MONTHYEARML24009A1092024-01-0909 January 2024 Acceptance of Westinghouse Electric Company, LLC Request to Exempt From10 CFR 70.50(b)(1) ML23355A1542023-12-20020 December 2023 WEC Acceptance 2023 DFP Surety Bond Change ML23184A1022023-06-30030 June 2023 Westinghouse Acceptance E-mail- Hematite Ash Part II ML23055A1872023-02-24024 February 2023 Final-NRC Doc Request - WEC FP IR 2023-001 ML23045A2042023-02-0909 February 2023 Email - RAI for Westinghouse Hematite Ash Part I EPID L-2022-LLA-0177 ML22320A0922022-11-0303 November 2022 Westinghouse Acceptance Email for Removal of Flywheel and Corrections to La ML22250A6642022-09-0707 September 2022 (External_Sender) Proposed Licenses Renewal for the Westinghouse Columbia Fuel Fabrication Facility ML22137A2752022-05-16016 May 2022 E-mail from Elizabeth Johnson, Sc SHPO - Re; Westinghouse Columbia Fuel Fabrication Facility (CFFF) Revised Draft Cultural Resources Survey Richland County ML22053A1432022-02-16016 February 2022 Email to P. Donnelly (Westinghouse) Acknowledging Receipt of 2022 ISA Summary ML21278A5242021-09-30030 September 2021 Stewart Review of Draft Environmental Assessment for Westinghouse Columbia Alternative Disposal Request ML21288A4082021-09-21021 September 2021 South Carolina State Historic Preservation Office Comments Westinghouse Columbia Fuel Fabrication Facility License Renewal Draft Environmental Impact Statement and Section 106 Review ML21288A2792021-09-20020 September 2021 Comment (15) E-mail Regarding WEC CFFF Draft EIS ML21257A4682021-09-13013 September 2021 Request for Additional Information Related to Westinghouse Electric Company, LLC, Exemption Request for Alternate Disposal of Specific Waste (Enterprise Project Identifier L 2021-Lla-0101) ML21252A0862021-09-0808 September 2021 Transmittal Email to Crow Butte Resources, Inc., Survey Methodology to Identify Sites of Significance to the Oglala Sioux Tribe ML21252A0882021-09-0808 September 2021 Transmittal Email to Oglala Sioux Tribe Survey Methodology Survey Methodology to Identify Sites of Significance to the Oglala Sioux Tribe for the Crow Butte ISR Facility License Renewal ML22164A9342021-08-17017 August 2021 WEC 2021 Donnelly ML21342A0402021-08-0606 August 2021 Transmittal to U.S. Fish and Wildlife Service of the Draft Environmental Impact Statement for the License Renewal of the Westinghouse Columbia Fuel Fabrication Facility in Richland County, South Carolina ML21342A0412021-08-0606 August 2021 Transmittal to U.S. National Marine Fisheries Service of the Draft Environmental Impact Statement for the License Renewal of the Westinghouse Columbia Fuel Fabrication Facility in Richland County, South Carolina ML21342A0392021-08-0606 August 2021 Transmittal to U.S. National Park Service of the Draft Environmental Impact Statement for the License Renewal of the Westinghouse Columbia Fuel Fabrication Facility in Richland County, South Carolina ML21342A0382021-08-0606 August 2021 Transmittal to U.S. Environmental Protection Agency, Region 4, of the Draft Environmental Impact Statement for the License Renewal of the Westinghouse Columbia Fuel Fabrication Facility in Richland County, South Carolina ML21194A1522021-07-12012 July 2021 E-mail from E. Malek, Westinghouse, to D. Tiktinksy, NRC, Westinghouse Columbia Facility Cultural Resource Survey Letter to Sc Shpo ML21166A1052021-06-14014 June 2021 Acceptance Review of Amendment/Exemption Request for Alternate Disposal of Wastes from Columbia Fuel Fabrication Facility Under 10CFR20.2002 ML21141A1502021-03-24024 March 2021 Additional Clarifications to Cfff RAIs 03/24/2021 ML21082A0492021-03-18018 March 2021 Clarifications to EIS RAIs for Cfff ML20252A1892020-08-28028 August 2020 Email Response to Pine Hill Indian Tribe Westinghouse Columbia Fuel Fabrication Facility License Renewal Application ML20226A2682020-07-31031 July 2020 NRC E-mail to M.Caldwell, Fish and Wildlife, Westinghouse Environmental Impact Statement (EIS) Scoping Process ML20226A3802020-07-31031 July 2020 NRC E-mail to Reese, Westinghouse Environmental Impact Statement Scoping Process ML20227A1152020-07-31031 July 2020 NRC E-mail to Catawba Indian Nation, Westinghouse Environmental Impact Statement Scoping Process ML20121A2592020-04-30030 April 2020 Westinghouse License Renewal - ISA Review- Conference Call Summary Dec 2017 ML20091L4452020-03-27027 March 2020 Email from K. Taylor, SCDHEC, to J.Quintero, NRC Regarding Extending Comment Period for Westinghouse Draft EA ML20014E6722020-01-14014 January 2020 1-14-20 Email Acceptance for Review of Westinghouse Electric Company Topical Report WCAP-18443-P/WCAP-18443-NP, Revision 0, Qualification of the Two-Dimensional Transport Code Paragon2 ML19322A0082019-12-19019 December 2019 Final Safety Evaluation Transmittal Email WCAP-16097, Revision 4, Common Qualified Platform Topical Report ML19343A0552019-12-0909 December 2019 12-9-19 Email Transmitting Cover Letter for Request for Additional Information Westinghouse Electric Company Topical Report WCAP-16045-P-A, Addendum 2, Revision 0, and WCAP-16045-NP-A, Addendum 2, Revision 0 Updated Nexus Cross-Section Meth ML19325D7312019-11-21021 November 2019 11-21-19 Email Acceptance for Review of Westinghouse Electric Company Request to Modify Safety Evaluation Report on Wcap-12472-P-A, Beacontm Core Monitoring and Operations Support System. ML19311C5912019-11-0707 November 2019 11-07-19 Email Transmitting Cover Letter for Request for Additional Information Westinghouse Electric Company Topical Report WCAP 16747 P/Wcap 16747 Np, Appendices C and D, Polca T: System Analysis Code with Three Dimensional Core Mode ML19295C9792019-10-22022 October 2019 Transmittal Email Draft Proprietary Safety Evaluation for WCAP-16096, Rev 4 ML19219A2422019-07-16016 July 2019 Email to Sc Shpo/Department of Archives & History Regarding Nrc'S Preliminary Determination Regarding Historic and Cultural Resources at Westinghouse'S Columbia Fuel Fabrication Facility ML19191A0742019-07-10010 July 2019 NRC to NMFS, Update on NRC Review of Westinghouse Cfff License Renewal ML19178A0102019-06-25025 June 2019 Email to Fws Requesting Reconcurrence on ESA Findings for WEC Cfff LRA ML19038A2112019-02-0707 February 2019 NRC Acceptance of Westinghouse January 2019 Updated Integrated Safety Analysis (ISA) Summary ML19031C6572019-01-31031 January 2019 U.S. Nuclear Regulatory Commission Acceptance of Westinghouse 10 CFR 70.72 Facility Change Report Summarizing Changes Completed within 2018 ML19031C9162019-01-31031 January 2019 U.S. Nuclear Regulatory Commission Acceptance of the Fundamental Nuclear Material Control Rev. 43 and Emergency Plans Rev. 18 for Formal Review ML19077A2082019-01-29029 January 2019 Email: NRC Request for Clarification on Westinghouse Electric Company Request to Release Additional Funds from Financial Assurance for Cfff ML18352B1042018-12-21021 December 2018 Summary for Pre-Application Call with Westinghouse Cfff for Removal of the Administration Building from the Controlled Access Area ML18323A0992018-11-14014 November 2018 Westinghouse Pre-Application Meeting Request for Proposed Change to the Controlled Access Area ML18138A2302018-05-0909 May 2018 Email to Westinghouse - License Transfer FRN ML18117A1302018-04-27027 April 2018 Email from SCDHEC Dated 042718 Regarding Comments on the Draft EA for Cfff License Renewal ML18025A3182018-01-24024 January 2018 NRC Email to Furtak NMFS 012418 ML17356A2232017-12-13013 December 2017 Enclosure 3 - Email with NRC Consultation Examples ML18338A2842017-07-10010 July 2017 Email to Close the Review of Non-Substantive Revision to Sppp Submitted by Letter GLE-2017-0015 Dated March 6, 2017 2024-01-09
[Table view] Category:Report
MONTHYEARML24094A0092024-04-0303 April 2024 2024 Licensee Performance Review Handout on Westinghouse, Docket No 70-1151 ML23114A3732023-04-24024 April 2023 Enclosure 1 - Final Remedial Investigation Report for the CFFF Site, Appendix I - Well Development Records ML23114A3602023-02-28028 February 2023 Enclosure 1 - Final Remedial Investigation Report for the CFFF Site ML23114A3722023-02-28028 February 2023 Enclosure 1 - Final Remedial Investigation Report for the CFFF Site, Appendix H - Groundwater Sample Collection Records ML23030B8552023-01-30030 January 2023 Westinghouse 10CFR70.72 Facility Change Report ML22294A1802022-10-21021 October 2022 Westinghouse, Supporting Documentation for SNM-1107 Amendment Request ML22116A0542022-04-30030 April 2022 Westinghouse Electric Companys Fuel Fabrication Facility Cultural Resources Survey - Final Report ML22018A2012022-01-18018 January 2022 EPA Columbia Fuel Specific Recommendations ML21336A4612021-12-0101 December 2021 Westinghouse Electric Company, LLC, Alternate Disposal Request Application Correction ML21252A0872021-09-30030 September 2021 Survey Methodology to Identify Sites of Significance to the Oglala Sioux Tribe for the Crow Butte ISR Facility License Renewal-Version with Track Changes ML21252A0892021-09-30030 September 2021 Survey Methodology to Identify Sites of Significance to the Oglala Sioux Tribe for the Crow Butte ISR Facility License Renewal ML21187A1682021-07-0606 July 2021 Bls 2020 Injuries, Illnesses, and Fatalities ML21027A2542021-01-27027 January 2021 Westinghouse 10CFR 70.72 Facility Change Report ML20259A2212020-07-30030 July 2020 Fuel Fabrication Facility Technetium (Tc-99) Source Investigation Report ML20259A1792020-07-30030 July 2020 Final Interim Remedial Investigation Data Summary Report Westinghouse Columbia Fuel Fabrication Facility ML20141L5562020-05-22022 May 2020 Letter to A. Spalding: Approval of WEC Request for a Temporary Change to the Site Emergency Plan ML20141L5572020-05-22022 May 2020 Enclosure 1: Safety Evaluation Report ML20141L5582020-05-22022 May 2020 Enclosure 2: SNM-1107 License (Public Version) ML20129J9362020-05-0808 May 2020 Enclosure 1 - Columbia Fuel Fabrication Facility Evaluation in Support of 10 CFR 20.2003 Request for Alternate Waste Disposal ML20129J9392020-05-0808 May 2020 Enclosure 6 - CaF2 Pile Radiological Data Set ML20129J9382020-05-0808 May 2020 Enclosure 5 - East Lagoon Analytical Reports ML20129J9372020-05-0808 May 2020 Enclosure 4 - Usei Ssda Date Input Screens with Cfff Project-Specific Information ML20063P3272020-02-29029 February 2020 Interim Remedial Investigation Data Summary Report Westinghouse Columbia Fuel Fabrication Facility ML19303A5892019-11-15015 November 2019 Letter to G. Couturequest for Additional Information Regarding Wec'S 2019 DFP Submittal ML19191A0742019-07-10010 July 2019 NRC to NMFS, Update on NRC Review of Westinghouse Cfff License Renewal ML23114A3652019-02-28028 February 2019 Enclosure 1 - Final Remedial Investigation Report for the CFFF Site, Appendix F - Boring Logs ML18204A0102018-07-20020 July 2018 WCAP-18124-NP-A, Revision 0, Fluence Determination with RAPTOR-M3G and Ferret, July 2018 2024-04-03
[Table view] Category:Technical
MONTHYEARML23114A3732023-04-24024 April 2023 Enclosure 1 - Final Remedial Investigation Report for the CFFF Site, Appendix I - Well Development Records ML23114A3722023-02-28028 February 2023 Enclosure 1 - Final Remedial Investigation Report for the CFFF Site, Appendix H - Groundwater Sample Collection Records ML23114A3602023-02-28028 February 2023 Enclosure 1 - Final Remedial Investigation Report for the CFFF Site ML23030B8552023-01-30030 January 2023 Westinghouse 10CFR70.72 Facility Change Report ML22116A0542022-04-30030 April 2022 Westinghouse Electric Companys Fuel Fabrication Facility Cultural Resources Survey - Final Report ML21336A4612021-12-0101 December 2021 Westinghouse Electric Company, LLC, Alternate Disposal Request Application Correction ML21252A0892021-09-30030 September 2021 Survey Methodology to Identify Sites of Significance to the Oglala Sioux Tribe for the Crow Butte ISR Facility License Renewal ML21252A0872021-09-30030 September 2021 Survey Methodology to Identify Sites of Significance to the Oglala Sioux Tribe for the Crow Butte ISR Facility License Renewal-Version with Track Changes ML21027A2542021-01-27027 January 2021 Westinghouse 10CFR 70.72 Facility Change Report ML20259A1792020-07-30030 July 2020 Final Interim Remedial Investigation Data Summary Report Westinghouse Columbia Fuel Fabrication Facility ML20259A2212020-07-30030 July 2020 Fuel Fabrication Facility Technetium (Tc-99) Source Investigation Report ML20129J9372020-05-0808 May 2020 Enclosure 4 - Usei Ssda Date Input Screens with Cfff Project-Specific Information ML20129J9382020-05-0808 May 2020 Enclosure 5 - East Lagoon Analytical Reports ML20129J9392020-05-0808 May 2020 Enclosure 6 - CaF2 Pile Radiological Data Set ML20129J9362020-05-0808 May 2020 Enclosure 1 - Columbia Fuel Fabrication Facility Evaluation in Support of 10 CFR 20.2003 Request for Alternate Waste Disposal ML20063P3272020-02-29029 February 2020 Interim Remedial Investigation Data Summary Report Westinghouse Columbia Fuel Fabrication Facility ML19191A0742019-07-10010 July 2019 NRC to NMFS, Update on NRC Review of Westinghouse Cfff License Renewal ML23114A3652019-02-28028 February 2019 Enclosure 1 - Final Remedial Investigation Report for the CFFF Site, Appendix F - Boring Logs ML18204A0102018-07-20020 July 2018 WCAP-18124-NP-A, Revision 0, Fluence Determination with RAPTOR-M3G and Ferret, July 2018 2023-04-24
[Table view] |
Text
From: Grange, Briana To: "Sarah Furtak - NOAA Federal" Cc: Quintero, Jessie
Subject:
FYI: Update on NRC review of Westinghouse CFFF license renewal Date: Wednesday, July 10, 2019 10:07:00 AM Attachments: NRC Analysis of Whether Reinitiation is Required - Westinghouse CFFF License Renewal.pdf
- Sarah, I wanted to update you on some developments concerning the NRCs environmental review of Westinghouse Electric Company, LLCs application for renewal of Special Nuclear Material License No. SNM-1107 for the Columbia Fuel Fabrication Facility (CFFF) located in Richland, South Carolina. The NRC and NMFS engaged in ESA Section 7 consultation on this project in 2017-2018. The NMFS provided its concurrence with not likely to adversely affect (NLAA) determinations for shortnose and Atlantic sturgeon in an April 12, 2018, letter.
Since that time, Westinghouse submitted a new environmental report to the NRC in March 2019. The new report describes additional groundwater monitoring that the company will perform in response to former buried wastewater pipe leaks that released contaminants into the sites subsurface. Westinghouse will install several new monitoring wells to support the additional monitoring. Additionally, the State has issued a new draft National Pollutant Discharge Elimination System (NPDES) permit for the CFFF. I have reviewed this new information and determined that the information does not necessitate further ESA Section 7 consultation between the NRC and the NMFS regarding sturgeon. The well installation and monitoring will not affect the aquatic environment, so there will be no effects to sturgeon from these activities. With respect to the draft NPDES permit, the permit, if issued, would not change the basis of the NLAA conclusions made during the consultation. My justification related to the draft NPDES permit is attached for your reference.
Thank you and let me know if you have any questions.
Briana
_____________
Briana A. Grange Conservation Biologist Division of Materials and License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission (301) 415-1042 briana.grange@nrc.gov
Westinghouse Columbia Fuel Fabrication Facility (CFFF)
Proposed 40-Year License Renewal Analysis of Potential Need to Reinitiate Endangered Species Act (ESA) Section 7 Consultation based on States Issuance of Draft Renewed National Pollutant Discharge Elimination System (NPDES) Permit July 10, 2019
SUMMARY
- The NRC staff has determined that the States issuance of a draft NPDES permit to Westinghouse Electric Company LLC for the CFFF does not require the NRC to reinitiate consultation under ESA Section 7 with the National Marine Fisheries Service (NMFS) related to the proposed CFFF license renewal.
Background:
ESA Section 7 Consultation for CFFF License Renewal The NRC and NMFS consulted under ESA Section 7 in 2017 and 2018 regarding the potential effects of the CFFF license renewal on two species: shortnose sturgeon and Atlantic sturgeon.
The consultation assumed that the CFFF would continue to operate under the conditions specified in the 2013 NPDES permit (ML17283A098).
The NMFS concluded that the proposed license renewal is not likely to adversely affect the two species by letter dated April 12, 2018 (ML18103A020). This letter concluded informal consultation between the agencies.
The NMFSs analysis supporting its conclusions appears on page 6 of its April 12, 2018, letter.
The potential adverse effects considered are exposure of sturgeon to effluent containing ammonia/un-ionized ammonia, fluorides, uranium, and inadequate dissolved oxygen.
New Information: Draft Renewed NPDES Permit The South Carolina Department of Health and Environmental Control issued a draft renewed NPDES permit on March 29, 2019. The permit, if issued, will have effective dates of July 1, 2019 (expected) through June 30, 2024 (expected).
The draft permit could require NRC to reinitiate ESA Section 7 consultation with the NMFS if the draft permit triggers any of the ESA Section 7 reinitiation criteria at 50 CFR 402.16. Specifically of concern is whether the draft permit would change effluent limits or other conditions upon which the NMFS based its conclusions because this could result in effects to listed species that were previously unconsidered.
Analysis of Need to Reinitiate Consultation The NRC staff considered whether the draft NPDES permit necessitates NRC to reinitiate ESA Section 7 through the following series of questions.
What effluent criteria upon which the NMFS based its conclusions are regulated by the State under the NPDES permit? Ammonia, fluoride, and dissolved oxygen.
Have any of the parameters related to these effluents changed in the draft NPDES permit? Yes. The draft permit increases the dissolved oxygen discharge limit from a minimum
of 1.0 mg/l at all times to a minimum of 5.0 mg/l at all times. Ammonia and fluoride discharge limitations and monitoring requirements are unchanged.
Does this change affect the NMFSs conclusions? No. The NMFSs analysis assumes a lower dissolved oxygen content within the effluent mixing zone than would be allowable under the draft permit, if issued. Therefore, potential impacts to shortnose and Atlantic sturgeon would be similar or less than those assumed during the consultation.
Does NRC need to reinitiate consultation with the NMFS based on the draft NPDES permit? No. The identified changes in the draft permit do not trigger any of the ESA Section 7 reinitiation criteria.
Analysis Performed By:
Briana A. Grange Conservation Biologist Division of Materials and License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission (301) 415-1042 briana.grange@nrc.gov