ML18354B209

From kanterella
Jump to navigation Jump to search

Attachment - Vogtle Electric Generating Plant Unit 3 (LAR 18-020)
ML18354B209
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/30/2019
From: Jordan Hoellman
NRC/NRO/DLSE/LB4
To:
Southern Nuclear Operating Co
hoellman j/415-5481
Shared Package
ML18354B207 List:
References
EPID L-2018-LLA-0214, LAR 18-020
Download: ML18354B209 (4)


Text

ATTACHMENT TO LICENSE AMENDMENT NO. 153 TO FACILITY COMBINED LICENSE NO. NPF-91 DOCKET NO.52-025 Replace the following pages of the Facility Combined License No. NPF-91 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Facility Combined License No. NPF-91 REMOVE INSERT 7 7 Appendix A to Facility Combined License Nos. NPF-91 and NPF-92 REMOVE INSERT 3.1.8-1 3.1.8-1 3.8.3-1 3.8.3-1

(7) Reporting Requirements (a) Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).

(b) SNC shall report any violation of a requirement in Section 2.D.(3),

Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.

(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 153, are hereby incorporated into this license.

(9) Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).

(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:

(a) Environmental Qualification Program implemented before initial fuel load; (b) Reactor Vessel Material Surveillance Program implemented before initial criticality; (c) Preservice Testing Program implemented before initial fuel load; (d) Containment Leakage Rate Testing Program implemented before initial fuel load; (e) Fire Protection Program

1. The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7 Amendment No. 153

Technical Specifications PHYSICS TESTS Exceptions

- MODE 2 3.1.8 3.1 REACTIVITY CONTROL SYSTEMS 3.1.8 PHYSICS TESTS Exceptions - MODE 2 LCO 3.1.8 During the performance of PHYSICS TESTS, the requirements of:

LCO 3.1.3 Moderator Temperature Coefficient (MTC),

LCO 3.1.4 Rod Group Alignment Limits, LCO 3.1.5 Shutdown Bank Insertion Limits, LCO 3.1.6 Control Bank Insertion Limits, and LCO 3.4.2 RCS Minimum Temperature for Criticality may be suspended, and the number of required channels for LCO 3.3.1, Reactor Trip System (RTS) Instrumentation, Functions 1, 2, 3, and 4 may be reduced to 3 provided:

a. Reactor Coolant System (RCS) lowest loop average temperature is 541°F,
b. SDM is within the limits specified in the COLR, and
c. THERMAL POWER is 5% RTP.

APPLICABILITY: During PHYSICS TESTS initiated in MODE 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. SDM not within limits. A.1 Initiate boration to restore 15 minutes SDM to within limits.

AND A.2 Suspend PHYSICS TESTS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> exceptions.

B. THERMAL POWER not B.1 Open reactor trip breakers. Immediately within limit.

C. RCS lowest loop C.1 Restore RCS lowest loop 15 minutes average temperature average temperature to not within limit. within limit.

VEGP Units 3 and 4 3.1.8 - 1 Amendment No. 153 (Unit 3)

Amendment No. 152 (Unit 4)

Technical Specifications Inverters - Operating 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Inverters - Operating LCO 3.8.3 The Division A, B, C, and D inverters shall be OPERABLE.

- NOTES -

One inverter may be disconnected from its associated DC bus for 72 hours3 days <br />0.429 weeks <br />0.0986 months <br /> to perform an equalizing charge on its associated battery, providing:

1. The associated instrument and control bus is energized from its Class 1E voltage regulating transformer; and
2. All other AC instrument and control buses are energized from their associated OPERABLE inverters.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or two inverter(s) A.1 ------------------------------------

within one division - NOTE -

inoperable. Enter applicable Conditions and Required Actions of LCO 3.8.5 Distribution Systems -

Operating with any instrument and control bus de-energized.

Restore inverter(s) to 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> OPERABLE status.

B. Required Action B.1 Be in MODE 3. 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and associated Completion Time AND not met.

B.2 Be in MODE 5. 36 hours1.5 days <br />0.214 weeks <br />0.0493 months <br /> VEGP Units 3 and 4 3.8.3 - 1 Amendment No. 153 (Unit 3)

Amendment No. 152 (Unit 4)