June 4, 2019 MEMORANDUM TO: Jennifer Dixon-Herrity, Chief Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors FROM: Donald Habib, Project Manager /RA/
Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors
SUBJECT:
SUMMARY
OF A PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY ON MARCH 28, 2019 The U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with Southern Nuclear Operating Company (SNC) on March 28, 2019. The purpose of the meeting was to discuss issues associated with the Uncompleted Inspection, Test, Analysis, and Acceptance Criteria (ITAAC) Notification (UIN), Item 2.2.02.07f.i [Index No. 145] for SNCs Vogtle Electric Generating Plant (VEGP) Units 3 and 4.
The meeting notice can be found in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML19052A394. The meeting notice is also posted on the NRC public website. Enclosures 1 and 2 are the meeting agenda and attendance list for the meeting, respectively. The other documents referenced during the discussion can be found at the ADAMS Accession Nos. given below:
- Notice of Uncompleted ITAAC 225-days Prior to ML19052A376 Initial Fuel Load, Item 2.2.02.07f.i [Index No. 145]
- UIN ICN [ITAAC Closure Notice] comment status ML19077A387 sheet ITAAC Index No. 145
- Briefing: Passive Containment Cooling Water Flow ML19084A139 Tests, ITAAC Index 145 CONTACT: Donald Habib, NRO/DLSE (301) 415-1035
J. Dixon-Herrity Summary of Meeting:
On March 28, 2019, staff from the NRC conducted a public meeting with representatives from SNC to discuss issues associated with the proposed testing methodology for SNCs VEGP Units 3 and 4 Notice of Uncompleted ITAAC for Item 2.2.02.07f.i, ITAAC Index No. 145. The staff had commented on the notice, and SNC requested a meeting to explain its approach to completing the ITAAC.
SNC briefed their presentation (ADAMS Accession No. ML19084A139) to the staff, and the staff asked clarifying questions about SNCs approach for the test, which involves measuring water delivery rates between the passive containment cooling system ancillary water storage tank, the passive containment cooling system water storage tank, and the spent fuel pool. SNCs approach for completing the ITAAC divided the test into two flowpaths, each with two segments and sharing a common point, and performing the test of each flowpath at different times to support the construction schedule and equipment availability issues. Detailed information about the testing configuration was provided in the briefing.
The staff commented that including the figures from the presentation in the UIN for this ITAAC would provide clarity to support the ITAAC closure. SNC agreed to follow up with the staff about whether additional information would be formally submitted to support the UIN.
At the conclusion of the meeting, there was an opportunity for the public to provide comments and ask questions. There were no comments or questions from the public.
Note: Subsequent to the meeting, SNC informed the staff it would resubmit the UIN with the additional figures.
Docket Nos.: 52-025 52-026
Enclosure:
As stated cc w/encls: See next page
ML19109A175 *via e-mail NRC-001 OFFICE PM: DLSE/LB2 LA: DLSE/LB2 PM: DLSE/LB2 BC: DLSE/LB2 NAME DHabib (c) RButler* CPatel JDixon-Herrity (c)
DATE 5/8/19 5/7/19 5/31/19 6/3/19 OFFICE PM: DLSE/LB2 NAME DHabib (s)
DATE 6/4/19 AGENDA FOR PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION (NRC)
Thursday, March 28, 2019 Teleconference 9:00 a.m. - Noon PURPOSE: To discuss issues associated with the safety review of licensing actions for Southern Nuclear Operating Companys (SNC) Vogtle Electric Generating Plant (VEGP) Units 3 and 4.
OPEN Time Topic Led By 9:00 a.m. Opening Remarks NRC 9:05 a.m. Discussion regarding ITAAC Index NRC/SNC No. 145 10:15 a.m. Opportunity for Public Comment NRC/PUBLIC 10:20 a.m. Adjourn Enclosure 1
PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION Thursday, March 28, 2019 One White Flint North, Room O-9B4 9:00 a.m. - Noon List of Attendees Name Organization Representing the Nuclear Regulatory Commission Donald Habib NRO/DLSE/LB2 Alina Schiller Boyce Travis Raul Hernandez NRO/DSRA/SCPB Hanry Wagage Chris Welch
- NRO/DCIP/CIPB Vic Hall Representing Industry Tom Petrak Calvin Morrison Southern Nuclear Company Wes Sparkman Mark Wilson Representing Public Steve Franzone Florida Power and Light
- = participated via teleconference Enclosure 2
Vogtle Units 3 and 4 Mailing List (Revised 08/16/2018) cc:
Office of the Attorney General Resident Inspector 40 Capitol Square, SW Vogtle Plant Units 3 & 4 Atlanta, GA 30334 8805 River Road Waynesboro, GA 30830 Resident Manager Oglethorpe Power Corporation Mr. Barty Simonton Alvin W. Vogtle Nuclear Plant Team Leader 7821 River Road Environmental Radiation Program Waynesboro, GA 30830 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company, Inc. 4244 International Parkway, Suite 120 Document Control Coordinator Bin N-226-EC Atlanta, GA 30354-3906 3535 Colonnade Parkway Birmingham, AL 35243 George B. Taylor, Jr.
2100 East Exchange Pl Anne F. Appleby Atlanta, GA 30084-5336 Olgethorpe Power Corporation 2100 East Exchange Place Brian H. Whitley Tucker, GA 30084 3535 Colonnade Parkway, Bin N-226-EC 42 Inverness Center Parkway, BIN B237 County Commissioner Birmingham, AL 35243 Office of the County Commissioner Burke County Commission Mr. Michael Yox Waynesboro, GA 30830 Site Regulatory Affairs Director Vogtle Units 3 & 4 Mr. Wayne Guilfoyle 7825 River Road, Bin 63031 Commissioner District 8 Waynesboro, GA 30830 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3
Vogtle Units 3 & 4 Mailing List Email acchambe@southernco.com (Amy Chamberlian) agaughtm@southernco.com (Amy Aughtman)
ALPUGH@southernco.com (Amanda Pugh) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)
Bill.Jacobs@gdsassociates.com (Bill Jacobs) bjadams@southernco.com (Brad Adams) bwwaites@southernco.com (Brandon Waites) castelca@westinghouse.com (Curtis Castell) comerj@westinghouse.com (James Comer) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dgbost@southernco.com (Danny Bost) dlfulton@southernco.com (Dale Fulton) drculver@southernco.com (Randy Culver) durhamdc@westinghouse.com (David Durham) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David) erg-xl@cox.net (Eddie R. Grant) fdhundle@southernco.com (Forrest Hundley) fhwillis@southernco.com (Fred Willis)
G2NDRMDC@southernco.com (SNC Document Control) graysw@westinghouse.com (Scott W. Gray) jadwilli@southernco.com (J.D. Williams) james1.beard@ge.com (James Beard) jannina.blanco@pillsburylaw.com (Jannina Blanco) jantol1dj@westinghouse.com (David Jantosik) jenmorri@southernco.com (Jennifer Buettner)
JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)
John.Bozga@nrc.gov (John Bozga)
Joseph_Hegner@dom.com (Joseph Hegner) jpredd@southernco.com (Jason R. Redd) jranalli@meagpower.org (Jerry Ranalli) karen.patterson@ttnus.com (Karen Patterson) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy)
KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa)
Page 2 of 3
Vogtle Units 3 & 4 Mailing List Matthew.Williams@hq.doe.gov (Matthew Williams) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)
Melissa.Smith@Hq.Doe.Gov (Melissa Smith)
Michael.Kuca@hq.doe.gov (Michael Kuca) mike.price@opc.com (M.W. Price)
MKWASHIN@southernco.com (MKWashington) mlgraves@southernco.com (Michelle Graves)
MSF@nei.org (Marvin Fertel) myox@southernco.com (Mike Yox) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple) patriciaL.campbell@ge.com (Patricia L. Campbell)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) r.joshi15@comcast.net (Ravi Joshi)
RJB@NEI.org (Russell Bell)
Ronald.Jones@scana.com (Ronald Jones) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak) sblanton@balch.com (Stanford Blanton)
Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) skauffman@mpr.com (Storm Kauffman) sroetger@psc.state.ga.us (Steve Roetger) stephan.moen@ge.com (Stephan Moen) stephen.burdick@morganlewis.com (Stephen Burdick) tom.miller@hq.doe.gov (Tom Miller)
TomClements329@cs.com (Tom Clements)
Vanessa.quinn@dhs.gov (Vanessa Quinn) vcsummer2n3@gmail.com (Brian McIntyre) wasparkm@southernco.com (Wesley A. Sparkman) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver) x2gabeck@southernco.com (Gary Becker) x2kmseib@southernco.com (Kristin Seibert)
Page 3 of 3