U.S. Nuclear Regulatory Commission Mail and Records Section Washington, D.C. 20555 Gentlemen:
Enclosed is a copy of the monthly report on operating data for the Palisades Plant for' the month of February.
consumers Power company Very truly yours, JAM:db cc:
J. G. Kepler, USNRC R.L.Haueter R.B.Sewell James A. Meineke General Engineer 2853
-....._:-.. ;_**-.,.~.. -~~-*-**:--t... "'-J"~~---**'-...........:~--~-*-~----"---~'----~~---*
- I f
- e
' 0
.r.O.
(
APPENDIX D*
UNIT Palisades DATE March 6, 1975.
D.Bollnow *
. COMPLETED BY 616-764-8913 DOCKET N0.-'5'-0_-_2_,_5-=-5 ____
OPERATING STATliS I.
REPORTING PERIOD: __
7_5'-0_2_0_1 __ -"-~----
THROUGH ___
7_5_0_2_2_8 ______
HOURS IN REPORTl:\\G PERIOD:
672
-~----"-~~~~--------------------
- 2.
CURRENTLY ACTHORIZED POWER LEVEL (~iWth). 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) ~7~0~0~-
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): __________ _
- 4.
REASONS FOR RESTRICTION (IF AN.Y):
THIS REPORTING PERIOD
- 5.
HOURS REACTOR WAS CRITICAL...... *......
0 ___
- 6.
REACTOR RESER VE SHUTDOWN HOURS.......
- 7.
. HOURS GENERATOR ON LINE.*...........***
0
- 8.
UNJT RESERVE SHUTDOWN HOURS. *..........
.o
- 9.
GROSS THER~!AL ENERGY GENERATED (~1WH)......*....*.********
0
- 10.
GROSS ELEqRICAL ENERGY
-GENERA TED (~IWH)... :.. *. * *.. * * *. * *. * *.. ___
0 ___ _
- 11.
- 12.
- 13.
- 14.
15.
NET ELECTRICAL ENERGY GENERATED (MWII)
REACTOR AVAILABILITY FACTOR(!)....*..*.
UNIT AVAILABILITY FACTOR (2).......*.*.*
l'NIT CAPACITY FACTOR (3).............*.
UNIT FORCED OUTAGE RATE (4)............
0 oc;a O;o 100%
CUMULATIVE YR TO DATE TO DATE 0
io,236.9 0
0 0
9.! 321.l 0
0 0
14,*1131260 0
4!504.!250
()
422'.232702 O°/o 6
t 3
- ~~()
0%
0%
3J. -fa 26.2~0 100%
)3. 7%
. 16.
SllllTDO\\\\'NS SCHEDULED TO BEGIN IN.NEXT6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHUT DOWN AT END OF. REPORT PERIOD, ESTIMATED DATE OF STARTUP: __ Ma r_c_h_*~3~1"~"-"*1""'9'-"'7"'"'5~---
- 18.
UNITS IN TEST STATUS (PRIOR TO COM~!ERCIAL OPERATION) REPORT THE FOLLOWING:
{I)
R,EAC'TOR A \\'AILABILITY FACTOR (2)
UNIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION
- COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
XIOO HOURS IN REPORTING PER!OD NF.T ELF.CTR IC AL POWFR GENERATED DATE LAST FORECAST DATE ACHIEVED MAX. DEPENDABLE CAPACITY (M\\Vc-NET) X HOURS IN REPORTING PERIOD
(-0
(."11 L'NIT FORCED OllTAGE RATE FORCED OUTAGE HOU_R_s_*-------------x 100.
HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
- ~ _.
I...
Ll6-D!
- ~~~""""'-"',,,,....~,,,.,...,.,,,..,.,,,.,..,,,,~. __.......... q... _,,,.,.* ~~~~
..,,,.,,.,,.l~"'"'!~'l!."'~'!'1'£'1'-'"""""~"'"',"*"-"'<l'~1"1--
l..
1' APPENDIX C cl*o**
DOCKET NO. ~50::..--=2"""55"'----
UN IT ---'-P..:.:ac=lc=i.:::.sa=d=e::..:s=----
<jO DA TE March* 6. 1975 COMPLETED BY D.Bollnow AVERAGE DAILY UNIT POWER LEVEL MONTH February 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 1 0
17*.
0 2
18 0
3 0
19 1 0
4 0
20*
0 5
0 21 0
6 0
22 0
7 0
23 0
8 0
24
..0 9
0 25 0
10 0
26 o*
11
- 27.
12 0
28 0
13 0
29 14 0
30 1!i 31 16 0
DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe~net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures,,;ill be used to plot a graph for. each reporting month. Note that by usi*ng maximum
~
dependable capacity for the net electrical rating of the unit. there may be occasions when the daily
~. *
average p~wer ~eve! exceeds the I 00% line (or the restricted po:ver level* line). In such cases, the G 1 o av:rage datly umt power output sheet should be footnoted to cxpla111 the apparent anomaly..
e *. *.
- 1.16-C-l
- L,,... _... ~
..,,,M.. -*~---*~*'Tl-
NO.
DATE 3
741104
SUMMARY
\\
- ~
........ __,.,*;,,,.,.,:.,.,... ;..,...._~is..,._....,._. ____ *_:"' ___...... __ _,....................................;..*....... _. ___
_. ~--.....,.,_:'..
TYPE F*FORCED DURATION S*SCHEDULED I
(HOURS)
F 2,866.6
- o
.o APPENDIX E UNIT SHUTDOWNS DOCKETNO. ~5_0_~2~5~5 ______ _
UNIT NAME Palisades.
DATE March 6. 1975 COMPLETED UY D.Bollnow REPORT MONTH _-=.F...::.eb=.::ru::...==a=...iry1....=l~97......,5'---
METHOD OF
~HUTTING DOWN REASON (1)
THE REACTOR (2)
CORR.ECTIVE ACTIONS/COMMENTS B
1 E.C.T. Steam Generators due to N.R.C.
Requirements.
'\\
\\
(1) REASON (2) METHOD.
A--EQUIPMENT FAILURE'(EXPLAIN)
I-MANUAL B-: MAINT. OR TEST 2-MANUAL c.. REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMIN!STRATIVE G-OPERA TIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN) 100% E<idy Current Testing o:f the Steam Gene:t'ators wtts completed during February.