ML19116A264

From kanterella
Jump to navigation Jump to search
Nuclear Regulatory Commission Vendor Inspection Report of Areva Np Creusot Forge, No. 99901381/2019-201
ML19116A264
Person / Time
Site: 99901381
Issue date: 04/29/2019
From: Kerri Kavanagh
Division of Inspection and Regional Support
To: Aubry P
AREVA NP
Ortega-Luciano J, NRR/DIRS
References
EPID I-2019-201-0037 IR 2019201
Download: ML19116A264 (10)


Text

April 29, 2019 Mr. Pierre Aubry AREVA NP Tour AREVA 1 Place Jean Millier 92400 COURBEVOIE FRANCE

SUBJECT:

NUCLEAR REGULATORY COMMISSION VENDOR INSPECTION REPORT OF AREVA NP CREUSOT FORGE, NO. 99901381/2019-201

Dear Mr. Aubry:

From March 11 through March 15, 2019, the U.S. Nuclear Regulatory Commission (NRC) staff conducted an inspection at the Creusot Forge site in Le Creusot, France. The purpose of this inspection was to follow-up on issues identified during the Multinational Design Evaluation Programme (MDEP) inspection of Creusot Forge in 2016, which is currently owned by Framatome and previously owned by AREVA NP. The NRC inspection team verified that the corrective actions initiated during the 2016 MDEP inspection related to forging activities were effectively implemented and met the applicable requirements of Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants, to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Domestic Licensing of Production and Utilization Facilities, and 10 CFR Part 21, Reporting of Defects and Noncompliance, and other codes and standards, as applicable.

This technically focused inspection specifically evaluated the reconciliation of the manufacturing files for forgings with identified irregularities supplied by AREVA NP to U.S. operating nuclear power plants. Specifically, the NRC inspection team reviewed documentation to verify that forgings were properly fabricated, inspected, and tested in accordance with customers design, regulatory, and code requirements. Framatome, under contract with AREVA NP, performed the reconciliation and evaluation of the irregularities in the manufacturing files and sent deviation notices to Westinghouse for their evaluation. Westinghouse will complete their review by the end of April 2019. The preliminary results indicate that Westinghouse has not identified any safety concerns within these deviation notices on the forged components provided by Creusot Forge, and that they will still perform their intended safety functions. Additionally, the NRC inspection team concluded that the Framatome evaluations provide reasonable assurance that these forgings meet the design requirements and can perform their intended safety functions.

Currently, there are no forgings being manufactured for U.S. reactors. The enclosed report presents the results of the inspection.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," the NRC will make available electronically for public inspection a copy of this letter and its enclosure through the NRC Public Document Room or from the

P. Aubry 2 NRCs document system (ADAMS), which is accessible at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Kerri A. Kavanagh, Chief Quality Assurance Vendor Inspection Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation Docket No.: 99901381 EPID No.: I-2019-201-0037

Enclosure:

Inspection Report 99901381/2019-201 and Attachment

ML19116A264 NRO-002 OFFICE NRO/DLSE NRR/DIRS NRR/DIRS NAME TLamb (JOrtega-Luciano for) JOrtega-Luciano KKavanagh DATE 04/29/19 04/29/19 04/29/19 U.S NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION DIVISION OF INSPECTION AND REGIONAL SUPPORT VENDOR INSPECTION REPORT Docket No.: 99901381 Report No.: 99901381/2019-201 Vendor: AREVA NP Tour AREVA 1 Place Jean Millier 92400 COURBEVOIE FRANCE Vendor

Contact:

Mr. Pierre Aubry E-mail: pierre.aubry@areva.com

Background:

AREVA SA and Électricité de France (EDF) signed a binding agreement that provides exclusive control by EDF of AREVA NP, and combine AREVA Groups activities relating to the design and manufacturing of nuclear reactors and equipment, fuel assemblies and services to the nuclear industry. The contracts for the Evolutionary Power Reactor (EPR) Olkiluoto 3 project and the resources required to complete the project, as well as certain contracts relating to components forged in the Le Creusot site, will stay within AREVA NP, in AREVA SAs scope.

Inspection Dates: March 11-15, 2019 Inspection Team Leader: Jonathan Ortega-Luciano, NRR/DIRS/QVIB Inspectors: Taylor Lamb, NRO/DLSE/CIPB Sébastien Véziat, Autorité de Sûreté Nucléaire (ASN), Observer Approved by: Kerri A. Kavanagh, Chief Quality Assurance Vendor Inspection Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation Enclosure

EXECUTIVE

SUMMARY

AREVA NP 99901381/2019-201 The U.S. Nuclear Regulatory Commission (NRC) conducted an inspection at the Creusot Forge site, previously owned by AREVA NP. This inspection was a follow-up to the multinational inspection that was conducted in accordance with the inspection protocol of the Multinational Design Evaluation Program (MDEP) in 2016. AREVA NP is the responsible entity for addressing findings from the MDEP inspection. The 2016 MDEP inspection was led by Autorité de Sûreté Nucléaire (ASN), in cooperation with representatives from the following regulatory bodies: Finland, Canada, China, United Kingdom, and United States. The NRC documented its participation in the MDEP inspection in a trip report available in Agencywide Documents Access and Management System (ADAMS) under Accession No. ML17052A119.

In May 2016, ASN stated that an ongoing quality audit at Creusot Forge site, which AREVA bought in 2006, had identified irregularities in the manufacturing files of plant components produced there since 1965. While AREVA NP was performing the evaluation of these irregularities, on December 2017, AREVA SA and Electricite de France (EDF) signed agreements that settled the terms of the sale of an interest conferring exclusive control by EDF of a subsidiary wholly owned by AREVA NP, referred to as 'New NP.' New NP combines AREVA Groups activities relating to the design and manufacturing of nuclear reactors and equipment, fuel assemblies, and services. Not included in the sale are contracts for the Olkiluoto 3 EPR project in Finland and for resources required to complete that project, as well as some contracts relating to components forged in the Creusot Forge site. These functions will remain within AREVA NP. In response to the ASN requests, AREVA NP contracted Framatome, who own the Creusot Forge site, to perform the evaluation of the irregularities identified in the manufacturing files and provide a technical conclusion. As described in Title 10 of the Code of Federal Regulations (10 CFR) Part 21, Reporting of Defects and Noncompliance, AREVA NP continues to be responsible for evaluation and reporting of any potential defects in components supplied to the U.S. nuclear fleet.

ASN participated in this follow-up inspection as observer and provided support to the NRC inspection team with regards to the corrective actions. ASN has acquired extensive knowledge related to the corrective actions at Creusot Forge as result of their leadership in closing out the 2016 MDEP inspection. Further, these observations foster the sharing of international experiences with the construction of new reactors and replacement of components for operating reactors, oversight of vendors, and modular construction techniques consistent with the objectives of the MDEP.

The following regulations served as the bases for this NRC inspection:

  • Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants, to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Domestic Licensing of Production and Utilization Facilities

2

The information below summarizes the results of this inspection.

Part 21 The NRC inspection team verified that AREVA NP had a clear understanding of their obligations to comply with 10 CFR Part 21, which do not end when contractual services are completed. As part of their obligation if AREVA NP discovers a deviation from the contractual technical requirements after a service has been performed, then it must evaluate it or inform the purchaser of the deviation; and if the evaluation determined that a defect exists, then a notification is required.

The NRC inspection team was able to verify that, as part of the contractual agreement between AREVA NP and Framatome, Framatome evaluated the irregularities found in the manufacturing files for Part 21 applicability. For those deviations identified by Framatome in which they do not have the capability to determine or conclude a potential defect exists, they proceeded to forward those deviations to AREVA NPs customers for further evaluation. The NRC inspection team concluded that AREVA NP was in compliance with the regulatory requirements of 10 CFR Part 21. No findings of significance were identified.

Corrective Actions In parallel to AREVA NPs and Framatomes reconciliation and evaluation of the manufacturing files, Framatome identified the underlying causes of the failures observed at its Creusot Forge site and implemented an improvement plan. On October 2017, Framatome informed ASN of its intention to resume forging of nuclear pressure equipment components for French nuclear facilities in its Creusot Forge site. ASN analyzed the steps taken by EDF and Framatome and carried out several inspections at the Creusot Forge site. Based on the results of those inspections, ASN considers that the steps taken by EDF and Framatome are adequate to meet the quality and regulatory requirements of the future production of French components by the Creusot Forge site.

To make a determination of the adequacy of the evaluations of the irregularities found in manufacturing files affecting forgings supplied to the U.S. operating reactors, the NRC inspection team recognized the work performed by ASN to close the findings of the 2016 MDEP inspection. ASN concluded that the corrective actions related to the quality assurance program and the manufacturing process are adequate and effective with certain conditions. For more information on these conditions please visit ASN website (http://www.french-nuclear-safety.fr/Inspections/Supervision-of-the-EPR-reactor/Anomaly-affecting-the-Flamanville-EPR-reactor-vessel). The NRC inspection team evaluated a sample of nonconformance reports generated by Framatome, to document their conclusion of their evaluation, and determined that Framatomes technical basis to disposition the irregularities were reasonable.

Based on this information and the evaluation of the corrective actions to address the irregularities identified in the manufacturing files, the NRC inspection team determined that reasonable assurance exists that the forgings provided to the U.S. operating reactors meet the applicable American Society of Mechanical Engineers (ASME) Code requirements and will be able to perform their intended safety function. No findings of significance were identified.

3

REPORT DETAILS

1. 10 CFR Part 21 Program
a. Inspection Scope The NRC inspection team was not able to evaluate policies and procedure governing the implementation of 10 CFR Part 21, Reporting of Defects and Noncompliance, because AREVA NP is no longer a supplier of forgings to the U.S. nuclear reactors. As part of the acquisition of AREVA by Électricité de France (EDF), EDF has control over the AREVA NP activities but the fabrication activities related to the Creusot Forge site were not part of this agreement. AREVA NP is still responsible for the forgings fabricated before the completion of the acquisition. For those manufacturing files that AREVA NP maintains responsibility for prior to the acquisition by EDF, the obligation to comply with 10 CFR Part 21 still exists.

AREVA NP contracted Framatome to reconciliate and evaluate the irregularities identified in the manufacturing files. Framatome performed the evaluation of these irregularities and also evaluated for Part 21 applicability using Framatomes Part 21 procedure.

b. Observations and Findings No findings of significance were identified.

c. Conclusion

The NRC inspection team concluded that AREVA NPs contractual arrangement with Framatome to perform evaluation of the irregularities identified in the manufacturing files satisfied the regulatory requirements of Part 21. No findings of significance were identified.

2. Corrective Action Program
a. Inspection Scope The NRC inspection team was not able to evaluate AREVA NPs policies and implementing procedures that govern the corrective action program to verify compliance with the requirements of Criterion XVI, Corrective Action, of Appendix B, Quality Assurance Program Criteria for Nuclear Power Plants and Fuel Reprocessing Plants, to 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities, (Appendix B to 10 CFR Part 50), because AREVA NP is no longer a supplier of forgings.

The NRC inspection team recognized that AREVA NP continues to be responsible for the manufacturing files of the forgings supplied to the U.S. nuclear reactors and as such must reconcile those files that were identified to contain irregularities. AREVA NP contracted Framatome to perform these evaluations and recommend corrective actions to disposition any irregularities identified during Framatomes reconciliation.

The NRC inspection team discussed the process that Framatome is using to evaluate AREVA NPs manufacturing files and how the dispositions of the deviations found in the 4

manufacturing files are going to be communicated to the affected customers. To reach a conclusion that the evaluations of the irregularities affecting forgings (i.e. marked files) supplied to the U.S. operating reactors are adequate, the NRC inspection team considered the ASN assessment and conclusions developed during the closeout of the 2016 MDEP multinational inspection. It was determined by ASN that the corrective actions related to the quality assurance program and the manufacturing process have been adequately implemented. The NRC inspection team sampled several nonconformance reports and supporting documentation to verify that the forgings were properly fabricated, inspected, and tested in accordance with the customers design specifications, as well as regulatory and code requirements. Based on ASNs conclusions and the NRC inspection teams evaluation of the corrective actions taken to address the irregularities identified in the manufacturing files, the NRC inspection team has reasonable assurance that there are no safety concerns with forgings provided to the U.S. operating reactors and the components will be able to perform their intended safety function. No findings of significance were identified.

b. Observations and Findings No findings of significance were identified.

c. Conclusion

The NRC inspection team concluded that AREVA NPs contractual arrangement with Framatome to perform reconciliation and evaluation of the irregularities identified in the manufacturing files satisfied the regulatory requirements of Criterion XVI of Appendix B to 10 CFR Part 50. No findings of significance were identified.

3. Entrance and Exit Meeting On Monday, March 11, 2019, the NRC inspection team discussed the inspection scope during an entrance meeting with David HAGUET, Director of Framatome Le Creusot (FLC),

and other members of Framatome and FLCs management and technical staff. On Friday, March 15, 2019, the NRC inspection team presented the inspection results during an exit meeting with David EMOND, Senior Executive Vice President of the Component Manufacturing BU of Framatome, David HAGUET and other members of Framatome and FLCs management and technical staff. The attachment to this report lists the attendees of the entrance and exit meetings, as well as those individuals whom the NRC inspection team interviewed.

5

ATTACHMENT

1. ENTRANCE/EXIT MEETING ATTENDEES Name Title Affiliation Entrance Exit Interviewed Inspector, Team Jonathan Ortega-Luciano NRC X X Leader Taylor Lamb Inspector NRC X X Autorité de Sébastien Véziat, Observer Sûreté Nucléaire X X (ASN)

Laure Monin Observer ASN X François Colonna Observer ASN X Davron Jean-Pierre Labaste Translator X X Translations Framatome Le Franck Charvieux Technical Director X Creusot (FLC)

Director of Sales &

Patrice Nogue FLC X X Projects Technical &

Regulatory Expert Thierry Berger Framatome X X X Manufacturing Component BU Quality and Safety Pascale Convers FLC X X Manager David Haguet Director FLC FLC X X Conformance Hugues Lecour FLC X X Project Manager Safety, Quality &

Operational Pascale Levivien Performance Framatome X Component Manufacturing BU Senior Executive Vice President David Emond Framatome X Component Manufacturing BU

2. INSPECTION PROCEDURES USED Inspection Procedure (IP) 36100, Inspection of 10 CFR Part 21 and Programs for Reporting Defects and Noncompliance, dated February 13, 2012.
  • IP 43002, Routine Inspections of Nuclear Vendors, dated January 27, 2017
3. LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
4. DOCUMENTS REVIEWED Deviation Notices
  • 9032964
  • 9023659
  • 9033007
  • 9036589
  • 9021743
  • 9036147
  • 9032746
  • 9022621
  • 9036369
  • 9032765
  • 9036549
  • 9032270
  • 9036409
  • 9036586
  • 9036590
  • 9036367
  • 9036535
  • 9036594
  • 9036381
  • 9035884
  • 9036369
  • 9036466
  • 9031642
  • 9036320
  • 9008951
  • 9023687
  • 9037735
  • 9008952
  • 9036588 Customer Response Letters
  • D02-TFPF-IN-18-2896
  • D02-TFPF-IN-18-2915
  • D02-TFPF-IN-18-3025
  • ENSA_BGR_18_0808 2