ML19038A228

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation, Revised Emergency Plan Implementing Procedures (Epips)
ML19038A228
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/04/2019
From: Bates A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
Download: ML19038A228 (2)


Text

SOUTHERN CALIFORNIA Al Bates EDISON~

An EDISON INTERNATIONAL Company.

Manager, Regulatory Affairs &

Oversight U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 February 4, 2019

Subject:

Docket Nos. 50-206, 50-361, 50-362, and 72-41 Revised Emergency Plan Implementing Procedures (EPIPs)

San Onofre Nuclear Generating Station (SONGS) Units 1, 2, and 3 and the Independent Spent Fuel Storage Installation

Dear Sir or Madam:

10 CFR 50.54(q)

Pursuant to 10 CFR 50.54(q)(5), Attachment 1 of this letter provides a copy of the following revised Emergency Plan documents:

Procedure Rev.

Effective Date S0123-VIII-ADMIN-1, Emergency 8

January 3, 2019 Preparedness Program Maintenance S0123-VIII-ER0-3, ERO Coordinator 2

January 15, 2019 Checklist S0123-VIII-ER0-5, Radiation Protection 2

January 15, 2019 Coordinator Checklist As specified in 10 CFR 50.54( q)(5), Attachment 2 provides a report and analysis summary for the EPIP changes. These changes do not reduce the effectiveness of the Emergency Plan or the EPIPs.

There are no commitments contained in this letter or its attachments.

Document Control Desk If you have any questions, please contact me at (949) 368-6945.

Sincerely, Attachments: 1. Revised Emergency Plan Implementing Procedures

2. Report and Analysis Summaries cc:

Emergency Response Coordinator, NRC Region IV (2 copies of Attachment 1)

S. A. Morris, Regional Administrator, NRC Region IV M. G. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3