049.

Severe Accident Capable Hardened Containment Vent System (HCVS) Order (EA-13-109) Compliance Status

- Order EA-13-109 established a schedule for 30 applicable licensees (boiling water reactors with Mark I or Mark II containments) to achieve full compliance with Phase 1 (wetwell vent) by June 30, 2018 and full compliance with Phase 2 (drywell vent or a strategy that makes drywell venting unlikely) by June 30, 2019.

- The NRC approved withdrawal of the order for the Pilgrim Nuclear Power Station on June 21, 2019

- The NRC approved withdrawal of the order for Oyster Creek Nuclear Generating Station on December 14, 2018.

- As of June 21, 2019, all 28 applicable operating boiling-water reactor units are in compliance with both phases of the order.

- The NRC staff will perform inspections for compliance with the HCVS Order in accordance with NRC Inspection Manual Temporary Instruction 2515/193 (TI-193) after all units at a site are in compliance.

- A pilot TI-193 inspection was completed at Dresden on July 28, 2018. The staff has completed TI-193 inspections at 4 sites.

A table with the Order Compliance Status is provided on the following page. Site names that are highlighted in dark green have completed all post-Fukushima activities and the NRC has issued a completion letter.

The NRC approved relaxation/withdrawal of the three orders for Pilgrim Nuclear Power Station on June 21, 2019. Pilgrim has permanently shutdown and certified that all fuel has been permanently removed from the reactor.

July 8, 2019 Order Implementation Status for Operating Reactors - By Region