3/1/1976 Letter, Requested to Review Reactor Coolant System Pressure Temperature Limits, Advising, Under Review with Consultants, & If Tech Spec Changes Required, Will Submit by 6/1/1976
ML18347A669
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/03/1976
From: Sewell R
Consumers Power Co
To: Purple R
Office of Nuclear Reactor Regulation
References
Download: ML18347A669 (1)


Text

.

  • consumers Power company General Offices: 212 West Michig1'in Avenue, Jackson, Michigan 49201
  • Area Code 517 788-0550 May 3, 1976 Director of Nuclear Reactor Regulat~on Att:

Mr R. A. Purple, Chief Operating Reactors Branch No 1 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255, LICENSE DPR PALISADES PLANT By letter dated March 1, 1976 Consumers Power Company was requested to review the reactor coolant system pressure temperature limits for heatup and cooldown operations, system hydrostatic tests and reactor core criticality for the Palisades Plant to determine if they are in fuli compliance with 10 CFR 50, Appendix G.

We engaged consultants to perform this review and they have compieted the review and'provided a report, At present, we do not believe Technical Specifications changes are required but it will be several more weeks before Consumers Power Company's review of the consultants' work is completed.

Thus, if Technical Spec~fications changes are required, they will be submitted by June 1, 1976 rather than within 60 days as requested in your letter.

r:~~

Ralpl:i: B. Sewell

  • .,~--~L_L __

Nuclear Licensing Administrator CC:

JGKeppler, USNRC fl e:.n.. r;