ML18296A003

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Braidwood Units 1 and 2 - Acceptance Review for Relief Request I4R-09 Regarding Repair of RPV Head Penetration Nozzles
ML18296A003
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/22/2018
From: Joel Wiebe
Plant Licensing Branch III
To: Zurawski L
Exelon Generation Co
References
L-2018-LLR-0130
Download: ML18296A003 (2)


Text

NRR-DMPSPEm Resource From: Wiebe, Joel Sent: Monday, October 22, 2018 2:58 PM To: Lisa Zurawski (Lisa.Zurawski@exeloncorp.com)

Subject:

Braidwood Units 1 and 2--Acceptance review for Relief Request I4R-09 regarding repair of RPV head penetration nozzles (EPID L-2018-LLR-0130)

Lisa, By letter dated October 4, 2018 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML18277A149), Exelon Generation Company, LLC (EGC) requested relief from various requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI, at Braidwood Station, Units 1 and 2. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(1), EGC submitted Relief Request I4R-09 on a contingency basis for the alternate repair of potential indications in reactor vessel head penetration nozzles using Inside Diameter Temper Bead weld repair method for the Fourth Ten-Year lnservice Inspection interval. The request is applicable to Braidwood Station, Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your request (I4R-09) and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 120 hours5 days <br />0.714 weeks <br />0.164 months <br /> to complete. The NRC staff expects to complete this review in approximately 11 months, which is September 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

If you have any questions, please contact me at (301) 415-6606.

Joel S. Wiebe, Sr. Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1

Hearing Identifier: NRR_DMPS Email Number: 633 Mail Envelope Properties (Joel.Wiebe@nrc.gov20181022145700)

Subject:

Braidwood Units 1 and 2--Acceptance review for Relief Request I4R-09 regarding repair of RPV head penetration nozzles (EPID L-2018-LLR-0130)

Sent Date: 10/22/2018 2:57:35 PM Received Date: 10/22/2018 2:57:00 PM From: Wiebe, Joel Created By: Joel.Wiebe@nrc.gov Recipients:

"Lisa Zurawski (Lisa.Zurawski@exeloncorp.com)" <Lisa.Zurawski@exeloncorp.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2850 10/22/2018 2:57:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: