SONGS Response to NRC Special Inspection Report 050-00206/2018-005, 050-00361/2018-005, 050 00362/2018-005, 072 00041/2018-001, Notice of Violation, and Proposed Imposition of Civil Penalty
ML19142A169
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/22/2019
From: Greg Warnick
Division of Nuclear Materials Safety IV
To: Bauder D
Southern California Edison Co
E. Simpson
References
EA-18-155 IR 2018001, IR 2018005
Download: ML19142A169 (3)


See also: IR 05000206/2018005

Text

May 22, 2019

EA-18-155

Mr. Doug Bauder

Vice President and Chief Nuclear Officer

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

SUBJECT:

SOUTHERN CALIFORNIA EDISON COMPANY RESPONSE TO NRC SPECIAL

INSPECTION REPORT 050-00206/2018-005, 050-00361/2018-005,

050-00362/2018-005, 072-00041/2018-001, NOTICE OF VIOLATION, AND

PROPOSED IMPOSITION OF CIVIL PENALTY

Dear Mr. Bauder:

On March 25, 2019, the U.S. Nuclear Regulatory Commission (NRC) cited Southern

California Edison for two violations that involved failures to: (1) ensure that important-to-safety

equipment was available to provide redundant drop protection features for a loaded spent fuel

canister during downloading operations and (2) make a timely notification to the NRC

Headquarters Operations Center for the August 3, 2018, incident which included disabling of

important-to-safety equipment. The Notice of Violation required you to respond in writing within

30 days (Agencywide Documents Access and Management System (ADAMS) Accession

No. ML19080A208). You responded by letter dated April 23, 2019 (ADAMS Accession No.

ML19116A056).

After reviewing the information you provided in your response to the Notice of Violation, we

have concluded that your completed and proposed actions appear to adequately address the

regulatory noncompliances described in the Notice of Violation. We will review your

implementation of these corrective actions during a future inspection to determine whether full

compliance has been restored and whether compliance will be maintained.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a

copy of this letter will be made available electronically for public inspection in the NRC Public

D. Bauder

2

Document Room or from the NRCs Agencywide Documents Access Management System

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Gregory G. Warnick, Chief

Reactor Inspection Branch

Division of Nuclear Materials Safety

Docket Nos.: 50-206; 50-361; 50-362;72-041

License Nos.: NPF-10; NPF-15; DPR-13

ML19142A169

SUNSI Review

By: EJS

ADAMS:

Yes No

Sensitive

Non-Sensitive

Non-Publicly Available

Publicly Available

Keyword

NRC-002

OFFICE

RIV/DNMS/RIB

C:RIB

NAME

EJSimpson

GGWarnick

SIGNATURE

/RA/

/RA/

DATE

5/22/19

5/22/19