ML19123A260

From kanterella
Jump to navigation Jump to search
Submittal of 2018 Annual Radioactive Effluent Release Report, 2018 Annual Radiological Environmental Operating Report, and 2018 Annual Environmental Operating Report (Non-Radiological)
ML19123A260
Person / Time
Site: Beaver Valley
Issue date: 04/23/2019
From: Bologna R
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML19123A268 List:
References
L-19-113
Download: ML19123A260 (4)


Text

"FENOC' RrstEnergy Nuclear Operating Company Richard D. Bologna Site Vice President April 23, 2019 L-19-113 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077 724-682-5234 Fax: 724-643-8069 10 CFR 50.36a Submittal of 2018 Annual Radioactive Effluent Release Report, 2018 Annual Radiological Environmental Operating Report, and 2018 Annual Environmental Operating Report (Non-Radiological)

FirstEnergy Nuclear Operating Company (FENOC) hereby submits the BVPS 2018 Radioactive Effluent Release Report and the 2018 Annual Radiological Environmental Operating Report. These reports are provided in Enclosure A, in accordance with 10 CFR 50.36a and Beaver Valley Power Station (BVPS) Unit Nos. 1 and 2 Technical Specifications 5.5.1, 5.6.1, and 5.6.2.

FENOC also submits the 2018 Annual Environmental Operating Report (Non-Radiological) in accordance with the BVPS Unit No. 2 Operating License, Appendix B - Environmental Protection Plan. This report is provided in Enclosure B.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas E. Migdal, Manager-Site Chemistry, at (724) 682-4141.

fiJj?&~

Richard D. Bolo~

Site Vice President

_z:£/JJ yt:Z5

~-

Beaver Valley Power Station Unit Nos. 1 and 2 L-19-113 Page2

Enclosures:

A. 2018 Annual Radioactive Effluent Release Report and 2018 Annual Radiological Environmental Operating Report B. 2018 Annual Environmental Operating Report (Non-Radiological) cc: NRC Region I Administrator NRC Resident Inspector NRR Project Manager Director BRP/DEP Site BRP/DEP Representative NRC Region I Health Physics Inspector

,I Enclosure A L-19-113

~~--

2018 Annual Radioactive Effluent Release Reporl and 2018 Annual Radiological Environmental Operating Reporl (Reports follow)

I Enclosure B L-19-113 2018 Annual Environmental Operating Report (Non-Radiological)

(Report follows)