10 CFR 50.55a Rulemaking Update Keith Hoffman Division of Materials and License Renewal Office of Nuclear Reactor Regulation May 22, 2019
Two Ongoing Rulemakings
38; RG 1.147, Rev. 19; RG 1.192, Rev 3)
(RIN 3150-AJ93, Docket ID NRC-2017-0024)
- 2. Final Rule: Incorporate by reference ASME 2015 & 2017 BPV Code Editions (RIN 3150-AJ74, Docket ID NRC-2016-0082) 2
Rulemaking Process 3
Final Rule Proposed Rule Regulatory (Technical)
Basis Identify need for rulemaking It has been NRCs practice to use ASME codes to establish requirements for nuclear power plants.
- Foundation of effective rulemaking
- Draft rule text
- Public meeting
- 75 day public comment period (typically)
- Final rule text Opportunities for public participation 3
IBR 2015 - 2017 Editions IBR Code Case RGs
Timeline -
Code Case RG Rulemakings Publication Year ASME BPV Code Case Supplements NRC Proposed Rule NRC Final Rule RG 1.84 RG 1.147 RG 1.192*
2005 4 5 6 7 70 FR 56809 (9/29/2005)
Rev. 33 Rev. 14 2006 8 9 10 11 71 FR 62942 (10/27/2006) 2007 0 1 2 3 72 FR 71750 (12/19/2007)
Rev. 34 Rev. 15 2008 4 5 6 7 2009 8 9 10 11 0
74 FR 26303 (6/2/2009) 2010 1 2 3 4 75 FR 61321 (10/5/2010)
Rev. 35 Rev. 16 2011 5 6 7 8 2012 9 10 11 2013 0 1 2 3 78 FR 37886 (6/24/2013) 2014 4 5 6 7 79 FR 65776 (11/5/2014)
Rev. 36 Rev. 17 Rev. 1 2015 0 1 2 3 4 2016 5 6 7 81 FR 10780 (3/2/2016) 2017 0 1 2 3 4 83 FR 2331 (1/17/2018)
Rev. 37 Rev. 18 Rev. 2 2018 5 6 7 83 FR 40685 (8/16/2018) 2019 Target: September 2019 Rev. 38 Rev. 19 Rev. 3
Rev. 1: 2004 Edition, 2006 Addenda Rev. 2: 2009 Edition, 2011 Addenda, 2012 Edition Rev. 3: 2015 Edition, 2017 Edition
ASME Code Case Rulemaking Schedule
- Proposed rule published in the Federal Register:
August 16, 2018, 83 FR 40685
- Public Comment period closed in October 2018
- Public comments can be viewed at the docket
- www.regulations.gov, Docket ID (NRC-2017-0024)
- Target date to publish final rule in the Federal Register is September 2019 58
Timeline -
Edition/Addenda Rulemakings Publication Year ASME BPV Code ASME OM NRC Proposed Rule NRC Final Rule 2003 2003 Addenda 2003 Addenda 2004 2004 Edition 2004 Edition 69 FR 879 (1/7/2004) 69 FR 58804 (10/1/2004) 2005 2005 Addenda 2005 Addenda 2006 2006 Addenda 2006 Addenda 2007 2007 Edition 72 FR 16731 (4/5/2007) 2008 2008 Addenda 73 FR 52730 (9/10/2008) 2009 2009 Addenda 2009 Edition 2010 2010 Edition 75 FR 24324 (5/4/2010) 2011 2011 Addenda 2011 Addenda 76 FR 36232 (6/21/2011) 2012 2012 Edition 2013 2013 Edition 2014 2015 2015 Edition 2015 Edition 80 FR 56820 (9/18/2015) 2016 2017 2017 Edition 2017 Edition 83 FR 56156 (11/9/2018) 82 FR 32934 (7/18/2017) 2018 Target: December 2019 6
ASME 2015-2017 Editions RulemakingSchedule
- Proposed rule published in the Federal Register:
November 9, 2018, 83 FR 56156
- Public Comment period closed in January 2019
- Public comments can be viewed at the docket
- www.regulations.gov, Docket ID (NRC-2016-0082)
- Target date to publish final rule in the Federal Register is September 2019 7
Scope of ASME 2015 & 2017 Editions Rulemaking
Scope of ASME 2015 & 2017 Editions Rulemaking (contd)
- (additional items within scope)
- Updating Code Cases N-770 & N-729
- Remove outdated conditions
- Revise existing conditions 9
Questions & Comments 10