ML19157A017
| ML19157A017 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 06/05/2019 |
| From: | Gregory Roach Exelon Generation Co |
| To: | NRC/RGN-III/DRS/OLB |
| Roach G | |
| Shared Package | |
| ML17214A855 | List: |
| References | |
| Download: ML19157A017 (3) | |
Text
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Dresden Generating Station Date of Exam: 4/8/19 Operating Test No.: 2019-301 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SRO-I
- 1 RX 2
2 2
1 1 0 NOR 1
1 1
1 1 I/C 2,3 3,4 5,6 1,4 8
4 4 2 MAJ 4,5 7,8 6,7,8 7
2 2 1 TS 3,4 2
0 2 2 SRO-I
- 2 RX 2
1 1
1 0 NOR 1
1 1
1 1 I/C 3,6 3,5 2,3 4,5 8
4 4 2 MAJ 7,8 6,7,8 6,7 7
2 2 1 TS 2,4 2
0 2 2 SRO-I
- 3 RX 2
1 1
1 0 NOR 0
1 1 1 I/C 1,2,3 1,3 4,5 2,4 9
4 4 2 MAJ 4,5 6,7,8 6,7 7
2 2 1 TS 2
3,5 3
0 2 2 SRO-I
- 4 RX 2
2 2
1 1 0 NOR 1
1 1
1 1 I/C 2,3 3,4 5,6 1,4 8
4 4 2 MAJ 4,5 7,8 6,7,8 7
2 2 1 TS 3,4 2
0 2 2 SRO-I
- 5 RX 2
2 2
1 1 0 NOR 0
1 1 1 I/C 1,2,3 3,6 1,3 4,5 9
4 4 2 MAJ 4,5 7,8 6,7,8 7
2 2 1 TS 2
3,5 3
0 2 2
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Dresden Generating Station Date of Exam: 4/8/19 Operating Test No.: 2019-301 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SRO-I
- 6 RX 2
1 1
1 0 NOR 1
1 1
1 1 I/C 1,2,3 3,4 5,6 2,4 9
4 4 2 MAJ 4,5 7,8 6,7 6
2 2 1 TS 2
3,4 3
0 2 2 SRO-I
- 7 RX 2
1 1
1 0 NOR 1
1 1
1 1 I/C 2,3 3,6 2,3 4,5 8
4 4 2 MAJ 4,5 7,8 6,7 6
2 2 1 TS 2,4 2
0 2 2 SRO-I
- 8 RX 2
1 1
1 0 NOR 0
1 1 1 I/C 1,2,3 1,3 4,5 2,4 9
4 4 2 MAJ 4,5 6,7,8 6,7 7
2 2 1 TS 2
3,5 3
0 2 2 SRO-I
- 9 RX 2
1 1
1 0 NOR 1
1 1
1 1 I/C 2,3 1,4 2,3 4,5 8
4 4 2 MAJ 4,5 6,7,8 6,7 7
2 2 1 TS 2,4 2
0 2 2 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants.
ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Dresden Generating Station Date of Exam: 4/8/19 Operating Test No.: 2019-301 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO - 1 RX 0
1 1 0 NOR 1
1 2
1 1 1 I/C 1
4,5 3,5 5
4 4 2 MAJ 4,5 7,8 6,7 6
2 2 1 TS 0
0 2 2 RO - 2 RX 0
1 1 0 NOR 1
1 1
1 1 I/C 1
4,5 3,5 5
4 4 2 MAJ 4,5 7,8 6,7,8 7
2 2 1 TS 0
0 2 2 RO - 3 RX 0
1 1 0 NOR 1
1 2
1 1 1 I/C 1
4,5 3,5 5
4 4 2 MAJ 4,5 7,8 6,7 6
2 2 1 TS 0
0 2 2 RO - 4 RX 0
1 1 0 NOR 1
1 1
1 1 I/C 1
3,5 3,5 5
4 4 2 MAJ 4,5 6,7,8 6,7 7
2 2 1 TS 0
0 2 2 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.