MONTHYEARML24031A0502024-01-31031 January 2024 COL Docs - FW Erroneous Description of Tier 2 Change Process in Construction Lessons-Learned Report ML24017A1122024-01-17017 January 2024 NRR E-mail Capture - Request for Access to Cyber Security Data - Vogtle, Units 3 and 4 ML23360A0042023-12-23023 December 2023 NRR E-mail Capture - Fyi - Office of Nuclear Regulatory Research (RES) Requests for Vogtle 3 & 4 ML23348A0782023-12-13013 December 2023 NRR E-mail Capture - Voluntary Request for Closed Meeting Regarding Cyber Security Assessments at Vogtle, Units 3 and 4 ML23342A0802023-12-0808 December 2023 NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) ML23331A9992023-11-27027 November 2023 COL Docs - Re Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9492023-11-26026 November 2023 Email Dated November 26, 2023, from Bo Pham to SNC and NRC - Vogtle Seismic Hazard Report ML23326A2802023-11-22022 November 2023 COL Docs - Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9622023-11-22022 November 2023 Email Dated November 22, 2023, from SNC to NRC - Vogtle Seismic Hazard Report ML23320A0342023-11-16016 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23320A2372023-11-0808 November 2023 NRR E-mail Capture - (External_Sender) Proposed LAR Regarding the Ultimate Heat Sink at Vogtle, Units 1 and 2 ML23312A2632023-11-0808 November 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Monday, November 13, 2023 - Vogtle Units 3&4, LAR-22-002, TS 3.8.3, Inverters - Operating Completion Time Extension ML23311A1512023-11-0707 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23304A2272023-10-31031 October 2023 NRR E-mail Capture - Request for State of Georgia Comment by 5pm Monday, Nov. 6, 2023 - License Amendment Request for Vogtle Unit 4 - to Remove Combined License Appendix C ML23289A1362023-10-16016 October 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Friday, October 20, 2023 - Vogtle Units 3&4, LAR-23-006, Rev.1, More Restrictive Action for Tech. Spec. 3.1.9 ML23283A0332023-10-10010 October 2023 COL Docs - FW Vogtle Units 3 and 4 (LAR 23-009) ML23283A0452023-10-0808 October 2023 E-Mail Re Plant Vogtle - Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request ML23279A2082023-10-0505 October 2023 Issuance of Formal RAIs - Vogtle, Units 1 and 2 - Proposed LAR and Proposed Alternative Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML23275A1002023-10-0202 October 2023 COL Docs - Re Action Summary of 9.27.23 Clarification Call with Southern Nuclear Company on LAR-22-0002, TS 3.8.3 Inverters - Operating Completion Time ML23270B1912023-09-27027 September 2023 COL Docs - Update Vogtle Units 3&4 Acceptance Letter for LAR-22-002 Technical Specification 3.8.3, Inverters Operating ML23263A1042023-09-20020 September 2023 COL Docs - FW Fyi for Tomorrow'S Psm Meeting ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23257A0632023-09-13013 September 2023 NRR E-mail Capture - Acceptance Review of Southern Nuclear Operating Company'S License Amendment Request to Remove Combined License Appendix C ML23256A2682023-09-13013 September 2023 COL Docs - Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23248A3482023-09-0505 September 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) 6 - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23243A9172023-08-31031 August 2023 NRR E-mail Capture - (External_Sender) Re Question - Legal Contact(S) for Vogtle Electric Generating Plant, Units 3 & 4 ML23241A0452023-08-29029 August 2023 COL Docs - FW Draft LAR and Exemption Request Regarding Tier 1 and Tier 2 Requirements ML23229A2322023-08-17017 August 2023 COL Docs - FW Re LAR 22-002 Second Round RAI Approved ML23188A151 for Vogtle Units 3 & 4 ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23221A3982023-08-0909 August 2023 COL Docs - LAR 22-002 Second Round RAI Approved ML23188A151 ML23216A1592023-08-0404 August 2023 COL Docs - FW Acceptance Review - Requested Licensing Action Regarding TS Revision to Adopt WCAP-17661-P-A, Improved Relaxed Axial Offset Control and Constant Axial Offset Control Fq Surveillance TS (L-2022-LLA-0148 and L-2022-LLA-0149) ML23212A9642023-07-31031 July 2023 COL Docs - Action - Start of Annual Fees - Vogtle Unit 3 Completion of Power Ascension Testing and Declaration of Commercial Operations ML23216A0962023-07-26026 July 2023 Document Request for Vogtle 1 & 2 RP Inspection, Report No. 05000424/2023003 and 05000425/2023003 ML23220A0572023-07-26026 July 2023 Document Request for Vogtle Units 1 and 2 - Radiation Protection Inspection - Inspection Report 2023-03 ML23200A0112023-07-18018 July 2023 Document Request for Vogtle Unit 3 RP Inspection ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23193A7832023-07-12012 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) 2024-01-31
[Table view] |
Text
Vogtle PEmails From: Hoellman, Jordan Sent: Tuesday, November 13, 2018 12:32 PM To: Vogtle PEmails
Subject:
draft Alternative to ASME OM Code for Preservice Testing of Squib Valves for 11/15/18 Public Meeting Attachments: Squib Valve Alternative Presub 11-15-18.pdf Attached is the draft Alternative to ASME OM Code for Preservice Testing of Squib Valves for the 11/15/18 public meeting. The attachment does not contain any SUNSI.
1
Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 388 Mail Envelope Properties (SN6PR0901MB236693E0B37CF5E00DE5F102D5C20)
Subject:
draft Alternative to ASME OM Code for Preservice Testing of Squib Valves for 11/15/18 Public Meeting Sent Date: 11/13/2018 12:32:19 PM Received Date: 11/13/2018 12:32:27 PM From: Hoellman, Jordan Created By: Jordan.Hoellman2@nrc.gov Recipients:
"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None Post Office: SN6PR0901MB2366.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 179 11/13/2018 12:32:27 PM Squib Valve Alternative Presub 11-15-18.pdf 856016 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
ND-18-1401 Enclosure Proposed Alternative VEGP 3&4-PST-Alt-01 in Accordance with 10 CFR 50.55a(z)(1) -
Alternative Requirements for Preservice Testing of Explosively Actuated Valves Plant Site-Unit: Vogtle Electric Generating Plant (VEGP) - Units 3 and 4 Interval-Interval Applies to the preservice testing period.
Dates:
Requested Date Approval is requested by May 30, 2019.
for Approval:
ASME Code Components ASME Explosively Actuated Valves.
Affected:
Applicable Code T
Edition and Addenda:
AF ASME OM Code, 2012 Edition (code of record).
ASME OM Code, ISTC-3100(d)(2) requires that for post-2000 plants, explosively actuated valves shall be preservice tested by:
Applicable Code Requirements: R Select a sample of at least 20% of the pyrotechnic charges in all valves to be tested. Test each selected charge either in the valve or a qualified test fixture to confirm the capability of each sampled charge to provide the necessary motive force to operate the valve to perform D its intended function without damage to the valve body or connected piping. The sampling must include at least one explosively actuated valve from each redundant safety train.
Based on the definition of Preservice test, which states test performed after completion of construction activities related to the Reason for component, and the statement in ISTC-3100(d)(2) that Request: Pyrotechnic charges in all valves indicates that the charges must be installed in the valves, and the valves installed in the system, prior to selection of the charges for testing. Handling of explosive charges exposes personnel to significant risks. Since the charges are fabricated and shipped separately, and the testing will be done by the vendor or another offsite test facility, the current requirements would involve shipping of the charges to the site, installation of the 1
ND-18-1401 Enclosure Proposed Alternative VEGP 3&4-PST-Alt-01 in Accordance with 10 CFR 50.55a(z)(1) -
Alternative Requirements for Preservice Testing of Explosively Actuated Valves charges in the valves (which would be installed in the piping, in containment), removal of the charges, and shipment of the charges back to the vendor or other test facility.
To minimize handling and transportation of explosive charges, it is proposed to select the charges after fabrication, and retain for testing at the vendor, or in the worst case, being shipped from the vendor to a separate test facility.
Proposed Alternative:
In lieu of the requirements of ISTC-3100(d)(2), perform the following:
Select a sample of pyrotechnic charges, following fabrication for T
testing, this may include charges used for qualification of the batch. The sample shall include a quantity of charges equal to at least 20% of the number of charges of each size installed in the plant and shall include at least one from each manufacturer AF batch. Each selected charge shall be tested in a qualified test fixture to confirm the capability of each sampled charge to provide the necessary motive force to operate the valve to perform its intended function without damage to the valve body or connected piping.
R Proposed Alternative and Basis for Use:
Basis for Use:
The proposed alternative provides an equivalent level of safety as it ensures the charges are tested to the same criteria, and that the D charges tested are from each manufacturer, lot and size (batch). The allowance of crediting the qualification samples is equivalent or better than ISTC-5260(d), which only requires test firing of one charge per batch prior to installation as a replacement charge.
The requirement regarding one from each train is not applicable, since the charges were selected for testing prior to installation in the valve. However, since the selection of charges for installation in valves of each train is random, the level of testing is equivalent.
The proposed alternative provides improved personnel safety by minimizing the transportation and handling of explosive charges.
2
ND-18-1401 Enclosure Proposed Alternative VEGP 3&4-PST-Alt-01 in Accordance with 10 CFR 50.55a(z)(1) -
Alternative Requirements for Preservice Testing of Explosively Actuated Valves Since the proposed alternative tests an equivalent number of pyrotechnic charges to the same criteria, this proposed alternative provides an acceptable level of quality and safety in accordance with 10 CFR 50.55a(z)(1).
Duration of Proposed Preservice testing conducted prior to commercial operation.
Alternative:
References:
None.
Status:
T Awaiting NRC authorization AF R
D 3