ML19120A103 BWXT Nuclear Operations Group (NOG)

Facility Licensed Activities

  • Process and develop uranium products
  • Operate on-site laboratories

NRCs Fuel Cycle Oversight Components Inspections Investigations Allegations Incident Enforcement Performance Response Assessment https://www.nrc.gov/about-nrc/contactus.html

Licensee Performance Review Process Inputs NRC Review Results NRC Response

  • Enforcement Performance Areas No Performance
  • Core Insp. Program Actions Issues
  • Inform the Public
  • Safety Significance
  • Previous
  • Performance Trends Or Performance
  • Cross Cutting Issues Area Needing
  • Insp. Program Changes
  • Corrective Actions Improvement
  • LPR Frequency (ANI)

Licensee Performance Areas Safety Operations Operational

  • Safety Controls Safety
  • Supporting Safety Programs
  • Criticality Controls Criticality
  • Program Oversight Safety
  • Criticality Incident Response Fire
  • Prevention, Detection, & Mitigation Protection

Licensee Performance Areas Radiological Controls Radiation

  • Members of the Public Protection
  • Plant Workers Effluent Control
  • Program Implementation and Environmental Protection
  • Liquid and Gaseous Effluents Waste
  • Processing, Handling, Storage &

Management Transportation of Waste

Licensee Performance Areas Facility Support & Other Areas Maintenance and

  • Safety Controls Surveillance
  • Supporting Program Elements Emergency
  • Evaluation of Emergency Drills Plant
  • Configuration Management Program Modifications
  • Request for NRC Approval Plant Events
  • Safety Assessment and Follow-up

NRC On-site Core Inspection Effort Category I Fuel Facility Criticality Safety (192 hrs)

Fire Safeguards Protection (230-720 hrs) (Triennial)

(90 hrs)

Resident Region 2 Resident Inspector Inspectors Inspector (797 hrs) (672 - 1,275 hrs)

(797 hrs)

Plant Radiological Modifications Controls (32-96 hrs) (96 hrs)

Emergency Preparedness Category 1 Fuel Facility (32-80 hrs)

Note: The hours above represent the estimated effort allocated to on-site routine inspections every year.

https://www.nrc.gov/about-nrc/contactus.html

BWXT NOG Facility Licensee Performance Review Summary (2017-2018)

  • Inspection program adjustment conducted in 2018
  • No area needing improvement (ANI) was identified in the performance assessment areas