I I
Mr. William McDonald, Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. McDonald:
Operating information for Surry Power Station, Unit Nos. 1 and 2, for the month of August is attached.
Attachments cc: Mr. James P. O'Reilly Very truly yours, ZO.)f)(.,~ec/~jd C.. M. Stallings Vice President-Power Supply and Production Operations
e e
UNIT Surry Unit 1 DATE 9-1-77 COMPLETED BY E. P. DeWandel DOCKET NO.
50-280 OPERATING STATUS REPORTING PERIOD:_o_o_o_1_7_7_0_s_o_1 _______ THROUGH _2_4_0_0_7_7_0_8_3_1 ______
HOURS IN REPORTING PERIOD:
744
- l.
- 2.
CURRENTL y AUTHORIZED POW_E_R_L_E_V_E_L_(_M_W_th_)_2_4_4_l __
M_A_X_. -D-E-PE_N_D_A_f>_L_E_C ___
.-.r_A_C_I_T_Y_(_M_W_e_-N_'E_T_)-.,7""'7"""5"""* -
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF :<\\NY) (MWe-NET): __
N_A ___. _____ _
- 4.
REASONS ~-OR RESTRICTION (IF ANY):
THIS REPORTING PERIOD
- 5.
HOURS REACTOR WAS CRITICAL.....*..*.***
- 6.
REACTOR RESERVE SHUTDOWN HOURS.*.****
- 7.
HOURS GENERATOR ON LINE......*.******.
- 8.
UNIT RESER VE SHUTDOWN HOURS.... * *.*****
- 9.
GROSS THERMAL ENERGY GENERATED(MWH).....*.*.*..*********
- 10.
GROSS ELECTRICAL ENERGY
-GENERATED (MWH)...**.*********. * *****
. 11.
NET ELECTRICAL ENERGY GENERATED (MWH)
- 12.
REACTOR AVAILABILITY FACTOR (1)..*.*****
- 13.
UNIT AVAILABILITY FACTOR (2)......*....*
- 14.
UNIT CAPACITY FACTOR (3)....**......**.
- 15.
UNIT FORCED OUTAGE RATE (4)............
728.3 0
713.9 0
1,646,264 534,390 506,974
- 97. 9%
- 96. 0%
87.9%
4.0%
CU~1ULATJ\\'E YR TO DATE TO DATE 4,448.3 27,002.7
'0
--0--
4,360.3 26,260.3 0
0 10,463,910 59,552,266 3,443,625 19,521, 988 3,274,830 1'
18,5-!-8?595 76.3%
65.7.~{
74.8%
b3.8%
72.5%
53.1%
- 2. 7%
19.4%
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, A:-.ID DURATION OF EACH):
Steam Generator Inspection -
11/19/77 -
6 weeks
- 17.
- 18.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: __
N_
1A __________ _
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
REACTOR AVAILABILITY FACTOR (2)
LINITAVAILABILITY FACTOR (3)
UNIT CA!' ACITY FACTOR (4)
...,... ~.,.. -... :*
~--. ":;.-* -*-. - ~
INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE
~~~~~~~~~~-~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DATE LAST DATE FORECAST ACHIEVED MAX. DEl'ENDABLE CAPACITY {MWc-NETJ X JIOURS IN Rl~l'OIUIN(; l'ERIOIJ FORCED OUTAGE !!OURS
= -
~~--~~-~~~~~~~x100 llOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS.
~*
e
- e.
DOCKET NO. 50-280 UNIT Surry Unit 1 DATE 9-1-77 COMPLETED BY E. p. Detlandel AVERAGE DAILY UNIT PO\\VER LEVEL
- MONTH August 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (M\\Ve-net)
DAY (MWe-net) 1 758. 7 17 738.5 2
760.1 18 273.7 3
759.6 19 739.7 4
758.9 20 750.8 5
758.5 21 7lf<J.4
- s 750.3 22 751.9 7
. 755.3 23 756.0 8
754.9 24 330.2 9
756.1 25 li86.7 10 754.6 26 485.3 11 751.6 27 611.1 12 752.5
. 28 479.5 13 750. 5 29 739. 8 14 750.3 30 749.8 15 750.5 31 418.3 16 748.5 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These fii;ures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the I 00% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the :ipparcnt anomaly.
~"-"*>' :-,*t" """ -* o*>*<J, ** '*",...,_
- 0 -~,
- -*.'*-0"<"" "*"*-***
'"f:"~..,,_ -~**
~
NO.
DATE Ti-0/
1 8/18/77 77-03 2
8/24/77 77-09 3
8/28/77 77-10 4
77-11 5
8/31/77 8/31/77
SUMMARY
'TYPE F*FORCED S*SCHEDULED F
F.'
F F
F DURATION (HOURS) 6.9 7.9 6.7
.**7.5.
1.1
.r.,
' i
'fl UNIT SHUTDOWNS REPORT MONTH.
August, 1977 REASON (1)
A
- -..A A
H H
METHOD OF
~HUTTING DOWN THE REACTOR (2) 1 1
3 3
DOCKETNO._~s_o_-2_8~~~---
UNIT NAME ___
su_r_r..:..y__....l -.
DATE __
9._-..... 1_-?....,?'---
COMPLETED BY E. p DeWandel CORRECTIVE ACTIONS/COMMENTS Loose copnector on control rod drive mech.
Tightened connector.
RCS controlled leakage high.
Back seated valve.
Failure of Lo Lube Oil pressure sensor on turbine - repaired sensor.
Elec. spike while calibrating RCS Flow Xmtr.*
Repaired Xmtr.
(1) REASON A* I::QLlll'MENT FAILURE (EXPLAIN)
D* MAlNT. OR TEST C--REFUELIN
J-MANL'AL 2-MANUAL SCRAM 3-AUTO:'ofATlC SC"RAM Lo Lo S/G Level - Feedwater control sen-sitivity during start-up.
1
. UNIT Surry Unit 2 DATE September 1, 1977 COMPLETED BY E
- p
- De Wandel DOCKET NO. 50-281 OPERATING STATUS
- l.
REPORTING PERIOD:_o_o_O_l_7_7_0_8_0_1 _______ THROUGH __
24_00_7_7_0_3_3_1 ______
hOURS IN REPORTING PERIOD:.
744 2:
CCR RE NTL Y AUTHORIZED POW_E_R_L_E_V-'E_L_(_M_W-th_)_24_4_l __
M_A_X-. -D-E-PE_N_D_A_B_L_E_C_A_P_A_C_I_T_Y_(_M_W_e_-N-'E_T_) __
.,..7_,,7.,.-5
- 3.
LOWEST POWER LEVEL TO WHICH SPECiFICALLY RESTRICTED (IF ANY) (MWe-NET): __
N_A __ ~----
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL......**.*.*.
- 6.
REACTOR RESER VE SHUTDOWN HOURS..**.**
- 7.
HO.URS GENERA TOR ON LINE......*.*.*.***
- 8.
UNIT RESER VE SHUTDOWN HOURS..*..*..***
- 9.
GROSS THER!>IAL E!'JERGY GENERA TED (MWH)...*......*.*********
- 10.
GROSS ELECTRICAL ENERGY
-GENERA TED (MW!{)........*..**...****.
- 11.
NET ELECTRICAL ENERGY GENERATED (MWH)
- 12.
REACTOR AVAILABILITY FACTOR (1) **.******
- 13.
UNIT AVAILABILITY FACTOR (2)....*......*
- 14.
UNIT CAPACITY FACTOR (3)............*..
- 15.
UNIT FORCED OUTAGE RATE (4)............
721.4 0
715.0 0
1,733,456 554,100 525,040 97.0%
96.rr-91.1%
3.9%
CUMULATIVE
- YR TO DATE TO DATE 4083*. 8 24,402.7 0
0 4054 23-:-999. 4 0
0 9,741,732 55,086,359 3,188,640 18,060,014 3,027,605 17,123,307 70.0%
64.2%
69.5%
63.1%
67.0%
58.1%
30.5%
26.5%
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
Refueling -
9-9 4 weeks
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: __ N_A __________ _
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(I)
REACTOR AVAILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR (4)
UNIT FORCED OUTAGE RATE
" - >'**--.,.-.* - *..* -...,.~ --*-**
INITIAL CRITICALITY
. -INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
--~-~~~--~~~~-xioo HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED DA TE LAST DA TE FORECAST ACHIEVED MAX. DEPENDABLE CAPACITY (MWc*NET) X HOURS IN REPORTING f'EJUOD FORCED OUTAGE HOURS
~~----~~~---~~-------XIOO HOURS GENERATOR ON LLNE +FORCED OUTAGE HOURS
- -*,.,,_.,,_... '. -.............. ~*-**- --*-*... --~. *-**..
~_.,,.....
,_,~
- )
DOCKETN0._
5_
0-_
2_
8_
1 ~~
UNIT Surry *unit 2 DATE 9-1-77 COMPLETED BY E
- P
- DeWandel AVERAGE DAILY UNIT POWER LEVEL MONTH Augus~ FJ77 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWc-net) 1*
750.6 17 728.0 2
755.9 18 743.9 3
747.5 19 741.2 4
718.8 20 749.7
- 5 754.9 21 749.9 6
752.9 22 752.7 7
742.8 23 750.9 8
742.3 24 734.6 9
749.8 25 746.1 10 716.t~
26 745.3 11 706.1 27 745~7 12 701.6 28 745.8
- 13.
0 29 743. 6 14 450.1 30 744.3 15 713.2 31 747.4
.,6 740.7 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this fom1, list the average daily unit" power level in MWe-net for each day in the reporting-month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical wting of the unit, there may be occasions.\\vhen the daily average power level exceeds the l 00% line (or the restricted power level line). In sucl! cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
'* r
- -*-~-,---:,..,..* - ** -
~
- TYPE F-FORCED DURATION NO.
DATE S-SCHEDULED (HOURS) 1 8-12-7 F~
16.4 77-05
- {.
2 8-13-7 F.
12."6 17.;..0"6
.i I
SUMMARY
- 1
\\
\\
I
~-
- I DOCKET No 50-281 -
I UNIT SHUTDOWNS UNIT NAME _s_u_r_ry_2_*,_' ___.. __
DATE _9-_l_-_7_7 ___ _
COMPLETED BY E
- P
- De Wandel
. REPORT MONTH __
A_u_gu_s_t_l_97_7 __
METHOD OF SHGTTING DOWN REASON (1)
THE REACTOR (2)
A 3
H
- 3.
~
CORRECTIVE ACTIONS/COMMENTS --
Failure~ solenoid on main feed reg.
valve, and Xenon precluded start-up.
Repaired failed solenoid~
Hi S/G Level Trip and spurious SI signal during start-up in manual feed control No corrective action required *
(l) REASON (2) METHOD A* *EQUIPMENT FAILURE (EXPLAIN)
I-MANUAL B-MAINT. OR TE3T 2-MANUAL C-* RHUELING SCRAM '
D-REGULATORY RESTRICTION 3-AUTOMAT E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G--OPERA TIONi\\L ERROR (EXPLAIN)
H-OTllER (EXPLAIN)
. *i I
~:
I
-I
A..