VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND,VIRGINIA 23261 December 8,* 1977..
Mr. William McDonald, Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. McDonald:
Serial No. 565 PO&M/TAP:wbh Docket Nos.
50~280 50-281 License Nos. DPR-32 DPR-37 Operating information for Surry Power Station, Unit Nos. 1 and 2 for the month of November 1977 is attached.
Attachments cc:
Mr. James P. O'Reilly, Director Office of Inspection and Enforcement Very truly yours,
'21;. 21)1. ~ad~Y2 v
C. M. Stallings Vice President.... Power Supply and Production Operations
. DOCKET NO. _
...... s.....
o---'-2"-"8_...0 __
UNIT Surry Unit 1 DATE December 1, 1977
- .COMPLETED BY o
- W * - Akins AVERAGE DAILY UNIT POWER LEVEL MONTH November 1977 AVERAGE DAILY POWER LEVEL DAY (MWe-net) 1 2
3 4
5 6
"7 8
9 10,,,
12 13*
14
- 15 1.6 765.7 764.7 765 6 761.8 763.3 762.2 762.9 762.4 762 8 762.8 495.t.
- o 0
O*
0 AVERAGE DAILY POWER LEVEL DAY (MWe-net) 17 0
18 0
19 0
20 0
21 0
22 0
23 o*
24 0
25 0
26 0
27
. 28 29 0
30 0
31 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit" power level in MWe-net for each day in the reporting month.
Compute to the nearest"whok megawatt.
. These figures will be used to plot a graph for each reporting month. Note that by usirig maximum dependable capacity for the* net electrical rating of the unit, there may be occasions when the daily
- :~
average power level exceeds the l 00% line (or the restritted_ power level line). In stich cases, the average daily unit pov,er output sheet should be footnoted to explain the apparent anomaly.
/
UNIT Surry Unit 1 DATE Dec. 1, 1977 COMPLETED BY 0
- W. Akins DOCKET No._50_-_2_8_0 ____
OPERATING STATUS
- l.
REPORTING PERIOD: 0001 771101
- THROUGH __
2~40~0..__--'7~7~1=1~3~0 ____ __
2.*
- 3.
- 4.
- s.
- 6.
- 7.
- 8.
9.*
~..... ;
- 11.
- 12.
- 13.
- 14.
lS.
- 16.
- 17.
- 18.
(l)
HCURS IN REPORTING PERIOD:
7 20
~
CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. pEPENDABLE CAPACITY (MWe-NET) 77 5 LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): __ _,N""'A.:......------
R.EASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD HOURS REACTOR WAS CRITICAL.... *....*.***
. REACTOR RESERVE SHUTDOWN HOURS **...**
HOURS GENERATOR ON LINE........****.**
.. UNIT RESER VE SHUTDOWN HOURS...*.*..***
GROSSTHERMAL~NERGY GENERATED (MWH).......*..**.**.*****
GROSS ELECTRICAL ENERGY
{;ENERATED (MWH).........**..*.** -****
NET ELECTRICAL ENERGY GENERATED
{!!':'!!-!)
w REACTOR AVAILABILITY FACTOR (1).* * *.*****
UNIT AVAILABILITY FACTOR (2)..**********
UNIT CAPACITY FACTOR (3) *.*.***********.
UNIT FORCED OUTAGE RATE (4)..***.****.*
258.2 0
258.0 0
1,168,348 204, 710 195,109 35.9%
35.0%
.0 CUMULATIVE YR TO DATE TO DATE 6,170.~
- 28. Z2?1.. I Q
Q 6,QZS.8 2Z,9Z5.._B__
0 0
15, 17 8, 451 64,266,807 42811,630 20,889,993 4s575,837 i9.Rl~!,fi02 ZZ.Q%
66.3%
ZS. 8%
64.6%
- 73. 7%
59.0%
2.Q%
rn.~%
SHUTDOWNS. SCHEDULED TO BEGIN IN NEXT 6 MONTIIS (STATE TYPE, DATE, AND DURATION OF EACH):
RE;fi.:1ehn1g and.S/G,In;>pec;fion May, 1978 1 5 weeks IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
December 4, 1977 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
REACTOR AVAILABILITY FACTOR INITIAL CRITICALITY
- IJ'llTIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 DA TE LAST DATE FORECAST ACHIEVED HOURS GENERA TOR ON LINE
= ~~~--~~~~~~-~x100 HOURS IN REPORTING PERIOD (2)
UNIT AVAILABILITY FACTOR NET ELECTRICAL POWF.R GENERATED (3)
UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY.(MWc-NET) X HOURS IN REPORTING PERIOD (4)
FORCED OUTAGE HOURS
~~~~--~~~~-~~~-~~--~~x100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS UNIT FORCED OUTAGE RA TE
- I
/
NO.
DATE 1
11-11..:. *.
77
SUMMARY
UNIT SHUTDOWNS REPORT MONTH November 1977 TYPE F*FORCED DURATION.
S-SCHEDULED (HOURS)
REASON (1)
METHOD OF
~HUTTING DOWN THE REACTOR (2) s 462.0 H
1 I
- ~.***~
- **** *'
~r
.'.~*~,,,*-
~***
.~'.-:'",*.
/.
- .\\.
. l bocI{ET No. _.....;s_o_-_28_0_.;...1* /
-(-:-
UNIT NAME _....:;._Su,;_r:..;.;r.:t-y_l~-,..;-*
DATE Dec 1, 1977 COMPLETED BY _
_.;;_o..;_
- ....;.w.;_;;._A;;,;;,k;.;;.;i....;.n.;.;.s_
- CORRECTIVE ACTIONS/COMMENTS S/G Inspection - Unit is still "shutdown at the end of this report period.
(1) REASON A*-EQUlPMENT FAILURE (EXPLAIN)
B-MAINT. OR TEST C--RErUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONALERROR (EXPLAIN)
H-OTHER (EXPLAIN)
(2) METHOD
!*-MANUAL 2-MANUAL SCRAM
. 3-AUTOMAT.r.
- ~; *~'.
. j
r-OPERA TING ST A TUS UNIT Surry Unit 2 DATE December 1. 1917
. COMPLETED BY 0. W
- Akins DOCKET N0._5""'0><.--_,2,.,8"""1~---
- l.
REPORTING PERIOD: __
O_O_O_l _ _.;.7_7_1_1_0=1-* _____ TI!ROUGH ""2'"'"4"""0"""'0 _ __._77.... l_J... 3
.... 0..__ _____ _
HCURS IN REPORTING PERIOD: ___ 7_2--'0"-----------------------__,...,..,..-
- 2.
- CURRENTLY AUTHORIZED POWER LEVEL (MWL'1) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET)
/JS
. 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): ___
N_A ______ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL..*. : ****.***
- 6.
.REACTOR RESERVE SHUTDOWN HOURS **.*.**
.7.
HOURS GENERATOR ON LINE *....*******.**
- 8.
UNIT RESERVE SHUTDOWN HOURS *..*.******
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)..*...**************,
- 10.
- GROSS ELECTRICAL ENERGY
<;ENERATED (MWH).*...****.*.*********
- 11.
NET ELECTRICAL ENERGY GENERA TED (MWH)
- 12.
REACTOR AVAILABILITY FACTOR (1).*.*.****
- 13.
UNIT AVAILABILITY FACTOR (2J **.**.******
- 14.
UNIT CAPACITY FACTOR (3)....***********
IS.
UNIT FORCED OUTAGE RATE (4).*...*.***.*
498.8 0
491.5 0
624,159 382,635 3622908 69.3%
68 n 65.0%
- 31. 7%
CUMULATIVE YR TO DATE TO DATE Ss 3'50.4 25,662.3 0
0 5z240.7 252186.1 0
0
.:.12 2 022, 040 57.366.667
!!.lQ6,520 18,977,8~4 32897,633 17~993,335 66.2%
63.9%
65 4.%.
62.2%
62.7%
SZ.8%
2:Z.Z%
26 ] 'Z
- 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
S/G Inspection, April 15, 1978 4 weeks
. 17.
. N/A IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:------------
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
.*~*
DA TE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY (I)
REACTOR AVAILABILITY FACTOR (2)
UNIT A VAILABIL!TY FACTOR (3)
UNIT CAPAClTY FACTOR (4)
UNIT FORCED OUTAGE RATE INITIAL ELECTRICAL POWER GENERATION COM?lERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE
= ~---~~-~~~~-x100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWF.R GENERATED
- MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTINli PERIOIJ HOURS GENERATOR ON Ll~E +FORCED OUTAGE HOURS x 100
. FORCEDOUTAGEHOURS c 'i
/
i '
I
--.'* l DOCKET NO.
50-281 UNIT Surry Unit 2 DATE Dec. I* 1977 COMPLETED BY 0, W. Akins
- .:.\\
AVERAGE DAILY UNIT POWER LEVEL.
MONTH Novembgr l2ZZ AVERAGE DAILY POWER LEVEL AVERAGE DAIL Y'POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 1 753.9 17 759.1 2
760.0 18 78.4 3
Z6l,Z 19 0
4 765.3 20 5
758.8 21 0
~
764.8 22 0
7 764.8 23 8
682.9 24 0
9 646.1 25 10 760.9 26
- o.
11 760.5 27 191.5 12 756.3
.. 28 621.0 13 758.4 29 743.2 14 758.9 30 757.7 15 Z52.l 31 16 258 t.i DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit' power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting m.onth. Note-that by using maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the I 00% line (or. the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted_ to explain the apparent anomaly.
'y
/
DOCKET NO.
50-281 UN!*r SHUTDOWNS UNIT NAME Surry 2 DATE Dec. 1, 1977
- COMPLETED BY o.w. Akins REPORT MONTH November 1977 TYPE l'V1ETHOD OF F-FORCED DURATION
~HUTTING DOWN NO.
DATE
$-SCHEDULED (HOURS)
REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS/COMMENTS 1
11 F 1.8 A
3 Repaired Main Feed Pump which tripped on 77 Low Lube Oil Pressure 2
11 F
" 1. 7 H
3 Hi Hi S/G Lever.Trip during manual feed 77 water control 3
11.F 223.3 A
1 Hi Primary to *Secondary S/G Leakage &
77 A spray valve failure during startup 4
11 F L7
.A 3
Loss of Auto Stop Oil from a relief 77 styckfopen-plugged line *and removed..
re ie.
(1) REASON (2) METHOD.
A*-EQUIPMENT FAILIJRE (EXPLAIN) 1-MANUAL
£-OPERATOR TRAINING AND SCRAM 1
LICENSE EXAMINATION F-ADMINISTRATIVE G-*OPERA TIONAL ERROR (EXPLAIN)
H-OTllER (EXPLAIN)
SUMMARY
' *~...
. '. '~.
.9TI DEC \\2 i~M \\ \\