ML19092A345

From kanterella
Jump to navigation Jump to search
IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
ML19092A345
Person / Time
Issue date: 05/16/2019
From: Jeffrey Bream
NRC/NRR/DIRS/IRIB
To:
Bream J, 610-337-5212
Shared Package
ML19086A275 List:
References
CN 19-015
Download: ML19092A345 (3)


Text

Issue Date: 05/16/19 1

60855.1 NRC INSPECTION MANUAL IRIB INSPECTION PROCEDURE 60855.1 OPERATION OF AN INDEPENDENT SPENT FUEL STORAGE INSTALLATION AT OPERATING PLANTS PROGRAM APPLICABILITY:

IMC 2515 C 60855.1-01 INSPECTION OBJECTIVE To provide for NRR funding for those portions of IP 60855, Operation of an Independent Spent Fuel Storage Installation, that are applicable to an operating nuclear power plant.

60855.1-02 INSPECTION REQUIREMENTS The following are the prioritized sections from IP 60855 that are to be performed at operating plants:

02.02 Review changes made to the programs and procedures listed below since the last inspection (they may have been reviewed last in Section 02.06 of IP 60854.1) to verify that changes made were consistent with the license or Certificate of Compliance (CoC) and did not reduce the effectiveness of the program. Verify that these procedures still fulfill the commitments and requirements specified in the Safety Analysis Report (SAR),

Safety Evaluation Report (SER), CoC, 10 CFR Part 72, the site-specific license and TS as applicable, any related 10 CFR 50.59 and 72.48 evaluations, and 10 CFR 72.212(b) evaluations for general licensed independent spent fuel storage installations (ISFSIs).

a.

Plant Operations

b.

Radwaste Storage and Handling

c.

Control of Heavy Loads

d.

Radiation Protection

e.

Security and Safeguards

f.

Emergency Preparedness

g.

Maintenance

h.

Surveillance

i.

Fire Protection

Issue Date: 05/16/19 2

60855.1

j.

Training

k.

Environmental Monitoring

l.

Quality Assurance Activities; and

m.

Administrative Procedures 02.04 Verify, by direct observation of selected activities and independent evaluation, that the licensee has performed either loading or unloading, as applicable, in a safe manner and in compliance with approved procedures.

02.05 Verify, by direct observations or review of selected records, that the licensee has identified each fuel assembly placed in the ISFSI, has recorded the parameters and characteristics of each fuel assembly, and has maintained a record of each fuel assembly as a controlled document.

60855.1-03 INSPECTION GUIDANCE Guidance is located in IP 60855 for applicable sections.

60855.1-04 INSPECTION RESOURCES Starting in FY 2004 (to account for NRR funding), this IP should be used in time reporting IP 60855 inspections at operating plants. Estimated hours for the above prioritized sections are:

Initial Inspection New ISFSI, General Licensee Initial Inspection New ISFSI, Site Specific Licensee Repeat Loadings 134 134 100 60855.1-05 REFERENCES Boger / Brach memorandum dated February 20, 2002, Response to Regional Input on ISFSI Resources, Table 1, lists the prioritized ISFSI IP sections required to be performed at operating plants and the estimated resources for these sections.

IMC 2515 Appendix C, Special and Infrequently Performed Inspections END

Issue Date: 05/16/19 A1-1 60855.1 Revision History for IP 60855.1 Commitment Tracking Number Accession Number Issue Date Change Notice Description of Change Description of Training Required and Completion Date Comment Resolution and Closed Feedback Form Accession Number (Pre-Decisional, Non-Public Information)

N/A 06/27/06 Revision history reviewed for the last four years.

N/A N/A N/A ML062440146 09/05/06 CN 06-022 IP 60855.1 is revised to correct the steps to be funded by NRR.

None Not necessary because the revision makes the IP 60855.1 consistent with guidance being implemented by regions.

N/A ML19092A345 05/16/19 Cn 19-015 Periodic review of procedure. No substantive revision to this procedure was wanted at this time.

None N/A