ML18303A095

From kanterella
Jump to navigation Jump to search
October 23, 2018 Summary of Telephone Call with U.S. Department of Commerce National Institute of Standards and Technology to Discuss Progress of Building 245 Which Includes Planned Title 10 of the Code of Federal Regulations Part 36 Irradi
ML18303A095
Person / Time
Site: 07000398
Issue date: 11/06/2018
From: Ty Naquin
NRC/NMSS/DFCSE/FLB
To: Jacob Zimmerman
NRC/NMSS/FCSS/FLIB
Naquin T
Shared Package
ML18303A059 List:
References
Download: ML18303A095 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 6, 2018 MEMORANDUM TO: Jacob I. Zimmerman, Chief Fuel Facility Licensing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards FROM: Tyrone D. Naquin, Project Manager \RA\

Fuel Facility Licensing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards

SUBJECT:

OCTOBER 23, 2018, TELEPHONE CALL

SUMMARY

U.S.

DEPARTMENT OF COMMERCE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY BUILDING EXPANSION On October 23, 2018, the U.S. Nuclear Regulatory Commission (NRC) staff held a telephone conference call with staff from the U.S. Department of Commerce National Institute of Standards and Technology (NIST) to discuss the progress of Building 245 (Health Physics Building), which includes a planned Title 10 of the Code of Federal Regulations (10 CFR) Part 36 Irradiator Facility. On November 21, 2017, NRC issued Amendment 9 to the SNM-362 license, authorizing NIST to proceed with the construction of a Part 36 irradiator facility in accordance with 10 CFR Section 36.15, Commencement of Construction. The irradiator facility is one small segment of a building expansion project that will add four floors of laboratory and research space to the Health Physics Building. NIST currently has an irradiator facility and intends to move one 15,000 Curie irradiator to the new facility. The purpose of the call was to discuss project status and ensure all required steps of commissioning are understood and coordinated, to include licensing and inspection. My last visit to the site was in June 2018. I am attaching the telephone summary for your use. The summary contains no proprietary or classified information.

Enclosure:

Telephone Conference Call Summary cc: Manny Mejias, NIST Docket No. 0700-0398 License No. SNM-362 CONTACT: Tyrone Naquin, NMSS/FCSE (301) 415-7352

2 J. Zimmerman

SUBJECT:

OCTOBER 23, 2018, TELEPHONE CALL

SUMMARY

U.S.

DEPARTMENT OF COMMERCE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY BUILDING EXPANSION DATED: November 6, 2018 DISTRIBUTION:

FCSE r/f LWardrobe/RI, ABurritt/RI ADAMS Accession Package Number: ML18303A059 OFC FCSE/FFLB FCSE/FFLB FCSE/FFLB NAME TNaquin TBrockington JZimmerman DATE 10/29/2018 11/01/2018 11/06/2018 OFFICIAL RECORD COPY