MONTHYEARIR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) 2024-09-06
[Table view] |
See also: IR 05000482/2018440
Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
November 2, 2018
EA-17-149
Mr. Adam C. Heflin, President,
Chief Executive Officer,
and Chief Nuclear Officer
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
SUBJECT: WOLF CREEK GENERATING STATION - NRC SUPPLEMENTAL INSPECTION
REPORT 05000482/2018440 AND FOLLOW-UP ASSESSMENT LETTER
Dear Mr. Heflin:
On September 20, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a
supplemental inspection using Inspection Procedure 95001, Supplemental Inspection
Response to Action Matrix Column 2 Input. The NRC inspector discussed the results of this
inspection with J. McCoy, Site Vice President and other members of your staff.
The NRC performed this supplemental inspection to review your stations actions in response to
a greater than green finding in the Security Cornerstone, finalized in NRC Inspection Report
05000482/2017490. On August 15, 2018, you informed the NRC that your station was ready for
the supplemental inspection (Agencywide Document Access Management System (ADAMS)
Accession No. ML18236A549).
The NRC performed this supplemental inspection to determine if (1) the root and contributing
causes for the significant issues were understood; (2) the extent of condition and extent of
cause for the identified issues were understood; and (3) your completed or planned corrective
actions were sufficient to address and prevent repetition of the root and contributing causes.
The inspection consisted of examination of activities conducted under your license as they
related to safety, compliance with the Commissions rules and regulations, and the conditions of
your operating license.
Based on the results of this inspection, the NRC determined that Wolf Creek Generating Station
performed a comprehensive evaluation of the events that led up to the Greater than Green input
in the Security Cornerstone.
Enclosure transmitted herewith
contains SUNSI. When separated
from enclosure, this transmittal
document is decontrolled.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
A. Helfin 2
The NRC also determined that completed and planned corrective actions were sufficient to
address the performance issues that led to the Greater than Green input in the Security
Cornerstone. As a result, the NRC concluded the inspection objectives were met and that the
performance issue will not be considered as an Action Matrix input after the end of the third
quarter of 2018.
The NRC inspector did not identify any finding or violation of more than minor significance.
This letter also informs you of the NRCs updated assessment of your facility. Based on the
guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, our
continuous review of plant performance, and the results of this inspection, the NRC updated its
assessment of Wolf Creek Generating Station. The NRCs assessment consisted of a review of
Wolf Creek Generating Stations performance indicators and inspection results. Specifically, the
NRC determined the performance at Wolf Creek Generating Station to be in the Licensee
Response Column of the Reactor Oversight Process Action Matrix as of the date of this letter.
In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding 2.390 of the NRCs Agency Rules of
Practice and Procedure, a copy of this letter will be available for public inspection and copying
at http://www.nrc.gov/about-nrc/regulatory/enforcement/enforce-pol.html in accordance with 10
CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
However, the enclosed report and Assessment Letter contains Security-Related Information, so
the enclosures will not be made publically available in accordance with 10 CFR 2.390(d)(1). If
you choose to provide a response that contains Security-Related Information, please mark your
entire response Security-Related-Information-Withhold from public disclosure under 10 CFR
2.390 in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10
CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in
accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Mark R. Shaffer, Director
Division of Reactor Safety
Docket No. 50-482
License No. NPF-42
Enclosure:
Inspection Report 05000482/2018440
w/attachment
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
ML18306A497
Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
SUNSI Review By: RCL Yes No Publicly Available Sensitive _______MD 3.4 A.3
ADAMS ACCESSION NUMBER: ML18306A496
Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
SUNSI Review By: RCL Yes No Publicly Available Sensitive NRC-002
OFFICE PSB1 C:PSB1 C:PBB C:PSB1 D:DRS
NAME RLanfear J Larsen NTaylor JLarsen MShaffer
SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/
DATE 10/30/18 10/30/18 11/01/18 11/01/18 11/02/18