Southern California Edison Company Response to NRC Special Inspection Report 05000206/2018005, 05000361/2018005, 05000362/2018005, 07200041/2018001, and Notice of Violation
ML19016A206
Person / Time
Site: San Onofre  
Issue date: 01/17/2019
From: Janine Katanic
Division of Nuclear Materials Safety IV
To: Bauder D
Southern California Edison Co
E. Simpson
References
IR 2018001, IR 2018005
Download: ML19016A206 (3)


See also: IR 05000206/2018005

Text

January 17, 2019

Mr. Doug Bauder

Vice President and Chief Nuclear Officer

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

SUBJECT:

SOUTHERN CALIFORNIA EDISON COMPANY RESPONSE TO NRC

SPECIAL INSPECTION REPORT 050-00206/2018-005, 050-00361/2018-005,

050-00362/2018-005, 072-00041/2018-001 AND NOTICE OF VIOLATION

Dear Mr. Bauder:

On November 28, 2018, the U.S. Nuclear Regulatory Commission (NRC) cited Southern

California Edison Company for three Severity Level IV violations that involved failures to:

(1) identify conditions potentially adverse to quality for placement into your corrective

actions program; (2) assure that operations of important to safety equipment were limited

to trained and certified personnel or under direct supervision; and (3) provide adequate

procedures for dry cask storage operations involving downloading operations. Inspection

Report 050-00206/2018-005, 050-00361/2018-005, 050-00362/2018-005, 072-00041/2018-001

with enclosed Notice of Violation required you to respond in writing within 30 days (Agencywide

Documents Access and Management System (ADAMS) Accession No. ML18332A357

and ML18341A172). You responded by letter dated December 26, 2018 (ML18362A148).

After reviewing the information you provided in your response to the Notice of Violation, we

have concluded that your completed and proposed actions appear to adequately address the

regulatory noncompliances described in the Notice of Violation. We will review your

implementation of these corrective actions during a future inspection to determine whether full

compliance has been restored and whether compliance will be maintained.

Please note that the two apparent violations that were described in Inspection

Report 050-00206/2018-005, 050-00361/2018-005, 050-00362/2018-005, 072-00041/2018-001

are under review by the NRC and will be the subject of a predecisional enforcement conference

that is scheduled to be held on January 24, 2019.

D. Bauder

2

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a

copy of this letter will be made available electronically for public inspection in the NRC Public

Document Room or from the NRCs Agencywide Documents Access Management System

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Janine F. Katanic, PhD, CHP, Chief

Fuel Cycle and Decommissioning Branch

Division of Nuclear Materials Safety

Docket Nos.: 50-206; 50-361; 50-362;72-041

License Nos.: NPF-10; NPF-15; DPR-13

cc: Electronic Distribution for

Southern California Edison Company

ML19016A206

SUNSI Review

By: EJS

ADAMS:

Yes No

Sensitive

Non-Sensitive

Non-Publicly Available

Publicly Available

Keyword

NRC-002

OFFICE

RIV/DNMS/FCDB

DNMS/FCDB

NAME

EJSimpson

JFKatanic

SIGNATURE

/RA/

/RA/

DATE

1/17/19

1/17/19