UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 8, 2019 MEMORANDUM TO: Jacob I. Zimmerman, Chief Fuel Facility Licensing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards FROM: Osiris Siurano-Perez, Project Manager /RA/
Fuel Facility Licensing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards
SUBJECT:
MARCH 6, 2019, TELEPHONE CALL
SUMMARY
- GENERAL ELECTRIC-HITACHI, VALLECITOS NUCLEAR CENTER, CHANGES TO PHYSICAL SECURITY PLAN On March 6, 2019, the U.S. Nuclear Regulatory Commission staff held a conference call with staff from General Electric-Hitachi, Vallecitos Nuclear Center (VNC) to discuss upcoming submittals regarding changes to the VNCs site physical security plan. I am enclosing the telephone summary for your use. The summary contains no proprietary, security-related, or classified information.
The licensee has reviewed this summary for factual correctness.
Enclosure:
Telephone Conference Summary cc: S. Murray, General Electric-Hitachi Docket Nos.: 05000073, 07000754 License Nos.: R-33, SNM-960 CONTACT: Osiris Siurano-Perez, NMSS/FCSE (301) 415-7827
J. Zimmerman 2
SUBJECT:
MARCH 6, 2019, TELEPHONE CALL
SUMMARY
- GENERAL ELECTRIC-HITACHI, VALLECITOS NUCLEAR CENTER, CHANGES TO PHYSICAL SECURITY PLAN DATE: April 08, 2019 DISTRIBUTION:
FCSE r/f JGroom, RIV DHardesty, NRR DHolman, RIV WKennedy, NRR AMendiola, NRR EReed, NRR ARivera, NSIR RStone, NSIR Accession Number: ML19093B339 OFFICE FCSE/FFLB FCSE/FFLB FCSE/FFLB NAME OSiurano TBrockington JZimmerman DATE 4/3/19 4/4/19 4/08/19 OFFICIAL RECORD COPY
Telephone Conference Call Summary GENERAL ELECTRIC-HITACHI, VALLECITOS NUCLEAR CENTER CHANGES TO PHYSICAL SECURITY PLAN Date and Time: March 6, 2019; 11:00 A.M.
Call
Participants:
U.S. Nuclear Regulatory Commission:
D. Hardesty, NRR E. Reed, NRR O. Siurano-Perez, NMSS R. Stone, NSIR J. Zimmerman, NMSS General Electric-Hitachi:
Michelle Catts Steve Cavanaugh Matt Feyrer Diana Hart Dave Heckman Wade Mattox Scott Murray Jeff Smyly Summary of discussion:
On March 6, 2019, U.S. Nuclear Regulatory Commission (NRC) staff held a conference call with representatives from the General Electric-Hitachi, Vallecitos Nuclear Center (VNC) to discuss upcoming changes to its NRC-approved site physical security plan (PSP) and associated license amendment requests. The PSP covers both the Title 10 of the Code of Federal Regulations (10 CFR) Part 50 activities conducted under its Amended Facility License Number R-33 for the Nuclear Test Reactor, and the 10 CFR Part 70 activities conducted under special nuclear material license number 960 (SNM-960). The VNC representatives provided a brief description of the proposed changes and noted that these were determined to not decrease the effectiveness of the PSP. A description of the changes, and a revised PSP incorporating the changes will be submitted to the NRC in accordance with 10 CFR 50.54(p)(2) and 70.32(e).
The VNC representatives stated that license amendments will be submitted to modify condition 2.C(3) of the R-33 license, and safeguards condition SG-1.1 of the SNM-960 license to clarify that the VNC can make changes to the PSP without prior Commission approval in accordance with 10 CFR Sections 50.54 and 70.32, respectively.
Action item:
The licensee will submit the PSP changes and license amendment requests before the end of March 2019.
Enclosure