Similar Documents at Surry |
---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0517203962005-06-13013 June 2005 May 2005 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0513705192005-05-0404 May 2005 April 2005 Monthly Operating Report for Surry Units 1 and 2 ML0510903492005-04-0808 April 2005 March 2005 Monthly Operating Report from Surry Power Station Units 1 and 2 ML0508104962005-03-15015 March 2005 February 2005 Monthly Operating Report for Surry Power Station Units 1 and 2 ML0505405492005-02-14014 February 2005 January 2005 Monthly Operating Report for Surry Power Station, Units 1 and 2 ML0501902152005-01-11011 January 2005 December 2004 Monthly Operating Report for the Surry Power Station, Units 1 and 2 ML0435501382004-12-10010 December 2004 November 2004 Monthly Operating Report for Surry Power Station Units 1 and 2 ML0432104852004-11-10010 November 2004 October 2004 Monthly Operating Report for Surry Power Station Units 1 and 2 ML0429402582004-10-0808 October 2004 September 2004 Monthly Operating Report for Surry, Units 1 & 2 ML0426104132004-09-0909 September 2004 August 2004 Monthly Operating Report for Surry Power Station Units 1 and 2 ML0423003592004-08-10010 August 2004 July 2004 Monthly Operating Report for Surry, Units 1 and 2 ML0420202602004-07-12012 July 2004 June 2004 Monthly Operating Report for Surry Power Station Units 1 and 2 ML0413905502004-05-11011 May 2004 April 2004 Monthly Operating Report for Surry Power Station, Units 1 and 2 ML0412602132004-04-13013 April 2004 March 2004 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0407607202004-03-0505 March 2004 February 2004 Monthly Operating Report for Surry, Units 1 and 2 ML0409605422004-02-0909 February 2004 January 2004 Monthly Operating Report for Surry, Units 1 and 2 ML0402107292004-01-11011 January 2004 December 2003 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0335300822003-12-11011 December 2003 November 2003 Monthly Operating Report for Surry, Units 1 and 2 ML0332404632003-11-10010 November 2003 October 2003 Monthly Operating Report for Surry Power Station, Units 1 and 2 ML0329406642003-10-13013 October 2003 September 2003 Monthly Operating Report for Surry Units 1 & 2 ML0326709772003-09-12012 September 2003 August 2003 Monthly Operating Report for Surry Units 1 & 2 ML0323805452003-08-11011 August 2003 July 2003 Monthly Operating Report for Surry Units 1 & 2 ML0319903262003-07-0909 July 2003 June 2003 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0316813982003-06-0505 June 2003 May 2003 Monthly Operating Report for Surry Units 1 and 2 ML0314104892003-05-14014 May 2003 April 2003 Monthly Operating Report for Surry Units 1 & 2 ML0310603802003-04-0808 April 2003 March 2003 Monthly Operating Report for Surry Units 1 & 2 ML0308301622003-03-14014 March 2003 February 2003 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0305507462003-02-13013 February 2003 January 2003 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0302303952003-01-14014 January 2003 December 2002 Monthly Operating Report for Surry Units 1 & 2 ML0235205262002-12-0909 December 2002 November 2002 Monthly Operating Report for Surry Units 1 & 2 ML0232503822002-11-12012 November 2002 October 2002 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0229100752002-10-0909 October 2002 September 2002 Monthly Operating Report for Surry Units 1 & 2 ML0226006852002-09-10010 September 2002 August 2002 Monthly Operating Report for Surry Units 1 & 2 ML0222702902002-08-0808 August 2002 July 2002 Monthly Operating Report for Surry Units 1 & 2 ML0220400052002-07-15015 July 2002 June 2002 Monthly Operating Report for Surry Power Station Units 1 & 2 ML0217104242002-06-11011 June 2002 May 2002 Monthly Operating Report for Surry Power Station, Units 1 & 2 ML0215504742002-05-0707 May 2002 April 2002 Monthly Operating Report for Surry Power Station, Units 1 & 2 ML0211304582002-04-15015 April 2002 March 2002 Monthly Operating Report for Surry Power Station, Units 1 and 2 ML0208403462002-03-11011 March 2002 February 2002 Monthly Operating Report for Surry Power Station, Units 1 & 2 ML0205801832002-02-0606 February 2002 January 2002 Monthly Operating Report for Surry Power Station, Units 1 and 2 ML0204504432002-01-11011 January 2002 December 2001 Monthly Operating Report for Surry Power Station, Units 1 & 2 ML19095A3841980-11-12012 November 1980 Monthly Operating Report for Month of October 1980 ML19095A3821978-08-16016 August 1978 Monthly Operating Report for Month of July 1978 ML19095A3831978-08-0101 August 1978 Monthly Operating Report for Month of July 1978 ML19095A3651978-07-18018 July 1978 Monthly Operating Report for Month of June 1978 ML19095A3661978-06-13013 June 1978 Refueling & Spent Fuel Storage Information & Monthly Operating Report for May 1978 ML19095A3671978-05-12012 May 1978 Monthly Operating Report for Month of April 1978 ML19095A3681978-04-12012 April 1978 Monthly Operating Report for Month of March 1978 ML19095A3691978-03-16016 March 1978 Monthly Operating Report for Month of February 1978 ML19095A3711978-01-0909 January 1978 Monthly Operating Report for Month of December 1977 2005-06-13
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND,VIRGINIA 23261 December 8,* 1977 ..
Mr. William McDonald, Director Serial No. 565 Office of Management Information and PO&M/TAP:wbh Program Control Docket Nos. 50~280 U. S. Nuclear Regulatory Commission 50-281 Washington, D. C. 20555 License Nos. DPR-32 DPR-37
Dear Mr. McDonald:
Operating information for Surry Power Station, Unit Nos. 1 and 2 for the month of November 1977 is attached.
Very truly yours,
'21;. 21)1. ~ad~Y2 v C. M. Stallings Vice President .... Power Supply and Production Operations Attachments cc: Mr. James P. O'Reilly, Director Office of Inspection and Enforcement
'. . DOCKET NO. _ ......s.....
o---'-2"-"8_...0__
UNIT Surry Unit 1 DATE December 1, 1977
- .COMPLETED BY o* W* - Akins AVERAGE DAILY UNIT POWER LEVEL '-*
MONTH November 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) 765.7 0 1 17 2 764.7 18 0 3 765 6 19 0 4 761.8 20 0 5 763.3 21 0 6 762.2 22 0 "7 762.9 o*
23 762.4 24 0 8
9 762 8 25 0 10 762.8 26 0
,,, 495 .t. 27 12 *o . 28 13* 29 0
- :~
14 0 30 0
- 15 O* 31 1.6 0 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit" power level in MWe-net for each day in the reporting month.
Compute to the nearest"whok megawatt .
. These figures will be used to plot a graph for each reporting month. Note that by usirig maximum dependable capacity for the* net electrical rating of the unit, there may be occasions when the daily average power level exceeds the l 00% line (or the restritted_ power level line). In stich cases, the ., .
average daily unit pov,er output sheet should be footnoted to explain the apparent anomaly.
/
UNIT Surry Unit 1 DATE Dec. 1, 1977 COMPLETED BY 0
- W. Akins DOCKET No._50_-_2_8_0_ _ _ __
OPERATING STATUS
- l. REPORTING PERIOD: 0001 771101
- THROUGH _ _ 2~40~0..__--'7~7~1=1~3~0_ _ _ ___
HCURS IN REPORTING PERIOD: 7 20
~
2.* CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. pEPENDABLE CAPACITY (MWe-NET) 77 5
- 3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ __,N""'A.:......------
- 4. R.EASONS FOR RESTRICTION (IF ANY):
.. THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE
- s. HOURS REACTOR WAS CRITICAL. ... *....*.*** 258.2 6,170.~ 28. Z2?1.. I
- 6. . REACTOR RESERVE SHUTDOWN HOURS **...** 0 Q Q
- 7. HOURS GENERATOR ON LINE ........****.** 258.0 6,QZS.8 2Z,9Z5.._B__
- 8. .. UNIT RESER VE SHUTDOWN HOURS ...*.*..*** 0 0 0 9.* GROSSTHERMAL~NERGY
- GENERATED (MWH) .......*..**.**.***** 1,168,348 15, 17 8, 451 64,266,807
~ ..... ; GROSS ELECTRICAL ENERGY
{;ENERATED (MWH) . . . . . . . . . * * . . * . * *- **** 204, 710 42811,630 20,889,993
- 11. NET ELECTRICAL ENERGY GENERATED
{!!':'!!-!)
- w - * * - * - * * * * - * - - : ; * * * * * ' *****
195,109 4s575,837 i9.Rl~!,fi02
- 12. REACTOR AVAILABILITY FACTOR (1) .* **.***** 35.9% ZZ.Q% 66.3%
- 13. UNIT AVAILABILITY FACTOR (2) ..********** ZS. 8% 64.6%
35.0% 73. 7% 59.0%
- 14. UNIT CAPACITY FACTOR (3) * . * . * * * * * * * * * * * .
lS. UNIT FORCED OUTAGE RATE (4) . . * * * . * * * * . * .0 2.Q% rn.~%
- 16. SHUTDOWNS. SCHEDULED TO BEGIN IN NEXT 6 MONTIIS (STATE TYPE, DATE, AND DURATION OF EACH):
RE;fi.:1ehn1g and .S/G ,In;>pec;fion May, 1978 1 5 weeks
- 17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: December 4, 1977
- 18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
DA TE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY
- IJ'llTIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (l) REACTOR AVAILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERA TOR ON LINE (2) UNIT AVAILABILITY FACTOR = ~~~--~~~~~~-~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWF.R GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY.(MWc-NET) X HOURS IN REPORTING PERIOD (4) UNIT FORCED OUTAGE RA TE .. FORCED OUTAGE HOURS
~~~~--~~~~-~~~-~~--~~x100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
/
. l bocI{ET No. _.....;s_o_-_28_0_.;...1*-(-:- /
UNIT SHUTDOWNS UNIT NAME _....:;._Su,;_r:..;.;r.:t-y_l~-,..;-*
DATE Dec 1, 1977 COMPLETED BY _ _.;;_o..;_
- . . ;.w.;_;;._A;;,;;,k;.;;.;i.. .;.n.;.;.s_
REPORT MONTH November 1977 TYPE METHOD OF F*FORCED DURATION . ~HUTTING DOWN NO. DATE S-SCHEDULED (HOURS) REASON (1) THE REACTOR (2) *CORRECTIVE ACTIONS/COMMENTS 1 11-11..:. *. s 462.0 H 1 S/G Inspection - Unit is still 77 "shutdown at the end of this report period.
(1) REASON (2) METHOD A*-EQUlPMENT FAILURE (EXPLAIN) !*-MANUAL B- MAINT. OR TEST 2-MANUAL C--RErUELING SCRAM D-REGULATORY RESTRICTION . 3-AUTOMAT.r.
E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION I *" F-ADMINISTRATIVE G-OPERATIONALERROR (EXPLAIN)
H-OTHER (EXPLAIN)
SUMMARY
- .,. -*.** ;:~.***~:**** *' ~r - ' * .,., .'.~*~,,,*- ~*** , .~'.-:'",*. *.**.,.,_
/. *.\ . '*'
UNIT Surry Unit 2 DATE December 1. 1917
. COMPLETED BY 0. W* Akins DOCKET N0._5""'0><.--_,2,.,8"""1~---
OPERA TING ST ATUS
- l. REPORTING PERIOD: _ _O_O_O_l_ _.;.7_7_1_1_0=1-*_____ TI!ROUGH ""2'"'"4"""0"""'0_ __._77....l_J...3....0..___ _ _ _ __
HCURS IN REPORTING PERIOD: _ _ _7_2--'0"-----------------------__,...,..,..-
- 2.
- CURRENTLY AUTHORIZED POWER LEVEL (MWL'1) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) /JS
. 3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ N_A_ _ _ _ _ __
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL ..*. : ****.*** 498.8 Ss 3'50.4 25,662.3
- 6. .REACTOR RESERVE SHUTDOWN HOURS **.*.** 0 0 0
.7. HOURS GENERATOR ON LINE *....*******.** 491.5 5z240.7 252186.1
- 8. UNIT RESERVE SHUTDOWN HOURS *..*.****** 0 0 0
- 9. GROSS THERMAL ENERGY GENERATED (MWH) ..*...************** , 624,159 .:.12 2022, 040 57.366.667
- 10.
<;ENERATED (MWH) .*...****.*.********* 382,635 !!.lQ6,520 18,977,8~4
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) . * * . . * . . . . . * . . . . . . .
- _ _ **..**** 3622908 32897,633 17~993,335
- 12. REACTOR AVAILABILITY FACTOR (1) . * . * . * * *
- 13. UNIT AVAILABILITY FACTOR (2J **.**.****** 68 n 65 4.%. 62.2%
- 14. UNIT CAPACITY FACTOR (3) ....*********** 65.0% 62.7% SZ.8%
IS. UNIT FORCED OUTAGE RATE (4) .*...*.***.* 31. 7% 2:Z.Z% 26 ] 'Z
- 16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
S/G Inspection, April 15, 1978 4 weeks
. 17. . N/A IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - -
- 18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
.*~*
DA TE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY
- INITIAL ELECTRICAL POWER GENERATION COM?lERCIAL OPERATION c
HOURS REACTOR WAS CRITICAL 'i (I) REACTOR AVAILABILITY FACTOR x 100 .'..
HOURS IN REPORTING PERIOD HOURS GENERA TOR ON LINE (2) UNIT AVAILABIL!TY FACTOR = ~---~~-~~~~-x100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWF.R GENERATED (3) UNIT CAPAClTY FACTOR
- MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTINli PERIOIJ
. FORCEDOUTAGEHOURS (4) UNIT FORCED OUTAGE RATE " HOURS GENERATOR ON Ll~E +FORCED OUTAGE HOURS x 100
/ ' .
Ii ' *.
--.'* l * "
DOCKET NO. 50-281 UNIT Surry Unit 2 'y DATE Dec. I* 1977 COMPLETED BY 0, W. Akins
- .:.\ AVERAGE DAILY UNIT POWER LEVEL.
MONTH Novembgr l2ZZ AVERAGE DAILY POWER LEVEL AVERAGE DAILY'POWER LEVEL DAY (MWe-net) DAY (MWe-net) 1 753.9 17 759.1 2 760.0 18 78.4 3 Z6l,Z 19 0 4 765.3 20 5 758.8 21 0
~ 764.8 22 0 7 764.8 23 8 682.9 24 0 9 646.1 25 10 760.9 26 o.
11 760.5 27 191.5 12 756.3 .. 28 621.0 13 758.4 29 743.2 14 758.9 30 757.7 15 Z52.l 31 ------
16 258 t.i DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit' power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting m.onth. Note-that by using maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the I 00% line (or. the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted_ to explain the apparent anomaly .
/ ! ..
DOCKET NO. 50-281 UN!*r SHUTDOWNS UNIT NAME Surry 2
- COMPLETED BY o.w. Akins REPORT MONTH November 1977 TYPE l'V1ETHOD OF F-FORCED DURATION ~HUTTING DOWN NO. DATE $-SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS/COMMENTS 1 11 F 1.8 A 3 Repaired Main Feed Pump which tripped on 77 Low Lube Oil Pressure 2 11 F " 1. 7 H 3 Hi.. Hi S/G Lever.Trip during manual feed 77 water control 3 11 .F 223.3 A ' 1 Hi Primary to *Secondary S/G Leakage &
77 - A spray valve failure during startup 4 11 F L7 .A 3 Loss of Auto Stop Oil from a relief 77
. styckfopen-plugged line *and removed ..
re ie .
(1) REASON (2) METHOD .
A*-EQUIPMENT FAILIJRE (EXPLAIN) 1-MANUAL
- B- MAINT. OR TEST 2-MANUAL C- REFUELING SC'RAM
.. D-REGllLATORY RESTRICTION 3-AUTOMATIC f
£-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION 1
- F-ADMINISTRATIVE G-*OPERA TIONAL ERROR (EXPLAIN)
H-OTllER (EXPLAIN)
SUMMARY
' *~ .. . .' . '~ .
.9TI DEC \2 i~M \ \