ML19120A074
| ML19120A074 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 04/30/2019 |
| From: | Anthony Williams Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19120A073 | List: |
| References | |
| WBL-19-014 | |
| Download: ML19120A074 (2) | |
Text
Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 wBL-19-014 April 30,2019 10 CFR 50 36a(ax2) 10 CFR 72.1 04(a)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Watts Bar Nuclear Plant, Unit 1 and Unit 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket Nos. 50-390, 50-391, and72-1048
Subject:
Watts Bar Nuclear Plant 2018 Annual Radioactive Effluent Release Report The purpose of this letter is to provide the Tennessee Valley Authority (rvA) Watts Bar Nuclear Plant (WBN) Annual Radioactive Effluent Release Report (ARERR) for the period of January 1, 2018 to December 31, 2018. The enclosed annual report is being submitted to the Nuclear Regulatory Commission (NRC) in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.36a and the Watts Bar Nuclear Plant WBN), Unit 1 and Unit 2, Technical Specification (TS) 5.9.3, that requires the ARERR be submitted prior to May 1st of each year. provides the required effluent release data. This report includes information related to the Independent Spent Fuel Storage lnstallation (lSFSl) which went into service for the first time at WBN in October of 2016. Attachment 1 to the enclosure documents any deviations which have occurred from Offsite Dose Calculation Manual (ODCM) requirements. Attachment 2 addresses any radioactive effluent monitoring instrumentation which was inoperable for greater than 30 days. Attachment 3 of the enclosure provides corrections to previous annual reports. Attachment 4 of the enclosure provides a copy of Revision 2 of the Two-Unit ODCM. This revision was in effect as of July 24,2018, and is provided in accordance with Technical Specification 5.7.2.3. Attachment 5 of the enclosure provides a copy of Revision 3 of the Two-Unit ODCM. This revision was in effect as of August 7, 2018, and is provided in accordance with Technical Specification 5.7.2.3. provides Revision 1 of the 2017 Annual Radioactive Effluent Release Report which was revised to include a missed sample. This error in documentation was
U.S. Nuclear Regulatory Commission Page2 April 30,2019 captured in the sites' Corrective Action Program (CAP) as Condition Report (CR) 1437317.
Changes to the Process Control Program (PCP) are reported in conjunction with the ARERR in accordance with Section 2.4 ol the PCP. No changes have been made to the PCP since the last annual report.
There are no new regulatory commitments associated with this letter. Please direct any questions concerning this matter to Kim Hulvey, WBN Licensing Manager at (423) 365-7720.
Anthony L. Williams lV Site Vice President Watts Bar Nuclear Plant
Enclosure:
- 1. Watts Bar Nuclear Plant - 2018 Annual Radioactive Effluent Release Report, Revision 0
- 2. Watts Bar Nuclear Plant - 2017 Annual Radioactive Effluent Release Report, Revision 1 cc (Enclosure):
U.S. Nuclear Regulatory Commission, Region ll NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant, ctfully,