ML18333A008

From kanterella
Jump to navigation Jump to search

Acceptance for Review of Global Nuclear Fuel Administrative Amendment 49 to Nede-24011-P-A-27, General Electric Standard Application for Reactor Fuel (Gestar II)
ML18333A008
Person / Time
Site: 99901376
Issue date: 12/06/2018
From: Dennis Morey
NRC/NRR/DLP/PLPB
To: Michelle Catts
GE-Hitachi Nuclear Energy Americas
Golla J, NRR/DLP 415-1002
References
EPID L-2018-TOP-0039
Download: ML18333A008 (4)


Text

December 6, 2018 Ms. Michelle Catts Senior Vice President, Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC P.O. Box 780, M/C A-10 Wilmington, NC 28401-0780

SUBJECT:

ACCEPTANCE FOR REVIEW OF GLOBAL NUCLEAR FUEL ADMINISTRATIVE AMENDMENT 49 TO NEDE-24011-P-A-27, GENERAL ELECTRIC STANDARD APPLICATION FOR REACTOR FUEL (GESTAR II) (EPID: L-2018-TOP-0039)

Dear Ms. Catts:

By letter dated October 1, 2018 (Agencywide Documents Access and Management System Accession No. ML18274A195), Global Nuclear Fuel - Americas (GNF), submitted for the U.S.

Nuclear Regulatory Commission (NRC) staff review Administrative Amendment 49 to NEDE-24011-P-A-27, General Electric Standard Application for Reactor Fuel (GESTAR II).

The NRC staff has performed an acceptance review of this proposed GESTAR II amendment.

We have found that the material presented is sufficient to perform our review, however, we will not begin the review until we receive the following approved documents from you formally on the docket:

  • Applicability of GE Methods to Expanded Operating Domains, Licensing Topical Report, NEDC-33173P-A, Revision 5
  • Applicability of GE Methods to Expanded Operating Domains - Supplement for GNF3 Fuel, NEDC-33173 Supplement 5P-A, Revision 1
  • Applicability of GE Methods to Expanded Operating Domains - Removal of the Safety Limit Minimum Critical Power Ratio (SLMCPR) Penalty, NEDC-33173 Supplement 6P-A, Revision 1 The NRC staff estimates that the review will require approximately 120 staff hours including project management. This approach to the review was discussed with Mr. Kent Halac and Ms. Lisa Schichlein and the NRC staff on December 4, 2018.

Section 170.21 of Title 10 of the Code of Federal Regulations requires that TRs are subject to fees based on the full cost of the review. You did not request a fee waiver; therefore, NRC staff hours will be billed accordingly.

M. Catts Please contact Joseph A. Golla at (301) 415-1002, if you have any questions on this subject.

Sincerely,

/RA/

Dennis C. Morey, Chief Licensing Processes Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 99901376 cc: See next page

ML18333A008; *concurrence via e-mail NRR-106 OFFICE NRR/DLP/PLPB NRR/DLP/PLPB* NRR/DSS/SNPB NRR/DLP/PLPB NAME JGolla DHarrison RLukes DMorey DATE 12/6/2018 12/4/2018 12/6/2018 12/6/2018 GE-Hitachi Nuclear Energy Americas Docket No. 99901376 Project No. 712 cc:

Ms. Michelle P. Catts Senior Vice President, Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC P.O. Box 780 M/C A-10 Wilmington, NC 28401 Michelle.Catts@ge.com Mr. Kent E. Halac Senior Project Manager, Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC P.O. Box 780, M/C A-70 Wilmington, NC 28401-0780 Kent.Halac@ge.com Dr. Brian R. Moore General Manager, Core & Fuel Engineering Global Nuclear Fuel-Americas, LLC P.O. Box 780, M/C A-75 Wilmington, NC 28401-0780 Brian.Moore@ge.com Ms. Lisa K. Schichlein Senior Project Manager, Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC P.O. Box 780, M/C A-70 Wilmington, NC 28401-0780 Lisa.Schichlein@ge.com