ML18360A430

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation - Submittal of Annual Financial Reports 2017
ML18360A430
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/18/2018
From: Dilorenzo M
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML18360A444 List:
References
102-07838-MDD/MSC
Download: ML18360A430 (1)


Text

Oaps 102-07838-MDD/MSC December 18, 2018 AlTN: Document Control* Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS) 10 CFR 50.71(b) 10 CFR 72.SO(b)

Palo Verde Nuclear Generating Station PO Box 52034 Phoenix, Arizona 85072~2034 Mall Station 7636 Units 1, 2, and 3 and Independent Spent Fuel Storage Installation Docket Numbers STN 50-528/529/530 and 72-44 Submittal of Annual Financial Reports 2017 Pursuant to 10 CFR 50.71(b) and 10 CFR 72.80(b), enclosed please find the 2017 Annual Financial Reports for three Participants Who jointly own PVNGS and do not file a Form 10-Q with the Securities and Exchange Commission or a Form 1 with the Federal Energy Regulatory Commission. These Participants are Southern California Public Power Authority, Los Angeles Department of Water and Power, and Salt River Project.

The remaining Participants who jointly own PVNGS file a Form 10-Q with the Securities and Exchange Commission or a Form 1 with the Federal Energy Regulatory Commission and therefore APS Is not required to file their Annual Financial Report In accordance with 10 CFR 50.71(b) or 10 CFR 72.80(b). These Participants are El Paso Electric Company, Arizona Public Service Company, Southern California Edison Company, and Public Service of New Mexico.

No commitments are being made to the NRC by this letter.

Should you need further Information regarding this submittal, please contact Matthew S. Cox, Regulatory Affairs Section Leader, at (623) 393-5753.

Sincerely, Michael D. Dilorenzo Department Leader, Regulatory Affairs MDD/MSC/TMJ/mg

Enclosures:

PVNGS 2017 Annual Financial Reports Southern California Public Power Authority Los Angeles Department of Water and Power Salt River Project cc:

K. M. Kennedy S. P. Lingam C.A. Peabody NRC Region IV Regional Administrator NRC NRR Project Manager for PVNGS NRC Senior Resident Inspector for PVNGS A member of the STARS Alliance LLC Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek H oblf

/JH55-Z/0 rJfl{l,,

tvt-15S