UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

February 12, 2019

Mr. Stephen McGavin

Fleet Security Director

Southern Nuclear Operating Co., Inc.

P. O. Box 1295

Birmingham, AL 35201

SUBJECT:

HATCH UNITS 1, 2 - NRC TEAM OR 45 DAYS REPORT INSPECTION

REPORT 05000321/2019410 AND 05000366/2019410

Dear Mr. McGavin:

On January 17, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection

at your Hatch Units 1, 2 and discussed the results of this inspection with Mr. T. Vehec and other

members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Sincerely,

/RA/

Binoy B. Desai, Chief

Plant Support Branch

Division of Reactor Safety

Docket Nos.: 05000321 and 05000366

License Nos.: DPR-57 and NPF-5

Enclosure:

Inspection Report 05000321/2019410

and 05000366/2019410

cc: see page 2

S. McGavin

2

cc:

Steven M. Shipman

Fleet Security Project Manager

Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway (Bin B042)

Birmingham, AL 35242

Michael P. Long

Fleet Nuclear Security Operations Manager

Southern Nuclear Operating Co, Inc.

40 Inverness Center Parkway (Bin B042)

Birmingham, AL 35242

Lisa B. Hogg

Fleet Security Project Manager

Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway (Bin B042)

Birmingham, AL 35242

Tom Vehec

Southern Nuclear Operating Co., Inc.

Edwin I. Hatch Nuclear Plant

11028 Hatch Parkway North

Baxley, GA 31513

Allie M. Meadows

Site Security Manager

Southern Nuclear Operating Co., Inc.

Edwin I. Hatch Nuclear Plant

11028 Hatch Parkway North

Baxley, GA 31513

ML 19043A678

SUNSI REVIEW COMPLETE

FORM 665 ATTACHED

OFFICE

RII/ DRS/PSB

RII/ DRS/PSB

RII/ DRP/PB2

RII/ DRS/PSB

SIGNATURE

JCS3

BBD

AJB3

BBD

NAME

J. Shehee

B. Desai

A. Blamey

B. Desai

DATE

2/ 7 /2019

2/ 11 /2019

2/ 11 /2019

2/ 12 /2019

2/ /2019

E-MAIL COPY?

YES

NO

YES

NO

YES

NO

YES

NO

YES

NO YES

NO

Enclosure

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number(s):

05000321 and 05000366

License Number(s):

DPR-57 and NPF-5

Report Number(s):

05000321/2019410 and 05000366/2019410

Enterprise Identifier: I-2019-410-0010

Licensee:

Southern Nuclear Operating Co., Inc.

Facility:

Hatch, Units 1 and 2

Location:

Birmingham, AL 35242

Inspection Dates:

January 14, 2019 to January 18, 2019

Inspectors:

J. Shehee, Branch Chief

Approved By:

Binoy B. Desai, Chief

Plant Support Branch

Division of Reactor Safety

2

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting a Security Reports Inspection at Hatch Units 1 and 2 in accordance

with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for

overseeing the safe operation of commercial nuclear power reactors. Refer to

https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and

violations being considered in the NRCs assessment are summarized in the table below.

List of Findings and Violations

No findings were identified.

3

INSPECTION SCOPE

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection

Program - Operations Phase. The inspectors reviewed selected procedures and records,

observed activities, and interviewed personnel to assess licensee performance and compliance

with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES - BASELINE

71130.07 - Security Training

The inspectors evaluated the nuclear security training program. The following elements

were evaluated from this IP dated August 23, 2018.

Security Training (1 Sample)

Tier I: all requirements

Tier II: all requirements

Tier III: 6 requirements 02.10, 02.11(a), (b); 02.13 (a), (b), (c)

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On January 17, 2019, the inspector presented the inspection results to Mr. T. Vehec and

other members of the licensee staff.

4

LIST OF DOCUMENTS REVIEWED

PROCEDURES

NMP-SE-101, Miles Use and Safety, Version 2.2

NMP-SE-020-001, Security Training Program Committee Conduct of Operations, Version 1.1

NMP-SE-020-002, Graded Systematic Approach to Security Training, Version 2-1

NMP-SE-020-003, SNC Fleet Security Conduct of Training, Version 2.0

NMP-SE-020-004, Qualification Requirements for Security Positions, Version 2.3

CONDITION REPORTS

275498

1050328

10569701