ML19123A198

From kanterella
Jump to navigation Jump to search
Annual Non-Radiological Environmental Operating Reports, Annual Radioactive Effluent Release Reports, .
ML19123A198
Person / Time
Site: Hatch, Vogtle, Farley  
Issue date: 04/30/2019
From: Gayheart C
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML19123A207 List:
References
NL-19-0486
Download: ML19123A198 (2)


Text

~

Southern Nuclear APR 3 0 2019 Docket Nos.: 50-321 50-348 50-424 50-366 50-364 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Cheryl A. Gayheart Regulatory Affairs Director Edwin I. Hatch Nuclear Plant - Units 1 &2 Joseph M. Farley Nuclear Plant - Units 1 &2 Vogtle Electric Generating Plant - Units 1 &2 3535 Colonnade Parkway Birmingham, AL 35243 205 992 5316 tel 205 992 7601 fax cagayhea@southernco.com NL-19-0486 Annual Non-Radiological Environmental Operating Reports, Annual Radioactive Effluent Release Reports, and Offsite Dose Calculation Manual for 2018 Ladies and Gentlemen:

In accordance with subsection 5.4.1 of the referenced plants' Environmental Protection Plans (Appendix B to the operating licenses), Southern Nuclear Operating Company hereby submits the Annual Non-Radiological Environmental Operating Reports for 2018.

In accordance with section 5.6.3 of the referenced plants' Technical Specifications, Southern Nuclear Operating Company hereby submits the Annual Radioactive Effluent Release Reports for 2018. Technical Specification 5.5.1.c for each plant requires that the Offsite Dose Calculation Manual (ODCM) be provided as part of, or concurrent with, the Radioactive Effluent Release Report for the period of the report in which any change in the ODCM was made. During the reporting period for the Annual Radioactive Effluent Release Reports for 2018, there were ODCM revisions at Joseph M. Farley Nuclear Plant

- Units 1 &2 (FNP) and Vogtle Electric Generating Plant - Units 1 &2 (VEGP).

This letter contains no NRC commitments. If you have any questions, please contact Jamie Coleman at 205.992.6611.

Respectfully submitted, Cheryl heart Regulat y Affairs Director CAG/kgl/sm 7EZ~

~.g4~

A-o tJ 9

v~r<

U. S. Nuclear Regulatory Commission NL-19-0486 Page 2

Enclosures:

1. Edwin I. Hatch Nuclear Plant - Units 1 &2 Annual Non-Radiological Environmental Operating Report for 2018
2. Joseph M. Farley Nuclear Plant - Units 1 &2 Annual Non-Radiological Environmental Operating Report for 2018
3. Vogtle Electric Generating Plant - Units 1 &2 Annual Non-Radiological Environmental Operating Report for 2018
4. Edwin I. Hatch Nuclear Plant - Units 1 &2 Annual Radioactive Effluent Release Report for 2018
5. Joseph M. Farley Nuclear Plant - Units 1 &2 Annual Radioactive Effluent Release Report for 2018
6. Vogtle Electric Generating Plant - Units 1 &2 Annual Radioactive Effluent Release Report for 2018
7. Joseph M. Farley Nuclear Plant - Units 1 &2 Offsite Dose Calculation Manual -

Version 26

8. Vogtle Electric Generating Plant - Units 1 &2 Offsite Dose Calculation Manual -

Version 32 cc:

Regional Administrator, Region II NRR Project Manager - Farley, Hatch, Vogtle 1 &2 Senior Resident Inspector -

Farley, Hatch, Vogtle 1 &2 RType: CGA02.001