COL Docs - Pre-submittal Presentation for ASME Section III Pressure Testing Post N-5 (ALT-12) for 11/15/18 Public Meeting
ML18317A260
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/13/2018
From:
NRC
To:
NRC/NRO/DLSE/LB4
References
Download: ML18317A260 (11)


Text

Vogtle PEmails From: Hoellman, Jordan Sent: Tuesday, November 13, 2018 12:26 PM To: Vogtle PEmails

Subject:

Pre-submittal Presentation for ASME Section III Pressure Testing Post N-5 (ALT-12) for 11/15/18 Public Meeting Attachments: Section III PT Presubmittal 11-15-18.pdf Attached is the Pre-submittal Presentation for the 11/15/18 public meeting regarding Alternative to ASME Section III Pressure Testing Requirements Post N-5 (ALT-12). The attachment does not contain any SUNSI.

1

Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 386 Mail Envelope Properties (SN6PR0901MB236614043E50817800F5348FD5C20)

Subject:

Pre-submittal Presentation for ASME Section III Pressure Testing Post N-5 (ALT-12) for 11/15/18 Public Meeting Sent Date: 11/13/2018 12:25:33 PM Received Date: 11/13/2018 12:25:39 PM From: Hoellman, Jordan Created By: Jordan.Hoellman2@nrc.gov Recipients:

"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>

Tracking Status: None Post Office: SN6PR0901MB2366.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 226 11/13/2018 12:25:39 PM Section III PT Presubmittal 11-15-18.pdf 504347 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

LAR-XXX and Alt-12 Alternative to ASME Section III Pressure Testing Requirements Post N-5 Presubmittal Meeting 11/15/18

2 Agenda

  • Background
  • Problem Statement
  • Scope
  • Issue Resolution
  • Basis
  • Documentation
  • Proposed LAR and Alternative Schedule

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

Background

  • ASME Section III requires a pressure test at 1.25 times design pressure following performance of a repair and/or replacement activity associated with a Class 1, 2, or 3 pressure boundary.
  • The requirement to conduct multiple pressure tests at the elevated pressures required by ASME Section III following repair/replacement activities prior to the Section 52.103(g) finding creates a hardship associated with establishing test boundaries and elevated test pressures.



$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

Problem Statement 61&LVVHHNLQJWRXVHQRPLQDOV\VWHPRSHUDWLQJSUHVVXUHWRSHUIRUP$60(6HFWLRQ

,,,K\GURVWDWLFSUHVVXUHWHVWLQJIRUUHSDLURUUHSODFHPHQWDFWLYLWLHVRI$60(6HFWLRQ

,,,&ODVVDQGFRPSRQHQWVGXULQJWKHWLPHEHWZHHQ

  • FRPSOHWLRQRIWKH$60(6HFWLRQ,,,1GDWDUHSRUWIRULQVWDOODWLRQRIWKH

FRPSRQHQW V LQWKHSODQWDQG

  • WKH J ILQGLQJ

,QOLHXRISHUIRUPLQJWKH6HFWLRQ,,,SUHVVXUHWHVWRIWKHUHSDLUHGRUUHSODFHG

FRPSRQHQWDOHDNFKHFNDWQRPLQDOV\VWHPRSHUDWLQJSUHVVXUHIRUWKHFRPSRQHQW

ZLOOEHSHUIRUPHG7KLVLVFRQVLVWHQWZLWK6HFWLRQ;,UHTXLUHPHQWV

This approach is similar to TVA Watts Bar 2



$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

Scope 7KHDOWHUQDWLYHZRXOGDSSO\WRSUHVVXUHWHVWLQJIRUDOO$60(6HFWLRQ,,,FRPSRQHQWV

H[FHSWUHSDLURUUHSODFHPHQWRIODUJH$60(6HFWLRQ,,,&ODVVFRPSRQHQWVLQFOXGLQJ

  • 6WHDP*HQHUDWRUV
  • 5&3V
  • 3UHVVXUL]HU
  • 5HDFWRU9HVVHO
  • $FFXPXODWRUV
  • &RUH0DNH8S7DQNV
  • /RRSSLSLQJDVGHILQHGLQ8)6$57LHU7DEOH
  • 35+5+HDW([FKDQJHUV All other ASME Section III requirements (e.g. NDE, acceptable flaw sizes) will be maintained.



$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

Issue Resolution (Licensing Path for Changes):

ASME Section III Code Alternative Proposal:

- Request to perform pressure test at nominal system operating pressure for components repaired and/or replaced following the ASME Section III N-5 installation data report consistent with Section XI requirements.

License Amendment and Exemption:

- Expands on ASME Section III alternative request basis and address impact of alternative on ITAAC



$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

Basis

  • Initially all ASME Section III requirements for system have been met, as documented by completion of N-5

- This includes all ASME Section III examinations performed; these examination are performed in accordance with ASME Section V

  • Pressure Testing post N-5 will be performed in accordance with ASME Section XI

- ASME Section XI is a proven industry code

  • This approach is consistent with operating plants and when they transition to ASME Section XI pressure testing.
  • The above approach provides reasonable assurance of the structural integrity of the subject ASME Section III piping.



$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

Documentation

  • Pressure testing required following the completion of the N-5 installation data report will be documented on a supplement to the N-5 installation data report

- Requires ANI review

  • An ITAAC Post Closure Notification (PCN) will be issued for ASME pressure tests completed following the completion of the N-5 installation data report



$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

3URSRVHG/$5DQG$OWHUQDWLYH6FKHGXOH

- Submittal - November 30, 2018

- Requested Approval Date - May 30, 2019