ML18355A625

From kanterella
Jump to navigation Jump to search
Submission of Periodic Reports
ML18355A625
Person / Time
Site: 05000017
Issue date: 12/14/2018
From: Mark D. Sartain
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of New Reactors
References
NA3-18-003
Download: ML18355A625 (2)


Text

Dominion Energy Services, Inc. ~

i4  ? .

Dominion

    • 5000 Dominion Boulevard, Glen Allen, VA 23060 Dof"(linionEnergy.com tJ a,, Energy

. December ~4, 2018 U. S. Nuclear Regulatory Commission Serial No. NA3-18-003 Attention: Document Control Desk Docket No.52-017 Washington, D. C. 20555 License No. NPF-103 NRA/DEA VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA UNIT 3 SUBMISSION OF PERIODIC REPORTS The purpose of this letter is to submit periodic reports for North Anna Unit 3 as required by NRC regulations and/or license conditions for a Part 52 combined license holder.

These reports address various annual or semi-annual reporting requirements. The following reports are addressed by this letter:

  • Semi-Annual Departures Report
  • Annual FSAR Update, including site-specific Tier 1 .material
  • Semi-Annual Changes, Tests, and Experiments Report
  • Semi-Annual Schedule for Implementation of Operational Programs Semi-Annual Departures Report. The design certification rule for the GEH ESBWR (10 CFR 52, Appendix E) became effective on November 14, 2014. Paragraph X.B.3.b of the rule requires the COL holder who references the ESBWR DCD to submit semi-annual reports to the NRC that describe plant-specific departures from the DCD. The departures report for North Anna Unit 3 consists of the departures section from the North Anna Unit 3 Combined License Application (COLA), Part 7, Departures Report.

An updated departures report was submitted to the NRC most recently _by letter NA3-16-050, dated December 16, 2016 (ML16355A182). No departures that were included in the December 16, 2016 letter have been revi~ed or deleted, and no new departures have been identified. Therefore, the previous report continues to be current.

Annual FSAR Update, including site-specific Tier 1 material. 10 CFR 50.71 (e)(3)(iii) requires that the FSAR filed as part of the COLA be updated annually until the Commission makes the finding under 10 CFR 52.103(g). The FSAR information was most recently submitted on June 22, 2016 (ML16208A322) as part of North Anna Unit 3 COLA submissions 18 and 19 which included Part 2, FSAR. No FSAR information has been revised, deleted, or added since that submittal. Therefore, the previously submitted FSAR continues to be current.

._.,t Serial No. NA3-18-003 Submission of Periodic Reports Page 2 of 2 Semi-Annual Changes, Tests, and Experiments Report. There have been no changes, tests, or experiments evaluated under 10 CFR 50.59 since issuance of the COL on June 2, 2017. Future 10 CFR 50.59 reports will be submitted on a semi-annual basis based on the COL issuance milestone.

Semi-Annual Schedule for Implementation of Operational Programs. In accordance with License Condition 2.D.(11), Virginia Electric and Power Company submitted an implementation schedule of operational programs for NA3 on June 1, 2018 (ML18159A032). There have been no changes to the scheduled implementation dates for the operational programs and other items since that time. Future program updates will be submitted every 6 months until 12 months before scheduled fuel loading.

Please contact Diane E. Aitken at (804) 273-2694 (diane.aitken@dominionenergy.com) if you have questions.

Very truly yours,

~-

Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support This letter contains no NRG commitments.

cc:

U. S. Nuclear Regulatory Commission, Region II J. J. Shea, Jr., NRG M.A. Eudy, NRG T. S. Dozier, NRG G. Croon, NRG D. Paylor, VDEQ M. K. Brandon, DTE R. J. Bell, NEI