ML19123A199

From kanterella
Jump to navigation Jump to search
Enclosure 1: Edwin I. Hatch Nuclear Plant, Units 1 & 2 - Annual Non-Radiological Environmental Operating Report for 2018
ML19123A199
Person / Time
Site: Hatch  
Issue date: 04/30/2019
From:
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19123A207 List:
References
NL-19-0486
Download: ML19123A199 (3)


Text

Edwin I. Hatch Nuclear Plant - Units 1 &2 Joseph M. Farley Nuclear Plant - Units 1 &2 Vogtle Electric Generating Plant - Units 1 &2 Annual Non-Radiological Environmental Operating Reports, Annual Radioactive Effluent Release Reports, and Offsite Dose Calculation Manual for 2018 Edwin I. Hatch Nuclear Plant - Units 1 &2 Annual Non-Radiological Environmental Operating Report for 2018 Page 1 of 2 Annual Non-Radiological Environmental Operating Reports for 2018 EDWIN I. HATCH NUCLEAR PLANT-UNITS 1 AND 2 I.

Introduction This report is submitted in accordance with Subsection 5.4.1 of the Edwin I. Hatch Nuclear Plant Environmental Protection Plan, Appendix B to Facility Operating Licenses DPR-57 and NPF-5.

This report describes implementation of the Environmental Protection Plan for the calendar year 2018.

II.

Reporting Requirements A.

Summaries and Analyses of Results of Environmental Protection Activities Required by Subsection 4.2 of the Environmental Protection Plan (EPP) for the Reporting Period

1. Aquatic Monitoring - Liquid effluent monitoring was performed in accordance with the State of Georgia National Pollutant Discharge Elimination System (NPDES)

Permit GA0004120; there was no additional requirement for aquatic monitoring during the year.

2. Terrestrial Monitoring - Terrestrial monitoring is not required.
3. Maintenance of Transmission Line Corridors -There is no reporting requirement associated with this condition.

B.

Comparisons of the Year's Monitoring Activities with Preoperational Studies, Operational Controls, and Previous Nonradiological Environmental Monitoring Reports These comparisons were not required because no nonradiological environmental monitoring programs were conducted during the reporting period beyond those performed in accordance with NPDES Permit No. GA0004120.

C.

Assessment of the Observed Impacts of Plant Operation on the Environment There were no significant adverse environmental impacts associated with plant operation during the year.

D.

EPP Noncompliance and Corrective Actions There were no EPP noncompliances during the year.

~~--

Page 2 of 2 Annual Non-Radiological Environmental Operating Reports for 2018 E.

Changes in Station Design or Operation, Tests, or Experiments Made in Accordance with EPP Subsection 3.1 Which Involved a Potentially Significant Unreviewed Environmental Question There were no changes in station design or operation, tests, or experiments which involved a potentially significant, unreviewed environmental question.

F.

Nonroutine Reports Submitted in Accordance with EPP Section 5.4.2 There were no nonroutine reports submitted during the year.