1 Vogtle PEmails From:

Hoellman, Jordan Sent:

Tuesday, November 13, 2018 12:26 PM To:

Vogtle PEmails

Subject:

Pre-submittal Presentation for ASME Section III Pressure Testing Post N-5 (ALT-12) for 11/15/18 Public Meeting Attachments:

Section III PT Presubmittal 11-15-18.pdf Attached is the Pre-submittal Presentation for the 11/15/18 public meeting regarding Alternative to ASME Section III Pressure Testing Requirements Post N-5 (ALT-12). The attachment does not contain any SUNSI.

Hearing Identifier:

Vogtle_COL_Docs_Public Email Number:

386 Mail Envelope Properties (SN6PR0901MB236614043E50817800F5348FD5C20)

Subject:

Pre-submittal Presentation for ASME Section III Pressure Testing Post N-5 (ALT-12) for 11/15/18 Public Meeting Sent Date:

11/13/2018 12:25:33 PM Received Date:

11/13/2018 12:25:39 PM From:

Hoellman, Jordan Created By:

Jordan.Hoellman2@nrc.gov Recipients:

"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>

Tracking Status: None Post Office:

SN6PR0901MB2366.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 226 11/13/2018 12:25:39 PM Section III PT Presubmittal 11-15-18.pdf 504347 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

LAR-XXX and Alt-12 Alternative to ASME Section III Pressure Testing Requirements Post N-5 Presubmittal Meeting 11/15/18

Agenda

  • Background
  • Problem Statement
  • Scope
  • Issue Resolution
  • Basis
  • Documentation
  • Proposed LAR and Alternative Schedule 2

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Background

  • ASME Section III requires a pressure test at 1.25 times design pressure following performance of a repair and/or replacement activity associated with a Class 1, 2, or 3 pressure boundary.
  • The requirement to conduct multiple pressure tests at the elevated pressures required by ASME Section III following repair/replacement activities prior to the Section 52.103(g) finding creates a hardship associated with establishing test boundaries and elevated test pressures.

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

Problem Statement 61&LVVHHNLQJWRXVHQRPLQDOV\\VWHPRSHUDWLQJSUHVVXUHWRSHUIRUP$60(6HFWLRQ

,,,K\\GURVWDWLFSUHVVXUHWHVWLQJIRUUHSDLURUUHSODFHPHQWDFWLYLWLHVRI$60(6HFWLRQ

,,,&ODVVDQGFRPSRQHQWVGXULQJWKHWLPHEHWZHHQ

  • FRPSOHWLRQRIWKH$60(6HFWLRQ,,,1GDWDUHSRUWIRULQVWDOODWLRQRIWKH

FRPSRQHQW V LQWKHSODQWDQG

  • WKH J ILQGLQJ

,QOLHXRISHUIRUPLQJWKH6HFWLRQ,,,SUHVVXUHWHVWRIWKHUHSDLUHGRUUHSODFHG

FRPSRQHQWDOHDNFKHFNDWQRPLQDOV\\VWHPRSHUDWLQJSUHVVXUHIRUWKHFRPSRQHQW

ZLOOEHSHUIRUPHG7KLVLVFRQVLVWHQWZLWK6HFWLRQ;,UHTXLUHPHQWV

This approach is similar to TVA Watts Bar 2





Scope 7KHDOWHUQDWLYHZRXOGDSSO\\WRSUHVVXUHWHVWLQJIRUDOO$60(6HFWLRQ,,,FRPSRQHQWV

H[FHSWUHSDLURUUHSODFHPHQWRIODUJH$60(6HFWLRQ,,,&ODVVFRPSRQHQWVLQFOXGLQJ

6WHDP*HQHUDWRUV 5&3V 3UHVVXUL]HU 5HDFWRU9HVVHO

$FFXPXODWRUV

&RUH0DNH8S7DQNV

/RRSSLSLQJDVGHILQHGLQ8)6$57LHU7DEOH

35+5+HDW([FKDQJHUV All other ASME Section III requirements (e.g. NDE, acceptable flaw sizes) will be maintained.

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Issue Resolution (Licensing Path for Changes):

ASME Section III Code Alternative Proposal:

- Request to perform pressure test at nominal system operating pressure for components repaired and/or replaced following the ASME Section III N-5 installation data report consistent with Section XI requirements.

License Amendment and Exemption:

- Expands on ASME Section III alternative request basis and address impact of alternative on ITAAC

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Basis

  • Initially all ASME Section III requirements for system have been met, as documented by completion of N-5

- This includes all ASME Section III examinations performed; these examination are performed in accordance with ASME Section V

  • Pressure Testing post N-5 will be performed in accordance with ASME Section XI

- ASME Section XI is a proven industry code

  • This approach is consistent with operating plants and when they transition to ASME Section XI pressure testing.
  • The above approach provides reasonable assurance of the structural integrity of the subject ASME Section III piping.

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Documentation

  • Pressure testing required following the completion of the N-5 installation data report will be documented on a supplement to the N-5 installation data report

- Requires ANI review

  • An ITAAC Post Closure Notification (PCN) will be issued for ASME pressure tests completed following the completion of the N-5 installation data report

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



3URSRVHG/$5DQG$OWHUQDWLYH6FKHGXOH

- Submittal - November 30, 2018

- Requested Approval Date - May 30, 2019