ML19190A211
| ML19190A211 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 07/03/2019 |
| From: | Bates A Southern California Edison Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19190A223 | List: |
| References | |
| Download: ML19190A211 (2) | |
Text
SOUTHERN CALIFORNIA Al Bates EDISON~
Manager, Regulatory Affairs An EDISON l~ERNA110NAL'fi Company July 3, 2019 10 CFR 50.54(q)
U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, D.C. 20555-0001
Subject:
Docket Nos. 50-206, 50-361, 50-362, and 72-41 Revision to the Permanently Defueled Emergency Plan Emergency Action Level Technical Bases Manual, and an Emergency Plan Implementing Procedure, San Onofre Nuclear Generating Station (SONGS), Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation
Dear Sir or Madam:
Pursuant to 10 CFR 50.54(q), Southern California Edison (SCE) has revised the Permanently Defueled Emergency Plan Emergency Action Level Technical Bases Manual and one Permanently Defueled Emergency Plan Implementing Procedure (EPIP) for the San Onofre Nuclear Generating Station (SONGS). This letter serves as the report required by 1 O CFR 50.54(q)(5).
SCE has determined that the changes do not reduce the effectiveness of the Permanently Defueled Emergency Plan (PDEP) or Permanently Defueled EPIPs. The PDEP, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of 10 CFR 50 Appendix E (as exempted). of this letter transmits Revision 4 of the SONGS Permanently Defueled Emergency Plan Emergency Action Level Technical Bases Manual effective June 6, 2019. provides a report and analysis summary of the Permanently Defueled Emergency Plan Emergency Action Level Technical Bases Manual changes. of this letter provides a copy of the following revised Permanently Defueled Emergency Plan Implementing Procedure:
ft p-fS
- J/v/5)2/p
/Jfl.1.SS
/LJ;f {
_c Document Control Desk Procedure S0123-VIII-ADMIN-1, EMERGENCY PREPAREDNESS PROGRAM MAINTENANCE Rev.
Effective Date 9
06/06/2019 provides a report and analysis summary of the Permanently Defueled EPIP changes.
There are no commitments contained in this letter or its attachments.
If you have any questions or require additional information please contact me at (949) 368-6945.
Attachments: 1. SONGS Permanently Defueled Emergency Plan Emergency Action Level Technical Bases Manual - Revision 4
- 2. Report and Analysis Summary of Changes to Permanently Defueled Emergency Plan Emergency Action Level Technical Bases Document
- 3. Revised Permanently Defueled Emergency Plan Implementing Procedure
- 4. Report and Analysis Summary of Permanently Defueled Emergency Plan Implementing Procedure Change cc:
Emergency Response Coordinator, NRC Region IV (2 copies of Attachment 3)
S. A. Morris, Regional Administrator, NRC Region IV M. G. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3