Enclosures 5 & 6: List of New Coc 1042 Amendment 1, Revision 3 Technical Specifications Changes and Justifications and List of Changes TS and UFSAR Pages
ML19058A284
Person / Time
Site: 07201042
Issue date: 02/19/2019
From:
Orano USA, TN Americas LLC
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML19058A410 List:
References
E-53166
Download: ML19058A284 (4)


Text

Enclosure 5 to E-53166 List of New CoC 1042 Amendment 1, Revision 3 Technical Specifications Table of Contents, List of Tables, and List of Figures 1.1 2.1 3.2.1 5.1.2.a 5.1.2.c.

5.1.3.1.b.iv 5.1.3.2.b.iv Table 3 Table 4 Changes and Justifications Updated As described in the response to Shielding RAI 6-18, the definition for 8LEU FUEL has been revised for clarification.

As described in the response to Materials RAI 8-1, the definition for CONTROL COMPONENTS has been modified..

The sentence "FAILED FUEL shall be stored in a failed fuel canister" was added for clarification and consistency with the definition of FAILED FUEL in Section 1.1.

As described in the response to Criticality RAI 7-5, the COMPLETION TIME associated with REQUIRED ACTION A.2.2 was changed from "24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />" to "Immediately".

As described in the response to Shielding RAI 6-7, the methodology to be used to qualify fuel considered for loading is added.

As described in Enclosure 4 Item 8.2, the dose rate limits were split into the two subsections, the existing EOS-HSM and the addition of the HSM-MX. For item iii within each subsection the term "average" was added for clarification with respect to the location stated.

As described in the response to Thermal RAI 4-2, Section 5.1.3.1.b.iv was revised to add the same concrete accident temperature limit of 500 °F with associated time limits based on the permissible duration for air vent blockage of 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> (EOS-HSM).

As described in the response to Thermal RAI 4-2, Section 5.1.3.2.b.iv was revised to add the same concrete accident temperature limit of 500 °F with associated time limits based on the permissible duration for air vent blockage of 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> (EOS-HSM-MX).

As described in Enclosure 4 Item 8.1, Table 3 was revised to reflect Co-60 equivalent activity per zone. This table previously reflected Co-60 equivalent activity per fuel assembly (FA).

As described in the response to Criticality RAI 7-1, the basket types were changed to "A4L" and "84L."

Page 1 of 1

-* ):>'

~*::

  • 7>-..

1-22 1-23 1-30 2-5 2-6 2-9 2-27 2-28 2-29 2-30 2-32 2-33 2-34 2-35 3.9.2-26 3.9.6-16 3.9.6-18 4-5 4-28 4.9.6-7 4.9.6-13 4.9.6-21 6-1 6-2 6-3 6-5 6-7 6-8 6-9 6-10 6-11 6-13 List of Changed TS and UFSAR Pages Involved in CoC 1042 Amendment 1, Revision 3

.*.*... :C.:t!;!;.l!rl(t~f Sj:>ecificadons";-~-~~f 1't]i},t 1-1 2-1 3-10 5-1 5-2 5-5 5-7 T-1 T-2 T-3

... --*,:,/.*',1 *. :~ />:.'.-:.. ;-"..

. *-~-:;~- ~-_.'"'";:_ **;*"',.

U,f:$ARPages and Drawing-Sheet$"'

'. _ ;. './,_,

A.1-22 A.4-59 A.2-6 A.4-60 A.2-7 A.4-61 A.2-8 A.4-62 A.2-10 A.4-63 A.3-5 A.4-64 A.3-6 A.4-65 A.3-7 A.4-66 A.3-9 A.4-94 A.3-13 A.4-95 A.3.9.1-3 A.4-96 A.3.9.1-5 A.4-97 A.3.9.1-7 A.4-98 A.3.9.1-9 A.4-99 A.3.9.1-10 A.4-100 A.3.9.1-11 A.4-101 A.3.9.1-12 A.4-102 A.3.9.1-13 A.4-103 A.3.9.1-14 A.4-104 A.3.9.1-16 A.4-105 A.3.9.1-17 A.4-106 A.3.9.4-1 A.4-107 A.3.9.4-5 A.4-108 A.3.9.4-8 A.4-109 A.3.9.4-9 A.4-110 A.3.9.4-11 A.4-111 A.3.9.4-12 A.4-112 A.3.9.4-13 A.4-113 A.3.9.4-15 A.4-114 A.3.9.4-16 A.6-3 A.3.9.4-17 A.6-6 A.3.9.4-20 A.6-7 Page 1 of 3 to E-53166

6-17 6-18 6-19 6-20 6-21 6-22 6-24 6-25 6-26 6-31 6-32 6-33 6-34 6-35 6-38 6-39 6-40 6-43 6-67 6-68 6-69 6-70 6-74 6-75 6-76 6-77 6-97 6-98 6-99 6-100 6-101 6-102 6-103 6-104 6-105 6-106 6-107 6-108 6-109 6-123 6-124 6-125 6-133 6-134 List of Changed TS and UFSAR Pages Involved in Coe 1042 Amendment 1, Revision 3 A.3.9.4-21 A.6-8 A.3.9.4-23 A.6-9 A.3.9.4-24 A.6-10 A.3.9.4-25 A.6-12 A.3.9.4-28 A.6-13 A.3.9.4-29 A.6-14 A.3.9.4-30 A.6-15 A.3.9.4-31 A.6-16 A.3.9.4-32 A.6-17 A.3.9.4-41 A.6-18 A.3.9.4-42 A.6-19 A.3.9.4-43 A.6-20 A.3.9.7-1 A.6-21 A.3.9.7-4 A.6-22 A.3.9.7-5 A.6-23 A.3.9.7-6 A.6-24 A.3.9.7-7 A.6-25 A.3.9.7-8 A.6-26 A.3.9.7-9 A.6-27 A.3.9.7-10 A.6-28 A.3.9.7-12 A.6-29 A.3.9.7-13 A.6-30 A.3.9.7-15 A.6-31 A.3.9.7-16 A.6-32 A.3.9.7-17 A.6-33 A.3.9.7-18 A.8-3 A.3.9.7-19 A.8-4 A.3.9.7-20 A.8-5 A.3.9.7-21 A.8-12 A.3.9.7-22 A.8-13 A.3.9.7-23 A.9-3 A.3.9.7-25 A.9-4 A.3.9.7-26 A.9-5 A.3.9.7-27 A.9-7 A.3.9.7-28 A.9-10 A.3.9.7-29 A.9-11 A.3.9.7-30 A.11-3 A.3.9.7-31 A.11-4 A.4-1 A.11-6 A.4-20 A.11-7 A.4-21 A.11-8 A.4-27 A.11-11 A.4-28 A.11-12 A.4-29 A.11-13 Page 2 of 3 to E-53166

7-1 7-15 7-24 7-119 7-120 7-121 7-122 12-7 A.1-3 List of Changed TS and UFSAR Pages Involved in Coe 1042 Amendment 1, Revision 3 A.4-30 A.11-14 A.4-31 A.11-15 A.4-32 A.11-16 A.4-33 A.11-17 A.4-34 A.11-18 A.4-35 A.11-19 A.4-36 A.11-20 A.4-37 A.11-21 A.4-51 A.11-22 Dwg MX01-5000-SAR (17 sheets)