ML18310A100

From kanterella
Jump to navigation Jump to search
The Independent Spent Fuel Storage Installation - Submittal of Revised Emergency Plan Implementing Procedure (EPIP)
ML18310A100
Person / Time
Site: San Onofre  
Issue date: 11/01/2018
From: Bates A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
SO123-VIII-ERO-2, Rev 3
Download: ML18310A100 (2)


Text

An F.DISON INTERNATIONAL' Complllly U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 November 1, 2018

Subject:

Docket Nos. 50-206, 50-361, 50-362, and 72-41 Al Bates Manager, Regulatory Affairs 10 CFR 50.54(q)

Revised Emergency Plan Implementing Procedure (EPIP)

San Onofre Nuclear Generating Station (SONGS) Units 1, 2, and 3 and the Independent Spent Fuel Storage Installation

Dear Sir or Madam:

Pursuant to 10 CFR 50.54(q)(5), Attachment 1 of this letter provides a copy of the following revised Emergency Plan document:

Procedure Rev.

Effective Date S0123-VIII-ER0-2, Shift 3

October 4, 2018 Manager/Emergency Director Checklist As specified in 10 CFR 50.54(q)(5), Attachment 2 provides a report and analysis summary for the EPIP changes. These changes do not reduce the effectiveness of the Emergency Plan or the EPIPs.

There are no commitments contained in this letter or its attachments.

P. 0. Box 128 San Clemente, CA 92672

4-)uJ 5

/J"4 ~s z_tp

J/_/(
JJvfS5

Document Control Desk.

If you have any questions, please contact me at (949) 368-6945.

Attachments: 1. Revised Emergency Plan Implementing Procedure

2. Report and Analysis Summary cc:

Emergency Response Coordinator, NRC Region IV (2 copies of Attachment 1)

K. M. Kennedy, Regional Administrator, NRC Region IV M. G. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3 W. C. Allen, NRC Project Manager, SONGS ISFSI