Letter Sequence Request |
---|
EPID:L-2019-LLR-0063, Revision to Relief Requests Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor Pressure Vessel Internals and Components Inspection (Open) |
|
|
|
---|
Category:Letter type:JAFP
MONTHYEARJAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-23-0069, Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements JAFP-23-0057, and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation JAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023 Emergency Plan Document Revision JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use JAFP-23-0059, Registration of Spent Fuel Cask Use2023-10-24024 October 2023 Registration of Spent Fuel Cask Use JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0050, Physical Security Plan, Revision 242023-08-31031 August 2023 Physical Security Plan, Revision 24 JAFP-23-0047, Correction to the 2022 Annual Radioactive Effluent Release Report2023-08-30030 August 2023 Correction to the 2022 Annual Radioactive Effluent Release Report JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0043, 10 CFR 50.46 Annual Report2023-07-31031 July 2023 10 CFR 50.46 Annual Report JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation JAFP-23-0025, 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Annual Radiological Environmental Operating Report JAFP-23-0023, 2022 Annual Radioactive Effluent Release Report2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report JAFP-23-0010, 2022 REIRS Transmittal of NRC Form 52023-03-20020 March 2023 2022 REIRS Transmittal of NRC Form 5 JAFP-23-0008, Supplement to Inservice Inspection Summary Report Cycle 252023-02-22022 February 2023 Supplement to Inservice Inspection Summary Report Cycle 25 JAFP-22-0053, Inservice Inspection Summary Report Cycle 252022-12-20020 December 2022 Inservice Inspection Summary Report Cycle 25 JAFP-22-0046, Core Operating Limits Report Cycle 262022-10-17017 October 2022 Core Operating Limits Report Cycle 26 JAFP-22-0040, 10 CFR 50.46 Annual Report2022-07-29029 July 2022 10 CFR 50.46 Annual Report JAFP-22-0033, Core Operating Limits Report Mid-Cycle 252022-06-23023 June 2022 Core Operating Limits Report Mid-Cycle 25 JAFP-22-0032, Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b..2022-06-16016 June 2022 Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.. JAFP-22-0030, Oswego County and New York State Participation in the Emergency Plan2022-05-13013 May 2022 Oswego County and New York State Participation in the Emergency Plan JAFP-22-0029, 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 2021 Annual Radiological Environmental Operating Report JAFP-22-0028, 2021 Annual Radioactive Effluent Release Report2022-04-27027 April 2022 2021 Annual Radioactive Effluent Release Report JAFP-22-0026, 2021 REIRS Transmittal of NRC Form 52022-04-0707 April 2022 2021 REIRS Transmittal of NRC Form 5 JAFP-22-2020, Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Info2022-03-0404 March 2022 Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Informed JAFP-22-0017, Amendments to Indemnity Agreements2022-02-15015 February 2022 Amendments to Indemnity Agreements JAFP-22-0007, Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102022-01-31031 January 2022 Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 JAFP-22-0010, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments2022-01-24024 January 2022 Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments JAFP-22-0008, Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary2022-01-14014 January 2022 Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary JAFP-21-0093, Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation2021-10-18018 October 2021 Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0083, Notification of Readiness for NRC 95001 Inspection2021-09-0909 September 2021 Notification of Readiness for NRC 95001 Inspection JAFP-21-0081, Supplement to Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-09-0303 September 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements JAFP-21-0075, Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2021-08-12012 August 2021 Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs JAFP-21-0073, Response to Request for Additional Information Regarding Application to Revise the James A. FitzPatrick Nuclear Power Plant Limiting Condition for Operation (LCO) 3.5.1, ECCS - Operating Surveillance.2021-08-0909 August 2021 Response to Request for Additional Information Regarding Application to Revise the James A. FitzPatrick Nuclear Power Plant Limiting Condition for Operation (LCO) 3.5.1, ECCS - Operating Surveillance. JAFP-21-0069, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2021-07-30030 July 2021 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors JAFP-21-0070, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b2021-07-30030 July 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b JAFP-21-0071, 10 CFR 50.46 Annual Report2021-07-29029 July 2021 10 CFR 50.46 Annual Report JAFP-21-0064, Supplemental Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-07-0707 July 2021 Supplemental Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting JAFP-21-0053, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-14014 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0052, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0050, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-12012 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0042, Reply to a Notice of Violation; EA-20-1382021-06-0303 June 2021 Reply to a Notice of Violation; EA-20-138 JAFP-21-0041, Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2021-05-17017 May 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing JAFP-21-0040, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2021-05-14014 May 2021 Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs 2023-08-31
[Table view] |
Text
Exelon Generation o 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp com 10 CFR 50.55a RS-19-032 JAFP-19-0025 February 19, 2019 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 James A. FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-59 NRC Docket No. 50-333 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 N RC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265
Subject:
Revision to Relief Requests Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor Pressure Vessel Internals and Components Inspection
References:
- 1) Letter from J. Poole (U.S. Nuclear Regulatory Commission) to B. Hanson (Exelon Generation Company, LLC), "Clinton Power Station, Unit 1 - Use of BWRVIP Guidelines in Lieu of Specific ASME Code Requirements (CAC No. MF6115)," dated March 10, 2016 (ML16012A344)
Revision to Relief Requests Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements February 19, 2019 Page 2
- 2) Letter from T. Tate (U.S. Nuclear Regulatory Commission) to M. Pacilio (Exelon Generation Company, LLC), "Dresden Nuclear Power Station, Units 2 and 3 - Safety Evaluation in Support of Request for Relief Associated with the Fifth 10-Year lnservice Inspection Interval Program (TAC Nos. ME9682, ME9683, ME9684, ME9685, ME9686, ME9687, ME9688, ME9689, ME9690, ME9691, ME9692, ME9693, ME9694, ME9695, ME9696, and ME9697)," dated September 30, 2013 (ML13258A004, ML13260A585, ML13258A003)
- 3) Letter from J. Danna (U.S. Nuclear Regulatory Commission) to B. Hanson (Exelon Generation Company, LLC), "James A. FitzPatrick Nuclear Power Plant - Relief Requests 15R-02, 15R-03, and 15R-04 for Alternatives to Certain ASME Code Requirements (CAC Nos. MG0116, MG0117, and MG0118; EPID L-2017-LLR-0083, EPID L-2017-LLR-0084, and EPID L-2017-LLR-0085)," dated May 30, 2018 (ML18039A854)
- 4) Letter from D. Wrona (U.S. Nuclear Regulatory Commission) to B. Hanson (Exelon Generation Company, LLC), LaSalle County Station, Units 1 and 2, Relief from the Requirements of the ASME Code and OM Code, dated November 17, 2017 (ML173058279)
- 5) Letter from S. Koenick (U.S. Nuclear Regulatory Commission) to B. Hanson (Exelon Generation Company, LLC}, "Safety Evaluation of Relief Requests 14R-02 and 14R-10 for the Fourth 10-Year Interval of the lnservice Inspection Program for Limerick Generating Station, Units 1 and 2 (CAC Nos. MF7587 and MF7588)," dated November 21, 2016 (ML16301A401)
- 6) Letter from J. Danna (U.S. Nuclear Regulatory Commission) to B. Hanson (Exelon Generation Company, LLC), "Peach Bottom Atomic Power Station, Units 2 and 3 - Safety Evaluation of Relief Request 15R-03 Regarding the Fifth 10-Year Interval of the Inservice Inspection Program (EPID NO. L-2018-LLR-0056)," dated July 18, 2018 (ML18179A394)
- 7) Letter from T. Tate (U.S. Nuclear Regulatory Commission) to M. Pacilio (Exelon Generation Company, LLC}, "Quad Cities Nuclear Power Station, Units 1 and 2 - Safety Evaluation in Support of Request for Relief Associated with the Fifth 10 Year Interval lnservice Inspection Program (TAC Nos. ME9668, ME9669, ME9670, ME9671, ME9672, ME9673, ME9674, ME9675, ME9676, ME9677, ME9678, ME9679, ME9680, ME9681)," dated September 30, 2013(ML13267A097)
In accordance with 10 CFR 50.55a(z)(1 ), Exelon Generation Company, LLC (Exelon) is requesting a revision to the above referenced Safety Evaluation Reports (References 1 through 7) concerning the use of the BWRVIP Guidelines in lieu of specific ASME Code requirements on Reactor Pressure Vessel internals and components inspection.
Revision to Relief Requests Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements February 19, 2019 Page3 Since the issuance of these U.S. Nuclear Regulatory Commission Safety Evaluation Reports, revisions to Boiling Water Reactor Vessel and Internals Project (BWRVIP) documents have occurred. Specifically, "BWRVIP-18, Revision 2-A: BWR Vessel and Internals Project BWR Core Spray Internals Inspection and Flaw Evaluation Guidelines," and "BWRVIP-41, Revision 4-A: BWR Vessel and Internals Project BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines" have been approved. Exelon is requesting the previously approved U.S. Nuclear Regulatory Commission Safety Evaluation Reports be revised to include these updated documents.
There are no regulatory commitments contained in this letter. Exelon requests your review and approval of this fleet request by September 3, 2019 so that the updated BWRVIP documents can be utilized in the fall 2019 outages.
If you have any questions, please contact Tom Loomis (610) 765-5510.
Ra*:*~
James Barstow Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC
Attachment:
Revision to Relief Requests Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor Pressure Vessel Internals and Components Inspection cc: Regional Administrator- NRC Region I Regional Administrator - NRC Region Ill NRC Senior Resident Inspector - Clinton Power Station NRC Senior Resident Inspector - Dresden Nuclear Power Station NRC Senior Resident Inspector - James A. FitzPatrick Nuclear Power Plant NRC Senior Resident Inspector - LaSalle County Station NRC Senior Resident Inspector - Limerick Generating Station NRC Senior Resident Inspector - Peach Bottom Atomic Power Station NRC Senior Resident Inspector - Quad Cities Nuclear Power Station NRC Project Manager - Clinton Power Station NRC Project Manager - Dresden Nuclear Power Station NRC Project Manager - James A. FitzPatrick Nuclear Power Plant NRC Project Manager - LaSalle County Station NRC Project Manager - Limerick Generating Station NRC Project Manager - Peach Bottom Atomic Power Station NRC Project Manager - Quad Cities Nuclear Power Station
Attachment Revision to Relief Requests Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor Pressure Vessel Internals and Components Inspection in Accordance with 10 CFR 50.55a(z)(1)
10 CFR 50.55a RELIEF REQUEST Revision O (Page 1 of 2)
Revision to Relief Requests Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor Pressure Vessel Internals and Components Inspection In Accordance with 10 CFR 50.55a(z)(1)
1.0 Reason for Request
Pursuant to 10 CFR 50.55a(z)(1 ), a revision is requested to the U.S. Nuclear Regulatory Commission previously approved relief requests (Table 1) associated with the use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) guidelines in lieu of specific ASME Code requirements on Reactor Pressure Vessel internals and components inspection. Since the issuance of these U.S. Nuclear Regulatory Commission Safety Evaluation Reports, revisions to BWRVIP documents has occurred. Specifically, BWRVIP-18, Revision 2-A (Reference 1) and BWRVIP-41, Revision 4-A (Reference 2) have been issued. Exelon is requesting approval to use the latest U.S. Nuclear Regulatory Commission approved documents in place of the document revisions cited in the Safety Evaluation Reports on the basis that these approved BWRVIP documents provide an acceptable level of quality and safety.
The BWRVIP guidelines have recommended aggressive specific inspection by BWR operators to identify material condition issues with BWR components. A wealth of inspection data has been gathered during these inspections across the BWR industry.
These guidelines focus on specific and susceptible components, specify appropriate inspection methods capable of identifying anticipated degradation mechanisms, and require re-examination at conservative intervals. In contrast, the code inspection requirements were prepared before the BWRVIP initiative and have not evolved with BWR inspection experience.
2.0 Proposed Revision The Exelon units listed in Table 1 have submitted relief requests proposing to use the BWRVIP guidelines as an alternative to the requirements of Section XI of the ASME Code for the ISi of the Reactor Pressure Vessel (RPV) interior surfaces, attachments, and core support structures. Relief requests have been approved by the NRG with specific revisions of BWRVIP documents listed. In some Safety Evaluation Reports, language is included which restricts the use of the relief request benefits to the BWRVIP document revisions specifically addressed within the relief request submittal. In the time since the staff's approval of Exelon's proposed alternatives, some BWRVIP documents have been revised by the BWRVIP and approved by the NRG. Exelon requests that the latest NRG approved revisions of the BWRVIP-18 and BWRVIP-41 be used as an alternative to the revisions currently listed in the respective Safety Evaluation Reports.
10 CFR 50.55a RELIEF REQUEST Revision o (Page 2 of 2) 3.0 References
- 1. BWRVIP-18, Revision 2-A: BWR Vessel and Internals Project BWR Core Spray Internals Inspection and Flaw Evaluation Guidelines. EPRI, Palo Alto, CA: 2016.
3002008089.
- 2. BWRVIP-41, Revision 4-A: BWR Vessel and Internals Project BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines. EPRI, Palo Alto, CA: 2018.
3002014254.
Table 1 Plants with Updated BWRVIP Document Revisions Unit Safety Evaluation ADAMS Listed Requested Listed Requested Accession No. BWRVIP-18 BWRVIP-18 BWRVIP-41 BWRVIP-41 Revision Revision Revision Revision Clinton Power ML16012A344 1-A 2-A 3 4-A Station, Unit 1 Dresden Nuclear ML13258A004, 1 2-A N/A* N/A Power Station, ML13260A585, Units 2 and 3 ML13258A003 James A. ML18039A854 1-A 2-A 3 4-A Fitzpatrick Nuclear Power Plant LaSalle County ML173058279 2-A No Change 3 4-A Station, Units 1 Requested and 2 Limerick ML16301A401 1-A 2-A 3 4-A Generating Station, Units 1 and 2 Peach Bottom ML18179A394 2-A No Change 3 4-A Atomic Power Requested Station, Units 2 and 3 Quad Cities ML13267A097 1 2-A N/A* N/A Nuclear Power Station, Units 1 and 2
- BWRVIP-41 was not included in the Dresden and Quad Cities relief requests as discussed in the associated U.S. Nuclear Regulatory Commission Safety Evaluation Reports.