MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] |
Text
DISTRIBUTION AFTER ISSUANCE 'PERATING LICENSE U.s. NUCI.EAR REGUI ATORY COMMIS N DOCKET NUMB NRC FORM 195 I2.78~)
F I I E NUM BE NRC DISTRIBVTION FoR PART 50 DOCKET MATERIAL TO: State of Alabama DATE OF DOCUMENT Water Improvement Commission 7/18/77 Mr. Herbert ST Sanger, Jri Montgomery, Alabama DATE R)fflPJP James W Warr ETTE R QNOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED ClORIGINAI
+UNCLASSIFIED gcopv DESCRIPTION ENCL,OSU R E Consists of response to Mri Sanger's 7/13/77 ltri concerning the operation of Brown's Ferry Nuclear Plant, Alabamais Water Quality Standards, and the recently issued IIPDES Permito ~ ~ ~ ~ ~
. 0%
PLANT NIXIE:Browns Ferry Units 1-2<<3 RJL 9/1/77 (2-P)
SAFETY FOR ACTION/INFORNIATION BRANCH CHIEF: 7 INTERNAL 0 RI BUTION flREG EXLE NR .PDR I G E (2)
OELD HANAUER CHECK STELLO EISENHUT SHAO BAER BUTLER GRIMES J. COLLINS EXTERNAL 0 IS i RIBUTION CONTROL NUMBER LPDR'IC iiISIC
~
7w~ ys4 Y0~
e'Aj 16 CYS ACRS SENT CATE
STATE OF ALABAMA WAYKB 4MPBOVKI'r2KN7 COMMKSSN)iaaf
. Ira t.. Myers, M. O. Commission Members:
Chairman State Health Oflicer hlarvln O. Derglln, Falrhope Or. Robert t'I. tsucher, Mobile John W. Hodnett Charles O. Cargile, Hueytovrn Vice Chairman Louis Grabensteder, Huntsville Commissioner, Department ot David L. Thomas, Montgomery Conservation and Natural Resources Mailing addresss Perry Hill Otllce Park 3815 Interstate Court James W. Warr State Oflice ttulldtng Montgomery, Alabama Chief Administrative Oflicer Montgomery, AL 36t30 Telephone 206/277-3630 July 18, 1977 sto- JLQ
. Herbert S. Sangex, @III' General Counsel TVA 400 Commerce Street
@lb Knoxville, TN . 37902
Dear Mr. Sangex:
~aegu~p~rg g~~f Re: Browns Perry Nuclear Plant
~
NPDES No. AL0022080 This is in response to your July 13, 1977, letter concerning.tIte operation.
of Browns Perry Nuclear Plant, Alab,mats Water Quality Standards, and the recently issued NPDPS Pexmit. Your letter also transmitted a copy of the petition for an adjudicatory hearing submitted to EPA seeking less stringent thermal effluent limitations. This request has been prompted by the poor performance of the cooling towers as well as structural failure of one tower and a concern that a similar failure may occur in other towers.
Xn a letter dated July 15, 1977, Region XV of EPA. stayed the contested provisions of the.NPDES Permit until a decision is made to either grant or deny the request for an adjudicatory heaxing. However, EPA went further and granted .your xequest,for,relief concexning.,water quality standards and imposed temporary discharge conditions. These conditi'ons specify that you will not exceed a maximum temperature limit of 90OP nor a maximum temperature rise of 5OP, both as measured at the downstream edge of the a"signed mixing zone.
TVA has previously supplied tbis. office with. environmental assessments that.
addxess the thermal dischaxge from he plant and the ixtpact on a balanced indigenous population of fish and aquatic life. We understand tha't you axe asking for concurrence'with EPA's position based on this previously supplied information. We further understand that TVA will update this= information by August 15, 1977, and determine what actions will be taken to rectify the existing situation concerning the cooling 'system.
We axe of the opinion that the position taken by EPA is a reasonable one in view of the existing information, and the critical need for this facility.
The technical. staff of the WXC, therefoxe, .concurs. with,that position.
Mr.-Herbert S. Sanger, Jr.
July 18, 1977 Page 2 We look forward to receiving the updated reports as well as TVA's plan of action concerning this problem.
ours very truly, Cc Dames W. Warr Chief Administrative Officer, Water improvement. Commission ZiÃ:WTD:dst cc: Mr. Howard Zeller