<I' VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 June 1, 2018 U. S. Nuclear Regulatory Commission Serial No. NA3-18-002 Attention: Document Control' Desk Docket No.52-017 Washington, D. C. 20555 License No. NPF-103 NRA/DEA VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA UNIT 3 SUBMISSION OF PERIODIC REPORTS The purpose of this letter is to submit periodic reports for North Anna Unit 3 as required by NRC regulations and/or license conditions for a Part 52 combined license holder.
These reports address various annual or semi-annual reporting requirements. The following reports are addressed by this letter:
- Semi-Annual Departures Report
- Annual FSAR Update, including site-specific Tier 1 material
- Semi-Annual Changes, Tests, and Experiments Report
- Semi-Annual Schedule for Implementation of Operational Programs Semi-Annual Departures Report. The design certification rule for the GEH ESBWR (10 CFR 52, Appendix E) became effective on November 14, 2014. Paragraph X.B.3.b of the rule requires the COL holder who references the ESBWR DCD to submit semi-annual reports to the NRC that describe plant-specific departures from the DCD. The departures report for North Anna Unit 3 consists of the departures section from the North Anna Unit 3 Combined License Application (COLA), Part 7, Departures Report.
An updated departures report was submitted to the NRC most recently by letter NA3-16-050, dated December 16, 2016 (ML16355A182). No departures that were included in the December 16, 2016 letter have been revised or deleted, and no new departures have been identified. Therefore, the previous report continues to be current.
Annual FSAR Update, including site-specific Tier 1 material. 10 CFR 50. 71 (e)(3)(iii) requires that the FSAR filed as part of the COLA be updated annually until the Commission makes the finding under 10 CFR 52.103(g). The FSAR information was most recently submitted on June 22, 2016 (ML16208A322) as part of North Anna Unit 3 COLA submissions 18 and 19 which included Part 2, FSAR. No FSAR information has been revised, deleted, or added since that submittal. Therefore, the previously submitted FSAR continues to be current.
- Serial No. NA3-18-002 Submission of Periodic Reports Page 2 of 3 Semi-Annual Changes, Tests, and Experiments Report. There have been no changes, tests, or experiments evaluated under 10 CFR 50.59 since issuance of the COL on June 2, 2017. Future 10 CFR 50.59 reports will be submitted on a semi-annual basis based on the COL issuance milestone.
Semi-Annual Schedule for Implementation of Operational Programs. The U.S.
Nuclear Regulatory Commission (NRG) issued Combined License (COL) NPF-103 to Virginia Electric and Power Company for North Anna Unit 3 (NA3) pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 52.97, "Issuance of combined licenses," on June 2, 2017. Virginia Electric and Power Company is required to submit, no later than 12 months after issuance of the COL and updated every 6 months until 12 months before scheduled fuel loading, the following in accordance with License Condition 2.D.(11):
- A schedule for implementation of the operational programs listed in Final Safety Analysis Report Table 13.4-201, including:
o the associated estimated date for initial loading of fuel; o The implementation of site specific Severe Accident Mitigation Management Guidelines; and o The spent fuel rack coupon monitoring program implementation The NA3 implementation schedule is provided in Enclosure 1. Since a decision has not been made to construct the NA3 unit at this time, there are no scheduled dates for the various programs and other items listed, including the estimated date for initial loading of fuel. Therefore, the scheduled implementation dates for the operational programs and other items are designated as "To Be Determined" (TBD).
Please contact Diane E. Aitken at (804) 273-2694 (diane.aitken@dominionenergy.com) if you have questions.
vef~s Cberald T. Bis~(I
~~
Senior Vice President Nucl ar Operations and Fleet Performance Attachment
- 1. Implementation Schedule of Operational Programs This letter contains no NRG commitments.
Serial No. NA3-18-002 Submission of Periodic Reports Page 3 of 3 cc w/o Attachment, except where noted:
U. S. Nuclear Regulatory Commission, Region II (with Attachment)
J. J. Shea, Jr., NRC (with Attachment)
M.A. Eudy, NRC T. S. Dozier, NRC (with Attachment)
G. Croon, NRC D. Paylor, VDEQ M. K. Brandon, DTE R. J. Bell, NEI
Serial No. NA3-18-002 Docket No.52-017 Attachment 1 Page 1 of 4 Attachment 1 IMPLEMENTATION SCHEDULE OF OPERATIONAL PROGRAMS
Serial No. NA3-18-002 Docket No.52-017 Attachment 1 Page 2 of 4 Implementation Schedule of Operational Programs Scheduled Implementation Item Program Name Date
- 2. lnservice Testing Program TBD
- 3. Environmental Qualification Program TBD
- 4. Preservice Inspection Program TBD
- 5. Reactor Vessel Material Surveillance Program TBD
- 6. Preservice Testing Program TBD
- 7. Containment Leakage Rate Testing Program TBD
- 8. Fire Protection Program TBD (portions applicable to radioactive material) TBD
- 9. Process and Effluent Monitoring and Sampling TBD Program:
Radiological Effluent Technical TBD Specifications/Standard Radiological Effluent Controls Offsite Dose Calculation manual TBD Radiological Environmental Monitoring Program TBD Process Control Program TBD
- 10. Radiation Protection Program TBD
Serial No. NA3-18-002 Docket No.52-017 Attachment 1 Page 3 of 4 Implementation Schedule of Operational Programs Item Program Name Scheduled Implementation Date
- 11. Non Licensed Plant Staff Training Program TBD (portions applicable to radioactive material)
- 12. Reactor Operator Training Program TBD
- 13. Reactor Operator Requalification Program TBD
- 14. Emergency Planning TBD
- 15. Security Program: TBD Physical Security Program TBD Safeguards Contingency Program TBD Training and Qualification Program TBD Cyber Security Plan TBD Special Nuclear Material Physical Protection TBD Program FFD Program for Construction (Workers and First TBD Line Supervisors)
FFD Program for Construction (Management and TBD Oversight Personnel)
FFD Program for Security Personnel TBD FFD Program for FFD Program Personnel TBD FFD Program for Individuals Required to Physically TBD Report to the TSC or EOF FFD Program for Operation TBD
Serial No. NA3-18-002 Docket No.52-017 Attachment 1 Page 4 of 4 Implementation Schedule of Operational Programs Item Program Name Scheduled Implementation Date
- 16. Quality Assurance Program - Operation TBD
- 17. Maintenance Rule TBD
- 18. Motor-Operated Valve Testing TBD
- 19. Initial Test Program TBD
- 20. Snubber Testing and Inspection TBD Program Preservice Inspection Program TBD lnservice Inspection Program TBD lnservice Testing Program TBD Preservice Thermal Movement Inspection TBD Preservice Testing Program TBD Notes: a. Snubber inservice examination is initially performed not less than two months after attaining 5% reactor power operation and will be completed within 12 calendar months after attaining 5% reactor power.
- 21. Mitigative Strategies Descriptions and Plans TBD
- 22. Lifecycle Minimization of Contamination TBD
- 23. SNM Material Control and Accounting Program TBD 2.D.(11) Severe Accident Management Guidelines TBD 2.D.(11) Spent Fuel Rack Coupon Monitoring Program TBD