ML19078A289
| ML19078A289 | |
| Person / Time | |
|---|---|
| Site: | Framatome ANP Richland |
| Issue date: | 03/15/2019 |
| From: | Travis Tate Framatome |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Security and Incident Response |
| References | |
| TJT:19:012 | |
| Download: ML19078A289 (2) | |
Text
framat March 15, 2019 TJT:19:012 me U.S. Nuclear Regulatory Commission Document Control Desk Office of Nuclear Security and Incident Response 11555 Rockville Pike One White Flint North Rockville, Maryland 20852
Subject:
Submittal for Pre-Approval of Emergency Plan, Version 14.0 for Framatome Inc. Richland, WA Fuel Fabrication Facility; License No. SNM-1227; Docket No. 70-1257
Dear Sir or Madam:
Enclosed with this letter is version 14.0 of the Emergency Plan for the Framatome Inc. Fuel Fabrication Facility in Richland, WA. This revision includes one change that requires USNRC pre-approval and two changes that do not require USNRC pre-approval. The changes are summarized in the Nature of Changes section on page i of the document.
The change requiring USNRC pre-approval adjusts the time required for event classification from five minutes to fifteen minutes after observing that an emergency action level has been reached. Historically, five minutes has been too restrictive, usually resulting in event reclassification shortly after the initial classification. Fifteen minutes is consistent with the requirements at other nuclear facilities.
Technical contact information relative to the Richland site Emergency Plan is as follows:
Framatome Inc.
Attn: Jeffrey Deist Emergency Preparedness Coordinator 2101 Horn Rapids Road Richland, WA 99354 Phone:
509-375-8285 Email:
jeff.deist@framatome.com Additionally, I can be reached at 509-375-8550 or yia email at timothy.tate@framatome.com.
Very truly yours, Timothy J. Tate, Manager Environmental, H~alth, Safety & Licensing Framatome Inc.
2101 Horn Rapids Road Richland, WA 99354 Tel: (509) 375-8100 www.framatome.com f\\) 5; Jf:D 1
,A-x4S tJS ( Fe-.
J\\)1v( 5 ~
USNRC March 15, 2019 CC:
w/ enclosure USNRC, Region II Attn: Richard Gibson 245 Peach Tree Center Ave N.E. Suite 1200 Atlanta, GA 30303 USNRC, Headquarters Attn: Kevin Ramsey Two White Flint North 11545 White Flint North MS 4A 60 Rockville, MD 20852 TJT:19:012 Page2
\\