pco VIRGINIA ELECTRIC AND POWER COMPANY, RICHMOND*, VIRGINIA 23261 i' ~gulatory. Docket. Fi~_
Nr. C. J. Heltemes, Jr,, Chief Quality Assurance Branch Division of Project Management May 28, 1976 Serial.No. 058 LQA/DRA:vhe Office of Nuclear Reactor Regulation
~---.-,.... __
U.S. _Nuclear Regulatory Commission
,,~\\\\t*_1 Gt,/\\~
Washington, D.C.
20555 I!-<...>*
'-.(<1,}.
,./
~*
RE:
Docket Nos. 50-280, 50-281
. !/
~~~~c; 1fo~ *;.::;
50-338, 50-339 t:.::
\\<?!*
1,..5 i*
50-404, 50-405 iif\\
50-434, 50-435
', * \\
.. v".
.,,,.....\\
~;~
Dear Mr. Heltemes:
- ~ -:~?{:--;,
.(, ~
\\.{
,.d'
-~/;
\\.--:~:.//'
- 1,,
i.P \\/:.:>;*;
"c "? ~
~;./: A
-:l'.* --.*..,
7
,,,./!
'.:;--:-1~:*P,j
/Q \\I)/:!'
~ *,:}'*,:\\ c..:...-,
\\.';.:11 '?
A1
~
~,;,.,~ --t.,
- qr,<, *\\
ir.'7-~--.
1'
0' I I I -~* '...
The Virginia Electric and Power o
submits thirty-'f~..........-
~opies of amendment two to.o*ur topical report entitled, 11Quality Assurance Program-Operations Phas~ 1 (VEP-1-A) for approval.
This amendment clarifies our comp 1 i ance with the WASH-1284, 1309, and 1283 (rev. l) documents as Ji sted in Table 1].2.0 of the report.
The following page numbers are affected by this proposed amendment:
Ti t1e Page
- 17. 2 - *v 17.2 - vi 17.2 -
2 thru 17.2 - 5 List of Amendments List of Effective Pages Table 17.2.0 -.Conformance of Vepco QA Program to QA Standards, Requirements and Guides I
When approved by you, this amended topical report will be applicable to.Surry Power Station Units 1 and 2, and when referenced, to a11 subsequent op~rational nuclear power generating stations.
The enclosed amended pages are non-proprietary in t~elr entiiety.
Enclosures:
35 copies Very truly yours,
~~
W. L. Proffitt~
Senior Vice Pr~sident 5573
\\
.. -~
.:*~
e J..j '*-
- VIRGINIA ELECTRIC AND POWER COMPANY TOPICAL REPORT QUALITY ASSURANCE PROGRAM OPERATIONS PHASE VEP-1 Amendment Two 4-21-76
\\I Amendment No.
Original One Two LIST OF AMENDMENTS 17.2-v Amendment Date 7-1-75 12-30-75 4 76 Amendment Two 4--:-21-76
~'-*.*,.,*
Page No.
. Title Page Abstracr.,,._,
17.2-17.2-ii 17.2-iii 17.2-iv 17.2-v
- 17. 2-vi 17.2-1 17.2-2.
17.2-3 17.2-4 17.2-5 17.2-6 17.2-7 17.2-8 17.2-9 17.2-10 17.2-11 17.2-12
- 17. 2-13 17.2-14 17.2-15
. 17.2-16 17.2-17 17.2-18 17.2-19 17.2-20' 17.2-21 17.2-22 17.2-23 17.2-24 17~ 2-25 17.2-26 17.2-27 17.2-28 17.2-29 17.2-30 17.2-31 17.2-32 17.2-33 17.2-34 17.2-35 17.2-36
- 17. 2-37 17.2-38 17.2-39 17.2-40 17.2-41 17.2-42 17.2-43 17.2-44 17.2-45 e
LIST OF EFFECTIVE PAGES Amendment No.
Two Original Original Original Original Original Two Two One Two Two Two Two Original One
. Original.
Original Original One.
Original Original Original One One Original
. Original Original
- original One Ori_ginal
. Original One One Original Original One One One One One One Original Original*
One One One One Original One Original
- One One Original
- 17. 2-vi Amendment Two 4-21-76
-...J.
N I
N
~ §'
I. (l)
C.
I 3
-...J (1)
O'\\ ::,
rT t
0
/
TABLE 17.2.0 CONFORMANCE OF VEPCO OPERATIONAL QUALITY ASSURANCE PROGRAM TO QUALITY ASSURANCE STANDARDS, REQU_I REMENTS AND GU I DES Standard, Requirement of Guide Regulatory Guide ).8 *- Personnel Sel~ction and Training (3/71)
Regulatory Guide 1.30 - Quality Assurance Requirements for the lnstal lat ion,. Inspection, and Testing of Instrumentation and Electric Equipment (8/72)
Regulatory Guide 1.33 - Quality Assurance Program Requirements (Operation)
(11/72)
Regulatory Gulde J,37 - Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-cooled Nuclear Power Reactors (3/73)
Regulatory Guide 1.38 - Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-cooled Nuclear Power Plants (3/73)
Regulatory Guide 1.39 - Ho~sekeeping Require-ments for Water-cooled Nuclear Power Plants
('2/73)
Regulatory Guid~ 1.58 - Qualification of Nuclear Power Plant Inspection, Examination, and Testing Personnel (8/73)
Regulatory Guide 1.64 - Quality Assurance Requirements for the Design of Nuclear Power Plants (10/73)'
I Conformance Status Conforms Cor;iforms
.Conforms Conforms as clarified in ANSI N45,2,1-1973 discussed be 1 ow Conforms as clarified* in ANSI. N45,2,2-1972 discussed below Conforms Alternative Conforms as Applicable Remarks RG 1.8 in~orporates ANSI Nl8.1 - dis~ussed
.below RG 1.30 incorporates ANSI N4~2.4 - 1972 -
discussed below e
- RG 1,33 incorporates ANSI N18,7 - 1972 and ANSI N45,2-1971 - discussed below RG 1,37 incorporates ANSI N45,2,J-1973 for both construction and operation - discusied below RG 1,38 Incorporates ANSI N45,2.2-1972 for both construction and operation - discussed below RG l.39 incorporates ANSI. N45,2,3-1973 e both construction and operat,i*on - discussed below.
RG 1,58 incorporates ANSI N4S.2.6-1973 for both construction and operation - discussed below.
Operational/function testing personne 1 meet the requirements of ANS I- *
- N 18. 1-1971
- RG 1.64 incorporates ANSI N45,2.11 (Draft 3, Rev *. 1, 7/73)- discussed below
N I
w Standard, Requirement or Guide Regulatory Guide 1.68 - Preoperational and Initial Startup Test Programs for Water-cooled Power Reactors (11/73)
Regulatory Guide 1.74 - Quality Assurance Terms and Definitions (2/74)
Regulatory Guide l.83 - lnservice Inspection of Pressurized Water Reactor Steam Generator Tubes (6/74)
Regulatory Guide 1.88 - Collection, Storage, and Maintenance of Nuclear Power Plant Qua 1 i ty Assurance Records*
(8/74)
ANSI N18. 1 - Proposed Standard for Selection and Training of Personnel for Nuclear Power*
Plants
{dated June 22, 1970)
ANSI N18.7 - 1972 - Administrative Controls for Nuclear Power
§"
ANSI N45.2-1971 - Quality Assurance Program
.i:-~
Requirements for Nuclear *Power Plants I a.
N3 "j"~
ANSI N45,2*. 1-1973 - _Cleaning of Fluid Systems
~rt and Associated Compo'nents during the i Construction Phase of Nuclear Power Plants ANSI N45.2,2-1972 - Packaging, Shipping, Receiving, Storage, and Handling *of Items for Nuclear_ Power Plants during the Construction Phase Conformance Status A 1 ternat ive.
Conforms Conforms Conforms Conforms Conforms Conforms Conforms as Applicable See also note (1)
Conforms as App 1 i c.ab 1 e See also note (1)
R_e_m_a_r_ks ____ __..\\--,*----
Details of conformance are* descri-b.ed in Chapters 3A and 14 of the North Anna Final Safety Analysis Report.
RG 1,74 incorporates ANSI N45.2,10 - 1973-discussed below e
RG 1.88 incorporates ANSI N45,2,9 discussed below 1974 VEPC0 1s program conforms to ANSI N18. 1 - 1971 rather than to the draft version referenced in RG 1
- 8 VEPC0 1s program meets this standard, as~
applicable to the Operational Phase
'11111111' VEPC0 1s program meets this standard, as applicable to _the Operational Phase
I
-...j.
l>
3
.:,,- (l) t N a.
_, 3 I
(l)
O'\\,;,*
t Standard, Requirement or Guide ANSI N45.2.3-1973 - Housekeeping during the Construction Phase of Nuclear Power P.Jants ANSI N45.2.4-1972 - Installation, Inspection, and Testing Requirements for Instrumentation and. Electrical Equipment during the Con-struction of Nuclear Power Generating Stations ANSI N45.2.6-1973 - Qualification of Inspection Examination, and Testing Personnel for the Construction Phase of Nuclear Power Plants ANSl N45.2.9 - Supplementary Quality Assurance.
Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems for the Construction Phase of Nuclear*
Power Plants (Ora.ft 3, Rev. 2, 9/73)
ANSI N45.2.9~1974 - Requirements for Collection, Storage, and Maintenance of Quality Assurance Records for Nuclear Power Plants ANSI N45.2.10-1973 - Quality Assurance Terms and Definitions ANS I N45*. 2. 11 - Qua 1 i ty Assurance Requirements for the Design of Nuclear Power Plants (Draft 3, Rev.
- 1. 7/73)
WASH-1284 - Guidance on Quality Assurance during the Operations Phase of Nuclear Power
.Plants (Orange Book)
(10/73)
Conformance Status Conforms as Applicable Conforms as App 1 i cab le Alternative Conforms as Applicable Conforms Conforms Conforms as Applicable
'conforms as c]anified in above listings.
R_e_m_a_r __ ks _____ ~,_-. __ _
VEPCO's program meets this standar.d, as appl icab]e to the Openational Phase VEPCO's program meets this standard, as applicable to the Operational phase VEPCO's program meets this stand~rd for~e Operational Phase, except operationa~/ ~
function testing personnel meet the re-quirements of ANSI N18. 1-1971. Only QA/QC personnel are qualified to this standard.
NOE personnel are qualified to SNT-TC-IA.
- VEPCO's program meets this standard, as applicable to the Operational Phase and referenced by WASH-1284 {Orange B.ook)
See also note (2)
Some Definitions.used by Vepco are word-differently than those in this standard; however., the genera 1 meanings are the same VEPCO's program conforms to ANSI N45.2.11-1974 as applicable to the Operational Phase, rather than to the draft version reference*
in RG. 1
- 64
- 1.
N
. I V,
~
(I>
-=- :,
I 0..
Standard, Requirement or Guide WASH-1309 - Guidance on Quality Assurance.
Requirements during the Construction Phase of Nuclear Power Plants (Green Book)
(S-74)
WASH-1283, Rev. 1 - Guidance on Quality Assurance Requirements during Design and Procurement Phase of Nuclear Power Plants (Gray Book)
(5/74) 10CFR50, Appendix B - Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants 10CFR50.55a - Licensing of Production and Utilization Facilities-. 1.nservice inspection require~ents Conformance Status Conforms as Applicable and clarified in above 1 is tings Conforms as Applicable and clarified in above 1 is tings.
Conforms Conforms
~---.~.\\
Remarks VEPC0 1s program meets this guidance, as applicable to the Operational Phase VEPC0 1s program meets this guidance, as applicable to the Operational Phase r
~ ~ Note (1)
- Only QA/QC personnel are qualified to ANSI N45.2.6-1973.
NOE personnel are qualified to SNT-TC-lA
- I ::,
....... r-t O'\\?
Note. (2)
- Surry Units 1 and 2 will conform by Jan~ary 1977.
North Anna Units 1 :and 2 will conform six months after commercial operation of Unit No. 2.