consumers Power company U.S. Nuclear Regulatory Commission Mail and Records Section Washington, D.C. 20555 Gentlemen:

Enclosed is a copy of the monthly report on operating data for the Palisades Plant for' the month of February.

Very truly yours, James A. Meineke General Engineer JAM:db cc: J. G. Kepler, USNRC R.L.Haueter R.B.Sewell 2853

-....._:-..;_**-.,.~ ..-~~-*-**:--t . ."'-J"~~---**'-...........:~--~-*-~----"---~'----~~---*

  • I ... f  :

APPENDIX D*

  • e UNIT Palisades 0

DATE March 6, 1975 .

D.Bollnow *

. COMPLETED BY 616-764-8913 DOCKET N0.-'5'-0_-_2_,_5-=-5_ _ _ __

OPERATING STATliS I. REPORTING PERIOD: _ _7_5'-0_2_0_1_ _-"-~---- THROUGH _ _ _7_5_0_2_2_8_ _ _ _ _ __

HOURS IN REPORTl:\G PERIOD: 672

-~----"-~~~~--------------------

2. CURRENTLY ACTHORIZED POWER LEVEL (~iWth). 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) ~7~0~0~-
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ _ __
4. REASONS FOR RESTRICTION (IF AN.Y):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE

5. HOURS REACTOR WAS CRITICAL. . . . . . * . . . . . . ___ 0_ _ __ 0 io,236.9
6. REACTOR RESER VE SHUTDOWN HOURS ...... . 0 0
7. . HOURS GENERATOR ON LINE.*. . . . . . . . . . . * *
  • 0 0 9.! 321.l
8. UNJT RESERVE SHUTDOWN HOURS . *. . . . . . . . . . .o 0 0
9. GROSS THER~!AL ENERGY GENERATED (~1WH) ......*....*.******** 0 0 14,*1131260
10. GROSS ELEqRICAL ENERGY

-GENERA TED (~IWH) . . . : . . * . * * . . * * * . * *. * * . . _ _ _

(

.r.O. .., . . <* ... :.*

11. NET ELECTRICAL ENERGY GENERATED (MWII) .*......*....**....*****.****

0_ _ __

0 0

()

4!504.!250 422'.232702

12. REACTOR AVAILABILITY FACTOR(!) . . . . * . . * . O°/o 36 *~~() t
13. UNIT AVAILABILITY FACTOR (2) . . . . . . . * . * .
  • oc;a 0% 3J. -fa . *~ _.
14. l'NIT CAPACITY FACTOR (3) .............*.

O;o 0% 26.2~0 15 . UNIT FORCED OUTAGE RATE (4) . . . . . . . . . . . .

100% 100% )3. 7%

. 16. SllllTDO\\'NS SCHEDULED TO BEGIN IN.NEXT6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

17. IF SHUT DOWN AT END OF. REPORT PERIOD, ESTIMATED DATE OF STARTUP: _ _Ma __ r_c_h_*~3~1"~"-"*1""'9'-"'7"'"'5~---
18. UNITS IN TEST STATUS (PRIOR TO COM~!ERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION

  • COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL

{I) R,EAC'TOR A \'AILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE (2) UNIT AVAILABILITY FACTOR -------------XIOO HOURS IN REPORTING PER!OD NF.T ELF.CTR IC AL POWFR GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (M\Vc-NET) X HOURS IN REPORTING PERIOD

(- 0 .,

(."11 L'NIT FORCED OllTAGE RATE FORCED OUTAGE H O U _ R _ s _ * - - - - - - - - - - - - - x 100.

I...

HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS Ll6-D!

  • ~~~""""'-"',,,,....~,,,.,...,.,,,..,.,,,.,..,,,,~. __ .......... q . . . _,,,.,.* ~~~~..,,,.,,.,,.l~"'"'!~'l!."'~'!'1'£'1'-'"""""~"'"',"*"-"'<l'~1"1--

l1' . -* APPENDIX C cl*o** DOCKET NO. ~50::..--=2"""55"'----

UN IT ---'-P..:.:ac=lc=i.:::.sa=d=e::..:s=----

DATE March* 6. 1975 COMPLETED BY D.Bollnow AVERAGE DAILY UNIT POWER LEVEL MONTH February 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) 0 17*. 0 1

2 0 18  ;**

0 19 1 0 3

0 20* 0 4

5 0 21 0 0 22 0 6

<jO 7 8

0 0

23 24 0

. .0 0 25 0 9

0 26 o*

10 11 27.

12 0 28 0 13 0 29 14 0 30 1!i 31 16 0 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe~net for each day in the reporting month.

Compute to the nearest whole megawatt.

., These figures ,,;ill be used to plot a graph for. each reporting month. Note that by usi*ng maximum

~

G1

~

e

  • o dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average p~wer ~eve! exceeds the I 00% line (or the restricted po:ver level* line). In such cases, the av:rage datly umt power output sheet should be footnoted to cxpla111 the apparent anomaly. . .

. *. *

  • 1.16-C-l . . .
  • L,,.. _.. ~. ,,,M.. -*~---*~*'Tl-

\

  • ~

........ __,.,*;, , .,.,: ., .,...;..,...._~is..,._....,._.____*_:"'___......_ __,....................................;..*......._._ _ _....._ .......--------*:..;*........,-- _.~--.....,.,_:' .

  • o APPENDIX E DOCKETNO. ~5_0_~2~5~5_______

.o J -

1 UNIT SHUTDOWNS UNIT NAME Palisades.

DATE March 6. 1975 COMPLETED UY D.Bollnow REPORT MONTH _-=.F...::.eb=.::ru::...==a=...iry1....=l~97......,5'---

TYPE METHOD OF F*FORCED DURATION ~HUTTING DOWN NO. DATE S*SCHEDULED I (HOURS) REASON (1) THE REACTOR (2) CORR.ECTIVE ACTIONS/COMMENTS 3 741104 F 2,866.6 B 1 E.C.T. Steam Generators due to N.R.C.

Requirements.

'\

\

(1) REASON (2) METHOD .

A--EQUIPMENT FAILURE'(EXPLAIN) I-MANUAL B-: MAINT. OR TEST 2-MANUAL c.. REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E-OPERATOR TRAINING AND SCRAM

.. LICENSE EXAMINATION I"

F-ADMIN!STRATIVE G-OPERA TIONAL ERROR J.

H-OTHER (EXPLAIN)

(EXPLAIN) l*

i .

SUMMARY

  • 100% E<idy Current Testing o:f the Steam Gene:t'ators wtts completed during February.

~

f .