VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 Security-Related Information - Withhold under 10 CFR 2.390 November 16, 2018 Attention: Document Control Desk Director, Division of Security Policy, Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 Serial No.:
17-470 NRA/MLW:
RO Docket Nos.:
50-338 50-339 License Nos.: NPF-4/7 NOTIFICATION OF INTERIM CYBER SECURITY MILESTONE 1-7 CORRECTIVE ACTION COMPLETION Virginia Electric and Power Company (the Licensee) received a Nuclear Regulatory Commission (NRG)
Inspection Report No.
05000338/2014404 and 05000339/2014404, dated March 13, 2014. This report documented the results of the NRG Temporary Instruction 2201/004, "Inspection of Implementation of Interim Cyber Security Milestones 1-7" inspection for North Anna Power Station.
The inspection report identified findings for which the NRG issued enforcement discretion due to "good-faith" attempts to interpret and implement Interim Cyber Security Milestones 1-7 commitments.
Before the enforcement discretion was considered or granted, the Licensee must have accepted the finding, placed the finding into their Corrective Action Program (CAP), and taken appropriate corrective action to restore compliance in a timely manner.
The NRG required that upon completion of all corrective actions, the Licensee provide written notification to the NRC's Regional office as to the method and date of closure for the identified issues. The written notification for North Anna Power Station is provided in the attachment to this letter.
If you have any questions, please contact Michael Whitlock at 804-273-3123.
Sincerely,
- ft-.£17 /Jz-~
Gerald T. Bischof Senior Vice President - Nuclear Operations & Fleet Performance Virginia Electric and Power Company
)/f/teDg
~ooJft-
- vst(L_
- J 1-t...t NOTE
- THE ATTACHMENT TO THIS LETTER CONTAINS "SECURITY-RELATED INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."
Serial No.17-470 Cyber Sec CA Completion Page 2 of 2
Attachment:
North Anna Power Station Notification of Cyber Security Corrective Action Completion Matrix Commitments made by this letter: None cc:
U. S. Nuclear Regulatory Commission, Region II Attn.: Regional Administrator Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Mr. James R. Hall (Without Attachment)
NRG Senior Project Manager North Anna U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRG Senior Resident Inspector (Without Attachment)
North Anna Power Station