Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 Phone 201 /622-7000 S-P-272-S"O u.(J I I St1t&"F"'/.S/f?//4J//
To:
Mr. A. W. Dromerick From:
- E. A. Liden February 3,-1975 The following information is supplied per your request:
- 1.
Total secondary system water and steam inventory (operating conditions)
- 2.
- 3.
Steam Water 65,200 2,620,000 2,685,200 lbs lbs lbs Steam Generator blowdown rate (operating conditions)
Normal conditions wi ti1 pr:.i.1u.&Lj-8t::.CCi.:'.nla.i: j Blowdown tank capacity Tank No. 11 (21)
Tank No. 12 (22) 120 gpm (total/unit)
.:..t.-UL'\\..
860 gal.
3680 gal.
~c g-;:::::
- 4.
Approximate mass of metal in contact with primary coolant (i.e., RV intervals, pumps, etc.)
6 2.53 x 10 lbm.
- 5.
Amount of primary coolant that leaks through double ended tube rupture 125,000 lb (See FSAR, Section 14.3.l.3)
- 6.
Time required for isolation of failed steam generator following a tube rupture (without off site power) 30 minutes (See FSAR, Section 14.3.1.3)
- 7.
Time required for isolation of intact steam generators following a steain line break accident outside containment (without off site power) 10 seconds (See FSAR, Section 14.3.1.2)