Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 Phone 201 /622-7000 S-P-272-S"O u.(J I I St1t&"F"'/.S/f?//4J//

To:

Mr. A. W. Dromerick From:

E. A. Liden February 3,-1975 The following information is supplied per your request:
1.

Total secondary system water and steam inventory (operating conditions)

2.
3.

Steam Water 65,200 2,620,000 2,685,200 lbs lbs lbs Steam Generator blowdown rate (operating conditions)

Normal conditions wi ti1 pr:.i.1u.&Lj-8t::.CCi.:'.nla.i: j Blowdown tank capacity Tank No. 11 (21)

Tank No. 12 (22) 120 gpm (total/unit)

.:..t.-UL'\\..

860 gal.

3680 gal.

~c g-;:::::

4.

Approximate mass of metal in contact with primary coolant (i.e., RV intervals, pumps, etc.)

6 2.53 x 10 lbm.

5.

Amount of primary coolant that leaks through double ended tube rupture 125,000 lb (See FSAR, Section 14.3.l.3)

6.

Time required for isolation of failed steam generator following a tube rupture (without off site power) 30 minutes (See FSAR, Section 14.3.1.3)

7.

Time required for isolation of intact steam generators following a steain line break accident outside containment (without off site power) 10 seconds (See FSAR, Section 14.3.1.2)