CNRO-2019-00006, Stations - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) - Entergy Nuclear Operations, Inc
| ML19087A276 | |
| Person / Time | |
|---|---|
| Site: | Indian Point, Pilgrim, Vermont Yankee, Big Rock Point |
| Issue date: | 03/28/2019 |
| From: | Halter M Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| CNRO-2019-00006 | |
| Download: ML19087A276 (13) | |
Text
Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Tel 601-368-5573 Mandy K. Halter Director, Nuclear Licensing 10 CFR 50.82(a)(8)(vii)
CNRO-2019-00006 March 28, 2019 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 205555-0001
SUBJECT:
Status of Funding for Managing Irradiated Fuel For Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) - Entergy Nuclear Operations, Inc.
Big Rock Point Docket No. 50-155 License No. DPR-6 Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Vermont Yankee Docket No. 50-271 License No. DPR-28 Indian Point Nuclear Generating Station 1 Docket No.50-003 License No. DPR-5
Dear Sir or Madam:
10 CFR 50.82(a)(8)(vii) requires that after submitting its site-specific decommissioning cost estimate pursuant to 10 CFR 50.82(a)(4)(i), a licensee must annually submit to the NRC, by March 31, a report on the status of its funding for managing irradiated fuel. On behalf of Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Palisades, LLC, Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Generation Company, LLC, Entergy Nuclear Operations, Inc. hereby submits the information required for Indian Point 1, Big Rock Point, Vermont Yankee, and Pilgrim.1 All or most of the spent fuel mananagement costs are a liability of the U.S. Government as a result of its breach of the spent fuel disposal contract. However, this report takes no credit for recoveries on that liability.
1 In January 2019, Entergy Nuclear Vermont Yankee, LLC was acquired by NorthStar Nuclear Decommissioning Company, LLC, and after the acquisition, Entergy Nuclear Operations, Inc. (ENOI) was no longer the Licensee for Vermont Yankee. ENOI is submitting this report pertaining to Vermont Yankee because as of December 31, 2018, ENOI was the Licensee for the plant. Following the acquisition, ENOI is no longer responsible for Vermont Yankee decommissioning plans.
CNRO-2019-00006 Page 2 of 3 There are no new commitments made in this letter. If you have any questions, please contact me at 601-368-5573.
Respectfully, MKH/LJS/gpn Attachments: 1. Entergy Nuclear Operations, Inc. Status of Funding for Managing Irradiated Fuel - Indian Point 1, for Year Ending December 31, 2018 -
- 2. Entergy Nuclear Operations, Inc. Status of Funding for Managing Irradiated Fuel - Big Rock Point, for Year Ending December 31, 2018 -
- 3. Entergy Nuclear Operations, Inc. Status of Funding for Managing Irradiated Fuel - Vermont Yankee, for Year Ending December 31, 2018 -
- 4. Entergy Nuclear Operations, Inc. Status of Funding for Managing Irradiated Fuel - Pilgrim, for Year Ending December 31, 2018 -
CNRO-2019-00006 Page 3 of 3 cc:
USNRC Regional Administrator, Region I USNRC Regional Administrator, Region III USNRC Project Manager, Indian Point 1 USNRC Project Manager, Indian Point 2 USNRC Project Manager, Indian Point 3 USNRC Project Manager, Big Rock Point USNRC Project Manager, Palisades USNRC Project Manager, Pilgrim USNRC Project Manager, Vermont Yankee USNRC Resident Inspector, Indian Point 2 USNRC Resident Inspector, Indian Point 3 USNRC Resident Inspector, Palisades USNRC Resident Inspector, Pilgrim Michigan Department of Environmental Quality Michigan Public Service Commission NYS Department of Public Service Vermont Department of Public Service Massachusetts Department of Public Utilities
CNRO-2019-00006 Page 1 of 1 Entergy Nuclear Operations, Inc.
Status of Funding for Managing Irradiated Fuel - Indian Point 1 For Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii)
Plant Name: Indian Point Nuclear Generating Unit No. 1
- 1. Funds accumulated to cover the cost of managing irradiated fuel as of 12/31/2018
$205.02 million
[Note 1]
- 2. Projected costs to manage fuel until DOE removal (2018$)
$54.96 million
- 3.
Plan as required See Note 2 Note 1: This amount represents the excess funds available in the Unit 1 decommissioning trust fund less an amount necessary to decommission the Independent Spent Fuel Storage Installation (ISFSI). Per Unit 1s updated decommissioning cost analysis, the present value (2018$) of excess funds in Unit 1s decommissioning trust at the end of decommissioning in 2073, after considering license termination expenses, is $206.7 million
($602.07 million/(1.02)^(2073-2019)). See Ending DTF Balance for 2073, Table 12-1, Decommissioning Funding Status Report per 10 CFR §50.75(f)(1) and 10 CFR 50.82(a)(8)(v) -- Entergy Nuclear Operations, Inc., filed March 2019 (Reference 1). The estimated cost for decommissioning Indian Point 1 and 2s share of the site ISFSI is $10.14 million. Of the 30 casks from Indian Point 1 and 2 on the ISFSI, 5 are attributable to Unit 1, or 16.7%. Unit 1s share of ISFSI decommissioning cost is calculated as 16.7% x $10.14 million, or $1.7 million. Thus, the present value of Unit 1 trust funds available for spent fuel management is $206.7 million minus $1.7 million, or $205 million. For purposes of this report only, Indian Point 1 trust funds are being considered separately from Indian Point 2 trust funds; however, both funds are covered by a single trust agreement, and will likely be handled together upon decommissioning.
Note 2: The excess currently existing in Unit 1s decommissioning trust is sufficient to cover the estimated costs of spent fuel management and ISFSI decommissioning. See Reference 1, 2. The licensee acknowledges the need for an exemption pursuant to 10 CFR §50.12(a) to use radiological decommissioning trust funds for costs other than decommissioning activities as defined in 10 CFR 50.2.
Reference:
- 1.
Letter, Entergy Nuclear Operations, Inc. to USNRC, Decommissioning Funding Status Report per 10 CFR §50.75(f)(1) and 10 CFR 50.82(a)(8)(v) -- Entergy Nuclear Operations, Inc., CNRO-2019-00005, dated March 2019
CNRO-2019-00006 Page 1 of 1 Entergy Nuclear Operations, Inc.
Status of Funding for Managing Irradiated Fuel - Big Rock Point For Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii)
Plant Name: Big Rock Point
- 1. Funds accumulated to cover the cost of managing irradiated fuel as of 12/31/2018 See Note 1
- 2. Projected costs to manage fuel until DOE removal (2018$)
$47.89 millionNote 2
- 3.
Plan as required See Note 1 Note 1: Spent fuel management costs have been paid for out of Entergy Nuclear Palisades, LLC operating funds since Big Rock Point was acquired from Consumers Energy on April 11, 2007. Entergy Nuclear Palisades, LLC plans to continue paying for spent fuel management costs from said operating funds. Therefore, no funds are specifically accumulated for the cost of managing irradiated fuel at Big Rock Point as of 12/31/2018.
Note 2: Projected costs to manage fuel until DOE removal computed using an assumed date of the completion of fuel removal from site of 2039.
CNRO-2019-00006 Page 1 of 4 Entergy Nuclear Operations, Inc.
Status of Funding for Managing Irradiated Fuel - Vermont Yankee For Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii)
Plant Name: Vermont Yankee2
- 1. Funds accumulated to cover the cost of managing irradiated fuel as of 12/31/2018
$195.58 million
[Note 1]
- 2. Projected costs to manage fuel until DOE removal (see Table 13-1 in Reference 2)
$148.20 million
- 3.
Plan as required See Note 2 Note 1: This amount represents the excess funds that were projected to be available as of December 31, 2018 in the Vermont Yankee decommissioning trust fund less an amount necessary to decommission the Independent Spent Fuel Storage Installation (ISFSI). Per Vermont Yankees site-specific decommissioning cost estimate (Reference 1), the present value of excess funds in the decommissioning trust at the end of decommissioning in 2075, after considering license termination expenses, would be $202.14 million ($612.71 million/(1.02)^(2075-2019)). See Table 3-1 below. Table 3-1 has been constructed by removing spent fuel management expenses from Table 13-1, Decommissioning Funding Status Report per 10 CFR §50.75(f)(1) and 10 CFR 50.82(a)(8)(v) -- Entergy Nuclear Operations, Inc. filed March 2019 (Reference 2), to yield the surplus at the end of decommissioning that would otherwise be available for spent fuel management and ISFSI decommissioning. This calculated surplus takes into account available funds in the decommissioning trust. The estimated cost for decommissioning Vermont Yankees ISFSI is $6.56 million. Thus, the present value of Vermont Yankee trust funds available for spent fuel management as of December 31, 2018 was $202.14 million minus $6.56 million, or
$195.58 million. Table 13-1 in Reference 2 demonstrates the adequacy of the excess funds to cover the spent fuel management costs.
Note 2: Attachment 13 of Reference 2 demonstrates that the Vermont Yankee decommissioning trust fund is sufficiently funded for all license termination activities and certain spent fuel management activities (i.e., operational costs, shown in Col. 2 of Table 13-1 of Reference 2, totaling approximately $148.2 million), and reflects completion of the transfer to dry fuel storage in 2018. As discussed in the Irradiated Fuel Management Program Update (Reference 3) costs related to spent fuel management operations (e.g., operations and maintenance costs for the spent fuel and Independent Spent Fuel Storage Installation) will be funded from the decommissioning trust fund. Entergy Nuclear Operations, Inc. obtained an exemption that allows the use of trust funds for spent fuel management activities (Reference 4). As of December 31, 2018, the dry fuel storage campaign at Vermont Yankee was completed, and no further costs associated with loading to dry fuel storage are forecasted.
2 In January 2019, Entergy Nuclear Vermont Yankee, LLC was acquired by NorthStar Nuclear Decommissioning Company, LLC, and after the acquisition, Entergy Nuclear Operations, Inc. (ENOI) was no longer the Licensee for Vermont Yankee. ENOI is submitting this report pertaining to Vermont Yankee because as of December 31, 2018, ENOI was the Licensee for the plant. Following the acquisition, ENOI is no longer responsible for Vermont Yankee decommissioning plans.
CNRO-2019-00006 Page 2 of 4 Entergy Nuclear Operations, Inc.
Status of Funding for Managing Irradiated Fuel - Vermont Yankee For Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii)
Table 3-1 Vermont Yankee Nuclear Power Station - SAFSTOR Methodology Annual Cash Flow Analysis - Total License Termination (InThousandsin2018Dollars)
Year Column 1 50.75 License Termination Cost ($000s)
Column 2 50.54 (bb)
Spent Fuel Management Cost ($000s)
Column 3 Exclude Dry Fuel Spent Fuel Management Cost ($000s)
Column 4 License Termination Cost plus Spent Fuel Management Cost less Dry Fuel Cost
($000s)
Column 5 Beginning of Year Trust Fund Balance
($000s)
Column 6 Withdraw
($000s)
Column 7 Contribute
($000s)
Column 8 Trust Fund Earnings
($000s)
Column 9 Year Ending Trust Fund Balance
($000s) 2019 5,727
5,727 498,432 5,727 0
9,854 502,559 2020 5,672
5,672 502,559 5,672 0
9,938 506,825 2021 5,672
5,672 506,825 5,672 0
10,023 511,176 2022 3,963
3,963 511,176 3,963 0
10,144 517,358 2023 3,963
3,963 517,358 3,963 0
10,268 523,663 2024 3,963
3,963 523,663 3,963 0
10,394 530,094 2025 3,898
3,898 530,094 3,898 0
10,524 536,721 2026 4,055
4,055 536,721 4,055 0
10,653 543,319 2027 4,110
4,110 543,319 4,110 0
10,784 549,993 2028 4,064
4,064 549,993 4,064 0
10,919 556,847 2029 4,055
4,055 556,847 4,055 0
11,056 563,848 2030 4,110
4,110 563,848 4,110 0
11,195 570,933 2031 4,055
4,055 570,933 4,055 0
11,338 578,215 2032 4,064
4,064 578,215 4,064 0
11,483 585,634 2033 4,110
4,110 585,634 4,110 0
11,630 593,154 2034 4,055
4,055 593,154 4,055 0
11,782 600,881 2035 4,055
4,055 600,881 4,055 0
11,937 608,763 2036 4,120
4,120 608,763 4,120 0
12,093 616,735 2037 4,055
4,055 616,735 4,055 0
12,254 624,934 2038 4,055
4,055 624,934 4,055 0
12,418 633,297 2039 4,110
4,110 633,297 4,110 0
12,584 641,770 2040 4,064
4,064 641,770 4,064 0
12,754 650,460 2041 4,055
4,055 650,460 4,055 0
12,928 659,333 2042 4,110
4,110 659,333 4,110 0
13,104 668,327 2043 4,055
4,055 668,327 4,055 0
13,285 677,558 2044 4,064
4,064 677,558 4,064 0
13,470 686,963 2045 4,110
4,110 686,963 4,110 0
13,657 696,510 2046 4,055
4,055 696,510 4,055 0
13,849 706,304 2047 4,055
4,055 706,304 4,055 0
14,045 716,294 2048 4,120
4,120 716,294 4,120 0
14,243 726,418
CNRO-2019-00006 Page 3 of 4 Entergy Nuclear Operations, Inc.
Status of Funding for Managing Irradiated Fuel - Vermont Yankee For Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) 2049 4,055
4,055 726,418 4,055 0
14,447 736,810 2050 4,055
4,055 736,810 4,055 0
14,655 747,410 2051 4,110
4,110 747,410 4,110 0
14,866 758,166 2052 4,064
4,064 758,166 4,064 0
15,082 769,183 2053 3,889
3,889 769,183 3,889 0
15,306 780,600 2054 3,944
3,944 780,600 3,944 0
15,533 792,189 2055 3,889
3,889 792,189 3,889 0
15,766 804,066 2056 3,898
3,898 804,066 3,898 0
16,003 816,171 2057 3,944
3,944 816,171 3,944 0
16,245 828,471 2058 3,889
3,889 828,471 3,889 0
16,492 841,074 2059 3,889
3,889 841,074 3,889 0
16,744 853,928 2060 3,954
3,954 853,928 3,954 0
16,999 866,974 2061 3,889
3,889 866,974 3,889 0
17,262 880,347 2062 3,889
3,889 880,347 3,889 0
17,529 893,987 2063 3,944
3,944 893,987 3,944 0
17,801 907,843 2064 3,898
3,898 907,843 3,898 0
18,079 922,024 2065 3,889
3,889 922,024 3,889 0
18,363 936,498 2066 3,944
3,944 936,498 3,944 0
18,651 951,204 2067 3,889
3,889 951,204 3,889 0
18,946 966,262 2068 35,546
35,546 966,262 35,546 0
18,614 949,330 2069 78,735
78,735 949,330 78,735 0
17,412 888,007 2070 112,853
112,853 888,007 112,853 0
15,503 790,657 2071 91,796
91,796 790,657 91,796 0
13,977 712,838 2072 92,267
92,267 712,838 92,267 0
12,411 632,982 2073 54,739
54,739 632,982 54,739 0
11,565 589,808 2074 566
566 589,808 566 0
11,785 601,026 2075 327
327 601,026 327 0
12,014 612,714
668,374 0
0 668,374 498,432 668,374 0
782,656 612,714
CNRO-2019-00006 Page 4 of 4 Entergy Nuclear Operations, Inc.
Status of Funding for Managing Irradiated Fuel - Vermont Yankee For Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii)
References:
- 1.
Letter, Entergy Nuclear Operations, Inc. to USNRC, Post Shutdown Decommissioning Activities Report, BVY 14-078, dated December 19, 2014 (Accession No. ML14357A110)
- 2.
Letter, Entergy Nuclear Operations, Inc. to USNRC, Decommissioning Funding Status Report per 10 CFR §50.75(f)(1) and 10 CFR 50.82(a)(8)(v) -- Entergy Nuclear Operations, Inc., CNRO-2019-00005, dated March 2019
- 3.
Letter, Entergy Nuclear Operations, Inc. to USNRC, Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb), BVY14-085, dated December 19, 2014 (Accession No. ML14358A251)
- 4.
NRC Approval of Exemption Request for Spent Fuel Management, 80 Fed. Reg. 35992 (June 23, 2015)
CNRO-2019-00006 Page 1 of 4 Entergy Nuclear Operations, Inc.
Status of Funding for Managing Irradiated Fuel - Pilgrim For Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii)
Plant Name: Pilgrim Nuclear Power Station
- 1. Funds accumulated to cover the cost of managing irradiated fuel as of 12/31/2018
$379.68 million
[Note 1]
- 2. Projected costs to manage fuel until DOE removal (see Table 14-1 in Reference 2)
$420.25 million
- 4.
Plan as required See Note 2 Note 1: This amount represents the excess funds available in the Pilgrim decommissioning trust fund less an amount necessary to decommission the Independent Spent Fuel Storage Installation (ISFSI). Considering the license termination expenditures shown in Pilgirms site-specific decommissioning cost estimate (Reference 1, Table 3), and the current fund balance, the present value of excess funds in the decommissioning trust at the end of decommissioning in 2080, after considering license termination expenses, is $389.10 million ($1,302.19 million/(1.02)^(2080-2019)). See Table 4-1 below. Table 4-1 has been constructed by removing spent fuel management expenses from Table 14-1 of the Decommissioning Funding Status Report per 10 CFR §50.75(f)(1) and 10 CFR 50.82(a)(8)(v) -- Entergy Nuclear Operations, Inc. filed March 2019 (Reference 2), to yield the surplus at the end of decommissioning that would otherwise be available for spent fuel management and ISFSI decommissioning. This calculated surplus takes into account available funds in the decommissioning trust. The estimated cost for decommissioning Pilgrims ISFSI is $9.42 million. Thus, the present value of Pilgrim trust funds available for spent fuel management is $389.10 million minus $9.42 million, or $379.68 million. Table 14-1 in Reference 2 demonstrates the adequacy of the excess funds to cover the spent fuel management costs.
Note 2: Attachment 14 of Reference 2 demonstrates that the Pilgrim decommissioning trust fund is sufficiently funded for all license termination activities and certain spent fuel management activities (i.e., operational costs, shown in Col. 2 of Table 14-1 of Reference 2). As discussed in the Irradiated Fuel Management Program Update (Reference 3) costs related to spent fuel management operations (e.g., operations and maintenance costs for the spent fuel and Independent Spent Fuel Storage Installation) will be funded from the decommissioning trust fund. The licensee acknowledges the need for an exemption pursuant to 10 CFR §50.12(a) to use radiological decommissioning trust funds for costs other than decommissioning activities as defined in 10 CFR 50.2. A request for such an exemption was submitted as Reference 4.
CNRO-2019-00006 Page 2 of 4 Entergy Nuclear Operations, Inc.
Status of Funding for Managing Irradiated Fuel - Pilgrim For Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii)
Pilgrim Nulcear Power Station - SAFSTOR Methodology AnnualCashFlowAnalysisTotalLicenseTerminationOnly (InThousandsin2018Dollars)
Year Column 1 50.75 License Termination Cost (thousands)
Column 2 50.54 (bb)
Spent Fuel Management Cost (thousands)
Column 3 Exclude Dry Fuel Spent Fuel Management Cost (thousands)
Column 4 License Termination Cost plus Spent Fuel Management Cost less Dry Fuel Cost (thousands)
Column 5 Beginning of Year Trust Fund Balance (thousands)
Column 6 Withdraw (thousands)
Column 7 Contribute (thousands)
Column 8 Trust Fund Earnings (thousands)
Column 9 Year Ending Trust Fund Balance (thousands) 2019 119,166 0
119,166 1,027,714 119,166 0
18,171 926,719 2020 61,574 0
61,574 926,719 61,574 0
17,303 882,449 2021 46,032 0
46,032 882,449 46,032 0
16,728 853,145 2022 43,799 0
43,799 853,145 43,799 0
16,187 825,533 2023 14,516 0
14,516 825,533 14,516 0
16,220 827,237 2024 6,897 6,897 827,237 6,897 0
16,407 836,746 2025 6,259 6,259 836,746 6,259 0
16,610 847,097 2026 5,884 5,884 847,097 5,884 0
16,824 858,038 2027 5,884 5,884 858,038 5,884 0
17,043 869,198 2028 5,897 5,897 869,198 5,897 0
17,266 880,566 2029 5,884 5,884 880,566 5,884 0
17,494 892,176 2030 5,884 5,884 892,176 5,884 0
17,726 904,018 2031 5,884 5,884 904,018 5,884 0
17,963 916,098 2032 5,897 5,897 916,098 5,897 0
18,204 928,404 2033 5,884 5,884 928,404 5,884 0
18,450 940,971 2034 5,884 5,884 940,971 5,884 0
18,702 953,789 2035 5,884 5,884 953,789 5,884 0
18,958 966,864 2036 5,897 5,897 966,864 5,897 0
19,219 980,186 2037 5,884 5,884 980,186 5,884 0
19,486 993,788 2038 5,884 5,884 993,788 5,884 0
19,758 1,007,663 2039 5,884 5,884 1,007,663 5,884 0
20,036 1,021,815 2040 5,897 5,897 1,021,815 5,897 0
20,318 1,036,236 2041 5,884 5,884 1,036,236 5,884 0
20,607 1,050,959 2042 5,884 5,884 1,050,959 5,884 0
20,902 1,065,977 2043 5,884 5,884 1,065,977 5,884 0
21,202 1,081,295 2044 5,897 5,897 1,081,295 5,897 0
21,508 1,096,906 2045 5,884 5,884 1,096,906 5,884 0
21,820 1,112,843 2046 5,884 5,884 1,112,843 5,884 0
22,139 1,129,098 2047 5,884 5,884 1,129,098 5,884 0
22,464 1,145,679
CNRO-2019-00006 Page 3 of 4 Entergy Nuclear Operations, Inc.
Status of Funding for Managing Irradiated Fuel - Pilgrim For Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) 2048 5,897 5,897 1,145,679 5,897 0
22,796 1,162,577 2049 5,884 5,884 1,162,577 5,884 0
23,134 1,179,828 2050 5,884 5,884 1,179,828 5,884 0
23,479 1,197,423 2051 5,884 5,884 1,197,423 5,884 0
23,831 1,215,370 2052 5,897 5,897 1,215,370 5,897 0
24,189 1,233,662 2053 5,884 5,884 1,233,662 5,884 0
24,556 1,252,334 2054 5,884 5,884 1,252,334 5,884 0
24,929 1,271,380 2055 5,884 5,884 1,271,380 5,884 0
25,310 1,290,806 2056 5,897 5,897 1,290,806 5,897 0
25,698 1,310,607 2057 5,884 5,884 1,310,607 5,884 0
26,094 1,330,818 2058 5,884 5,884 1,330,818 5,884 0
26,499 1,351,433 2059 5,884 5,884 1,351,433 5,884 0
26,911 1,372,460 2060 5,897 5,897 1,372,460 5,897 0
27,331 1,393,894 2061 5,884 5,884 1,393,894 5,884 0
27,760 1,415,771 2062 5,884 5,884 1,415,771 5,884 0
28,198 1,438,085 2063 4,697 4,697 1,438,085 4,697 0
28,668 1,462,055 2064 4,710 4,710 1,462,055 4,710 0
29,147 1,486,492 2065 4,697 4,697 1,486,492 4,697 0
29,636 1,511,431 2066 4,697 4,697 1,511,431 4,697 0
30,135 1,536,868 2067 4,697 4,697 1,536,868 4,697 0
30,643 1,562,815 2068 4,710 4,710 1,562,815 4,710 0
31,162 1,589,267 2069 4,697 4,697 1,589,267 4,697 0
31,691 1,616,261 2070 4,697 4,697 1,616,261 4,697 0
32,231 1,643,795 2071 4,697 4,697 1,643,795 4,697 0
32,782 1,671,880 2072 4,710 4,710 1,671,880 4,710 0
33,343 1,700,513 2073 28,634 28,634 1,700,513 28,634 0
33,438 1,705,317 2074 61,751 61,751 1,705,317 61,751 0
32,871 1,676,437 2075 160,046 160,046 1,676,437 160,046 0
30,328 1,546,719 2076 138,344 138,344 1,546,719 138,344 0
28,168 1,436,543 2077 120,920 120,920 1,436,543 120,920 0
26,312 1,341,935 2078 96,205 96,205 1,341,935 96,205 0
24,915 1,270,645 2079 18,888 18,888 1,270,645 18,888 0
25,035 1,276,792 2080 137 137 1,276,792 137 0
25,533 1,302,188
1,187,994 0
0 1,187,994
1,187,994 0
1,462,468 1,302,188
CNRO-2019-00006 Page 4 of 4 Entergy Nuclear Operations, Inc.
Status of Funding for Managing Irradiated Fuel - Pilgrim For Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii)
References:
- 1.
Letter, Entergy Nuclear Operations, Inc. to USNRC, Post Shutdown Decommissioning Activities Report, dated November 16, 2018 (Accession No. ML18320A034)
- 2.
Letter, Entergy Nuclear Operations, Inc. to USNRC, Decommissioning Funding Status Report per 10 CFR §50.75(f)(1) and 10 CFR 50.82(a)(8)(v) -- Entergy Nuclear Operations, Inc., CNRO-2019-00005, dated March 2019
- 3.
Letter, Entergy Nuclear Operations, Inc. to USNRC, Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb), dated November 16, 2018 (Accession No. ML18320A036)
- 4.
Letter, Entergy Nuclear Operations, Inc. to USNRC, Request for Exemption from 10 CFR 50.82(a)(8)(i)(A), Pilgrim Nuclear Power Station, dated November 16, 2018 (Accession No. ML18320A037)