MONTHYEARML24302A1762024-10-22022 October 2024 Core Operating Limits Report Surry 2 Cycle 33 Pattern Hot Revision 0 ML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 And Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 2024-09-03
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARML20304A2032020-10-0808 October 2020 Readiness Notification for 95001 Supplemental Inspection Notice of Violation: EA-20-057 ML20244A2832020-08-28028 August 2020 Reply to Notice of Violation; EA-20-057 ML1112300532011-05-0202 May 2011 Reply to a Notice of Violation EA-10-255, NRC Inspection Report No. 50-280/2011-012 and 50-281/2011-012, NRC Office of Investigations Report 2-2010-029 and Notice of Violation ML0623600122006-08-22022 August 2006 NRC Inspection Nos. 50/280/2006-010 & 05-281/2006-010, Reply to Notice of Violation ML0202901912002-01-18018 January 2002 Reply to a Notice of Violation NRC IR 05000280/2001-006 & 05000281/2001-006 ML19093A9191978-07-26026 July 1978 Response to a Letter of 07/12/1978, in Reference to Inspection Conducted on 05/16-19/1978, 05/22-26/1978, 06/21-23/1978 & Reported in IE Inspection Report Nos. 05000280/1978016 & 05000281/1978016 ML19093A9331978-04-11011 April 1978 Response to a Letter of 03/20/1978, in Reference to Inspection Conducted on 01/20/1978 & 01-24-25/1978 & Reported in IE Inspection Report Nos. 05000280/1978004 & 05000281/1978004 ML19093A9341978-04-11011 April 1978 Response to a Letter of 03/20/1978, in Reference to Inspection Conducted on 01/20/1978 & 01/24-25/1978 & Reported in IE Inspection Report Nos. 05000280/1978004 & 05000281/1978004 ML19093A9381978-03-22022 March 1978 Response to a Letter of 02/28/1978 in Reference to the Inspection Conducted on 01/16-20/1978 & 01/24/1978 and Reported in Inspection Reports IE-05000280/1978002 & 05000281/1978002 ML19093A9411978-03-10010 March 1978 Response to a Letter of 02/21/1978 in Reference to the Inspection Conducted on 0812/20-21/1977, 01/10-13/1978, 01/16-19/1978 & 01/25/1978 and Reported in Inspection Reports IE-05000280/1978001 & 05000281/1978001 ML19093A4041978-02-0707 February 1978 Response to Letter of 11/11/1977 in Reference to Inspection Conducted on 10/04-10/07/1977 and Reported in IE Inspection Report Nos. 05000280/1977029 & 05000281/1977029 ML19093A3911978-01-24024 January 1978 Response of Letter of 01/10/1978 in Reference to Inspection Conducted on 11/29-12/02/1977 and Reported in Inspection Report Nos. 05000280/1977035 & 05000281/1977035 ML19093A3991977-12-30030 December 1977 Response to Letter of 12/07/1977 in Reference to the Inspection Conducted on 10/25-10/28/1977 and Reported in I.E. Inspection Reports 05000280/1977031 & 05000281/1977031 ML19093A4071977-12-21021 December 1977 Response to a Letter of 11/11/1977 in Reference to Inspection Conducted on 10/04-10/07/1976 and Reported in IE Inspection Report Nos. 05000280/1977029 & 05000281/1977029 ML19093A3951977-12-14014 December 1977 Response to a Letter of 12/01/1977 in Reference to Inspection Conducted on 11/01-11/04/1977 and Reported in Inspection Report No. 05000280/1977033 & 05000281/1977033 ML19093A4081977-12-0606 December 1977 Response to a Letter of 11/11/1977 in Reference to the Inspection Conducted on 10/04-10/07/1977 and Reported in IE Inspection Reports 05000280/1977029 & 05000281/1977029 ML19093A4101977-11-30030 November 1977 Response to a Letter of 11/03/1977 in Reference to Inspection Conducted on 09/19-09/23/1977 and Reported in I.E. Inspection Reports 05000280/1977027 & 05000281/1977027 ML19093A4141977-11-0404 November 1977 Response to a Letter of 10/20/1977 in Reference to Inspection Conducted on 09/14-09/16/1977 and Reported in Inspection Reports IE 05000280/1977026 & 05000281/1977026 ML19093A4181977-10-25025 October 1977 Response to Letter of 09/27/1977 in Reference to Inspection Conducted on 08/08-08/12/1977 and Reported in IE Inspection Reports 0500280/1977022 & 05000281/1977022 ML19093A3891977-10-21021 October 1977 Response to a Letter of 09/28/1977 in Reference to Inspection Conducted on 08/30-09/02/1977 and Reported in Inspection Reports I.E. 05000280/1977024 & 05000281/1977024 ML19093A4151977-09-15015 September 1977 Response to Letter of 09/01/1977 in Reference to Inspection Conducted on 08/18-08/21/1977 and Reported in Inspection Reports IE 05000280/1977023 & 05000281/1977023 ML19093A4191977-09-0707 September 1977 Response to a Letter of 08/17/1977 in Reference to the Inspection Conducted on 08/04-08/08/1977 and Reported in Inspection Reports IE-05000280/1977021 & 05000281/1977021 ML19093A4351977-08-0101 August 1977 Reply to Letter of 07/12/4977, Concerning the Inspection of Vepco'S Surry Power Station Security Program on 05/04-05/05, 05/12-05/13, 05/23-05/26/1977 ML19093A3881977-07-15015 July 1977 Response to Letter of 06/28/1977 in Reference to Inspection Conducted on 05/24/1977 and Reported in Inspection Reports IE 05000280/1977010 & 05000281/1977010 ML19093A4511977-03-0404 March 1977 Response to a Letter of 02/25/1977 in Reference to Inspection Conducted on 01/25-01/28/1977 and Reported in Inspection Reports IE 05000280/1977002 & 05000281/1977002 2020-08-28
[Table view] |
Text
e VI:B.GUUA ELECTRIC A...~D POWER COMPA..."'f'Y RIClOIOND, V1"RGINIA. 23261 April 11, 1978 Mr. James P. O'Reilly 7 Director Seri.al No. 157/032078 Office* of Inspectiou atld Enforceaeut FO&M/DL.B: d.a.s U. s. Nuclear Regulato-ry Camais-eion Docket jos. 50-280 B.egiou !I - Suite 818 50-281 230 Peachtree Street License Nos. DPR-32 Atlanta, Georgia 3030.3 :UPB.-37
Dear Mr. 0 1 3.eilly:
We have reviewed your"*'1e*tear of.Y..arch "20~. I9'18 in -re:f*erence* to the inspection cotlducted at Surry Power Statiou ou Jamary 20 and 24-25, 1978 and rB1'orted ill IE ID.Speetion Report Noe. 50-280/78-4 and 50-281/78-4. Our respouae to tha s;iecific infraction is attached.
We have deter:mined that; no p-ropri.etary information is, contained in the reports.
Accordi.:lgl.y > the Virginia Electric and Power ~.any interposes no obj ecticu ta these reports being inada a mat.tar of publie disclosure.
e
.. / - -_: ) -) ,. - - ,.* ,* -
/ I J
I ".* ;f *"; l*'-'"J..J--
~', -* ./ ,.._""'"
C. ~. Stal J :invs 0 V+/-ee, P:'esident: - Power S1..1)ply aad Production Operatious Atuu:bment.
cc: Mr. Albert Schwencer j ti/:;; --
.;_-,: ~::-.;
- ,;i ~
\_n
~II \ I .
__J
L e
RESPONSE TO INFRACTION
- NRC COMMENT LISTED IN IE INSPECTION REPORT NOS. 50-280/78-4 A...~'D 50-281/78-4 Based on the results of the NRC investigation conducted on January 20 and 24-25, 1978, it appears that certain of your activities were not conducted in full compliance with NRC regulations and License conditions as indicated below.
These items have been categorized. as described in our correspondence to you dated December 31s 1974.
Criterion IX of Appendix B to 10 CFR 50, as implemented by Vepco Topical Report Quality Assurance Program Operations Phase VEP-1-A, Section 17.2.9, requires, in part, that measures shall be established to assure that special processes, including welding, ....* are control-led and accomplished by qualified. personnel ***.**
Contrary to the above requirement, welding operations were performed by nonqualified personnel during welding of the diaphragm. to body seal weld on the Reactor Building Spray Cooler for Unit No. 2 (Cooler No. 2-RS-E-lB) on November 21, 1977.
This is. an infraction.
RESPONSE
e The infraction listed above is correct as stated.
- 1. Corrective steps which have been taken and results achieved.
The investigations, review and conclusions of an independent VEPCO investigating. team substantiated the allegation (infraction) as stated. The conclusions of the VEPCO team and the Region II investigations, aft,ar review of safety implications, reveal, "The
-quality of the weld has no safety implications.II
- II. Corrective steps which will be taken to avoid further non-compliance.
The following corrective steps. have been implemented and should pre-clude non-compliance at a later data.
(A) All Surry Power Station welders have been instructed/reinstructed in the use of the following:
(1) The methodology to use in interpreting the station welder qualification matrix (chart) which is available to all welders and is presently installed in Foreman's office.
(_2) Co.rporate/Station administractive policies concerning welding and the conduct of business in the welding discipline as it is applied at Surry Power Station.
_r
-~
e e (3) All welders have attended a general welder training session which was conducted to clarify possible misunderstood or m~sinterpreted areas on how business is to be conducted in these areas.
III. The date when fu~l compliance will be achieved.
Full compliance has been achieved.