FOIA/PA-2017-0698 (NRC-2017-000696) - Resp 3 - Final. Agency Records Subject to Request Enclosed
ML18278A113
Person / Time
Issue date: 09/27/2018
From:
NRC/OCIO
To:
Shared Package
ML18278A260 List:
References
FOIA/PA-2017-0696, NRC-2017-000696
Download: ML18278A113 (542)


Text

Fr om : faroao Michael To: Benjami 1amie: Rodrii:uez Lionel; Dunlop Andrew; Phillios Charles

Subject:

RE: acme or square threads Date: Thursday, J une 01, 201 7 10:14:30 AM 1did a search on the 2nd op eval looking for the word "square" and came up empty. Are you t hinking of the va lve stern to stem nut interface which is a stub ACME thread?

Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Commission 301-415-1486 From: Benjamin, Jamie Sent: Thursday, June 01, 2017 10:44 AM To: Rodriguez, Lione l <Lione l. Rodr iguez@n rc.gov>; Dun lop, Andrew <Andrew .Du nlop@nrc.gov>;

Farnan, Micha el <M ichael.Farnan @nrc.gov>; Phill ips, Charles <Charles.Phill ips@nrc.gov>

Subject:

acme or square t hreads Fai lure analysis said the threads were acme, didn't the operability evaluation state that they were square threads? Difference?

From: Mclntvre David To: Benney Bnan: Bumell. Scott: Ng. Chjng: Q"Brien Kenneth: Jhomas Erlc Cc: Wilkins. Lynnea; Mitlyng. Viktorla: Chandrathil. Prema

Subject:

RE: ACTION - answers needed for LaSalle Communicatlon Plan - J une 2017 Date: Thursday, June 01, 2017 4:05:34 PM Attachments: LaSalle Commun1cation Plan - une 2017 dtm com ments.docx Brian - From a quick read, several comments and questions, seeking clarity. Scott will add his insights tomorrow. l'm copying my R3 colleagues Vika and Prema for their awareness.

Thanks ,

Dave From: Benney, Brian Sent: Thursday, June 01, 2017 3:52 PM To: Burnell, Scott <Scott.Burnell@nrc.gov>; Mclntyre, Davld <Dav1d .Mc1ntyre@nrc.gov>; Ng, Ching <Ching.Ng@nrc.gov>; O'Brien, Kenneth <Kenneth.O'Brien@ nrc.gov>; Thomas, Eric

<Eric.Thomas@ nrc.gov>

Cc: Wilkins, Lynnea <Lynnea.Wil kins@nrc.gov>

Subject:

ACTION - answers needed for LaSalle Commun ication Plan - June 2017 Folks, we are t rying to "fi nalize" th is comm unicat ions plan for Greg's approval TOMORROW.

Following that, it will be posted on Eric's Sha repoint site.

Please help us to get solid answers t o the Q&A section, w hi le OPA takes a look at t he rest.

Please do not lim it yourse lf to j ust these quest ions. lf needed please add ot her expect ed guestions and answer if known. This should be used to help us durng the end of June public meeting. Once th is is up on Sharepoint we will be able t o do much more.

Thankyou, Brian Benney

[ Commeot IMDI: defiue )

Communication Plan June 1, 2017 / Commeot [MD: Where'! When'/ By h whom? Was th is subsequent to Feb l l at 11

~

LaSalle?

Goals

.,,,t' Com meot lMDI : Does this mean This communication plan serves as a reference document as information is discovered ~

oroblems? Ma lftmctious?

throughout the LIC-504 process. Significant information, references, observations and ....;i Commen1 IMDI: ls mdustry . .

umg these

~

messages should be included in this plan.

..lii methods? Have we asked tbem to justify

""i them , but we stili bave coacerns?

Communication Team ...,,,1'"**: Commeot [MDI: Yet they are operating 1

lp f

,,,. , with potentially faul ty valves that have Region 111 , NRR (DPR, DE, DIRS), NRO (DCIP), OPA

....:,..:: : actua lly had problems, and we don't trust

.,,./ the way industty is cl1ecking to see if the Jpl Timeline f:1!; valves are OK?

  • Region 3 exit for the LaSalle SIT - June 16, 2017  !!H;
  • lssuance of the IN - Expected delivery of the draft is June 12 for comment. with issuance  !!!:i June 16 1Hli
  • Public Meeting- as early as June 19, 2017 ...,,i!

!!J Key Messages  ::::;

!!fli 1Jfi:

  • Anchor Darling valves have been found to be susceptible to wedge pin failure, including  ::::;

simple unthreading of the stem and wedge due to inadequate torqueing of a critical part f!U; 1,1 1 ,

during assembly resulting in valve failure. l;:1 1

u:
  • The safety significance depends on the size of the valve as well as its function. Based on /:/ /:

conservative input and failure probability, it is reasonable to conclude that the increase in i/[i/

DF)_is less than 1E-5, which is within the bounds of RG 1.174 for small chan9.es in risk. __ ___ i// /i
H
  • '6-pproximately 26 valves have been 1nspectec__ Although the full .f>O_pulation of valves within _}i 1/

the scope of the Part 21s was not known, it is believed that only a small portion of the in- / /!

service valves have been inspected. (rhere have been valve operation indicationsl_ __________j //

  • The NRC is working closely with industry throughout the process to apply lessons learned //

that will ensure the best possible outcomes. frhe NRC has concerns with the use of stem /i rotation checks to demonstrate valve functionality and the use of motor operated valve i/

diagnostictesting (e.g., stem strain measurement traces) to demonstrate valve functionalityUf

  • {rhe NRC has concluded that U.S. nuclear facilities are safe and that they do not pose an /

undue risk to the public health and safety L---------------------------------------------------------1

Background

These valves are used on numerous plants, and there has been recent operating experience.

On February 11 , 2017, the LaSalle Unit 2 HPCS injection valve stem was found to be separated from the upper wedge/disc assembly during a fill and vent activity1

had successfully passed a local leak rate test where the valve had hclecsuccessfully several -~ --,..,.- Comment (MDJ: Wbat does tbis mea11'?

times. Valve disassembly and inspection revea led the wedge pin had sheared and the valve C cled on and off'? Q en aod simt?

stem threads were damaged. This valve was an Anchor/Darling 12 inch Double Disc Gate , Comment fMDf : So rhey were awareof Valve (ADDDGV) and was included in those valves associated with the Flowserve and Browns / .i poteu'lial problem and were monitoring Ferry Part 21 reports submitted in 2013 (ADAMS ML13008A321 and ML13064A012). [rhe / and checking the va lves, but did not see licensee was addressing the Part 21 reporti:iby usin_g_industy guidance Pf OVided by the_Boilin.9 __ / indications offailure uotil fail urc actually Water Reactor Owners Group (BWROG) prior to the failure. '!h.!!!a= e::.:.

ne:::::d::...._ _ _ _ _ _ _ _ __,

VERTlCAl..

STEM <t BACKSEAT (STEM CENTERUNE)

STf M SlEM THREADS BODY HOR/ZONTAL t

LO R (PORT CENl!RLINE)

WE E

On February 11 , 2017, the LaSalle Unit 2 HPCS injection valve stem was found to be separated Comment {MDI: Wbich ufüity'! Dukc from the upper wedge/disc assembly during a fill and vent activity. Pdor to the failu re, the valve .mentioned later '! Which lant? When'!

had successfully passed a local leak rate test where the valve had cycled successfully several i t1mes. Valve disassembly and inspection revealed the wedge pin had sheared and the valve i stem threads were damaged. This valve was an Anchor/Darling 12 inch Double Disc Gate i1 Valve (ADDDGV) and was included in those valves associated with the Flowserve and Browns Ferry Part 21 reports submitted in 2013 (ADAMS ML13008A321 and ML13064A012). The 1 licensee was addressing the Part 21 reports by using industry guidance provided by the Boiling f Water Reactor Owners Group (BWROG) pror to the failure. Following the identification of the separation, the licensee redesigned and repaired the failed Unit 2 HPCS lnjection valve.

i i

1 1

1 (b)(4)

I 1

.._ _________________________________ __./

A December 2016 Update to the Boiling Water Reactor Owners Group (BWROG) Guidance /

(BWROG-TP-13-006, "Recommendations to Resolve Flowserve 10CFR Part 21 Notificatlon J Affecting Anchor Darling Double Disc Gate Valve Wedge Pin Failures,") associated with the Part f 21 Reports, ~ocurnented t hat another Utility disassembled and inspected similar vatves l associated with the Part 21 Report and identified that 24 of the 26 valves stems and upper l wedges were not properly torqued prior to installationl As a_result the stem could_be --*-----*--__)

unthreaded from the upper wedge by hand after the wedge pin was removed . None of these inspected valves were noted to have broken or sheared wedge pins.

On February 11, 2017, the Unit 2 high pressure core spray (HPCS) injection valve stem was tound to be separated from the upper wedge/disc assembly during a fill and vent activity.

The BWROG issued Revision 2 to BWROG-TP-13-006, "Recommendations to Resolve Flowserve 10 CFR Part 21 Notification Affecting Anchor Darling Double Disc Gate Valve Wedge

Pin Failures," (ast wee!lJJ:l_E}_\:.l..Q93~1E}Q!.E}Y1§19D.Lf2q.Qp.Q9~-~-I.Q§~Q_§_lE}9!.r}~_q_-_q_!~9_?.§!I.!~---*-*'*** Comm ent {MDI: Bcs1givc the datc to valve failure and provides recommendations for (1) enhanced valve testing methods for stem ensure currene .

rotation _checks (intend_ed to detect atcheting behavio~_1_.9Jg_)_1~D.9_<2q~~1j~9~_ql.Q1.1:!LE!lQL_ ____ ...----(>c==m =m::::::::n=t =!M

==D=l:=S

== _= =h=at=i= J=_= =<

0 11 1 suscepttble valve repair/replacement (e.g., med1um and h1gh risk slgrnf1cant valves wtth a safety

  • e - - orry I s tiis function to cycle multiple times should be repaired/replaced within one operating cycle or 2 Commcnt [MOi: I presume tbis years ). / ha ened? Do we bave a readout?

1 I

1 (b)(4) 1!

I i

1 1

l i

The PWROG had not taken any actions to date and does not have a recommended schedule i for action on the Part 21 s, but will be having ~ phone call 5/1 9 o initiate. the .9-rocess to address _J this concern as an "emergent issue".

Flowserve believes operating experience is consstent with the failure analysis supporting their previous Part 21 and does not plan to take any further action .

The BWROG performed a survey of their members in support of the Revision 2 update to BWROG-TP-13-006. This survey identified the following:

  • Duke has disassembled more than 23 valves and found that the stem-disc connection was not torqued to the required preload, but that no wedge pins or stem threads were damaged.
  • Diablo Canyon is inspecting valves within the Part 21 scope during an ongoing outage and have found two valves with anomalous indications. Both of these valves will be disassembled and inspected.

NRC is questioning whether the use of the MOV diagnostic testing (i.e., stem strain trace measurements) and the stem rotation deflection check reliably demonstrate that wedge pins

remain intact, that prior over-torqueing did not occur, or that stem/wedge thread degradation / Comment tMDI: Did this happen? A.ny has not already occurred. / ' results?

"'-"=c..:;:;.;...._ _ _ _ _ _ _ _ __ _ ,

The NRC is gathering information to support developing a path forward, (ncluding a call on May /

16, 2017l No final decisions have been made with re~d to this issue. _ _ _ _ _ _ _ _ /

Questions and Answers Q. What issue was reported in the Part 21 report?

A.

Q. Have these valves failed before? What was the consequence?

A.

Q. Are the plants really safe?

A. The NRC has concluded that U.S. nuclear facilities are safe and that they do not pose an undue risk to the public health and safety.

Q. Can FLEX equipment be used to mitigate failure?

A.

Q . Does this impact other types of valves?

A.

Contacts: Scott Burnell, OPA Greg Bowman, DPR

From: ChandrathiL Prema To: Benjam i lamie: leffers Mark: P"Brien Kenneth; Shualbt, Mohammed Cc: Mitlyng Vjktorja; Stoedter. Karla

Subject:

FW: ACTIO N - answers needed for LaSalle Communication Plan - J une 2017 Date: Thursday, June 01, 2017 4:41:23 PM Attachments: LaSal!e Communlcat ion Plan - une 2017.docx l'rn forwarding you the comm plan from HO. Let us know if you would like to do anything with it in terms of answering Q's. We can also work with you, whatever is easier for you guys.

Thanks for the discussion.

Take care.

Prema From: Mc!ntyre, David Sent: Thursday, June 01, 2017 3:37 PM To: Mitlyng, Viktoria <Viktorta.Mitlyng@nrc.gov>; Chand rathil, Prema <Prema.Chandrathi !@nrc.gov>

Subject:

FW: ACTION - answers needed for LaSalle Communication Plan - Jun e 2017 FYI From: Benney, Brian Sent: Th ursday, June 01, 2017 3:52 PM To: Burne!I, Scott <Scott.Burnell@nrc.gov>; Mclntyre, David <David.Mclntyre@nrc.gov>; Ng, Ching <Ching.Ng@nrc.gov>; O'Brien, Kenneth <Kenneth.O'Brien@n rc.gov>; Thomas, Eric

<Eric Thomas@nrc .gov>

Cc: Wilkins, Lynnea <Lynnea.Wil kins@nrc.gov>

Subject:

ACTION - answers needed for LaSalle Communication Plan - June 2017 Folks, we are trying to "finalize" th is communications plan for Greg's approval TOMORROW.

Following t hat, it will be posted on Eric's Sha repoint sit e.

Please help us to get solid answers to the Q&A section, while OPA takes a look at the rest.

Please do not lim it yourself to just these questions. lf needed please add other expected guestions and answer if known. This should be used to help us du ring the end of June public meeting. Once th is is up on Sharepoint we will be able to do m uch more.

Thank you, Bria n Benney

From: Pbilips Charles To: Benjam i 1amie; Ruiz Robert: Farnan. Michael; Rodrieuez Lionel; Punlop Andrew: Rod(ieuez Lionel Cc: leffers. Mark: Stoedter. Karla

Subject:

RE: exit meeting this Friday at 0900 Date: Thursday, June 01, 2017 12:41:47 PM l(b)(5) Deliberative Privilege From: Benjamin, Jam ie Sent: Thursday, Ju ne 01, 2017 12:33 PM To: Phillips, Charles <Charles.Phi ll ips@nrc.gov>; Ru iz, Robert <Robert.Ruiz@nrc.gov>; Farnan, Michael <Michael. Fa rnan@nrc.gov>; Rodriguez, lionel <lionel. Rod riguez@ nrc.gov>; Dun lop, Andrew <Andrew.Du nl op@nrc.gov>; Rodriguez, lionel <lionel.Rodriguez@nrc.gov>

Cc: Jeffers, Ma rk <M ark.Jeffers@ nrc.gov>; Stoedter, Karla <Karla.Stoedt er@nrc.gov>

Subject:

RE: exit meeti ng t hi s Friday at 0900 l(b)(5) Deliberative Privilege From: Phi llips, Cha rles Sent: Thursday, June 01, 2017 10:32 AM To: Benj ami n, Jam ie <Jamie.Benjamin@nrc.gov>; Ru iz, Robert <Robert.Ru jz@nrc.gov>; Fa rnan, Michael <Michael.Farnan@nrc.gov>; Rodriguez, Lionel <Lionel.Rodrjguez@nrc.gov>; Du nl op, Andrew <And rew.Dunlop@nrc.gov>; Rodriguez, Lionel <lionel.Rodriguez@nrc.gov>

Cc: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>

Subject:

RE: exit meeting t his Friday at 0900 1was applying the cross-cutting issue from IMC 031 O to~. from the standpoint of safety-culture, not the licensee.

(b)(5) Deliberative Privilege ln addition, from IMC 0326:

03.09 Reasonable Expectation: The dlscovery of a degraded or nonconforming condition may call the operability of one or more SSCs into question. A subsequent determination of operability should be based on the licensee"s "reasonable expectation," from the evidence collected, that the SSCs are operable and that the operability determination will support that expectation. Reasonable expectation does not mean absolute assurance that the SSCs are

operable. The SSCs mqy be considered operable when there is evidence that the possibility of failure of an SSC has increased, but not to the point of eroding confidence in the reasonable expectation that the SSC remains operable. The supporting basis for the reasonable expectation of SSC operability should provide a high degree of confidence that the SSCs remain operable. It should be noted that the standard ot "reasonable expectation" is a high standard, and that there is no such thing as an indeterminate state of operability; an SSC is either operable or inoperable.

(b)(5) Deliberative Privilege From: Benjamin, Jamie Sent: Thursday, Ju ne 01, 2017 8:31 AM To: Phill ips, Charles <Cha rles.Phi lli ps@nrc.gov>; Ruiz, Robert <Robert.Ru iz@nrc.gov>; Farna n, Michael <Michael. Farnan@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@ nrc.gov>; Du nlop, Andrew <Andrew. Dunl op@nrc.gov>; Rodriguez, Lionel <Lionel. Rod ri guez@nrc.gov>

Cc: Jeffers, Ma rk <Mark.Jeffe rs@ nrc.gov>; Stoedt er, Ka rl a <Ka rla.Stoedter@n rc.gov>

Subject:

RE: exit meeting t his Friday at 0900 (b)(5) Deliberative Privilege e had s1gni 1can 1scuss1ons as is topic.

Or cross-cutting components are not enforceable.

l(b)(S) Deliberative Privilege From: Philli ps, Cha rles Sent: Wednesday, M ay 31, 2017 3:52 PM To: Rui z, Robert <Robert.Ruiz@nrc.gov>; Benja min, Jam ie <J amie.Benjamn@nrc . gov> ; Fa rnan, Michael <M ichael. Fa rnan@nrc.gov>; Rodriguez, Lionel <Lionel. Rodriguez@ nrc.gov>; Du nl op, Andrew <Andrew.Du nl op@nrc.gov>; Rod riguez, Lionel <Lionel.Rod riguez@nrc.gov>

Cc: Jeffers, Mark <Mark.Jeffers@ nrc.gov>; Stoedter, Karla <Ka rla.Stoedter@nrc.gov>

Subject:

RE: exit meeting t his Friday at 0900 (b)(5) Deliberative Privilege From IMC 0310:

Conservative Bias: lndividuals use decision making-practices that emphasize prudent choices over those that are simply allowable. A proposed action is determined to be safe in order to proceed, rather than unsafe in order to stop (DM.2).

1don't mean this to be as snarky as it sounds but l'm just trying to understand the decision.

From: Ruiz, Robert Sent: Wednesday, M ay 31, 2017 3:26 PM To: Benjami n, Jam ie <Jamie.Benlamio@nrc.gov>; Fa rn an, Michael <Michael.Farnan@nrc.gov>;

Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Dun lop, Andrew <Andrew.DunJop@nrc.gov>;

Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Phill ips, Charl es <Charles.Phill ips@nrc.gov>

Cc: Jeffers, Mark <MarkJeffers@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>

Subject:

RE: exit meeting t his Friday at 0900 Just re-sending to add Chuck to distribution.

From: Benjamin, Jamie Sent: Wednesday, M ay 31, 2017 3:25 PM To: Ru iz, Robert <Robert.Ruiz@nrc.gov>; Fa rn an, M ichael <Michael.Farnao@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Dunlop, And rew <Andrew.Dunlop@nrc.gov>; Rodriguez, Lionel

<Lionel.Rod riguez@n rc.gov>

Cc: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>

Subject:

RE: exit meeting this Friday at 0900 Good point to draw out.

We will iust be honest and factual. 1 b)(5) Deliberative Privilege Make sense to everyone? '

V/R, Jamie

From: Ruiz, Robert Sent: Wednesday, May 31, 2017 12:55 PM To: Benjamin, Jamie <Jamie.Benjamin@ nrc.gov>; Farnan, Michael <Michael.Fa rnan@nrc.gov>;

Rodriguez, Lionel <Lionel.Rodriguez@n rc.gov>; Dunlop, Andrew <Andrew.Ounlop@nrc.gov>;

Rod riguez, Lionel <Lionel. Rodriguez@orc.gov>

Cc: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Stoedter, Karla <Karla .Stoedter@nrc.gov>

Subject:

RE: exit meeting this Friday at 0900 1will try to be there in person, but I make no promises, as certain aspects of my availability are beyond my control at this point.

Regarding what might be added to ~~.w.w.1.=IMU-'-l~.&....-'~w if we're at a point yet to talk about potential next-steps, i.e. , the (b)(S) Deliberative Privilege. 've heard mentioned.

(b)(S) Deliberative Privilege

-Rob From: Benjamin, Jamie Sent: Wednesday, May 31, 2017 9:26 AM To: Farnan, Michael <Michael.Farnan@nrc.gov>; Rodriguez, Lionel <Lionel Rod riguez@nrc gov>;

Dunlop, Andrew <And rew.Dunlop@nrc.gov>; Rod riguez, Lionel <LioneLRodriguez@nrc.gov>

Cc: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Stoedter, Karla <Ka rla.Stoedter@nrc.gov>; Ruiz, Robert

<Robert.Ru iz@ nrc.gov>

Subject:

exit meeting this Frlday at 0900 You will have notes by today/early tomorrow.

Gan everyone but Mike attend in person? Mike, are you available if I get a bridge number?

Mark, will you be able to call in? Karla and Rob, can you attend?

Ken O'Brien is planning to attend.

We have one PD that will be exited as TBD and plenty of assessment and observations.

1 am going to plan to do the majority of the presenting but if you all want any part of the discussion just Iet me know and we will coordinate it.

l(b )(5) DeliberatWe Privilege

(b)(S) Deliberative Privilege What am I missing?

From: Benjam i lamie To: Pbillips Charles: Ruiz Robert: farnan. Michael: Rodriguez. Lionel: Dunlop Andrew: Rodriguez. Lionel Cc: leffers. Mark: Stoedter. Karla

Subject:

RE: exit meeting this Friday at 0900 Date: Thursday, J une 01, 201712:38:33 PM (b)(S) Deliberative Privilege Fro m: Phi lli ps, Cha rles Se nt: Thursday, June 01, 2017 10:32 AM To: Benja mi n, Jam ie <Jamie.Benjamin@nrc.gov>; Ru iz, Robert <Robert.Ru iz@n rc.gov>; Farnan, Michael <Michael. Fa rnan@nrc.gov>; Rodriguez, Lionel <Lionel.Rod riguez@ nrc.gov>; Dunlop, And rew <Andrew. Dun lop@nrc.gov>; Rod riguez, Lionel <Lionel .Rodriguez@nrc.gov>

Cc: Jeffers, Mark <Mark.Jeffers@ nrc.gov>; Stoedter, Karla <Karla.Stoedter@ nrc.gov>

Subject:

RE: exit meeting t his Friday at 0900 1was applying the cross-cutting issue from IMC 031 Oto us, from the standpoint of safety-culture, not the licensee.

(b)(5) Deliberative Privilege ln addition, from IMC 0326:

03.09 Reasonable Expectation: The discovery of a degraded or noncontorming condition may call the operability of one or more SSCs into question. A subsequent determination of operability should be based on the licensee's "reasonable expectation/ from the evidence collected, that the SSCs are operable and that the operability determination will support that expectation. Reasonable expectation does not mean absolute assurance that the SSCs are operable. ;he SSCs may be considered operable when there is evidence that the possibility of failure of an SSC has increased, but not to the poi nt of eroding confidence in the reasonable expectation that the SSC remains operable. The supporting basis for the reasonable expectation of SSC operability should provide a high degree of confidence that the SSCs remain operable. It should be noted that the standard of "reasonable expectation" is a high standard, and that there is no such thing as an indeterminate state of operability; an SSC is either operable or inoperable.

(b)(5) Deliberative Privilege

From: Benjamin, Ja mie Sent: Thursday, June 01, 2017 8:31 AM To: Phill ips, Charles <Charles.Phi lli ps@nrc.gov>; Ruiz, Robert <Robert.Ru iz@nrc.gov>; Farnan, Michael <Michael Farnan@nrc.gov>; Rodriguez, Lienei <Uonel Rodriguez@nrc gov>; Dunlop, Anci rew <Andrew. Dun lop@nrc.gov>; Rod riguez, Lienei <Lienei, Rod rjguez@nrc.gov>

Cc: Jeffers, Mark <Mark.Jeffers@n rc.gov>; Stoedter, Ka rla <Karla.Stoedter@nrc.gov>

Subject:

RE: exit meeting t his Friday at 0900 (b)(5) Deliberative Privilege Or cross-cutting components are not enforceable.

l(b)(SJ Deliberali,e eo*1,g, From: Phillips, Charles Sent: Wednesday, May 31, 2017 3:52 PM To: Rulz, Robert <Robert.Ruiz@orqNv>; Benjamin, Jam ie <Jamie.Beniamin@nrc.gov>; Farnan, Michael <Michael. Farna n @nrc.gov>; Rod riguez, Lienei <Lionel.Rodriguez@nrc.gov>; Dun lop, Anci rew <Andrew. Dun lop@nrc.gov>; Rod riguez, Lionel <Lienei. Rod riguez@nrc.gov>

Cc: Jeffers, Ma rk <MarkJeffers@nrc.gov>; Stoedter, Ka rla <Karla.Stoedter@nrc.gov>

Subject:

RE: exit meeting this Friday at 0900 (b)(5) Deliberative Privilege From IMC 0310:

Conservative Bias: lndividuals use decision making-practices that emphasize prudent choices over those that are simply allowable. A proposed action is determined to be safe in order to proceed, rather than unsafe in order to stop (DM.2).

1 don't mean this to be as snarky as it sounds but l'm just trying to understand the decision.

From: Ruiz, Robert Sent: Wednesday, May 31, 2017 3:26 PM To: Benjamin, Jamie <Jamie Benjamin@nrc.gov>; Farnan, Michael <MichaeL Farnan@nrc.gov>;

Rodriguez, Lionel <Lionel.Rodriguez@n rc.gov>; Dun lop, Andrew <Andrew.Dun lop@nrc.gov>;

Rodriguez, Lionel <UoneLRodriguez@nrc.gov>; Phill ips, Charles <Charles.Phrlllps@nrc.gov>

Cc: Jeffers, Ma rk <Mark.Jeffers@n rc.gov>; Stoedter, Ka rl a <Kar!a.Stoedt er@nrc.gov>

Subject:

RE: exit meeting t his Friday at 0900 Just re-sending to add Chuck to distribution.

From: Benjamin, Jamie Sent: Wednesday, M ay 31, 2017 3:25 PM To: Rui z, Robert <Robert.Ruiz@nrc.gov>; Fa rn an, M ichael <Michael.Farnan@nrc. gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Dun lop, And rew <Andrew.Dunlop@nrc.gov>; Rodriguez, Lionel

<Uooel.Rod rguez@orc . gov>

Cc: Jeffers, Ma rk <Mark.Jeffers@ nrc.gov>; Stoedt e.r, Ka rl a <Ka rla .St oedter@nrc.gov>

Subject:

RE: exit meeting t his Friday at 0900 Good point to draw out.

We will iust be honest and factua1. I (b)(5) Deliberative Privilege 1

Make sense to everyone?

V/ R, Jamie From: Ruiz, Robert Sent: Wednesday, M ay 31, 2017 12:55 PM To: Benjami n, Jam ie <Jamie.Benjamin@nrc.gov>; Fa rn an, Michael <Michael.Fa rn an@nrc.gov>;

Rodriguez, Lionel <Lione l. Rodriguez@nrc.gov>; Dun lop, Andrew <Andrew.Dun lop@nrc.gov>;

Rodriguez, Lionel <Lionel. Rodriguez@n rc.gov>

Cc: Jeffers, Ma rk <Mark.Jeffers@ nrc.gov>; Stoedter, Ka rl a <Kar!a.Stoedter@nrc.gov>

Subject:

RE: exit meeting t his Friday at 0900

1will try to be there in person, but I make no promises, as certain aspects of my availability are beyond my control at this point.

Regarding what might be added to the discussion: 1don't know if we're at a about potential next-steps (b)(5) Deliberative Privilege (b)(5) Deliberative Privilege

-Rob From: Benj amin, Jamie Sent: Wed nesday, M ay 3 1, 2017 9:26 AM To: Farnan, Micha el <Michael.Farnan@nrc.gov>; Rodriguez, Lienei <Uonel.Rodriguez@nrc.gov>;

Dun lop, Andrew <Andrew Dun lop@nrc.gov>; Rodriguez, Lionel < Lionel.Rodrjguez@nrc.gov>

Cc: Jeffers, Ma rk <Mark.Jeffers@n rc.gov>; St oedter, Karla <Karla.Stoedter@orc.gov>; Ru iz, Robert

<Robert.Ruiz@nrc.gov>

Subject:

exit m eetng this F r d ay at 0900 You will have notes by today/early tomorrow.

Can everyone but Mike attend in person? Mike, are you available if I get a bridge number?

Mark, will you be able to call in? Karla and Rob, can you attend?

Ken O'Brien is plann ing to attend.

We have one PD that will be exited as TBD and plenty of assessment and observatlons.

1am going to plan to do the majority of the presenting but if you ali want any part of the discussion just Iet me know and we will coordinate it.

(b)(5) Deliberative Privilege What am I missing?

From : Dunlop, Andrew To: Beniamln. lamie

Subject:

RE: tailure analysis review Date: Thursday, June 01, 2017 9:26:00 AM 1agree From: Benjamin, Jamie Sent: Thursday, June 01, 2017 9:22 AM To: Rodriguez, Lione l <Lione l. Rodriguez@nrc.gov>; Dun lop, Andrew <Andrew.Du nlop@nrc.gov>;

Phil lips, Charles <Cha rles. Phi ll ips@n rc.gov>; Farnan, M ichael <Michael.Fa rn an@nrc.gov>

Cc: Stoedter, Ka rl a <Ka rla. St oedter@nrc.gov>; Jeffers, Ma rk <Mark.Jeffers@ nrc.gov>; O'Brien, Kenn eth <1Ken neth.O'Brien@nrc.gov>; Ruiz, Robert <Robert. Ruiz@nrc.gov>

Subject:

fa ilu re analysis review 1am going to recommend that we move the exit to next Monday. Our assessment is based upon the potential failure mechanfsm and we need to review the failure analysis to see if our decisions and assessments are stili valid with the new information. lf not we wi ll be exiting on old information.

Thoughts? Everyone agree? Or Not?

Regardless.

Team meeting at 1400 today to discuss the fai lure analysis results.

1'11 set up a conference call and reserve a room .

From: Mitlyng Viktorja To: leffers Mark: Benjami lamie: Stone. AnnMarie; Chandrathll Prema* Logaras Harral; Barker AUan; Heck lared Cc: Farnan. Michael

  • Rodriguez. Lionel: Phillips. Charles; Qunlop. Andrew; Stoedter. Karla: Ru iz. Robert

Subject:

RE: FYI - LaSalle Exit is this Friday June 2 at 0900 Date: Thursday, June 01, 201712:41:53 PM Thanks so much for the update, Mark! -Vika From: Jeffers, M ark Sent: Th ursday, June 01, 2017 12 :36 PM To: Benjamin, Jam ie <Jamie.Benjamin@nrc.gov>; Stone, Ann Ma rie <AnnMarie.Stone@nrc.gov>;

Chandrathi l, Prema <Prema.Cha nd rathil@nrc.gev>; M it lyng, Vikteria <Vikteria. M itlyng@ nrc.gev>;

Legaras, Harral <Harral.Logaras@nrc.gov>; Barker, Allan <Allan .Barker@n rc.gev>; Heck, Ja red

<Jared.Heck@ nrc.gov>

Cc: Farnan, Michael <M ichael.Farnan@nrc.gov>; Rodriguez, Lienei <Lienel.Redriguez@nrc.gev>;

Phillips1 Charles <Charles.Phi ll ips@n rc.gev>; Dun lop, Andrew <Andrew.Dun lop@nrc.gev>; Steedter, Karla <Karla.Stoedter @nrc.gev>; Ruiz, Robert <Robert.Ruiz@ nrc.gev>

Subject:

RE: FYI - LaSalle Exit is t his Friday June 2 at 0900 The team just received the licensee's lab report for the evaluation of the failed valve. As a result of this new information, we are going to postpone the exit to next week to support the team reviewing the analysis and determine if it has any impact on the proposed violation .

So no daily note for tomorrow.

Thank Yeu, Mark Jeffers Branch Chief I RIII DRS EB2 x9798 From: Benjamin, Jamie Sent: Wednesday, M ay 31, 201710:11 AM To: Stone, AnnMarie <AnnMarje.Stone@nrc.gov>; Chand rath il, Prema

<Prem a.Cha ndrathil@nrc.gev>; Mitlyng, Viktori a <Vjkt eria.Mitlyng@ nrc.gov>; Legaras, Harral

<Harral.Legaras@ nrc.gev>; Barker, Allan <Allan.Barker@ nrc.gov>; Heck, Jared

<Jared,Heck@nrc.gov>

Cc: Farnan, Michael <MichaeLFarnan@nrc.gov>; Jeffers, M ark <Ma rk.Jeffers@nrc.gov>; Rodriguez, Lienei <Lionel.Redriguez@nrc.gov>; Phi llips, Cha rl es <Charles.Phill ips@ nrc.gov>; Dun lop, Andrew

<Andrew. Dunlop@nrq~ov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>; Ruiz, Robert

<Robert.Ruiz@nrc.gov>

Subject:

FYI - LaSa ll e Exit is th is Friday Jun e 2 at 0900 Ann Marie, is this enough info for a daily note?

From: Wilklns, Lynnea To: Anchor oa rlng uc-so4 Distributlon

Subject:

LaSalle 2E22-F004 fa ilure analysis report Date: Thu rsday, June 01, 20171 :37:23 PM Attachments: 21 01-0022-LTR-001 RO LaSall e HPCS I njection Valve Failure Evai May 30 w ....pdf

Ali, As discussed in this morning's meeting, please see the attached HPCS lnjection Valve Failure Report.

Thanks Lynnea Lyl'lAl\..e,Cv W ~ Project Manager Licensing Processes Branch (PLPB)

Division of Policy and Rulemaking Office of Nuclear Reactor Regulation US Nuclear Regu] atory Commjssion Phone: 301-4 15-1377

From: Bowen. Jeremv To: O"Brien Kennelh

Subject:

Fwd: LaSalle 504 i nternai follow up Date: Thu rsday, June 01, 2017 9:06:41 AM Attachments: A&cndn [un,; 1 >o11 doc;s AQ Valve~ RGI 74. pdf Summarv o f May ?. HO U C-504 Call on LaSalle MOV lssues.mso From: "Coyne, Kevjn" <Kevin.Coyne@nrc.gov>

Subject:

RE: LaSalle 504 internai follow up Date: 31 May 2017 16:40 To: "Benney, Brian" <Brian.Benney@nrc.gov>, "Helton, Shana" <Shana.Helton @nrc.gov>,

"Gavrilas, Mirela" <Mirela.Gavrilas@nrc.gov>, "Oesterle, Eric" <Eric.Oester1e@nrc.gov>,

"Hickey, James" <James.Hickey@nrc.gov>, "AIJey, David" <David.AJley@nrc.gov>,

"Faman, Michael" <Mjchael.Farnan@nrc.gov>, "Thompson, John"

<John.Thompson@nrc.gov>, "Miller, Chris" <Chris.Miller@nrc.gov>, "King, Michael"

<Michael.King2@nrc.gov>, "Weerakkody, Suni!" <Sunil.Weerakkody@nrc.gov>, "Gütter, Joseph" <Joseph.Giitter@mc.gov>, "Bowen, Jeremy" <Jeremy.Bowen@nrc.gov>, "Jeffers, Mark" <Mark.Jeffers@nrc.gov>, "Stoedter, Karla" <Karla.Stoedter@nrc.gov>, "O'Brien, Kenneth" <Kenneth.O'Brien@nrc.gov>, Casto, Greg" <Greg.Casto@nrc.gov>, "Circle, .Jeff

<Jeff.Circle@nrc.gov>, Benjamin, Jamie" <Jamie.Benjamin@nrc.gov>, Leech, Matthew"

<Matthew.Leech@nrc.gov>, "Shuaibi, Mohammed" <Mohammed.Shuaibi@mc.gov>, "Lara, Julio" <Julio.Lara@nrc.gov>, "McGinty, Tim" <Tim.McGinty@nrc.gov>, "Krohn, Paul"

<Pau1.Krolm@nrc.gov>, "Burke, John" <John.Burke@nrc.gov>, "Kavanagh, Keni"

<Kerri.Kavanagh@nrc.gov>, "Herrity, Thomas" <Tbomas.Herrity@nrc.gov>, "Rod1iguez, Lionel" <Lionel.Rodri_guez@nrc.gov>, "Corujo-Sandin, Jorge" <Jorge.Corujo-Sandin@nrc.gov>, "Louden, Patrick" <Pattick.Louden@nrc.gov>, "Kozak, Laura"

<Laura.Kozak@nrc.gov>, "Ng, Ching" <Clling.Ng@nrc.gov>, "Miller, Ed"

<Ed.Miller@nrc.gov>, "Willcios, Lynnea" <Lynnea.Wilkins@nrc.gov>, "Lubinski, John"

<John.Lubinski@nrc.gov>, "Hsueh, Kevin" <Kevin.Hsueh@nrc.gov>, "Stuchell, Sheldon"

<Sheldon.Stuchell@nrc.gov>, "Garmoe, Alex" <Alex.Garmoe@nrc.gov>, "Bowman, Gregory <Gregory.Bowman@nrc.gov>, "Luncl, Lowse" <Louise.Luncl@nrc.gov>,

"Chernoff, Harold" <Harold.Chernoff@nrc.gov>, "Scarbrough, Thomas"

<Thomas.Scarbrough@m*c.gov>, "Gascot Lozacla, Ramon"

<Ramon.GascotLozada@nrc.gov>, "Pumell, Blake" <Blake.Purnell@nrc.gov>, "Clark, Theresa" <Theresa.C1ark@nrc.gov>, "Vaidya, Bhalchandra"

<Bhalchandra.Vaidya@mc.gov>, "Wrona, David" <David.Wrona@nrc.gov>, "Whjtman, Jennifer <Jennifer.Whitman@nrc.gov>, "Tiltoa, Caroline" <Caro1ine.Tilton@nrc.gov>,

"Mclntyre, Dav.id" <David.Mclntyre@nrc.gov>, "Bumell, Scott" <Scott.Burnell@nrc.gov>,

"Morey, Dennis" <Dennis.Morey@nrc.gov>, Martinez, Nancy"

<Nancy.Martinez@nrc.gov>

Folks -

Please see attached agenda for Thursday's (6/1) LIC-504 meeting. l've also attached the summary for the last meeting and the preliminary risk results from DRA.

Thanks again for your support of this process -

Kevin


Origin al Appointment----

From: Benney, Brian Sent: Thursday, May 25, 2017 11:27 AM To: Benney, Brian; Helton, Shana; Gavrilas, Mi rela; Oesterle, Eric; Hickey, James; Al ley, David; Farnan, Michael; Thom pson, John; M lller, Chris; King1 Michael; Weerakkody, Suni l; Giitter, Joseph; Bowen, Jeremy; Jeffers, Mark; Stoedter, Karla; O'Brien, Kenneth; Casto, Greg; Circle, Jeff; Benjamin, Jam ie; Leech, Matthew; Shuaibi, Mohammed; Lara, Julio; McGinty, Tim; Krohn, Pa ul; Burke, John; Kavanagh, Kerri; Herrlty, Thomas; Rod riguez, Lionel; Corujo-Sandi n, Jorge; Louden, Patrick; Kazak, laura; Ng, Ching; M iller, Ed; W il kins, Lynnea; Lubinski, John; Hsueh, Kevin; Stuchell, Sheldon; Garmoe, Alex; Bowman, Gregory; Lund, Louise; Chernoff, Harald; Scarbrough, Thomas; Gascot Lozad a, Ramon; Purnell, Blake; Clark, Theresa; Coyne, Kevin; Vaidya, Bhalcha ndra; Wrona, David; Whitman, Jennifer; Tilton, Caroline; M clntyre, David; Burnell, Scott; Morey, Dennis; Martin ez, Na ncy

Subject:

LaSal le 504 interna i follow up When: Th ursday, June 01, 2017 10:00 AM -11:00 AM (UTC-05:00) Eastern Time (US & Canada) .

Where: HQ-OWFN-1 2B04-25P Previous Agenda is attached for reference, but will be updated.

aaa-4ss-1 734 jParticipant passcode: .... lcb_

)(6_) - - ~

<< Fil e: Agenda_May 24_2017.docx >>

From: Benjam i lamie To: Kusumawatimurra y. Putri:{Genco-Nucl Cc: ford Ir Guy v*<Genco-Nucl; Rodni:uez. lionel; Farnan. Michael; Phillips. Charles; Dunlop. Andrew Subject : RE: laSalle Failure Evaluation Report for LaSalle 2E22-F004 Stem-to-Wedge Failure Date: Thursday, June 01, 2017 8:36:28 AM 1thought that you all send th is part out east to Carolina? MPR and Powerlab's name are on the report.

Are there more reports available? Where did the part go initially?

From: Kusu mawati mu rray, Putri :( GenCo-N uc) [ma ilto: Putri. Kusumawatim u rray@exeloncorp.com]

Sent: Wednesday, May 31, 2017 3:33 PM To: Benjamin, Jamle <Jamie.Benjamin@nrc.gov>

Cc: Ford Jr, Guy V:(GenCo- Nuc) <guy.ford@exeloncorp.com>

Subject:

[External_SenderJ LaSal le Fa il ure Evaluation Report for LaSalle 2E22-F004 Stem-to-Wedge Failu re

Jamie, Plea se see the attached re port.

Thank you, Dwi Murray Princ,pal Regulatory Engineer Regulatory Assurance - LaSalle County Statlon

.=: Ex~on C, -at,011 8 15-415-2814 Putri.Kusumawatimurray@exeloncom.com

From: Benja mi larn je To: Q"Brien, Kenneth

Subject:

FW: LaSalle Failure Evaluation Report for LaSalle 2E22- F004 Stem -to-Wedge Failure Date: Thu rsday, J une 01, 2017 8:52:20 AM Attachments: 2101-0022-LT R-001 RO LaSall e HPCS I njection Va lve Failure Evai May 30 w ....pdf 1knew that you would find this read interesting ...

LaSalle failu re analysis just came in.

From: Kusumawatimurray, Putri :(GenCo-Nuc) [mailto :Putri .Kusumawatimurray@exeloncorp.com]

Se nt: Wednesday, May 31, 2017 3:33 PM To: Benjamin, Jamle <Jamie .Benjamin@nrc.gov>

Cc: Ford Jr, Guy V:(GenCo-Nuc) <guy.ford@exeloncorp.com>

Subje ct: [Externa l_Sender] LaSal le Failure Evaluation Report for LaSa ll e 2E22-F004 Stem-to-Wedge Failu re

Jamie, Please see the attached report.

Thank you, Dwi Murray Principa! Regulatory Engineer Regulalory Assurance LaSalle County Station

.=- Exe!onC, i1 ,on.

8 15-4 15-28 14 Putri .Kusumawatj murray@exeloncorp.com

From: 1effers. Mark To: Benjam i 1amie: Rodri1rnez Liooel

Subject:

FW: LaSalle Date: Thu rsday, June 01, 2017 11 :48:10 AM Please correct me it I am wrong, but the friction analysis did NOT consider the friction needed to move the stem collar, correct?

Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 x9798 From: Coyne, Kevin Sent: Th ursday, June 01, 201712:29 PM To: Jeffers, Ma rk <Mark.Jeffers@nrc.gov>

Cc: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>

Subject:

RE: LaSalle Hi Mark-Just had my biweekly meeting with Brian McDermott and one question he had was if the licensee's stem-disc margin analysis considered the friction needed to move the stem collar (e.g., under the presumption that the stem collar offers some resistance to vertical movement of the stem, does this impact the available margin?). 1think the answer to question 1 below covers the wedge pin question (i.e., shearing both ends of the wedge pin is considered) , but I wasn't sure if the collar was also factored in. Any insights you have are very much appreciated !

Kevin From: O'Brien, Kenneth Sent: Thursday, May 25, 2017 7:29 AM To: Miller, Chris <Chrjs.Miller@nrc.gov>; King, Mike <Mike .K1ng@nrc.gov>; Coyne, Kevin

<Kevin Coyne@nrc,gov>

Subject:

LaSal le Chris Some initial insights in the questions you provided.

The team had a late call with the licensee to wrap up some final details. 1expect a debrief from the team first thing this morning.

Will give you a holler shortly thereafter.

Thanks

Ken From: Jeffers, M ark Sent: Wednesday, M ay 24, 2017 1:57 PM To: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shua ibi, Mohammed

<Mohammed.Shuaibi@ nrc.gov>

Cc: Stoedter, Ka rla <Karla.Stoedter@nrc.gov>

Subject:

RE: LaSal le For your awareness, 1consolidated the questions from this email string and provided some concise answers. Please Iet me know if you have any questions.

1. Did the NRC or licensee wedge pin shear analysis account for the two diameters of the wedge pin (both ends must shear simultaneously) and the force necessary to move the collar up the stem (must occur for even a hand tight stem to further rotate into the wedge on a closing stroke)?
a. The analysis does account for the two. The formula in the BWROG for the pin analysis is written the same way as well.
2. Has the licensee or vendor concluded that the valve in question has a press fit collar vs. the integral collar?
a. Press fit collar.
3. Have we learned anything from the plants (diablo and one other I believe) currently in outages that are looking at similar valves.
a. Columbia (similar design as LaSalle) entered into their outage last Friday.

No update yet of expected tlme to inspect the HPCS valve at the site.

b. Diablo Canyon identified two MOVs with abnormalities in their diagnostic traces.
i. SI injection to loop hot leg 8" valve failed to fully open during MOV diagnostic testing. The site inspected the valve, noted no disc stem separation and the wedge pin was intact; however, the licensee noteci "slight movement between the disc and stem" and "minor galling to the threads. " The reason for the abnormality in the trace has not yet been determined.

ii. RHR pump suction valve also had abnormalities during diagnostic testing.

lnspection scheduled for tonight (5/24).

4. How does the team reconcile the fact that the unit 1 valve had its stem replaced and thus does not have the same service life as the Unit 2 valve?
a. The licensee is currently estimating that the difference in total strokes between Unit 1 and the failed Unit 2 valve is approximately 20 strokes (this is based on a difference in number of outages between Unit 1 and Unit 2 and discussions with former test engineers from preoperational testing). The team's position is that, based on the wedge pin analysis, the forces being exerted on the pin on the Unit 1 valve is sufficient to shear the pin at any given stroke (i.e., not just during design basis accident conditions, but during any normai stroke); theretore. the difference in number of strokes is insignificant to the weak link analysis.
5. How does the Unit 1 HPCS valve breakout from others in industry that have a lot of run time and very few failures.

a.

(b)(5) Deliberative Privilege

6. ls this repa,rable on11ne*t
a. The licensee would have to shutdown (MODE 4) in order to inspect and repair the valve.

Additionally, some other aspects that you may want to consider:

1. The wedge pin analysis performed by the licensee used an inconsistent equation to compute margin to failure. Using the same data and the appropriate equation, the SIT calculates that the Unit 1 HPCS injection valve currently has negative margin (i.e., -27%) when using the same data. Therefore , the pinis susceptible to shear every time the valve is closed. This was discussed with LaSalle this morning and they are currently trying to justify their use of a different equation.
2. Stem rotation checks and the MOV diagnostic data have not been demonstrated to identify whether stem degradation has occurred or will occur. l.e. the Urnt 2 HPCS injection valve that failed showed minimum stem deflection through all stem rotation checks performed and exhibited no trace abnormality that could be correlated to stem degradation.
3. The licensee could not successfully benchmark the methodology used for operability. l.e., using the operability bases described in the opeval, the Unit 2 HPCS valve that failed would have been declared operable with positive margin.

Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 x9798 From: O'Brien, Kenneth Sent: Wednesday, M ay 24, 2017 11:39 AM To: Jeffers, Ma rk <M ark.Jeffers@nrc.gov>

Subject:

FW : LaSal le Mark Some insights on the questions and thoughts being developed at HO.

Ken

From: M ill er, Chris Sent: Wednesday, May 24, 2017 10:43 AM To: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>

Subject:

FW: LaSal le HiKen (b)(5) Deliberative Privilege chris From: Coyne, Kevin Sent: Wednesday, May 24, 2017 9:07 AM To: King, Michael <Michael.Kin2@nrc.ov>; Lubinski, John <John.Lubinski@orc goy>

Cc: Miller, Chris <Chris.Miller@nrc.gov>

Subject:

RE: LaSa lle l've also asked Mike Farnan to get some perspectives on the questions from the ET ...

From: King, M ichael Sent: Wednesday, May 24, 2017 8:57 AM To: Coyne, Kevin <Kevin.Coyne@n rc.gov>; Lubinski, John <John.Lubinski@nrc.gov>

Cc: Miller, Chris <Chris.Miller@nrc.gov>

Subject:

FW: LaSa lle Have not heard from Ken yet this morning. Gonna be tricky lining up a prebrief with Brian and a NRR/RIII call given everything else going on today!

From: Dea n, Bi ll Sent: Wednesday, May 24, 2017 8:40 AM To: McDermott, Brian <Brian.McDermott@nrc.gov>; King, Michael <Michael.King2@nrc.gov>;

Lubi nski, John <John.Lubinski@nrc.gov>; Evans, M ichele <Michele .Evans@nrc.gov>

Cc: Miller, Chris <Chris.Miller@nrc.gov>; Coyne, Kevin <Kevin .Coyne@nrc.gov>

Subject:

RE : LaSa lle And to pile on, have we learned anything from the plants (diablo and one other I believe) currently in outages that are looking at similar valves. And how does the team reconcile the

fact that the unit 1 valve had its stem replaced and thus does not have the same service life as the Unit 2 valve?

8/LL From: McDermott, Brian Sent: Wednesday, May 24, 2017 7:58 AM To: King, Michael <Michael King2@nrc.gov>; Lubinski, John <John.Lubinski@nrc.gov>; Dean, Bil l

<Bi ll .Dean@n rc.gov>; Evans, Michele <Michele.Eva os@ nrc.gov>

Cc: Miller, Chris <Chris.M iller@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>

Subject:

RE: LaSa lle Thanks ali. 1 still have questions about the wedge pin shear analysis. Mentioned this to Mike F and Kevin this morning on the elevator.

1. Did the NRC or licensee wedge pin shear analysis account for the two diameters of the wedge pin (both ends must shear simultaneously) .and. the force necessary to move the collar up the stem (must occur for even a hand tight stem to further rotate into the wedge on a closing stroke)?
2. Has the licensee or vendor concluded that the valve in question has a press fit collar vs. the integral collar?

Thanks ,

13vla,n; Brian J. M cDermott, Oeputy Direct or Office of Nuclear Reactor Regulation 1took the S1.Irvey. My Oplnlon Countst FE@ S From: King, M ichael Sent: Wednesday, May 24, 2017 7:15 AM To: Lub inski, John <John.Lubinski@nrc.gov>; McDermott, Brian <Brian .McDermott@nrc.gov>; Dea n, Bill <Bill Dean@nrc.gov>; Evans, M ichele <Michele.Evans@nrc gov>

Cc: Miller, Chris <Chris.Miller@orc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>

Subject:

RE: LaSa lle Thanks John, We will learn more later this morning, but my understanding is that for this particular valve

the actuator torque is several times the calculated torque required ~ ~ - ~ ~ = ' - - - -

Which is a arentl not the case for the other valves in uestion.

(b)(5) Deliberative Privilege From: Lubinski, John Sent: Wednesday, May 24, 2017 6:43 AM To: McDermott, Brian <Brian.McDermott@ nrc.gov>; King, Michael <Michael K1ng2@nrc.gov>; Dean, Bill <BilLDean@nrc.gov>; Evans, Michele <M ichele.Evans@nrc.gov>

Cc: Miller, Chris <Chris.M ilJer@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>

Subject:

RE: l aSalle Brian, 1agree. Mike Farnan has been supporting the SIT. However, we had not heard of this conclusion until now. Given it is one valve, 1assume there is some valve specific data to support the recommendation from Ken. We will try to get information from RIII today, hopefully before our 3:30 caJI on all issues related to the valves.

From: McDermott, Brian Sent: Wednesday, M ay 24, 2017 6:39 AM To: King, M ichael <Michael.King2@nrc.gov>; Dean, Bill <Bill.Dean@nrc.gov>; Eva ns, M ichele

<M ichele.Evans@nrc.gov>

Cc: Miller, Chris <Chris .Mi!ler@nrc.gov>; Lub inski, John <John .Lubinski@nrc.gov>; Coyne, Kevin

<Kevin.Coyne@nrc.gov>

Subject:

Re : LaSalle Tha nks M ike. Assuming we go down the path of another ca ll w it h RIII, 1 would like to hea r directly from our staff before the call.

On: 23 May 2017 18:14, "King, M ichael" <Michael. King2@nrc.gov> wrote:

Heads-up .. .

(b)(5) Deliberative Privilege Th is would put the licensee in a 14 day TS LCO AS . Ken was not sure if this is something repairable online.

Will fill you in as we learn more.

Thanks!

Mike King Deputy Director, Division of lnspect ion and Regiona l Support Office of Nuclear Reactor Regulation US Nuclear Regu latory Commission 301-415-1004

From: Rodriguez Lienei To: Benjam i lamie: Dunlop. Andrew; farnao Michael; Phillips. Charles Cc: 1efters. Mark

Subject:

Operability Outline Date: Thu rsday, June 01, 2017 4!13: 04 PM Attachments: Oocume nt2 .docx Hello Team, Here's what I wrote during the meeting.

Uonel Rodriguez NRC/R III/DRS/EB2 630-829-9609

  • Threaded and Pinned Connection Capability o Stem/Wedge Thread Condition Unknown o Negatives
  • U2 would pass given the methodology used to demonstrate U1 is operable
  • Methodology is Wrong?
  • lnputs are Wrong?
  • Unknown Failure Mechanism?
  • Analysis methodology only evaluates static conditions. The real "dynamic" conditions do not apply loads evenly and may overstress threads.

o Positives

  • U1 has not failed yet
  • Thread Shear Capabil ity o Thread Engagement Unknown o Stem/Wedge Thread Condition Unknown
  • Number of Cycles o Motor Brakes o Gear Change
  • Stem Rotation Checks
  • Diagnostic Traces
  • Pretorque of Threaded and Pinned Connection o lnconclusive
  • Stem Collar Design Capability o Exceeded

From: Benjam i . lamie To: Rodriguez. Llonel: Farnan. Michael: Dunop Andrew: Pbillips. Chares

Subject:

Section 7 The failure mechanism Date: Thu rsday, June 01, 201710:15:31 AM When you all read this section, does it mean that the Part 21 issue does not have to apply for the failure to occur because of the press fit collar design.

From: Mjller. Chrjs To: Louden. Patrick Cc: O"Brien. Kenneth; Lara. iulio; Shualbi. Mohammed subject: RE: Sorry for mssing call Date: Thursday, J une 01, 2017 7:24:18 AM

  • ,es. B . t* {b)(5) Deliberative No Worr nan men ,one Privilege LaSalle this morning. Any news on that frant?

From: Louden, Patrick Sent: Wednesday, M ay 31, 2017 4:36 PM To: Miller, Chris <Chris.Miller@nrc.gov>

Cc: O'Brien, Kenneth <Kenneth .O'Br ien@nrc.gov>; Lara, Ju lio <Jul io.Lara@nrc.gov>; Shuaibi, Mohammed <Mohammed .Shu aibi@nrc.gov>

Subject:

Sorry for missing ca ll Sorry Chris We were all in a human capital retreat mast of the day and missed getting this meeting rescheduled.

Our bad.

Pat

From: Ounlop, Andrew To: farnao Michael

Subject:

RE: stem rot ation check?

Date: Thursday, J une 01, 2017 4:26:00 PM Mike You discussed the removal of the motor breaks in 1995. lf you look at the same time they also changed the actuator gearing which slowed the valve down from around 1O seconds to 19 seconds. 1 would think that also plays into counting strokes. Thoughts?

FYI. 1 will be out of the office tomorrow so I would be available for an exit next Friday.

Andrew Dunlop Senior Reactor Engi neer Engineering Branch 2 Division of Reactor Safety 630-829-9726 From: Fa rnan, M ichael Sent: Thursday, June 01, 20 17 9:02 AM To: Benj ami n, Jam ie <Jamie.Benjamin@nrc.gov>; Rodriguez, Lienei <Lione l.Rodriguez@nrc.gov>;

Du nlop, And rew <Andrew.Dunlop@nrc.gov>; Phil lips, Charles <Cha rl es.Phillips@nrc.gov>

Cc: Jeffers, Ma rk <M arkJeffers@ nrc.gov>

Subject:

RE: stem rotation check?

1 agree.

Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Commission 301-415-1486 From: Benjamin, Jamie Sent: Thursday, June 01, 2017 10:01 AM To: Rodriguez, Lione l <Lionel.Rodrjguez@nrc.gov>; Dunlop, And rew <Andrew .Dun lop@nrc.gov>;

Phil lips, Charles <Charles.Phi llips@nrc.gov>; Fa rnan, Michael <M lchael.Farnan@nrc.gov>

Cc: Jeffers, Ma rk <MarkJeffers@nrc.gov>

Subject:

stem rotation check?

With the wedge pin sheared, interferences between the broken pin fragments/debris and adjacent threads can cause damage and interferences between the rnating threads, while also limiting rotation. The interferences may be sufficient to bind the joint during subse uent strokes, preventing detection of a loosened or degraded connection .

Page 9 of 60 of the failure analysis.

Explains why stem rotation check might have showed minimal rotation just prior to the failure.

Benjamin, Jamie From: Kusumawatimurray, Putri:(GenCo-Nuc) <Putri.Kusumawatimurray@exeloncorp.com>

Sent: Friday, June 02, 2017 3:08 PM To: Benjamin, Jamie Subje ct: [External_Sender] RE: LaSalle letter regarding Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 lssues.

At.tachme nts: NRC RA17-056.pdf

Jamie, Thank you for the feedback. Please see the attached letter that was submitted to the NRC electronically today for your copy.

Thank you, Dwi Murray Prncipal Regulatory Engineer Regulatory Assurance - LaSalle County Station 815-415-28 14 Putri.Kusumawatimurray@exeloncorp.com From: Benjamin, Jamie [1]

Sent: Friday, June 02, 2017 1:20 PM To: Kusumawatimurray, Putri: (GenCo-Nuc)

Subject:

RE: LaSalle letter regarding Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 I ssues.

1spoke with Ken O'Brien . The letter is consistent wnh his conversation w ith Exelon Senior Management.

From: Kusumawatimurray, Putri:(GenCo-Nuc) fmailto :Putri. Kusumawatimurray@exeloncorp.com]

Sent: Friday, June 02, 2017 8:51 AM To: Benjamin, Jamie <Jamie.Benjamin@nrc.gov>

Subject:

[External_Sender] LaSalle letter regarding Commitment s for Resolution of Anchor Darling Double Disc Gate Valve Part 21 lssues .

lmportance: High

Jamie, Please see t he attached letter that has been reviewed by LaSalle's management regarding commitments for resolution of Anchor Darling Double Disc Gate Valve Part 21 issues based on May 25, 2017 discussion . We intend t o submit the letter today pending any feedback from the NRC.

Please Iet me know if any questions or concerns.

Thank you, Dwl Murray Principa! Regulatory Engineer Regulatory Assurance - LaSalle County Station 1

-- h lon (

'8 15-415-2814 Putri.Kusu mawati mu rray@exeloncorp.com 2

From: Burnell Scott To: Mcrntvre oavid: Benney. Brian; Ne Cbiog: O"Brien Kenneth; Thomas Eric Cc: Wilkins. Lynnea; Mitlyng. Viktoria: ChandrathH. Prema

Subject:

RE: ACTION - answers needed for LaSalle Communicatlon Plan - J une 2017 Date: Friday, J une 02, 2017 6:56:09 AM Attachments: LaSalle Communicati on .Plan - une 201 7 dtm srb comm ents.docx Brian; Dave's comments cover the narrative, 1added a couple additional Qs that touch on the same points. Thanks.

Scott From: Mclntyre, David Sent: Thursday, June 01, 2017 5:05 PM To: Benney, Brian <Brian .Benney@nrc.gov>; Burnell, Scott <Scott.Burnell@nrc.gov>; Ng, Ch ing

<Chi ng.Ng@nrc.gov>; O'Brien, Ken neth <Kenneth.O'Brien@nrc.gov>; Thomas, Eric

<Eric.Thomas@nrc.gov>

Cc: Wilkins, Lynnea <Lynnea.Wil kins@nrc.gov>; Mitlyng, Viktoria <Viktoria.Mitlyng@nrc.gov>;

Chandrathil, Prema <Prema.Cha ndrath il@nrc.gov>

Subject:

RE: ACTION - answers needed for LaSa ll e Commu nication Plan - June 2017 Brian - From a quick read, several comments and questions, seeking clarity. Scott will add his insights tomorrow. l'm copying my R3 colleagues Vika and Prema for their awareness.

Thanks, Dave From: Benney, Brian Sent: Thursday, June 01, 2017 3:52 PM To: Burnell, Scott <Scott.Burnell@nrc.gov>; Mclntyre, Davld <David.Mclntyre@nrc.gov>; Ng, Ching <Ching.Ng@nrc.gov>~ O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Thomas, Eric

<Eric.Thomas@nrc.gov>

Cc: Wilkins, Lynnea <Lynnea .Wilkins@nrc.gov>

Subject:

ACTION - answers needed for LaSalle Communication Plan - June 2017 Folks, we are trying to "finalize" th is communications plan for Greg's approval TOMORROW.

Following t hat, it will be posted on Eric's Sharepoint site.

Please help us to get solid answers to the Q&A section, while OPA takes a look at the rest.

Please do not limit yourself to j ust t hese questions. lf needed please add other expected guestions and answer if known. This should be used to help us during the end of June public meeting . Once th is is up on Sharepoint we will be able t o do much more.

Thank you,

Bria n Benn ey Communication Plan - Anchor/Darling Valve Failures (Last Updated June 8, 2017) lssue to be Communicated On February 11 , 2017, a valve failure (stem disk separation) occurred at LaSalle Unit 2 to an Anchor Darling Double Disk gate valve . The plant specific implications of this issue are being addressed through a special inspection team . Due to the fact that this type of valve is widely used in the nuclear industry, the generic implications of this failure merit investigation. This investigation is ongoing. This plan addresses only the generic aspects of the valve failure.

Plant specific issues will be addressed by Region 111.

Stakeholders may be interested in:

The fc1cts associated with the failure, including cause The extent of use of the valves in the industry The generic safety sign ificance of the failure to the industry Actions proposed by industry/NRC staff asa result of the generic investigation Communication Team Region 111, NRR (DPR, DE, DIRS), NRO (DCIP), OPA Communication Methods to be Employed

1. This plan and accompanying information will be provided to ali members of the communication team
2. An lnformation Notice will be issued. The projected issue date is 16 June 2017
3. A category 2 public meeting will be held at NRC Headquarters. The date of the public meeting is still pending but could be as early as 19 June 2017
4. NRC staff is in direct communication with the licensee and affected industry groups to obtain the necessary facts to support the lnformation Notice and the public meeting Key Messages to be Communicated The NRC staff has significant interest in this issue but has no immediate safety concerns with respect to plant operations due in part to the relatively sparse operating experience, the low risk associated with failure , and the redundancy associated with even the most safety critical valves.

The valves under consideration are widely used in the industry.

There have been two known failures of these valves , one each at Browns Ferry in 2012 and LaSalle this year. due to this failure mechanism. There have been a few additional failures which may be due to related causes.

The safety significance of these valves to the operation of the plant varies from plant to plant based on where in the plant the valves are installed.

The NRC staff has significant interest in this issue but has no immediate safety concerns with respect to plant operations due in part to the relatively sparse operating experience, the low risk associated with failure, and the redundancy associated with even the most safety critical valves.

The NRC is currently investigating both plant specific and generic implications of the valve failures and will continue to update information concerning this failure as it becomes available.

Supporting Facts/Analysis The present inquiry involves Anchor Darling double disk gate valves with threaded and pinned connections between the stem and the upper wedge, and non-integral (shrink fit) collars, where the valve actuator has sufficient power to shear the wedge pin (torque load) and/or move the collar (axial and torque loads) (See figure below)

VERTICAL STEM It BACKSEAT (STEM CENTERUNE)

STEM STEM THREADS BODY HORIZONTAL

't (PORT CfNTERLINE)

WEDGE SPRING The design philosophy for valves configured as described above was that the wedge should be torqued against a rigid collar with sufficient force to resist alt applied loads. All loads would ,

therefore, be carried by the threads and interaction forces between the wedge and the collar.

The pin serves as a non load bearing component to preclude unthreading of the stem/wedge due to, for example, vibration .

Current testing and analyses for valves configured as described above is that the resistance of the collar to motion along the stem is less than the force applied by the actuator. This results in the collar slipping up the stem and the loss of any pretorque and other interactive forces between the wedge and the collar. Upon loss of these forces, the torque from the actuator is applied directly to the wedge pin. The wedge pin was not designed to be load bearing and may fail in shear.

There have been two valve failures due to the above scenario; Browns Ferry in November 8, 2012, and the current failu re at LaSalle. ln each case the pin sheared, the threads were damaged sufficiently to limit rotation of the stem in the disk. ln the Browns Ferry case the ultimate failure of the valve was a loose part that prevented the disks from seating resulting in excessive leakage; the wedge and stem did not separate. Thread damage was so severe that the wedge could not be unthreaded from the stem and had to be cut free. ln the LaSalle case, the collar was pushed up, thereby causing a loss of torque, then the load was transmitted to the wedge pin, which caused the pin to shear. The shearing of the pin caused some damage to the threads which restricted but did not fully eliminate rotation of the stem in the wedge . Over time, relative motion of the stem and wedge caused sufficient damage to permit stem disk separation.

The key elements to these failures are collar motion, transfer of loads to the wedge pin, shearing of the wedge pin with resultant thread damage, and at a much later time (based on oxidation of the wedge pin ends) failure of the valve.

Following the Browns Ferry failure, the manufacturer issued apart 21 on the event. The manufacturer proposed that the failures were due to inadequate torqueing and that the issue could be resolved by retorqueing the stem and wedge. Following the failure analysis of the LaSalle valve, the manufacturer has indicated that they will review the accuracy of the part 21.

The NRC staff presumes that this review is to assess the motion of the collar and its effect on the previously proposed solution.

Questions and Answers Q1 What are the facts associated with the failure, including cause?

A1 See facts above Q2 Are these valves extensively used in the industry?

A2 Yes, see the Flowserve Part 21 dated Feb 25, 2013, ADAMS No. ML13064A012 Q3 What is the generic safety significance of the failure to the industry?

A3 Based on a8 very conservative model.1-wl=i-iG-A- assumi!J.ges that ali valves are of the type under consideration and have the potential to fail, finds an insignificant qeneric~e change in risk to the plant as compared to the "normai,, scenario is insignificant._The plant-specific safety significance of this failure is 13lant speei.fic as ea~laR-t may have this type-efvaries depending on where valves of this type are used in different systems with different safety significances.

Based on a very conservative modei which assumes that all valves are of the type under consideration and have the potential to fail , the change in risk to the plant as compared to the

"normai" scenario is insignificant. Additionally, the failure of even the most risk significant of these valves can be tolerated due to the presence of backup and alternate systems 04 Actions proposed by industry/NRC staff asa result of the generic investigation A4 The NRC staff's investigation is ongoing. Courses of action will be developed either during or following the investigation, as appropriate.

From: Morris Scott To: Stoedter Karla

  • Groom letemy: Alexander Ryan; jrk Matthew: Pruett. Jroy: Lantz. Ryan Cc: O"Brien. Kenneth: leffers Mark: Ben jami. lamie

Subject:

RE: LaSalle Failure Eva luation Report for LaSa lle 2E22- F004 St em-t o-Wedge Failure Date: Friday, J une 02, 2017 11 :51 :14 AM Thanks!

From: St oedter, Karla Sent: Friday, Jun e 02, 2017 11:47 AM To: Groom, Jeremy <Jeremy.Groom@nrc.gov>; Alexa nder, Rya n <Rya n.Alexander@nrc.gov>; Kirk, Matthew <Matthew.Kirk@nrc.gov>; Pruett, Troy <Troy.Pruett@ nrc.gov>; Lantz, Ryan

<Rya n.La ntz@ nrc.gov>; Morris, Scott <Scott.Morris@nrc.gov>

Cc: O'Brien, Kenn et h <Kenneth.O'Brien@nrc.gov>; Jeffers, M ark <Ma rk.J effers@nrc.gov>; Benjamin, Jamie <Jam ie.Benj am in @nrc.gov>

Subject:

FW : LaSal le Failu re Eva lu ation Report for LaSal le 2E22-F004 St em-to-Wedge Failu re AII-Attached is the LaSalle HPCS injection valve failure report we received yesterday. Pages 11 and 12 contain a good summary of the failure mechanism which may be helptul as you continue to explore potential similar issues at Columbia.

Have a good day, Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

From: Benjamin, Jamie Sent: Thursday, June 01, 2017 8:34 AM To: Jeffers, Ma rk <Mark.Jeffers@ nrc.gov>; Stoedter, Ka rl a <Karla .Stoedter@nrc.gov>; Ru iz, Robert

<Robert.Ru iz@nrc.gov>; Rodriguez, Lionel <Lione l.Rodriguez@nrc.gov>; Phillips, Charles

<Charles.Phi ll ips@nrc.gov>; Dun lop, Andrew <Andrew.Dun lop@nrc.gov>; Farna n, M ichae l

<Michael.Farnan@nrc.gov>; Corujo-Sa ndin, Jorge <Jorge.Corujo-Sandin@nrc.gov>

Subject:

FW: LaSa lle Failu re Eva luation Report for LaSal le 2E22-F004 St em-t o-Wedge Fai lu re Just received from the licensee.

Failure analysis report.

From: Kusumawatimurray, Putri:(GenCo-Nuc) [mailto :Putri.Kusumawatlmurray@exeloncorp.com]

Sent: Wednesday, M ay 31, 2017 3:33 PM dup to p 538 GHC To: Benjami n, Jam ie <Jamie.Benjamin@n rc.gov> .

Cc: Ford Jr, Guy V:(GenCo-Nuc) <guy.ford@exeloncorp.com>

Subject:

[Externa l_Sender] LaSa ll e Fail ure Evaluation Report for LaSa ll e 2E22 -F004 Stem-to-Wedge Failu re

Please see the attached re port.

Thank you ,

Dwl Murray Principa! Regulatory Engineer Regulatory Assurance - LaSalle County Station

-= ExetonG, ra11oc1.

815-415-2814 Putri Kusumawatimurray@exeloncorp.com

Fr om: O"Brien Kenneth To: Benjam i lamie: leffers Mark: Stoedter Karla: Skokowski Richard: Shuaibi Mohammed: Lara luiio; ~

Patrick; Ruiz, Robert Cc: Rodriguez, lionel; Dunlop. Andrew: Phillips Charles; Farnan. Mk hael

Subject:

RE: LaSalle letter regarding Commi tm ents for Resolut ion of Anchor Darling Double Disc Gat e Valve Part 21 Issues.

Date: Friday, June 02, 2017 10:52:28 AM Jamie The write up is consistent with my conversation with Bill.

Thanks Ken From: Benjamin, Jamie Sent: Friday, June 02, 2017 9:10 AM To: Jeffers, Ma rk <M ark.Jeffers@ nrc.gov>; Stoedter, Karla <Karla .Stoedter@nrc.gov>; Skokowski, Richard <Richard .Skokowski@nrc.gov>; 0 1Brien, Kenn eth <Kenneth.O'Brien@n rc.gov>; Shu aibi, Mohammed <Mohammed .Shua ibi@ nrc.gov>; La ra, Julio <J ulio. Lara@nrc.gov>; Loud en, Patrick

<Pat rick. Louden @nrc.gov>; Ruiz, Robert <Robe rt.Ruiz@ nrc.gov>

Cc: Rodriguez, Lionel <Lionel. Rodriguez@n rc.gov>; Dun lop, Andrew <Andrew .Du nlop@ nrc.gov>;

Phill ips, Charles <Cha rles.Phill ips@nrc.gov>; Fa rn an, M ichael <Michael.Fa rnan@nrc.gov>

Subject:

FW: LaSa lle letter regarding Commit ment s for Resol ution of Anchor Darli ng Double Disc Gate Va lve Part 21 lssues.

lmportance: High The licensee sent me a copy of t heir ap proved CAL letter. This is not a draft letter but has not been ma iled yet.

They told me that t hey wfll send it out today by COB. They want ed me to ta ke a look at it to see if it met ou r expectat ions.

r)(S)DeliberaO,e Prl, ilege Ken - You spoke with th e licensee directly ...

From: Kusu mawati mu rray, Putri :( GenCo-N uc) [ma ilto :Putri. Kusumawati m u rray@exeloncorp.com J Sent: Friday, Jun e 02, 2017 8:51 AM ldup to p 559 GHC To: Benjam in, Jam ie <Jam je.Ben jamio@nrc gov>

Subject:

[External_Sender] LaSa ll e letter regard ing Commitments for Resolution ofAnchor Dar ling Double Disc Gate Valve Part 21 lssues.

lmportance: High

Jamie, Please see the attached letter that has been reviewed by LaSa lle's management regardng commitments for resolution of Anchor Darling Double Disc Gate Valve Pa rt 21 issues based on May 25, 2017 discussion. We int end to submit the letter today pendng any feedback frorn the NRC.

Please Iet me know if any questions or concerns.

Tha nk you, Dwi Murray Principa! Regulatory Engineer Regulato(y Assurance - LaSalle County Station

.z. E112~onG, , a\lon 815-415-2814 Putri,Kusumawatimurray@exeloncoro.com

requester stated that he is not interested in administrative issues and is only seeking iinformaiton on HPCS unit 1 La Salle ,

From: Roberts Darrell please refer to the incoming request (G HC)

To: Daley. Robea; ALLIU

Subject:

RE: Region III Daily Morning Meeting Minutes for Friday, J une 2, 2017 Date: Friday, J une 02, 2017 10:32:20 AM Outside of Scope From: Daley, Robert Sent: Friday, June 02, 2017 8:47 AM To: ALL_R3 <A11_ R3@nrc.gov>

Subject:

Region 111 Daily Morning Meeting M in ut es for Friday, June 2, 2017 The Daily Morning Meeting News for Friday, June 2, 2017 Regional Duty Officer: Bo,...b_D_a_le_.v_ _ _ _ _ _ _ _ __

Teleconference Nu mber: _jo_u_ts_ d_e..,.of_s_c_op_e......,.....,.....,..........,....,....--.......

Nate: Th is nei.o.tsletter m.iy contain pre-deci sio oal iofo Da oat dist ci btite QtJts-ide t he NRC.

--1 Outside of Scope Materials Events/lssues:

Outside of Scope

IOuSide oi Scope Part 21 :

Plant Status BRANCH 1-LaSalle: Due to continuing issues with operabil ity determ inations and fi ndings by the lkensee, SIT related inspection continues.

BRANCH 2 Outsde of Scope BRANCH 3 IOülside oi Scope BRANCH 4 Outside of Scope NRR:

Outside of Scope

Froq Coyne Kevfn To: . Q"Bricn Kenn~th

Subject:

Fwd: Summary of J u.ne 1 HQ l!C-504 Call on L~SalJe MOV lssues Date: Friday,June 02, 2.017 6:03:23 AM Hi Ken -

Had a question from Bill Dean abotJt the adequacy of the BWROG guidance relative to any performance deficiency that the SIT may identify for LaSalle. I provided a 1ittle more context on the BWROG guidance below, but wanted to nm the question by you for yow- perspective.

Hope all is well -

Kevin Begin Forwarded Message:

From: "Coyue, Kevin" <Kevin.Coyne@mc.gov>

Subject:

Re: Summary of June 1 HQ LIC-504 Call on LaSalle MOV lssues Date: 02 June 20 17 07:00 To: "Dean, Bill" <Bill.Dean@mc.gov>

Cc: "Lubinski, John" <John.Lubinski@nrc.gov>, "McDermott, Brian"

<Briru1.McDermott@nrc.gov>

Bill -

Hope your ttip is going well. I think a key aspect the SIT has been focusing on is the integrity of the stem-disc wedge pin. The concern is that the BWROG testing guidance cannot determ.ine if the wedge pin is still intact (though it may be able to detect if there is gross movemeut of tbe stem disc connection). So, if there is conceru that the wedge pin has been sheared due overtorquing by the motor actuator, the testing will not be able to detenniue if the pin is intact or if the stem/disc connection has been damaged . However, shearing of the pin does not necessarily Jead to stem-disc separation, but it Jeaves the valve in an indetenniuate state without auy design feature to prevent stem-disc separation . During the May 16 call, the BWROG noted that the most recent rev of the guidance included additional requirements to trend stem rotation checks over time, but this was viewed as a compensatory measure (so the revision also noted that the long term solution for high prio1ity valves was disassembly and inspection unless an analysis could demonstrate that the valve was not overtorqued in the past). The guidance to inspect bigh priority valves is in better alignment with the Flowserve Pa1t 21 which reconunended dissassembly/retorquing in order to resolve tbe issue.

I'll get with Ken O'Brien aud cla.rify where the team is at with the BWROG guidance relative to any performance deficiency they may identify. Also haven't gota fin al read from our staff on the adequacy of the newer BWROG guidance but will check with Mike Farnan to see where we're at.

Safe travels back bome!

Kevin On: 02 June 2017 04: 21 , "Dean, BiJI" <BiU .D ean @nrc.gov> wrote:

Great comprehensive sunu11ary Kevin. Probably took you 20 minutes to type this ! Thanks for taking the time and effort.

J bave one concem/question and that is the S(T perception that BWROG gujdance i.s inadequate.

That should be a detennination made by HQ and the region shoulcl focu s on 1a Salle implementation - T would assume that is the perfotmance deficiency. Tf the root cause is inadequate guidance then you have no performance deficiency.

BJLL DEAN Director, NRR On: 02 June 2017 03:13, "Coyne, Kevi.n" <Kevin.Coyne@nrc.gov> wrote:

Thanks to all who supported today's call. Here's a summary of today's discussions (and please feel free to provide and corrections or comments on items I may have missed).

High!ights:

  • NRR/DIRS and NRR/ DPR are expediting issuance of lnformation Notice on the Anchor Darling Double Disc Gate Valve issue. DPR has developed an accelerated schedule with goal of issuing the IN on or about June 16.
  • NRR/DPR continuing preparations for a public meeting to discuss the industry response to the Flowserve Part 21 and recent operating experience. Meeting will be coordinated with owners groups, Flowserve, and NEI and will assist the staff in assessing the need for further regulatory action following issuance of the lnformation Notice. The objective of this meeting will be to solicit input from industry on recent actions taken with regard to the Flowserve Part 21 in light of LaSalle valve failure. This information will be used to inform the LIC-504 decision-making process ..
  • Region 111 ei l ln c i n Te m r week.

(b)(5) Deliberative Privilege xe on in en s o su m1 a e er comm1 1ng o rmp e , , res for a potential failure of the Unit 1 HPCS system (e.g. , guarding RCIC and ADS) , {2) inspecting the Unit 1 HPCS valve at the next Mode 4 entry, and (3) inspecting other valves whose operability was questioned by the SIT at the next outage.

  • NRO/DCIP to conduct vendor inspection at Flowserve during the week of July 16, 2017
  • NRR/DIRS has set up a SharePoint ste to collect information -

http://fusion.nrc.gov/nrr/team/dirs/ioeb/anchor darling val ve issue/default.aspx

  • Next HO LIC-504 meeting will be scheduled for the week of June 12 DetaHed Summary Meeting commenced at 10:00 am on Thursday, June 1. Representatives from the following organizations were in attendance:
  • NRR/DE
  • NRR/DRA
  • NRR/DSS
  • NRR/DPR
  • NRR/DIRS
  • NRO/DCIP
  • Region 111
  • OEDO

Purpose:

Continue discussion of LIC-504 process to address generic impllcations arising from LaSalle special inspection. Where appropriate, make decisions on the following:

  • Continue to refine potential decision options Schedule for completing IN ldentify subsequent follow-up activities (e.g., additional generic communications, inspection activities)
  • Discuss planning for Follow-up Public Meeting This is the seventh meeting held on the LaSalle LIC-504 issue - previous meetings were held on May 3, May 5, May 10, May 11 , May 18, and May 24. Agenda is attached.

Status Reports:

  • LaSalle Special lnspection (M . Jeffers, Region 111) The Special lnspection Team (SIT) still has operability concerns for the Unit 1 HPCS injection valve after reviewing the licensee's revised operability evaluation. ln general, the methods used by the licensee to demonstrate operability of the susceptible Anchor Darling Double Disc Gate Valves are not able to predict failure when benchmarked to the Unit 2 HPCS injection valve. However, the licensee has been able to provide sufficient information to preclude the SIT from proving beyond a reasonable Ievel of confidence that the Unit 1 HPCS injection valve is inoperable.

ln particular, there is uncertainty associated with certain analysis parameters, such as the stem coefficient of friction, that support the licensee's operability determination. Therefore, The licensees has received the completed failure analysis for the Unit 2 HPCS injection valve. This was provided to HQ staff for informat...io_n_. - - - - - - - .

The SIT plans to exit either on Friday or ea[ly next week. (b)(5) Deli beratve Privilege (b)(5) Deliberative Privilege Exelon plans to senci in a letter identifying compensatory measures to mitigate potential failure of the Unit 1 HPCS injection valve (e.g., guarding systems such as RHR and ADS), committing to inspecting the Unit 1 HPCS valve during the next Mode 4 entry, and inspecting other susceptible valves identified by the team.

The SIT's perception is that the BWROG guidance is not effective at establishing operability of A/D valves in light of the Flowserve Part 21 issue The SIT believes that the Flowserve Part 21 adequately captures the failure mode and provides adequate guidance to disassemble, inspect and retorque the valves.

  • lnteractions with PWROG/BWROG (B. Benney, L. Watkins, NRR/DPR) - No new information
  • lnteractlons with NEI (G. Bowman, NRR/DPR) - DPR has contacted NEI in order to identify a point of contact for the valve issue. Once a POC is identified, DPR will set up a preliminary phone call to provide NEI with basie information related to the Flowserve Part 21 and related valve issues and being coordination for a follow-on public meeting. Aegion 3 would like to be included in call.
  • Risk Assessment (J. Circle, NRR/DRA) - DRA provided additional background on the pretim army risk assessment conducted for this issue. A total of 11 plants were evaluated -

2 with known locations of Anchor/Darling double disc gate valves, and 9 that represented a spectrum of BWR/PWR plant designs. To represent the degraded state of the Anchor Darling valves, the base MOV failure probability was multiplied by a factor of 5.9 ar 10.9 (to represent a 50 ar 100 fold increase in the mechanical failu re probability of the valve, assumed to be 10% of the total base failure probability). This resulted in an increase in CDF considered to be "small" per AG 1.174 guidelines. DRA committed to document the method and results obtained from their study. The risk results were also plotted against the AG 1.174 acceptance guidelines (see below - results for 10.9 multiplier for base MOV probability of failu re).

Acceptance guidelines for ~CDF in RG 1.174 1f O}

1r m u.. 1 [ 04 Region 1- No Change!. Allowed 0

u Region 1

  • Otl'ier 5itt-~ (AII MOVsl l'I) 11.1 1 l*OS * *
  • Cook (AO Valve,}

-0

  • *
  • l~l {AO Valve-s) 1 E-06
    • Region 11
  • ... Region 111 1.E-07 1 r n.; t r os t r (l. 1 r 01 1r m CDF LJC-504 Topies:
  • Re-affirmed Qualitative Risk Assessment (K. Coyne, NRA/DE) - The team discussed the risk assessment supporting the conclusion that there was not a need for immediate regulatory action per the guidance in LIC-504. The assessment is provided in the attached agenda. The team concluded that the risk assessment remains valid . NAR/DRA provided the following summary information that was added to the assessment:

UC-504 Topies:

  • Re-affirmed Qualitative Risk Assessment (K. Coyne, NRR/ DE) - The team discussed the risk assessment supporting the conclusion that there was not a need for immediate regulatory action per the guidance in LIC-504. The assessment is provided in the attached agenda. The team concluded that the risk assessment remains valid. NRR/DRA provided the following summary information that was added to the assessment:

A risk assessment conducted for 11 plants using conservative assumptions indicates that the increase in CDF associated with the degraded valve conditions constitutes a small increase in CDF (approximately less than lE-05/yr).

  • LIC-504 Decision Options (K. Coyne, NRR/DE) - The team next discussed the following topies:

Schedule for lssuance of IN - NRR/ DIRS(E. Thomas) reported that a draft IN is nearly complete and will be forwarded to DPR by the end of the day (this milestone was met).

DPR (N. Martinez) presented an accelerated 10 working day schedule for issuance of the IN (in contrast to the normai 3-4 month IN schedule) - this is an aggressive schedule and will require cooperation of all organizations involved in the IN approval process. The IN is written at a high Ievel and provides an overview of recent operating experience (LaSalle, Browns Ferry, Surry, River Bend)

Schedule for Public Meeting - NRR/DPR (L. Watkins) discussed the planning goals for public meeting with industry to discuss recent actions taken to address anchor darling valve failures. Th is meeting will be used to gather information to support the NRC's LIC-504 process. DPR is proposed scheduling the public meeting during the week of June 19 (preferably 6/20 or 6/22). DPR will also coordinate with industry stakeholders (NEI, PWROG, and BWROG) to ensure that they will have sufficient time to present their recent activities at the meeting. DPR will develop a draft agenda for the meeting (e.g., NRC overview, followed by PWROG/BWROG/NEI perspectives and open discussion).

Further Follow-up Activities - Potential follow-up activities were briefly discussed, but it was concluded that insights from the public meeting would be needed to further refine the LIC-504 decision options.

  • Communication Plan (B. Benney, NRR/.DPR)- DPR has developed a draft communications plan and will circulate among key team members to refine Q&A's and key messages. Goal is to have the comm plan available on the team SharePoint site by the end of the week to enable further review and comment.
  • Next Meeting (K. Coyne, NRR/DE) - ln light of recent progress and need to focus on the development and issuance of the IN, the schedule for the next meeting was discussed. It was decided to schedule the next meeting for the week of June 12. This will allow a review of progress toward issuance of the IN and planning for the public meeting. A follow-up LIC-504 meeting will be scheduled for team alignment just prior to the public meeting.

Next Meeting: the next LIC-504 meeting will be scheduled for the week of 6/12.

Action ltems:

ALL

  • Provide potential questions for Flowserve to NRO/DCIP (John Burke) for possible inclusion in the Flowserve vendor inspection plan.
  • Provide input for LIC-504 decision options and information needs as appropriate.
  • Support expedited concurrence process for IN
  • Provide feedback on communication plan once posted on team SharePoint site.

NRO/DCIP

  • Continue to coordinate with DPR to support expedited issuance of IN NRR/DIRS
  • Oe*itelop initial draft of lnformation Notice on Anchor Darling valve issue (11. Ghernoff) completed by Eric Thomas (6/1/2017)

NRR/DPR:

  • lmplement accelerated schedule for issuance of IN
  • ldentify point of contact at NEI and set up initial informatlon call (G. Bowman)
  • Continue development of Communication Plan (B. Benney)
  • Begin planning activitles for publlc meeting with industry representatives to discuss response to Flowserve Part 21 and related operating experience (L .Wilkins)
  • lssue meeting summary for May 16 meeting with owners groups (L. Wilkins)
  • Develop draft agenda for public meeting (L. Wilkins)

NRR/DRA

  • Document generic risk assessment activities (C. Ng, M. Leech)

NRR/DSS

  • Jim Hickey will take the lead on documenting the LIC-504 assessment Thanks again for your support of this process and my apologies on some of the teleconference communicatton issues we experlenced -

Kevin Kevin Coyne, PE, PhD Deputy Director (Acting), Division of Engineering Office of Nuctear Reactor Regulatfon Kevin. Covne@nrc. ;ov (301) 415-2478

From: Farnan Michael To: Benjam i 1amie: Dunlop. Andrew; Rodrii:uez Llonel: Corujo-Sandin tori:e Cc: leffers. Mark; Stoedter. Karla; Rujz. Robert

Subject:

RE: Team is at Site next week.

Date: Friday, June 02, 2017 1 :32:52 PM 1would love to join you folks next week but in parallel with assisting you on this inspection, l am trying to get ready for an ASME OM Code meeting scheduled for Monday June 12. 1 will fly out if you believe that it is better for me to be on site. Let me know.

FYI - I am in the process of dissecting MPR report noting discrepancies and following up on their conclusions. The more I read, 1cannot understand how Exelon still th inks that there is nothing wrong with Unit 1 HPCS valve.

Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Commission 301-415-1486 From: Benjamin, Jamie Sent: Friday, June 02, 2017 2:26 PM To: Farnan, Michael <M ichael. Farnan@nrc.gov>; Dun lop, Andrew <Andrew.Dun lop@nrc.gov>;

Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Coruj o-Sandin, Jorge <Jorge.Corujo-Sandin@nrc.gov>

Cc: Jeffers, Mark <MarkJeffers@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>; Ruiz, Robert

<Robert.Ruiz@nrc.gov>

Subject:

Team is at Site next week.

We will be at the site Monday through Thursday next week. Mike, totally up to you if you want to fly aut next week or work from your normai location.

lf you are off today, and don't get this email until Monday morning, just plan on working from the site Tuesday through Thursday.

Home stretch. We are developing our position paper one last time with all of the new information.

lf you haven't heard, Columbia's HPCS injection valve had a broken pin when they disassembled it this week. More to come. The LaSalle licensee was sending people out to Columbia to both help them and to get a first hand understanding of the Op Ex.

He a great and reasonably safe weekend.

Jamie

From: Stoedter Karla To: O"Brjen Kenneth Subj ect: RE: Columbia updat ed information Date: Monday, June 05, 2017 1 :47:31 PM 1 don't have anything yet, but Greg knows we would appreciate anything he can get his hands on.

Karla Stoedter, Chief Region 111 Div1sion of Reactor Projects - Branch 1 630-829-9731 (office)

From: O'Brie n, Kenneth Sent: Monday, Ju ne 05, 2017 1:47 PM To: Stoedt er, Ka rl a <Ka rla.Stoedt er@nrc.gov>

Subject:

RE: Columbia updated informat ion Thanks Any pictures, any further clarification on the information from the sri vice the pe From: Stoedter, Karla Sent: Monday, Jun e 05, 2017 1:46 PM To: 0 1Brien, Kenneth <Kenneth.O'Brien@nrc.gov>

Subject:

RE: Columbia updated informatio n No, but I believe the other valves are smaller. Region IVs counterpart meeting is this week so the residents are not at the site. Greg Kolcum just happened to call me from the airport.

Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

From: O'Brien, Kenneth Sent: Monday, June 05, 2017 1:45 PM To: Stoedter, Karla <Karla.Stoedter@nrc.gov>

Subject:

RE: Columbia updated information Do we know the sizes?

From: Stoedter, Karla Sent: Monday, June 05, 2017 1:38 PM To: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Benjamin, Jamie <Jamie.Benjamin@nrc.gov>

Subject:

Colu mbia updated information T he licensee opened up their HPCS 12 valve over the weekend and the pin was intact.

The licensee plans to open up the HPCS 15 valve after midnight tonight.

Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

From: Farnan Michael To: Benjam i . lamie: Pbil\ips. Charles; Punlop Andrew: Rodrii:uez Lionel

Subject:

Comments on MPR failure analysis Date: Monday, J une 05, 2017 7:49:19 AM Attachments: La Salle Fa ilure Analysis Farnan Comments.docx Attached please find m comments on MPR fa ilu re analysis. FYI -1 am working from home today and can be reached at (b)(6)

Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Comm ission 301-415-1486

From: farnan Michael To: Rodriguez Lionel Cc: Dynlop. Andrew

Subject:

RE: Help finding an EPRI reference Date: Monday, J une 05, 2017 1:28:44 PM Actually I paid attention to the friction factors that they are using and I am fami li ar with the EPRI document because I used it at Ginna when I was applyi ng EPRI PPM calcs to AD OD gate valves. The factors used seemed reasonable.

Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Commission 301-415-1486 From: Rod riguez, Lionel Sent: Monday, Jun e 05, 2017 2:25 PM To: Farnan, Michael <Michael.Farnan@n rc.gov>

Cc: Dun lop, Andrew <Andrew.Dun lop@nrc.gov>

Subject:

Help fi nding an EPRI reference Hello Mike, The Brunswick Analysis references the following document for the friction factors they are using:

  • EPRI MOV Performance Prediction Program, "Stem Thrust Prediction Method for Anchor Darling Double Disc Gate Valves," Report No. TR-103232, Research Project 3433.16, November 1994.

Do you have a copy of that reference document?

Thanks, Lionel Rodriguez NRC/RIII/DRS/EB2 630-829-9609

From: McDermott Brian To: Q"Brien Kenneth

Subject:

Re: FW: HPCS anchor darling va lve at Columbia Date: Monday. June 05, 2017 12:09:47 PM That's great Ken, thanks.

On: 05 June 201 7 09:04, "O'Brien, Kennetb" <Keonetb.O'Brien@nrc.gov> wrote:

Brian You must have been sitting beside me last week as I talked with the team!

They are back on site this week and plan to finish also. They plan to identify each final argument the licensee is using, our assessment of same, and the engineering basis for agreement or otherwise.

The team has done some great work and just needs a bit more efforts to get it across the flnish line.

Thanks for the feedback.

Ken From: McDermott, Brian Sent: Monday, June 05, 2017 7:17 AM To: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>

Subject:

Re: FW : HPCS anchor darl ing va lve at Columbia Thanks Ken .

As an aside, 1 feel like we are in a mode of NRC management having to cha llenge the staff's conclu sions rega rding operability. 1 believe we need the staff to focus on the licensee 's OD and chal lenging their assessment, assumptions, etc. .. Performing the OD is t he obligation of the licensee.

lf they are not doi ng it well, then we shou ld put the facts on the licensee's plate and senci them back to redo the OD. Mike F is a great asset, he has lat of first hand experience and knowledge. His time asa regu lator has been relatively short and he has been on the licensing end of things, not the inspection side.

On: 04 Jun e 2017 13:09, "O'Brien, Kenneth " <Kenneth.O'Brien@nrc.gov> wrote:

Your Welcome.

Hoping to bring the issue to resolution th is week.

The t eam is back onsite at LaSalle to ensure maximum comm un ication with the licensee.

Enjoy!

Ken net h G. O' Brien, Di rector Division of Reactor Safety Region 111 Kennet h.0Brien@NRC.Gov 630-829-9700 On: 04 June 2017 11:47, "McDe rmott , Brian" <Brian.McDermott@nrc.gov> wrot e:

Thanks Ken On: 02 June 2017 14:13, "O' Brien, Ke nneth" <Kenneth.O'Brien@nrc.gov> wrote:

FYI From : Morris, Scott Sent: Friday, June 02, 2017 1:10 PM To: O'B rien, Kenneth <Kenneth.O' Brien@nrc.gov>

Subject:

FW: HPCS anchor darli ng va lve at Colum bia lmportance: High Just got this!

From : Alexander, Ryan Sent: Friday, June 02, 2017 1:09 PM To: Morris, Scott <Scott.Mor ris@nrc.gov>; Pruett, Troy <Troy.Pruett@nrc.gov>; Lantz, Ryan <Ryan. Lantz@nrc.gov>; Kennedy, Kriss <Kriss.kennedy@nrc.gov>

Cc: Sull ivan, Thomas <Thomas.Sullivan@nrc.gov>; Ha ire, Mark <Mark.Haire@nrc,gov>;

Kirk, Matthew <Matthew.Kirk@nrc.gov>; Speer, Chris <Chris.Speer@nrc.gov>; Kolcum, Gregory <Gregory.Kolcum@nrc.gov>; Brandt, Lindsay <Lindsay.Brandt@nrc.gov>;

Vegel, Anton <Anton.Vegel@nrc.gov>; Clark, Jeff <Jeff.Clark@nrc.gov>

Subject:

RE: HPCS anchor darling va lve at Co lumb ia lmportance: High AII:

lnformation on the condition of the first of 3 Anchor-Darling (A-0) valves in the CGS HPCS system only developed in the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Here is a thumbnail bullets of what the CGS Residents currently know about HPCS-V-4 (HPCS injection valve):

1. HPCS valve (V-4) traces consistent over life of valve (no anomalous traces)
2. No stem rotation observed prior to auto start of H PCS on 5/25/2017
a. On 5/25, due to an apparent l&C error during a maintenance activity, HPCS auto-started
3. Diagnostic after auto start on 5/25/17 and prior to disassembly 6/1/2017 showed > 10 degrees rotation and open stroke failed trace
a. The BWROG acceptance criteria for stem rotation is <!= 5 degrees rotation
4. Stem was connected to upper wedge with minor displacement from full insertion (threaded)
5. Stem rotated freely by hand
6. Wedge pin sheared but still in the wedge
7. No FME in valve body
8. Collar minor displacement from stem (mils)
a. This is different than LaSalle who saw significant collar displacement
9. Actuator tripped on thermals after auto start on 5/25/2017
10. Magnesium rotor inspection - satisfactory 11 . Gear actuator possible gear damage awaiting inspection
12. Traces, photos, video, and corrective actions for repair underway (same for V-12, and V-15)
a. V-12 is the HPCS min-flow valve and V-15 is the HPCS suction transfer valve
b. Work on V-12 and V-15 disassembly and inspection over this weekend.

More to come as the CGS Residents get additional information as the licensee

inspections continue. Of note - Greg and Lindsay have and continue do a great job following this, and other ongoing outage issues.

Ryan D. Alexander Senior Project Engineer NRC Region IV, Div. of Reactor Projects Branch A (CPNPP, CGS, & DCPP) & "Ali Things JLD" Regional POC 1600 E. Lamar Blvd, Arl ington, TX 76011 Otfice: (817) 200-1195 tel1 ...

!<b_)(6_

) _ _ _ __.

~ Please consider the environment before printing this e-mail.

From : Morris, Scott Sent: Friday, June 02, 2017 11:49 AM To: Haire, Mark <Mark.Haire@nrc.gov>; Alexander, Rya n <Ryan .Alexander@nrc.gov>;

Sullivan, Thomas <Thomas.Sullivan@nrc.gov>; Kirk, Matthew

<Matthew.Kirk@nrc.gov>; Lantz, Ryan <Ryan.Lantz@nrc.gov>; Pruett, Troy

<Troy.Pruett@nrc.gov>

Subject:

HPCS anchor darli ng va lve at Columbia lmportance: High Any update on the licensee's inspection of the HPCS valve? 1just spoke with Region 111 management and they are quite interested in the status of the valve internais.

Benjamin, Jamie From: Rodriguez, Lionel Sent: Monday, June 05, 2017 12:40 PM To: Benjamin, Jamie

Subject:

IR on Design Issue from First Week.

Attachments: AR 04003319.pdf

Hello, Attached is the IR the licensee generated on the first week of our inspection.

Lionel R.

From: Coyne. Kevin To: Q"Bcieo Kenneth Subj ect: RE: laSalle 504 internai follow up Date: Monday, J une 05, 2017 7:43:48 AM Hi Ken-Got to run to the Monday morning madness series of meetings, but 1'11 call around lunch time it you're available. It there's a better time for the Region, l'm good with alternate times (just wanted to put a stake out there and cc'ed folks so you could weigh in .. .).

Kevin From : O'Brien, Kenneth Sent: Monday, June 05, 2017 8:42 AM To: Coyne, Kevin <Kevin.Coyne@nrc.gov>

Subject:

RE: LaSa lle 504 internai follow up But how does that look for region iii?

Log into skype From: Coyne, Kevin Sent: Monday, June 05, 2017 7:41 AM To: W ilkins, Lynnea <Lynnea.Wi lki ns@n rc.gov>

Cc: King, Michael <Michae l.King2@nrc.gov>; Lubinski, John <John.Lubinski@nrc.gov>;

Bowman, Gregory <Gregory.Bowman@n rc.gov>; Felts, Russell <Russe ll.Felts@nrc.gov>;

O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Benney, Brian <Brian.Benney@nrc.gov>;

Gavrilas, Mirela <M irela.Gavrilas@nrc.gov>

Subject:

RE: LaSa lle 504 internai fol low up Hi Lynnea-We received some late breaking news trom Columbia regarding their anchor/darling valve inspection results on Friday. Given the new information, 1think it would make sense to move this meeting up. So, could you reschedule this meeting to this week?

Thursday (6/8) at 3 pm (eastern) looks good for DE.

Thanks!

Kevin

---Original Appointment-----

From: Wtlkins, Lynnea Sent: Friday, June 02, 2017 6:14 PM To: Wilkins, Lynnea; Benney, Brian; Helton 1 Shana; Gavrilas, Mirela; Oesterle, Eric; Hickey, James; Alley, David; Farnan, Michael; Thompson, John; Miller, Ch ris; King, M ichael; Weerakkody, Sun il; Giitter, Joseph; Bowen, Jeremy; Jeffers, Mark; Stoedter, Karla; O'Brien, Kenneth; Casto, Greg; Circl e, Jeff; Benjamin, Jamie; Leech, Matthew; Shuaibi, Mohammed; Lara, Julio; McGinty, Ti m; Krohn, Paul; Burke, John; Kavanagh, Kerri; Herrity, Thomas; Rodriguez, Lionel; Corujo-Sandin, Jorge; Louden, Patrick; Kazak, Laura; Ng, Ching; Miller, Ed; Lubinski, John; Hsueh, Kevin; Stuchel l, Sheldon; Garmoe, Alex; Bowman, Gregory; Lu nd, Louise; Chernoff, Harold; Scarbrough, Thomas; Gascot Lozada, Ramon; Purnell, Bl ake; Clark, The resa; Coyne, Kevin; Vaidya, Bhalchandra; Wrona, David; Whitman, Jennifer; Tilton, Carollne; Mclntyre, David; Burne ll, Scott; Morey, Dennis; Martinez, Nancy

Subject:

LaSal le 504 internai follow up When: Thursday, June 15, 2017 9:00 AM-10:00 AM (UTC-05:00) Eastern Time (US & Canada).

Where: HQ-OWFN-12B04-25P Previous Agenda is attached for reference, but will be updated.

866-659-54 12 Participant passcode:... l(b_l<6_l _ _ ____,

<< File: Agenda_June 1_ 2017.docx >>

From: Stoedter. Karla To: teffers Mark: QBrien. Kenneth

Subject:

FW: LaSalle Failure Evaluation Report for LaSalle 2E22-F004 Stem-t o-Wedge Fai lure Date: Monday, June 05, 2017 7:29:36 AM FYI. ..

Karla Stoedter, Chief Region 111 Divlsion of Reactor Projects - Branch 1 630-829-9731 (offlce)

From: Alexander, Ryan Sent: Friday, June 02, 2017 4:03 PM To: Stoedter, Ka rl a <Ka rla.Stoedt er@nrc.gov>

Subject:

Re: LaSalle Failu re Evaluation Report for LaSalle 2E22- F004 Stem-to-Wedge Failu re Karla:

Thanks for all of the information on LaSalle you sent this afternoon.

I understand you talked to the CGS SRJ, Kulcum, and got the preliminary info on V-4 HPCS Injection. Unfortunately given the recent operational history for V -4 and the inadvertent HPCS autostart on 5/25, it's unclear to me if this valve may be representative of the entire CGS population of A-D valves. CGS is opening up the other two valves this weekend (HPCS min flow and HPCS suction swap) so we likely will have more Ext of Condition info nexl week.

For your info, R1V has designated a DRP and DRS POC for ali things A-D and we continue to feed all of the info to them. Chris Speer (RI at Waterford) and Chad Stott (EB 1 inspector) should continue to have the best snapshot of complete info we have in RIV as it comes in.

Finally, for you info and to update yow* distribution lists, Jeremy Groom and Mark Haire recently swapped BC slots such that Mark is now my Chief with oversighl of CGS, Diablo, and Comanche; Jeremy is now the PSBl (security) chief.

Have a great weekend.

Ryan A.

On: 02 June 2017 11 :47, "S toedter, Karla" <Karla.Stoedter@nrc.gov> wrote :

Ali -

Attached is the LaSalle HPCS injection valve failure report we received yesterday. Pages 11 and 12 contain a good summary of the failure mechanism wl1ich may be helpful as you continue to explore potential similar issues at Columbia.

Have a good day, Karla Stoedter, Chief

Region 11 1Division of Reactor Projects - Branch 1 630-829-9731 (office)

From: Benjarnin, Jarnie Sent: Th ursday, June 01, 2017 8:34 AM To: Jeffers, Mark <Mark.J effers@nrc.goy>; Stoedter, Karla <Karla.Stoedter@nrc.gov>; Ruiz, Robert

<Robert.Rui z@nrc.gov>; Rodriguez, Lionel <Lionel .Rod riguez@nrc.gov>; Phill ips, Charles

<Charles.Phillips@nrc.gov>; Dunlop, Andrew <Andrew,Dunlop@ nrc.gov>; Farnan, Michael

<Michael.Farna o@orc.gov>; Coruj o -Sa ndin, Jorge <Jorge.Corujo-Sa ndin@orc.gov>

Subject:

FW: LaSalle Fai lu re Eva luati on Report for LaSal le 2E22-F004 Stern-to-Wedge Fai lu re Just received from the licensee.

Failure analysis report.

From: Kusu rnawati rnu rray, Putri :( GenCo-N uc) [ma i lto:Putri .Kusumawatj m u rray@exeloncorp.com]

Sent: Wednesday, May 31, 2017 3:33 PM To: Benj arnin, Jarn ie <Jam ie.Benjamin @nrc.gov>

Cc: Ford Jr, Guy V:(GenCo-Nuc) <guy .ford@exeloncorp.com>

Subject:

[Ext erna l_Sender] LaSa ll e Fa il ure Evaluat ion Report for LaSall e 2E22-F004 St em-to-Wedge Failu re

Jamie, Please see the at tached re port.

Tha nk you, Dwi Murray Principa! Regulatory Engineer Regulatory Assurance - LaSalle County Station

. . ; Exelonr.e tal 10n.

815-415-2814 Putri.Kusurnawatjmurray@exeloncorp.com

EXCIP From: Philips Charles To: Benjam i lam je; Dunlop. Andrew; Rodriguez. Llonel; f arnan. Mlchael

Subject:

RE: STT"s position on valve cycles Date: Monday, June 05, 201711:05: 23 AM Attachments: LaSalle STT Simulator observat iohs.docx From: Benjamin, Jamie Sent: Monday, Jun e 05, 2017 10:20 AM To: Phil lips, Charles <Cha rles. Phi ll ips@ nrc.gov>; Dun lop, Andrew <Andrew.Du nlop@ nrc.gov>;

Rodriguez, Lionel <Lione LRodriguez@ nrc.gov>; Fa rnan, M ichael <M ichael.Farnan@nrc.gov>

Subject:

S!T's position on valve cycles The licensee states in their operability evaluation that their 1 E22-F004 valve design function in 4 valve cycles.

Do we know if the valve actually cycled more for any past events.

What is the jmjtjna eyent that wrnJtd res1111 io tbe mast valve cvcles? Ibe statiao 11sed L'sso.)

O@llberative Privilege

From : Shuaibi, Mohammed To: O"Brien. Kenneth; Lara Iulio

Subject:

RE: Solicitation of Com ments 6/6: Draft JN on anchor/darling double disc gate va lve (TAC MF9698)

Date: Monday, June 05, 2017 8: 03:00 AM 1'11 give it a closer look, but very quick scan looks like its missing last week's test results at Columbia, which may be very relevant.

From: O' Bri en, Kenneth Sent: Monday, June 05, 2017 8:01 AM To: Shuaibi, Mohammed <Mohammed.Shua1bi@nrc.gov>; La ra, Julio <Jul io.La ra@nrc.gov>

Subject:

FW : Solicit ation of Comments 6/6 : Draft IN on anchor/ darl ing double disc gat e valve (TAC MF9698}

FYI and insights.

From: Ma rti nez, Nancy Sent: M ond ay, Jun e 05, 2017 7:18 AM To: Pelt on, David <David.Pelton@nrc.gov>; Yerokun, Jimi <Jimi.Yerokun@nrc.gov>; Niek, Joseph

<Joseph.Nick@nrc.gov>; Franke, Ma rk <Mark.Franke@nrc.gov>; M il ler, Mark

<Mark.Mlller@nrc.gov>; Desai, Binoy <Bjnoy.Desa1@nrc.gov>; Lara, Julio <Julio.Lara@n rc.gov>;

Sh uaibi, Moham med <Mohammed .Shuaibi@nrcgoy>; Li pa, Ch ristin e <Christine.Lipa@nrc.gov>;

Lantz, Ryan <Ryan.Lantz@nrc.gov>; Clark, Jeff <Jeff.Clark@nrc.gov>; Howel l, Li nda

<Linda.Howell@nrc.gov>; Jones, W il liam <Wil liam.Jones@nrc.gov>

Cc: Ferdas, Ma rc <Marc.Ferdas@nrc.gov>; M cKenna, Phil ip <Philip.McKenna@nrc.gov>; St one, An nMa rie <AnnMarie.Stone@nrc.gov>; Hipschman, Thomas <Thomas.Hipschman@nrc.gov>;

Garmoe, Alex <Alex.Garmoe@nrc.gov>; Lo rson, Raymond <Raymond .Lorson@nrc.gov>; Scott, M ichael <Michael.Scott@nrc.gov>; Gody, Tony <Tony.Gody@nrc.gov>; M unday, Joel

<Joel.Munday@nrc.gov>; O' Brien, Kenneth <Kenneth .O'Brien@nrc.gov>; Louden, Patrick

<Patrick.Louden@nrc.gov>; Pruet t, Troy <Troy,Pruett@nrc.gov>; Vegel, Anton

<Anton.Vegel@nrc.gov>

Subject:

Solicitat ion of Com ments 6/6 : Dra ft IN on anchor/darling double disc gate valve (TAC MF9698)

The NRR Generic Communications Branch has been working with the NRR/DIRS Operating Experience Branch to develop the attached/linked draft lnformation Notice (IN) discussing operating experience associated with anchor/darling double disc gate valve wedge pin shearing and will promptly begin the formai concurrence process. Since these valves are used widely in various diverse safety systems (HPCI, HPCS, RHR, ACS, etc),

t he NRC staff is working towards issuing this high priority IN within 2 weeks.

The Regions will be part of the formai concurrence chain for this document and concu rrence wi ll be requested in the next couple of days from one of your Division Directors (DRP or DRS). You are receiving this e-mail to have an opportu nity to review the draft IN and provide comments prior to the formai concurrence process. Time spent reviewing this IN can be charged to TAG MF9698. To support prompt issuance of the IN, please provide any comments or questions to Nancy Martinez by COB Tuesday, June 6.

The draft IN can be found in ADAMS ML17153A053.

Thank you, Nancy Martinez Generic Communications Branch (PGCB)

Division of Policy and Rulemaking (DPR)

Office of Nuclear Reactor Regulation (NRR) 301 -415-2719 From: Ma rti nez, Na ncy Sent: Th ursday, May 25, 2017 10:53 AM To: Pelton, David <David.Pelton@nrc.gov>; Yerokun, Jimi <Jimi.Yerokun@nrc.gov>; Niek, Joseph

<Joseph.Nick@nrc.gov>; Fra nke, M ark <Mark.Franke@nrc.gov>; M iller, Ma rk

; Desai, Binoy <Binoy.Desat@nrqrnv>; Lara, Julio <Juljo.Lara@nrc.gov>;

Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; Li pa, Ch ristin e <Christine.Lipa@nrc.gov>;

Lant z, Ryan <Ryan.Lantz@nrc.gov>; Clark, Jeff <Jeff.Clark@nrc.gov>; Howel l, Li nda

<Linda.Howell@nrc.gov>; Jones, W il liam <Wi ll iam Jones@nrc gov>

Cc: Ferdas, Ma rc <Marc. Ferdas@nrcgov>; McKenna, Phil ip <Phi!ip.McKenna@nrc.gov>; Stone, An nMa rie <AnnMarie.Stone@nrc.gov>; Hipschma n, Thomas <Thomas.Hipschman@nrc.gov>;

Stuchel l, Sheldon <Sheldon.Stuchell@nrc.gov>; Ga rmoe, Alex <Alex.Garmoe@nrc.gov>

Subject:

For Prompt Awa reness: upcoming com ment request on an information notice (IN }

Good Morning, An lnformation Notice is currently being developed pertaining to anchor/darling double disc gate valve wedge pin shearing. There is a need to inform the industry as quickly as possible since these valves are used widely in various diverse safety systems (HPCI, HPCS, RHR, RCS, etc) and two 10 CFR 21 reports issued in 2013 may not provide necessary information to address this problem.

This is a heads up that we will be requesting a very prompt review from your organization. 1 currently do not have a draft of the lnformation Notice to share, but please be on the lookout for a comment request next week. lf you have any questions, please do not hesitate to contact me.

Thank you ,

Nancy Generic Communications Branch (PGCB)

Division of Policy and Rulemaking (DPR)

Office of Nuclear Reactor Regulation (NRR) 301-415-2719

From: Stone AnnMarie To: Lara lulio: leffers Mark; Shuajbi Mohammed: O"Brjen Kenneth: Louden. Patrick Subj ect: RE: Solicitation of Comments 6/6: Draft !N on anchor/darling double disc gate valve (TAC MF9698)

Date: Monday, J une 05, 2017 12:30:16 PM Just talked to Ken - 1'11 gather comments and send in From: La ra, Julio Sent: Monday, June 05, 2017 11:52 AM To: Stone, AnnMarie <Ann M arie.Stone@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Shua ibi, Moharnrned <Moharnrned.Shua ibi@ nrc.gov>; O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>;

Louden, Pat rick <Patrick.Louden@nrc.gov>

Subject:

RE: Solicitation of Cornrnents 6/6: Draft IN on anchor/darl ing double disc gate va lve (TAC M F9698}

The issuance of an IN is an outcome of the LIC-504 process which is intended to ensure licensees are aware ot the Part 21 and highlight the recent LaSalle issues. It is intended to communicate the issue quickly rather than wait for any regulatory conclusions.

Hence, 1 support NRR/DE/DIRS issuance after receiving comments.

From: Stone, AnnMarie Sent: Monday, Ju ne 05, 2017 11:47 AM To: Jeffers, Ma rk <Mark.Jeffers@nrc.gov>; Shuaibi, Moha rnrned <Moh ammed.Shuaibi@nrc.gov>;

O'Brien, Kenneth <Kenneth.O' Brien@nrc.gov>; La ra Jul io <Julio.Lara@nrc.gov>; Louden, Patrick

<Patrick.Louden@nrc gov>

Subject:

FW: Solicit ation of Comments 6/6: Draft IN on anchor/da rl ing double disc gat e valve (TAC MF9698}

lmportance: High Please advise:

This was received while I was away ..... . 1 recommend NOT issuing the IN untll we review the licensee's analysis.

From: Martinez, Na ncy Sent: Monday, June 05, 2017 7: 18 AM To: Pe lton, David <David.Pelton@nrc.gov>; Yerokun, Jimi <Jimi.Yerokun@nrc.gov>; Niek, Joseph

<Joseph.Nick@nrc.gov>; Franke, Mark <Mark.Franke@nrc.gov>; M il ler, Ma rk

<Mark.M iller@nrc.gov>; Desai, Binoy <Binoy.Desa i@nrc.gov>; Lara, Julio <Julio. Lara@nrc.gov>;

Shuaibi, Moharnrned <Moharnrned.Shuaibi@nrc.gov>; Lipa, Christine <Christine.Lipa@nrc.gov>;

Lant z, Ryan <Ryan.Lantz@nrc.gov>; Clark, Jeff <Jeff.Clark@nrc.gov>; Howell, Li nda

<Linda.Howell @nrc.gov>; Jones, W illiam <Wi ll iarn.Jones@nrc.gov>

Cc: Ferdas, Marc <Marc.Ferdas@nrc.gov>; McKenna, Philip <Philip.McKenna@nrc.gov>; Stone, AnnMarie <AnnMarie.Stone@nrc.gov>; Hipschman, Thornas <Thomas.Hipschman@nrc.gov>;

Garmoe, Alex <Alex.Garmoe@nrc.gov>; Lo rson, Raymond <Raymond.Lorson@nrc.gov>; Scott, Michael <M ichael.Scott@nrc.gov>; Gody, Tony <Tony.Gody@nrc.gov>; Munday, Joel

<Joel.Munday@nrc.gov>; O'Brien, Ken neth <Kenneth.O'Brien@nrc.gov>; Louden, Patrick

<Patrick.Louden@nrc.gov>; Pruett, Troy <Troy.Pruett@nrc.gov>; Vegel, Anton

<Anton .Vegel@nrc.gov>

Subject:

Solicitation of Comments 6/6: Draft IN on anchor/darling double disc gate valve (TAC MF9698}

The NRR Generic Communications Branch has been working with the NRR/DIRS Operating Experience Branch to develop the attached/linked draft lnformation Notice (IN) discussing operating experience associated with anchor/darling double disc gate valve wedge pin shearing and will promptly begin the formai concurrence process. Since these valves are used widely in various diverse safety systems (HPCI, HPCS, RHR, RCS, etc),

the NRC staff is working towards issuing this high priority IN within 2 weeks.

The Regions will be part of the formai concurrence chain for this document and concurrence will be requested in the next couple of days from one of your Division Directors (DRP or DRS). You are receiving this e-mail to have an opportunity to review the draft IN and provide comments prior to the formai concurrence process. Time spent reviewing this IN can be charged to TAC MF969~ To support prompt issuance of the IN, please provide any comments or questions to Nancy Martinez by COB Tuesday, June 6.

The draft IN can be found in ADAMS ML17153A053.

Thank you, Nancy Martinez Generic Communications Branch (PGCB)

Division of Policy and Rulemaking (DPR)

Office of Nuclear Reactor Regulation (NRR) 301-415-2719 From: Marti nez, Nancy Sent: Th ursday, May 25, 2017 10:53 AM To: Pelton, David <David.Pelton@nrc.gov>; Yerokun, Jimi <Jimi.Yerokun@nrc.gov>; Niek, Joseph

<Joseph. Nick@ nrc.gov>; Fra nke, Mark <Mark.Franke @nrc.gov>; M il ler, Ma rk

<M ark.Mlller@nrc.gov>; Desai, Binoy <Binoy.Desai@nrc.gov>; Lara, Julio <Julio.Lara@nrc.gov>;

Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; Lipa, Ch ri stine <Christine. Lipa@nrc gov>;

Lantz, Ryan <Ryan. Lantz@nrc.gov>; Clark, Jeff <JefLClark@nrc.gov>; Howel l, Li nda

<Linda .Howell @nrc.gov>; Jones, Wi lliam <William .Jones@nrc.gov>

Cc: Ferdas, Ma rc <Marc.Ferdas@nrc.gov>; McKenna, Phil ip <Philip.McKenna@nrc.gov>; Stone, An nMa rie <AnnMane.Stone@nrc.gov>; Hipschma n, Thomas <Thomas.Hioschma n@nrc.gov>;

Stuchel l, Sheldon <Sheldon.Stuchell@nrc.gov>; Garmoe, Alex <Alex.Garmoe@nrc.gov>

Subject:

For Prompt Awareness: upcoming comment request on an information notice (IN}

Good Morning, An lnformation Notice is currently being developed pertaining to anchor/darling double disc gate valve wedge pin shearing. There is a need to inform the industry as quickly as possible since these valves are used widely in various diverse safety systems (HPCI, HPCS, RHR, RCS, etc) and two 10 CFR 21 reports issued in 2013 may not provide necessary information to address this problem.

This is a heads up that we will be requesting a very prompt review from your organization. 1 currently do not have a draft of the lnformation Notice to share, but please be on the lookout for a comment request next week. It you have any questions, please do not hesitate to contact me.

Thank you, Nancy Generic Communications Branch (PGCB)

Division of Policy and Rulemaking (DPR)

Office of Nuclear Reactor Regulation (NRR) 301-415-2719

From: farnan Michael To: Benjam i 1amie: Phillips Charles; Rodrii:uez Lionel; Dunlop Andrew Cc: 1effers. Mark

Subject:

RE: Today Date: Monday, June 05, 2017 10:14:55 AM Ditto, l' m good either way. 1didn't know if the group wanted to discuss more now that we have had a longer t ime to digest the MPR re port.

Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Commission 301-415-1486 From: Benjamin, Jamie Sent: Monday, Ju ne 05, 2017 11:11 AM To: Farnan, M ichael <M ichael.Farnan@nrc.gov>; Phill ips, Charles <Charles.Phillips@nrc.gov>;

Rodriguez, Lionel <Lionel.Rodr iguez@nrc.gov>; Dun lop, Andrew <Andrew.Dun lop@nrc.gov>

Cc: Jeffers, Mark <Mark.Jeffers@ nrc.gov>

Subject:

RE: Today Do we want an internai call first? l'm good either way. We did talk about the MPR report internally last week and then tried to talk with the licensee but they weren't ready. So this is their "do-over" call.

From: Farnan, M ichael Sent: Monday, Ju ne 05, 2017 10:09 AM To: Benj amin, Jam ie <Jamie.Benjamin@n rc.gov>; Phill ips, Charl es <Charles.Phillips@nrc.gov>;

Rodriguez, Lionel <Lione l. Rodriguez@nrc.gov>; Dun lop, Andrew <Andrew.Dun lop@nrc.gov>

Cc: Jeffers, Mark <Mark.Jeffers@ nrc.gov>

Subject:

RE : Today Thanks for the update. 1have not heard any more on Col umbia. 1spoke with John Thompson th is morning and he said that he would senci new info when it comes in . As for possible meeting notice for today, will we be having a SIT call before we discuss with licensee or is this j usta single ca ll with the plant?

Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Comm ission 301-415-1486 From: Benjamin, Jamie Sent: Monday, Ju ne 05, 2017 10:50 AM To: Phil li ps, Charles <Charles.Phi llips@nrc.gov>; Fa rnan, M ichael <M ichael. Farna n@nrc.gov>;

Rodriguez, Lienei <Lionel.Rodriguez@nrc.gov>; Dun lop, Andrew <Andrew .Dun lop@nrc.gov>

Cc: Jef fers, M ark <Mark.Jeffers@nrc.gov>

Subject:

Today Waiting to hear when the licensee is ready to discuss the MPR report so look for a meeting notice for today.

l'm working on refining our position paper. It will ao over each basis the licensee has for ooerabilitv and we will add some additional. \

(b){5) Delberati ve Privilege I

Anyone have new info on Columbia valve?

Also. 1 was thinking about thread friction. 1 would th1nk normai thread friction would be significantly less than the amount it takes to machine the wedge pin to look like a thread.

Maybe a torque/thrust position could explain that delta.

Lionel - with regards to what formula to use. 1 think the licensee is still under the impression that the pre-torque is always applied, hence lifting a load would be ak, right?

But when you loose pre-torque and now thrust the stem down onto the wedge threads, it has to be lowering a load. Could pre-torque being lost explain why KEI missed it?

Because they didn't make that assumption.

From: Ben jam i lamie To: Stoedter. Karla: O"Brien Kenneth; leffers Mark

Subject:

RE: a message from Flowserve to LaSalle PM in NRR/DORL via PDR Date: Tuesday, June 06, 2017 10:03:34 AM LaSalle and MPR reached aut to Flowserve after the SIT challenged the failure analysis in light asa design issue. This just happened yesterday but sounds like Flowserve agrees that it is a design issue. Specifically, the press fit collar is a weak link if closing thrust are high enough. This was the exact issue that Lionel identified the first Wednesday of the inspection and was confirmed through the MPR analysis.

From: Stoedte r, Karla Sent: Tuesday, June 06, 2017 9:56 AM To: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Jeffers, M ark <Ma rk.Jeffers@nrc.gov>; Benjamin, Jamie <Jam ie.Benja m in @nrc.gov>

Subject:

FW: a message from Flowse rve to LaSa ll e PM in NRR/DORL via PDR Ali-This just came in from the LaSalle PM. It isn't in ADAMS yet, but it seems strange.

Thoughts?

Karla Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

From: Vaidya, Bhalchandra Sent: Tuesday, Jun e 06, 2017 9: 10 AM To: 'lisa.simpson@exeloncorp.com' <!isa.simoson@exe loncoro.com>

Cc: 'david .gullott@exeloncorp.com ' <david.gullott@exeloncoro.com>; guy.ford@exeloncorp.com; Stoedter, Ka rl a <Ka rla.Stoedter@nrc.gov>; Thompson, John <Joh n.Thompson@nrc.gov>; Coyne, Kevin <Kevin.Coyne@ nrc.gov>; Wrona, David <David.Wrona@nrc.gov>

Subject:

a message from Flowserve to LaSa lle PM in NRR/DORL via PDR

Lisa, 1have received the following message from FLOWSERVE via Public Document Room (PDR):

Good Afternoon, 1 am t he QA Ma nager here at Flowserve Ra leigh and we are looking into the recent issue at t he Lasalle Nuclear Station. Flowserve Ra leigh believes that an amendment to this origina l notification may be needed and wou ld like to know w hat t he process would be for an amendment or if we needed to open a new investigation fo r the NRC. Your immed iate assista nce on t his matter would

be greatly appreciated. 1have copied in my Engineering Manager as he will be involved in this update/amendment.

Thanks again, Best regards, Joseph Carter Quality Assurance M anager NQA-1 Lead Auditor Flowserve Corp, Flow Control Division 1900 S. Sau nders St.

Ra leigh, NC 27603 Phone: 919-831-3220 j ocarter @flowserve.com Why are they contacting NRC or me at this point? 1 have not talked to Flowserve so far.

Please resolve this with them .

1 think, the Licensee/LaSalle/Exelon needs to make this decision first and if any discussion is needed it has to be between LaSalle/Exelon and NRC staff.

Please get back to me ASAP with the outcome of your discussions with Flowserve.

Thanks, Bhalchandra K. Vaidya Ucensing Project Manager NRC/NRR/DORULPL3 (301 )-415-3308 (0) bhalchandra.vaidya@nrc.gov

From: Coyne Kevjn To: Q"Brien Kenneth; Shuaibi Mohammed

Subject:

FW: a message from Flowserve to LaSalle PM in NRR/DOR L via PDR Date: Tuesday, J une 06, 2017 9:42:01 AM Importance: High Should have had you guys on cc-see below ...

From: Coyne, Kevin Sent: Tu esday, Jun e 06, 2017 10:39 AM To: Burke, John <Joh n.Burke@nrc.gov>

Cc: Krohn, Pau l <Paul.Kroh11@n rc.gov>; McG inty, Tim <Tirn.McGinty@ nrc.gov>; Vaidya, Bhalchandra

<Bha lchandra.Vaidya@nrc.gov>; King, Mkhael <Michael.King2@nrc.gov>; l ubins ki, John

<John.Lubinski@nrc.gov>; Miller, Chris <Chris .Miller@nrc.gov>; Wrona, David

<David.Wrona @nrc.gov>; Stoedter, Ka rla <Karla.Stoedter@nrc.gov>; Thompson, John

<John.Thompson@nrc.gov>; Prescott, Paul <Pau l. Prescott@n rc.gov>

Subject:

FW: a message from Flowserve to LaSa ll e PM in NRR/DORL via PDR lmportance: High John-Thought you ought to be in the loop on the below message.

Kevin Kevin Coyne, Ph. D., P. E.

Deputy Director, Acting Division of Engineering, Office of Nuclear Reactor Regulatwn U.S. Nuclear Regu/atory Commission Washington, DC 20555-0001 (301) 415-2478 (work)

From: Vaidya, Bhalcha ndra Sent: Tuesday, June 06, 2017 10:10 AM To: 'lisa.simpson@exeloncorp.com' <!isa.simpson@exeloncorp.com>

Cc: 1david.gullott@exeloncorp .com ' <david.gul!ott@exeloncorp.com>; guy.ford@exeloncorp.com; Stoedter, Ka rl a <Karla.Stoedt er@nrc.gov>; Thompson, Joh n <John.Th ompson@nrc.gov>; Coyne, Kevin <Kevin .Coyne@ nrc.gov>; Wrona, David <David .Wrona@nrc.gov>

Subject:

a message from Flowserve to LaSa lle PM in NRR/DORL via PDR

Lisa, 1have received the following message from FLOWSERVE via Public Document Room (PDR):

Good Afternoon, 1 am the QA Manager here at Flowserve Ra leigh and we are looking into the recent issue at the Lasalle Nuclea r Station. Flowserve Raleigh believes t hat an amendment to this origin al notification mav be needed and wou ld li ke to know w hat the process would be for an amendment or if we needed to open a new investigation for the NRC. Your immed iate assista nce on t his matter would be great ly appreclated. 1 have copied in my Engineerlng Manager as he will be involved in t his update/amendment.

Tha nks again, Best regards, Joseph Carter Qua lity Assurance Manager NQA-1 Lead Aud itor Flowserve Corp, Flow Control Division 1900 S. Saunders St.

Ra leigh, NC 27603 Phone: 919-831-3220 jocarter@flowserve.com Why are they contacting NRC or me at this point? 1 have not talked to Flowserve so far.

Please resolve this with them.

1 think, the Licensee/LaSalle/Exelon needs to make this decision first and if any discussion is needed it has to be between LaSalle/Exelon and NRC staff.

Please get back to me ASAP with the outcome of your discussions with Flowserve.

Thanks ,

Bhalchandra K. Vaidya Licensing Project Manager NRC/NRR/DORULPL3 (301 )-415-3308 (0) bhalchandra.vaidya@orc.gov

From: faroao Michael To: Rodri~uez Lionel; Beniamin 1amje Cc: Dunlop. Andrew Subj ect: RE: Draft Flow Chart for Shrink Fit Collar Date: Tuesday, J une 06, 2017 10:24:31 AM l like what you have so far. 1 do have a comment on the last decision diamond. lf the response is yes, 1would add a decision diamond that would say something like "Does the valve have acceptable diagnostic trace history, pass the 5 degree rotation check, and the valve discs are out of the flow stream?" At this stage of the process, the wedge pinis assumed to be sheared. This allows the stem to rotate. Should it rotate enough, the disc will be lower in the valve body and likely in the flow stream. Now the threads would have to be evaluated for fretting wear due to flow vibration. The River Bend operating experience noted a sheared pin, loss of preload, and fretting of the wedge/stem threads due to flow vibration because the discs were in the flow stream.

Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Comm ission 301-415-1486 From: Rodriguez, Lionel Sent: Tuesday, June 06, 2017 11:04 AM To: Benj am in, Jam ie <Jamie.Benjamin@nrc.gov>

Cc: Dunlop, Andrew <Andrew.Dunlop@nrc.gov>; Farnan, M ichael <M ichael. Farna n@nrc.gov>

Subject:

Draft Flow Chart for Shrink Fit Collar

Hello, This is what I have so far. It still needs cleaning up, but it's an idea.

Lienei R.

From : Rodriguez Uonel To: Benjam i lamie Cc: Dunlop. Andrew; Farnan. Michael

Subject:

Oraft Flow Chart for Shrink Fit Collar Date: Tuesday, June 06, 2017 10:04:30 AM Note: Th is one-page attachment Attachments: Operability Flow Chart rev.3.pptx was wrthheld in its entirety interim

Hello, Th is is what I have so far. It still needs cleaning up, but it's an idea.

Lienei R.

From: O"Brien Kenneth To: Stone AnnMarie

Subject:

Fwd: Draft Information Notice on Anchor Darling DDGV failures Date: Tuesday, J une 06, 2017 7:24:03 PM Attachments: IN Anchor Darling DDGV Failures PGCM PM Comments IOEB Response 6-2-17.docx 2101-0022-LTR-001 RO LaSalle HPCS lnjection Valve Failure Evai May 30 w ....pdf Here it is Kenneth G. O'Brien, Director Division of Reactor Safety Region III Kenneth.OBrien@NRC.Gov 630-829-9700 From: "Coyne, Kevin" <Kevin.Coyne@mc.gov>

Subject:

FW: Draft Information Notice on Anchor Da.rling DDGV failures Date: 05 June 2017 16:1 7 To: "Bowrnan, Gregory <Gregory.Bowman@nrc.gov>, "Kiog, Michael"

<Michael. King2@orc.gov>

Cc: "Miller, Chris" <Ch.ris.Miller@nrc.gov>, "Lubinski, John" <John.Lubinski@nrc.gov>,

"O'Brien, Kenneth" <Kenneth.O'Brien@nrc.gov>, "Shuaibi, Mohammed"

<Mohammed.Shuaibi@nrc.gov>, "Farnan, Michael" <Michael.Faman@nrc.gov>, "Alley, David" <David.Alley@mc.gov>

Mike, Greg -

ln light of some of the recent questions coming out of the LaSalle inspection (including the failure analysis report for the Unit 2 HPCS valve), l'm wondering if we should make some small adjustments to the IN (attached) to avoid focusing too much on the stem torqueing issue? For example, the MPR failure analysis report cover letter provides the following conclusion (attached, :

.. . jailure of the valve 2E22-F004 stem-to-wedge connection was due to multiple closing load cycles (with both axial thrust and torque components) which caused loosening and eventual shear failu re of the wedge pin and threads. The loosening and shearfailu.re were caused by an insujj_icient ca acity of the shrinkfit stem collar.

Section 2.2 of the failure report also states "Loss of preload is expected if closing loads exceed the collar slip capacity. Note that small changes in the interference fit and friction coefficient have a significant impact on the collar slip capacity". So, there are a few statements in Friday's draft of the IN that may be a bit too definitive in light of this information. For example, the opening sentence states:

The U.S. Nuclear Regulatory Commission {NRC) is issuing this information notice (IN ) to inform addressees of operating experience regarding Anchor/Darling (a subsidiary of Flowse rve) double disc gate valve (DDGV) non-conformances involvi l'1g inade(1uate tor(1ue of tne ste111 to upper wedge co, 11 ,ection that resulted in stem-to-upper wedge anti-rotation pi n (wedge pin) failu res.

We may want to delete the portion of the actual cause and just leave as non-conformances as shown above. ln the Discussion portion we provide a lat of information from the Flowserve Part 21 (which is taken verbatim), but we may want to add a statement that indicates to licensees that the evaluation of the recent failure event at LaSalle is ongoing and additional information may be available in the near future. For example (and l'm not wedded to this wording ... ):

Licensees ca n use th is information in addition to t he techni cal information provided in the 2013 Flowserve Part 21 report (ADAMS Accession No. ML13064A012) t o consider actions, as appropriate, to avoid sim ilar problems. Licensees should also be aware t hat fa ilure evaluations for t he recent LaSal le Cou nty Station event are conti nui ng and additiona l information may come to light as t hese activit ies progress.

l'm guessing that if the role of the stem-collar in leading to wedge pin failure is verified by Flowserve and/or Exelon 1 an update to the Part 21 would need to be issued. 1 don't want to disrupt the fast track for the IN (which limits how much information we can run to ground),

but we also need to make sure that the IN doesn't narrowly focus on justa portion of the potenti ai problem.

Kevin From: Thomas, Eric Sent: Friday, June 02, 2017 10:11 AM To: Martinez, Nancy <Nancy.Marti nez@nrc.gov>; Bowma n, Gregory <Gregory .Bowman@nrc.gov>

Cc: Chernoff, Harold <Harold.Chernoff@ nrc.gov>; M iller, Chris <Chris.M iller@nrc.gov>; King, Michael <Michael. King2@nrc.gov>; Coyne, Kevin <Kevin.Coyne@ nrc.gov>; Thompson, John

<Joh n.Thompson@n rc.gov>; Garmoe, Alex <Alex.Garmoe@nrc.gov>

Subject:

RE : Draft lnformation Not ice on Anchor Darling DDGV fa ilu res

Nancy, Please see my responses (along with a few changes to the document) in the attached file .

Eric From: Marti nez, Na ncy Sent: Th ursday, June 01, 2017 7:56 PM To: Thomas, Eric <Eric.Thomas@nrc.gov>; Bowman, Gregory <Gregory.Bowma n@nrc.gov>

Cc: Chernoff, Harold <Harold.Chernoff@ nrc.gov>; M iller, Chris <Chris.Miller@nrc.gov>; King, Michael <Michael,King2@nrc.gov>; Coyne, Kevin <Kevin .Coyne@nrc .gov>; Thompson, John

<Joh n.Thomosoo@orc.gov>; Ga rmoe, Alex <Alex.Garmoe@nrc.gov>

Subject:

RE: Draft lnformat ion Not ice on Anchor Darling DDGV fa ilu res

Eric,

Thank you for the draft IN. Please find attached my edits and comments attached. lf you could respond to these comments by tomorrow morning (Friday 6/2) that would be great so we can stay on track for the 2-week schedule.

1will be teleworking tomorrow and will be available via email and phone Uust call my office phone since it will be forwarded).

Thanks ,

Nancy From: Thomas, Eric Sent: Thursday, June 01, 2017 6:17 PM To: Martinez, Nancy <Nancy.Martinez@nrc.gov>; Bowman, Gregory <Gregory.Bowman@nrc.gov>

Cc: Chernoff, Ha ral d < Harod . Chernoff@nrc.gov>; M il ler, Chris <Chris .Miller@nrc.gov>; King, Michael <Michael.King2@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>; Thompson, John

<John.Thompson@nrc.gov>

Subject:

Draft lnformation Notice on Anchor Darling DDGV failures Nancy, Please find the draft IN attached. 1am working from home tomorrow and will be available via email or mobile.

Regards, Eric Eric Thomas NRR/DIRS/IOEB 301-415-6772 6l _ _ __.(mobi le) l(b_l<_

From: Jeffers, Mark To: Logaras Harral Cc: Barker. Allan* Heck (ared: Benj amin (amie (( amie.Bejam in@nrc gov}; Chandrathil Prema (Prema.Chandrathil@nrc. gov}: Mitlyng Viktoria (Viktoria.Mitlyng@nrc.gov)

Subject:

RE: La Salle SIT Update Date: Tu esday,June 06, 2017 8:02:00 AM The only remaining inspection activities for the LaSalle SIT include inspecting the operability of the Unit 1 High Pressure Core Spray injection valve (i.e. , the opposite unit's valve to the one that failed). The team has gane back and forth with the licensee on the development of information that would provide reasonable assurance of operability. The licensee has continuously been updating their operability based on new information developed/provided by the BWROG, the valve vendor, specialty engineering firms, and an independent lab performing the failure analysis evaluation. The mast recent delay was due to the delivery of the failure analysis report that was completed last Wednesday. The team is currently reviewing/inspecting the report and discussing the issues with the licensee.

The team is scheduled to make their recommendation on the operability of the Unit 1 valve by Wednesday. Depending on the recommendation, we will then schedule the exit meeting. Please Iet me know if you have any questions.

Additionally, for your awareness, headquarters entered into the LIC-504 process (i.e. , risk informed decision making procedure developed after Davis Besse) to address the generic implications of the failure. Some actions to be completed include:

- DIRS is working to get an lnformation Notice aut within the next few weeks to highlight the failure at LaSalle and similar other failures of this specific type of valve.

- DIRS is evaluating the need for other forms of generic communications (e.g. ,

Generic Letter, Bulletin, etc.) to require licensees to respond to the agency.

- Vendor lnspection branch will be going aut to the vendor (Flowserve) for an inspection and Region 111 will supplement that inspection with SIT members familiar with the mast recent issue.

Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 x9798 From: Logaras, Harra l Sent: Tu esday, Ju ne 06, 2017 7:26 AM To: Jeffers, Ma rk <Mark.Jeffers@ nrc.gov>

Cc: Barker, Allan <Allan .Barker@nrc.gov>; Heck, Jared <Ja red.Heck@nrc.gov>

Subject:

LaSalle SIT Update

Mark, 1 wonder if I could get update information on the LaSalle SIT exit plans. 1 have been working to keep some of ou r counterparts up to speed and I find the last such update I got was Wednesday, last week. Please teli me if there will be any such information sharing that 1 can sit in on so you don't have to do the work again just for the RSLO. Thank you.

Ha rral Logaras, M BA

U. S. NRC Region 111 Regiona l Government Lia ison 630-829-9659 NRC 24 hour Operations Center 301-816-5100 1

l:l'J~

Eight State Flags of Region-111

  • IA IL IN Ml MN MO OH WI

Link to the Award Winning NRC lnformation Digest (Cick Here for the Latest Editjon)

Link to the NRC Web Log or Blog http://public-blog.nrc-gateway.gov/

Link to NRC Fact Sheets and Brochures http://www.nrc.gov/reading-rm/doc-co!lections/fact-sheets/

From: coyne. Kevin To: O"Brien. Kenneth Cc: Shuaibi. Mohammed subject: LaSalle SIT Date: Tuesday, June 06, 2017 8:24:55 AM Ken-Two (hopefully) quick questions:

  • ls Exelon revisiting their operability evaluation in light of the MPR report and the team's questions?
  • Has Exelon shared the MPR report with Flowserve (which would hopefully get us additional information from Flowserve as to their perspectives on the conclusions)?

Thanks!

Kevin

From : Coyne. Kevjn To: O"Brlen. Kenneth; Shuaibi Mohammed Subje ct: FW: LaSalle submiss1on re: Anchor Darling Vales Part 21 Date: Tuesday, June 06, 2017 8: 16:38 AM At tachments: E170602t030957 NRC RA17-056.pdf From: Ma rti nez, Na ncy Sent: Tu esday, June 06, 2017 9:14 AM To: Coyne, Kevin <Kevin.Coyne@ nrc.gov>; Thomas, Eric <Eric.Thomas@nrc.gov>; Thompson, John

<John .Thompson@nrc.gov>; Chernoff, Harald <Harold.Chernoff@nrc.gov>

Cc: Garmoe, Alex <Alex.Garmoe@ nrc.gov>

Subject:

FW: LaSa lle subm ission re: Anchor Darl ing Vales Part 21 FYI From: Vafdya, Bhalcha ndra Sent: Tuesday, Ju ne 06, 2017 7:44 AM To: Martinez, Nancy <Nancy.Martinez@nrc.gov>

Subject:

LaSal le subm ission re: Anchor Darli ng Vales Part 21

Nancy, The attached file is the EIE submission from LaSalle re: Resolution of Anchor Darling Double Disc Gate Valve Part 21 lssues.

However 1 the NRC Document Control Desk has some issues with the submission and I am working with the LaSalle to resolve them.

The information in the letter might be sti li good. Therefore 1 1am sending it to you so you can share it wlth other members of t he LIC-504 group.

Thanks ,

Bhalchandra K. Vaidya Licensing Project Manager NRC/NRR/DORULPL3 (301 )-415-3308 (0) bhalchandra.vaidya@nrc.gov

From: O"Brien Kenneth To: Shualbj Mohammed

Subject:

FW: Reverse CAL???

Date: Tuesday,June 06, 2017 12:00:34 PM Attachments: E170602t0309 57 NRC RA17-056.pdf Fyi From: St oedte r, Karla Sent: Tuesday, June 06, 2017 10:19 AM To: Benja min, Jam ie <Jamie.Benjamin@nrc.gov>; Jeffers, Ma rk <Mark.Jeffers@nrc.gov>; O'Brien, Kenneth <Kenneth.0 1Brien@nrc.gov>

Subject:

Reverse CAL ???

ls this the signed letter we have been looking for from LaSalle?

Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

From: Va idya, Bhalchandra Sent: Tuesday, Jun e 06, 2017 7:57 AM To: Wojewoda, Jacquelyn <J acguelyn.Woiewoda@nrc.gov>; Hunt, Christopher

<Ch ristopher.Hunt@nrc.gov>; Stoedter, Karla <Karla5toedter@nrc.gov>

Subject:

FYI.

Please note that th is submission is not in ADAMS yet.

Bhalchandra K. Vaidya Licensing Project Manager NRC/ NRR/DORULPL3 (301 )-415-3308 (0) bhalchandra.vaidya@nrc.gov

From: Benjam i lamie To: l effers; Mark Cc: OBrien. Kenneth; Stoedter. Karla subject: RE: Unit 2 Shutdown Date: Tuesday, J une 06, 2017 9: 19:31 AM Willdo.

From: Jeffers, M ark Sent: Monday, Jun e 05, 2017 10:22 PM To: Benjami n, Jam ie <Jamie.Benjamin@nrc.gov>

Cc: O'Brien, Kenneth <Kenneth .0'8rien@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>

Subject:

Unit 2 Shutdown

Jamie, Sounds like LaSalle Unit 2 may be shutting down due to a recirc pump motor issue. We should be asking abo ut their plans (if any) to go into the HPCS min flow valve. This probably will not have much impact on our Unit 1 operabifüy concerns (since we have ruJed out m uch of the min fl ow valve concerns), but it could provide some rnore data for the overall generic issue. Let me k now when you get to the site tomoffow.
Thanks, Mark Sent from my iPho ne. Please forgive any typos.

From : Stoedter Karla To: Pbillips Charles: Wojewoda lacouelyn Cc: Hayertape. 1oshua

Subject:

FW: Update on l aSa lle MOV Issue and HQ LIC-504 Process Date: Tuesday, June 06, 2017 11:56:15 AM Attachments: E170602t030957 NRC RA17-056.pd f a message from Flowserve to LaSalle PM in NRRDORL vra PDR.msg Here's the latest.

Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

From: O'Brien, Kenneth Sent: Tu esday, Jun e 06, 2017 11:35 AM To: Jeffers, M ark <Ma rkJeffers@ nrc .gov>; Stoedter, Karla <Ka rla .Stoedt er@nrc.gov>

Subject:

FW: Update on LaSalle MOV !ssue and HQ LI C-504 Process FYI From: Coyne, Kevin Sent: Tuesday, June 06, 201 7 10:0 1 AM To: M iller, Ch ris <Chris.M iller@nrc.gov>; King, Michael <Michael Kjng2@nrc.gov>; Gavri las, M irela

<Mirela.Gavrilas@nrc.gov>; Helt on, Shana <Shana.Helton@nrc.gov>; Lubinski, John

<John.Lubinski@nrc.gov>; Lund, Louise <louise. Lund@ nrc.gov>; Bowma n, Gregory

<Gregory. Bowma n@n rc.goy>

Cc: O'Brien, Kennet h <Kenneth.O'Brien@nrc.gov>; Sh uaibi, Mohammed

< Mohammed.Shuaibi@nrc.gov>; Fa rnan, M ichael < Michael, Fa rn an@nrc.gov>; Alley, David

<David.Alley@nrc.gov>; Benney, Brian <Brian.Benney@nrc.gov>; W ilkins, Lynnea

< Lynnea .W il kins@nrc.gov>; Bu rke, John <John .Burke@nrc.gov>; Kroh n, Paul

<PauLKroh n@nrc .gov>; McGinty, Tim <Tim.McGinty@nrc.gov>; Dean, Bill <Bill.Dean@nrc gov>;

M cDermott, Brian <Brian.McDer mott@ nrc.gov>; Evans, M ichele <Michele.Evans@nrc.gov>

Subject:

Updat e on LaSalle MOV lssue and HQ LIC-504 Process Folks -

Spoke with Ken (Region 111) again this morning. Here's an update on the SIT activities and the LIC-504 implications:

LaSalle SIT

  • MPR provided Exelon the failure evaluation for the Unit 2 HPCS lnjection Valve on May
30. This report was distributed to the LIC-504 team last week (Iet me know if you need a copy) . The failure analysis report provided some new information, including the role of stem collar slippage resulting in loss of stem torque preload (the resistance of the stem collar to movement appears to be less than the applied load and repeated loading cycles leading loosening of the stem-disc connection and failure of the wedge pin. Of particular note is that if axial stem loads exceed the press fit collar resistance, the valve

will lose preload (the MPR report concluded that the collar resistance was only about 50-60% of normallv aoolied load) 1'

~ (bj(5) Deliberative Privilege Poteotial Generic lroplications for the UC-504 Process

  • lf the role of stem collar slippage is verified, this is a condition that is not described in the Flowserve Part 21 (indicating that the Flowserve Part 21 may be deficient).

Flowserve is apparently thinking along these lines as the QA manager from Flowserve just contacted the DORL PM to get information on the process to update/amend a Part

21) - see attachment #2.
  • Vendor lnspection at Flowserve (NRO/DCIP) scheduled for week of July 16.
  • The lnformation Notice is on a fast track to be issued by June 16. We should revise some of the language in the draft IN be revised to avoid too narrow a focus on the pre-torque issue and the existing Part 21 (since it may not address the valve issue sufficiently). However, any change we make to the IN at this point should not impact the fast track schedule. DIRS is following up on these changes.
  • We are planning to have a public meeting Jn the near term (late June, early July) to gather information from industry on industry actions related to the recent valve issues and the Flowserve Part 21. lf the issues described in the MPR report are verified , then the Part 21 may not completely describe the potential non-conformance and the corrective actions recommended by the Part 21 may not be sufficient to prevent recurrence of the failure. This would underscore the importance of holding this meeting as soon as possible (providing industry will be ready to provide quality information) to support continuation of the LIC-504 decision making process.
  • We are starting to get better sense of potential categorizatlon of higher priority anchor darling valves - still preliminary1 but (1) press fit stem collar, (2) actuator output greater than load capability of wedge pin, (3) safety function to open, (4) valve setup that requlres high speed close operation, etc. As we get this better refined, we will be able to better focus on the subset of valves that are more susceptible to failure.

Next Steps

  • Next LIC-504 meeting scheduled for Thursday, June 8 at 3:00 pm eastern time (we moved this up in response to the recent information from the MPR failure analysis)
  • Target issuance for IN June 16
  • Public Meeting late June/early July
  • Flowserve Vendor inspectlon - week of July 16.

Kevin Coyne, Ph.D-; P.E.

Deputy Director, Acting Division of Engineering, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

{301) 415-2478 (work)

From: Rodriguez. Uonel To: teffers Mark Cc: Benjam i . lamie; Dunlop. Andrew; Farnan, Michael; Phillips. Charles subject: Assessment on Cycle Life of the Valves Date: Wednesday, June 07, 2017 3:54:16 PM Hello, Below is my assessment:

The difference in valve cycles between U1 (since 1987) and U2 (since unit startup in about 1984) is not significant, or within the margin of error. The only significant difference in valve cycles between the units can be attributed to pre-operational testing . Since only anecdotal data exists for pre-operational testing, there is no cert *

  • wi h h w man lve had over the U1 valve.

(b)(5) Deliberative Privilege Let me know if you have any questions.

Thanks ,

Lienei Rodriguez NRC/RIII/DRS/EB2 630-829-9609

From: Kozak, Laura To: Benjam i lamie; Hanna lohn; Rodriguez Uone; farnan Mjchae ; Dunlop Andrew; PIJl!lips Charles Cc: Lara lulio; leffers, Mark; Stoedter, Karla

Subject:

RE: LaSalle 2E22- F004 va lve failure - draft PD Date: Wednesday,June 07, 2017 10:06: 38 AM Thanks for the update Jamie.

(b)(5) Deliberative Privilege 5

lf you need to talk to me - 1am on my celi phone todavr..._)<_)_ _ _ _.....

Laura From: Benjamin, Jamie Sent : Wednesday, June 07, 2017 9:52 AM To: Kazak, La ura <La ura.Kozak@n rc.gov>; Ha nn a, John <John .Hanna@nrc.gov>; Rodriguez, Lienei

<Lionel.Rodriguez@nrc.gov>; Fa rnan, Michael <Michael. Farna n @nrc.gov>; Dunlop, Andrew

<Andrew.Dunlop@nrc.gov>; Phi llips, Cha rles <Charles.Phill ips@n rc.gov>

Cc: Lara, Ju lio <J ulio.Lara@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Stoedter, Karla

<Karla.St oedter@nrc.gov>

Subject:

RE: LaSalle 2E22-F004 valve failure - draft PD (b)(5) Deliberative Privilege This weak link analysis did not eva uate t e press 1

~;:;rr:::;";:"":;~hn'~~~,,....~'l'l"ll"l"'""""~e* is planning on updating their 2013 Part 21 or reissuing (b)(5) Deliberative Privilege

(b)(5) Deliberative Pri vilege Assuming RCIC is the failure, HPCS is the only high pressure source. HPCS will cycle between reactor vessel Ievel low and high. The analysis does not discuss bringing the plant to Mode 4 in any type of time frame. Pending upon why a loss of main feedwater occurred it is reasonable to conclude that the plant could be in Mode 3 for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or longer. Loss of main feedwater is described asa frequent (1-20 year est) transient in Chapter 15 accident analysis.

The licensee was missing this piece until the team pointed this. The licensee was and is still using a station black out design basis event which has a predefined 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> coping period time frame. SBO at LaSalle is a design basis infrequent transient and nota beyond design basis event.

The PRA mission time and the design basis mission time are not different or significantly different.

Thanks for your feedback and input.

From: Kozak, Laura Sent: Wednesday, June 07, 2017 8:35 AM To: Benjam in, Jam ie <Jamie.Benjamin@nrc.gov>; Han na, John <John .Hanna@nrc.gov>

Cc: Lara, Jul io <Julio.La ra@ nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Stoedter, Karla

<Karla.Stoedter@n rc.gov>

Subject:

RE: LaSalle 2E22-F004 valve failure - draft PD Jamie John and I discussed the issue this morn ing. John is in the process offinishing up in RII and moving to Lisle so I will continue to be the SRA point of contact on this issue unt il he gets here.

(b)(5) Deliberative Pri vilege

(b)(5) Deliberative Privilege 1will cal l you to discuss this in more deta il.

Laura From: Benjamin, Jamie Sent: Tuesday, May 30, 2017 2:29 PM To: Ha nna, John <John.Hanna@nrc.gov>

Cc: Kazak, La ura <Laura .Kazak@nrc.gav>; La ra, Ju lia <Julia .Lara@nrc.gav>; Jeffers, Ma rk

<Mark,Jeffers@nrc.gov>; Staedter, Karla <Karla Stoedter@nrc.gov>

Subject:

FW: LaSal le 2E22-F004 valve fai lure - draft PD John, Laura is aut of the office till next Wednesday June 7 and I have heard that you will be taking this issue over at some point. Are ou available to rovide us a reliminar risk screenin for our upcoming exit. ...._

(b)(5) Deliberative (b)(5) Deliberative Privilege We were considering exiting this Friday June 9, 0900. 1do not know how much work Laura has done with this review but it is likely minimal since(b)(5) Deliberative Privilege l(b)(5) Deliberative Privilege Thanks for your support and welcome to the Region.

Jamie - LaSalle SIT team lead From: Benjamin, Jamie Sent: Tuesday, May 30, 2017 10:48 AM To: Kazak, Laura <Laura .Kazak@nrc.gov>; Skakawski, Richa rd <Richard.Skokowskj@nrq~oy>; Jeffers, M ark <Mark.Jeffers@nrc.gav>; Staedter, Karla <Karla.Stoedter@nrc.gov>; Ruiz, Robert

<Robert.Ru iz@nrc.gov>; Rodriguez, Lianel <Lianel.Rodriguez@nrc.gov>; Dunlop, Andrew

<Andrew.Dunlop@ nrc.gov>; Phil lips, Charles <Cha rles.Phillips@nrc.gov>; Farnan, Michael

< Mfchael.Farnan@ nrc.gov>

Subject:

LaSal le 2E22-F004 valve fa ilu re - draft PD

. k tt h d . . (b)(5) Deliberative Privilege Laura an d R1c , a ac e 1s an overv1e Do you feel that we can support a Friday June 2 exit for a ---~--------_,

From: Covne. Kevin To: Benncy Brjan; Gavri)as Mj rca; Oester!c Eric; HcUoo Shana; Hjckey Jamcs; AUcy Davjd; Faman Mjchacl*

Thompson John: Miller Ch ris; King. Michael; Weerakkody Suni!: Giiner. Josepb; Bowen. Jeremy; Jt:ffers, Mark; Stoedter Karla; OBrie n. Kenneth; Casto Gre&; Circle leff; Benj amin Jamie; l,&ech Malthew; Shuaihi. Mohammed; Lar;t ruio; McGjnty Tim; Kroh Paul; Bure John; Kavana*h KeJij; Heiriy TI10mas* Ro<lri*uez LioneJ; QQ.ouQ:.

Sandjn Jorge; Louden Patrkk: Kozak. Laura; Ng. Clüng; MjHer fal; Wi1kjns. Lynnea: Lubinski John: Hsueh Kevin; Stuchell . She.ldon; Gam10e Alex; Bowman Greoory; Lund. Louise; Chernoff. Harold* Scarbrough. Thomas; Gascol l.ozada Ramon; Purnell Rlake: C)ark Theresa: Vajdya BhaJchandra; Wrona Dayjd; WJ1j1man Jennjfer: IiJ..LoJ.J.

~  ; Mclntyre Davj<J; Bumel! Scot; Morey Dennjs; Maninez. Nancy: Thomas. Erk Cc: McDermott Bdan

Subject:

RE: LaSalle 504 internai follow up Date: Wednesday,June 07, 2017 6:22:16 PM Attachments: A oenda June R 2017.doc.x E 170602t030957 NRC RAl7-056.pdf Folks -

Please see attached agenda for the LaSalle HQ LIC-504 call on Thursday afternoon (3 pm eastern). 1 have also attached the letter from Exelon regarding their planned actions for this issue.

Kevin


Origi nal Appointment -----

From: Benney, Brian Sent: Monday, June 05, 2017 9:04 AM To: Benney, Brian; Gavrilas, M irela; Oesterle, Eric; Helton, Shana; Hickey, James; Alley, David; Farnan, Michael; Thompson, John; M iller, Chris; King, M ichael; Weerakkody, Suni l; Giitter, Joseph ; Bowen, Jeremy; Jeffers, Mark; Stoedter, Karla; O' Brien, Kenneth; Casto, Greg; Circle, Jeff; Benjamin, Jam ie; Leech, Matthew; Shuaibi, Mohammed; Lara, Julio; McGi nty, Tim; Krohn, Pa ul; Burke, John; Kavanagh, Kerri; Herrity, Thomas; Rod rigu ez, Lionel; Coruj o-Sandi n, Jo rge; Louden, Patrick; Kozak, La ura; Ng, Ching; M iller, Ed; W il kins, Lynnea; Lub inski, John; Hsueh, Kevin; Stuchell, Sheldon; Garmoe, Alex; Bowman, Gregory; Lund, Louise; Chernoff, Ha rald; Sca rbrough, Thomas; Gascot Lozada, Ramon; Purnell, Blake; Clark, Theresa; Coyne, Kevin; Vaidya, Bhalcha ndra; Wrona, David; Whitman, Jennifer; Tilton, Caroline; M clntyre, David; Burnell, Scott; Morey, Dennis; Martinez, Na ncy; Thomas, Eric

Subject:

laSalle 504 interna i follow up When : Th ursday, June 08, 2017 3:00 PM-4:00 PM (UTC-05:00) East ern Time {US & Canada).

Where: HQ-OWFN-12B04-25P ln light of some late breaking news from Columbia regarding their anchor/darling valve inspection resu lts on Friday. Please attend this Thursday (6/8) at 3 pm (eastern).

888-455-1 734 6

Participant passcode: .... J< l_ ___.

lcb_

From: Coyne Kevio To: Q"Brien. Kenneth

Subject:

FW: LaSalle 504 internai follow up Date: Wednesday, J une 07, 2017 1:49:28 PM Ken-1know the SIT is working through the issues on Unit 1. but wanted to give you a heads up the questions we are ettin from the NRR ET. 1'11 sk e or call later toda when and it ou have some time (b)(5) Deliberative Privilege Kevin From: McDermot t, Brian Sent: Wednesday, June 07, 2017 12:39 PM To: Dean, Bill <Bill.Dean@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>

Cc: Evans, Michele <Michele.Evans@nrc.gov>; Lubinski, John <John.Lubi nski@nrc.gov>

Subject:

Re: LaSalle 504 int ern ai follow up (b)(5) Deliberative Pri vilege Bri an 11 On : 07 June 2017 11:50, Dea n, Bill" < Bil.Dean@n rc. goy> wrote:

r)(S) Dehberati,e P,i, üege BILLDEAN Director, NRR On: 07 June 2017 10:36, "Coyne, Kevin" <Kevin.Coyne@nrc.gov> wrote:

Bill, Brian -

b)(5) Deliberative Pri vilege

n later toda


' 1'11 send you an update as soon as I know more.

Kevin From: Dean, Bil l Sent: Wednesday, June 07, 2017 3:23 AM To: McDermott, Brian <Brian.McDermott@nrc.gov>

Cc: Evans, Michele <Miche le.Evans@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>

Subject:

Re: LaSalle 504 intern ai follow up BILL DEAN Director, NRR On: 05 June 2017 08:37, "McDermott, Brian" <Brian .McDermott@nrc.gov> wrote:

Bill, A detailed assessment of the failu reis attached, but the following sentences sum up the problem qute well:

"the collar axial load capacity was only about 50% to 60% of the normal ly applied loads, such that col lar slip occurred. (Note that if the collar capacity was sufflcient by itself, the threads would not have shea red during a closi ng st roke.) Also, t he maxim um combined axial capacity of t he collar and wedge pi n was about 70% of the normal ly applied loads, allowing axia l movement th rough t he thread clearances even if the collar shared t he load with the wedge pin. "

~b)(SJ Deliberati,e P1,ge Kevin has been doing a great j ob in keeping ali parti es engaged and keeping t he LIC-504 eva luation moving.

Brian

From: Ceyne, Kevin Sent: Th ursday, Ju ne 01, 2017 3:53 PM To: Benney, Brian <Brian.Benney@nrc.gev>; Helt en, Shana <Shana.Helten@nrc.gov>; Gavri las, Mirela <Mirela.Gavrilas@nrc.gev>; Oesterle, Eric <Eric.Oesterle@nrc.gev>; Hickey, James

<James. Hickey@nrc.gev>; Alley, David <David .Alley@nrc.gov>; Farnan, M ichael

<MichaeLFarnan@nrc gov>; Thempsen, Jehn <John.Thompsoo@nrc gov>; Miller, Chris

<Chris.Miller@nrc.gev>; King, M ichael <Michael .King2@nrc.gev>; Weerakkedy, Su nil

<Sunil.Weerakkedy@nrc.gev>; Gi itter, Jeseph <Jeseph.Giitter@nrc.gev>; Bewen, Jeremy

<Jeremy.Bewen@nrc.gev>; Jeffers, Mark <Mark.Jeffers@nrc.gev>; Steedter, Karla

<Karla.Stoedter@nrc.gov>; O'Bri en, Kennet h <Ken neth.O'Brien@nrc.gev>; Cast e, Greg

<Greg.Caste@nrc.gev>; Circle, Jeff <Jeff.Circle@nrc.gev>; Benjami n, Jam ie

<Jamie.Benjamin@nrc.gev>; Leech, Matthew <Matthew.Leech@nrc.gev>; Shua ibi, Mehammed

<Mehammed.Shuaibi@nrqNV>; Lara, Julie <Julie.Lara@nrc.gev>; McGinty, Tim

<Tim .McGinty@nrc.gov>; Krehn, Pau l <Paul.Krohn@nrc,gov>; Burke, Jehn <John.Burke@nrc.gov>;

Kavanagh, Kerri <Kerrf.Kavanagh@nrc.gev>; Herrity, Th emas <Themas.Herrity@nrc.gev>; Red riguez, Lienei <Lienel.Redriguez@nrc.gev>; Ceruje-Sand in, Jorge <Jerge.Ceruje-Sandin@nrc.gov>; Leuden, Patrick <Patrick.Louden@nrc.gev>; Kezak, Lau ra <Laura.Kozak@nrc.gov>; Ng, Chi ng

<Ching Ng@nrc gov>; Miller, Ed <Ed.Miller@nrq~ov>; Wil kins, Lynn ea <Lynnea .Wilkins@nrc.gov>;

Lubi nski, Jehn <Jehn.Lubinski@nrc.gov>; Hsueh, Kevin <Kevin.Hsueh@nrc.gov>; St uchell, Shelden

<Sheldon.Stuchell@nrc.gev>; Ga rmee, Alex <Alex.Garmee@nrc.gov>; Bowma n, Gregery

<Gregory.Bewman@nrc.gov>; Lund, Leu ise <Leuise .Lund@nrc.gov>; Cherneff, Harold

<Harold.Chernoff@nrc.gov>; Sca rbreugh, Thomas <Thomas.Scarbrough@nrc.gov>; Gascet Lezada, Ramen <Ramon.GascotLozada@nrc.gev>; Purnel l, Bla ke <Blake.Purnell@nrc.gov>; Clark, Theresa

<Theresa .Clar k@nrc.gev>; Vaidya, Bha lchandra <Bhalchandra.Vaidya@nrc.gov>; Wrona, David

<David .Wrona@nrc.gov>; Whitman, Jenn ifer <Jennifer.Whitman@nrc.gev>; Tilten, Caroli ne

<Caroline.Tilton@nrc.gov>; Mclntyre, David <Dayid.Mclntyre@nrc.gov>; Burnell, Scett

<Scott.BurnelJ@nrc.gov>; Merey, Dennis <Dennis.Morey@nrc.gov>; Mart inez, Nancy

<Nancy.Martinez@nrc.gev>

Subject:

RE: LaSa lle 504 intern ai foll ew up Please see attached failure analysis report mentioned during the LIC-504 call earlier today.

Kevin


Origin al Appeintment-----

From: Benney, Brian Sent: Th ursday, May 25, 2017 11:27 AM To: Benney, Brian; Helten, Shana; Gavrilas, M irela; Oesterle, Eric; Hickey, James; Al ley, David; Farnan, Michael; Thempsen, Jehn; M iller, Chris; King, M ichael; Weerakkedy, Suni l; Giitter, Jeseph; Bewen, Jeremy; Jeffers, Mark; Steedter, Karla; O'Brien, Kenneth; Caste, Greg; Circle, Jeff; Benjamin, Jam ie; Leech, M at t hew; Shuaibi, Mehammed; Lara, Julio; McGi nty, Tim; Kro hn, Pa ul; Burke, Jehn; Kavanagh, Kerri; Herrity, Thomas; Red riguez, Lienei; Ceruj e-Sa ndi n, Je rge; Leuden, Patrick; Keza k, La ura; Ng, Ching; M il le r, Ed; W il kins, Lynnea; Lubinski, Jehn; Hsueh, Kevin; Stuchell, Shelden; Garmee, Alex; Bewman, Gregery; Lund, Leuise; Cherneff, Hareld; Scarbreugh, Thomas; Gascet Lezada, Ramen; Purnell, Blake; Clark, Theresa; Ceyne, Kevin; Va idya, Bhalcha ndra; Wrena, David; Whit man, Je nn if er; Tilten, Caroline; M clntyre, David; Burnell, Scott; Merey, Dennis; M artin ez, Na ncy

Subject:

LaSal le 504 in ternai follow up When : Thu rsday, June 01, 2017 10:00 AM-11:00 AM (UTC-05:00) Eastern Time (US & Canada).

W here: HQ-OWFN-12B04-25P revious A enda is attached for reference, but will be updated.

888-455-1 734 Participant passcode :!< ....b_H6_l _ _ ____.

<< File: Agenda_ May 24_ 2017.docx >>

From: Covne. Kevin To: Benncy Brjan; Gavri)as Mj rca; Oester!c Eric; HcUoo Shana; Hjckey Jamcs; AUcy Davjd; Faman Mjchacl*

Thompson John: Miller Ch ris; King. Michael; Weerakkody Suni!: Giiner. Josepb; Bowen. Jeremy; Jt:ffers, Mark; Stoedter Karla; OBrie n. Kenneth; Casto Gre&; Circle leff; Benj amin Jamie; l,&ech Malthew; Shuaihi. Mohammed; Lar;t ruio; McGjnty Tim; Kroh Paul; Bure John; Kavana*h KeJij; Heiriy TI10mas* Ro<lri*uez LioneJ; QQ.ouQ:.

Sandjn Jorge; Louden Patrkk: Kozak. Laura; Ng. Clüng; MjHer fal; Wi1kjns. Lynnea: Lubinski John: Hsueh Kevin; Stuchell . She.ldon; Gam10e Alex; Bowman Greoory; Lund. Louise; Chernoff. Harold* Scarbrough. Thomas; Gascol l.ozada Ramon; Purnell Rlake: C)ark Theresa: Vajdya BhaJchandra; Wrona Dayjd; WJ1j1man Jennjfer: IiJ..LoJ.J.

~  ; Mclntyre Davj<J; Bumel! Scot; Morey Dennjs; Maninez. Nancy: Thomas. Erk Cc: McDermott Bdan

Subject:

RE: LaSalle 504 internai follow up Date: Wednesday,June 07, 2017 6:22:16 PM Attachments: A oenda June R 2017.doc.x E 170602t030957 NRC RAl7-056.pdf Folks -

Please see attached agenda for the LaSalle HQ LIC-504 call on Thursday afternoon (3 pm eastern). 1 have also attached the letter from Exelon regarding their planned actions for this issue.

Kevin


Origi nal Appointment -----

From: Benney, Brian Sent: Monday, June 05, 2017 9:04 AM To: Benney, Brian; Gavrilas, M irela; Oesterle, Eric; Helton, Shana; Hickey, James; Alley, David; Farnan, Michael; Thompson, John; M iller, Chris; King, M ichael; Weerakkody, Suni l; Giitter, Joseph ; Bowen, Jeremy; Jeffers, Mark; Stoedter, Karla; O' Brien, Kenneth; Casto, Greg; Circle, Jeff; Benjamin, Jam ie; Leech, Matthew; Shuaibi, Mohammed; Lara, Julio; McGi nty, Tim; Krohn, Pa ul; Burke, John; Kavanagh, Kerri; Herrity, Thomas; Rod rigu ez, Lionel; Coruj o-Sandi n, Jo rge; Louden, Patrick; Kozak, La ura; Ng, Ching; M iller, Ed; W il kins, Lynnea; Lub inski, John; Hsueh, Kevin; Stuchell, Sheldon; Garmoe, Alex; Bowman, Gregory; Lund, Louise; Chernoff, Ha rald; Sca rbrough, Thomas; Gascot Lozada, Ramon; Purnell, Blake; Clark, Theresa; Coyne, Kevin; Vaidya, Bhalcha ndra; Wrona, David; Whitman, Jennifer; Tilton, Caroline; M clntyre, David; Burnell, Scott; Morey, Dennis; Martinez, Na ncy; Thomas, Eric

Subject:

laSalle 504 interna i follow up When : Th ursday, June 08, 2017 3:00 PM-4:00 PM (UTC-05:00) East ern Time {US & Canada).

Where: HQ-OWFN-12B04-25P ln light of some late breaking news from Columbia regarding their anchor/darling valve inspection resu lts on Friday. Please attend this Thursday (6/8) at 3 pm (eastern).

888-455-1 734 6

iParticipant passcode: _r_<)_ __

From: farnan Mjchael To: Benjami lamie; leffers Mark: Rodrjguez Lienei; Stoedter. Karla: PbilHps Charles: Dunlop Andrew

Subject:

RE: LaSalle F004 valve cydes information .

Date: Wednesday, June 07, 2017 8:05:20 AM It is not clear if they count strokes for diagnostic testing.

Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Commission 301-415-1486 From: Benjamin, Jamie Sent: Wednesday, June 07, 2017 9:01 AM To: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Stoedter, Karla <Karla .Stoedter @nrc.gov>; Phi ll ips, Charles <Charles.Ph il lips@ nrc.gov>; Du nlop, And rew

<Andrew;Du nlop@n rc.gov>; Fa rna n, M ichael <Michael.Farnan@nrc.gov>

Subject:

FW: LaSal le F004 va lve cycles information.

As you can see. One outage can result in as many as 20 cycles.

l(b)(5) Deliberati ve Privilege Lienei is evaluating.

From: Kusumawatimu rray, Putri:(GenCo-Nuc) [ma ilto :Putri.Kusumawatimu rray@exeloncorp.com]

Sent: Tuesday, June 06, 2017 5:59 PM To: Benjami n, Jam ie <Jamie.Benjamio@orqNv>; Rod riguez, Lienei <Lionel.Roddguez@nrc.gov>

Cc: Ford Jr, Guy V:(GenCo- Nuc) <guy.ford @exeloncorp.com>; Tanton, Sean:(GenCo- Nuc)

<Sean.Tanton@exe loncorp.com >; Chouina rd, Matthew:(GenCo-N uc)

<Matthew.Chouinard@exeloncorp.com>; Shah, Vikram R:(Ge nco-Nuc)

<vikram shah@exeloncorp.com>

Subject:

[Externa l_Sender] LaSa ll e F004 valve cycles information.

Jamie and Lienei, Please see the at tached information of 1(2)E22- F004 valve cycle informat ion .

Thank you, Dwi Murray Principa! Regulatory Engineer Regulatory Assurance - LaSalle County Station

- - Exeton C" *-:n1100 815-41 5-2814 Putri.Kusumawatimurray@exeloncorp.com

From: 1effers Mark To: Stoedter Karla

Subject:

FW: LaSalle Next Steps Date: Wednesday, June 07, 20171:52:40 PM FYl. ,(b)(5) Deliberative Privilege Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 l x9798 From: Jeffers, Mark Sent: Wed nesday, June 07, 2017 1:50 PM To: O'Brien, Kenneth <Kenneth.O'Brien@n rc.gov>

Cc: Shuaibi, M ohammed (Moham med.Shuaibi@ nrc.gov) <Mohammed.Shua1bi@nrc.gov>

Subject:

LaSa lle Next St eps Ken ,

We are preparin for a team call at 2 to make the final decision/recommendation for the aile SIT.

)(5) Deliberative Privile e can go over the details of each point this a ternoon ; however, 1wanted to share a recommendation for the next steps ahead of time it we decide to go down this path.

1. Gain al ignment among the team/DRS this afternoon.
2. Setup Region 111 alignment meeting tomorrow.
3. Assuming we have Region 111 alignment, 1would r,.,......w.i.~~-~=~~~~~...

DDs and Bill Dean face-to-face earl next week.

b)(5) Deliberative Privilege We can discuss more details shortly, 1just wanted to give you the heads up of where the team is heading.

Thank You, Mark Jeffers Branch Ch1ef I RIII DRS EB2 x9798

From: Stoedter Karla To: O"Brjen Kenneth

Subject:

FW: LaSalle SIT call? Big favor request.

Date: Wednesday, J une 07, 2017 10:29:42 AM This just came in ... l also believe the info from Ryan Alexander on the Columbia HPCS 4 valve is consistent with the information I provided to you after I spoke with Greg Kolcum.

Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

From: Haire, Mark Sent: Wednesday, June 07, 2017 10:28 AM To: Benjamin, Jam ie <Jamie.Benjamin@n rc.gov>; Kolcum, Gregory <G regory.Kolcum@nrc.gov>;

Brandt, Lindsay

  • ; Alexander, Ryan <Ryan.Alexander@nrc.gov>; Farnan, Michael <Michael.Farnan@nrc.gov> Cc: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Stoedter, Karla <Karla .Stoedter@ nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Dunlop, Andrew <Andrew.Dun lop@nrc.gov>; Phi lli ps, Cha rles <Charles.Phi ll ips@nrc.gov>; Stott, Chad <Chad.Stott@nrc.gov>; Speer, Chris <Chris.Speer@nrc.gov>

    Subject:

    RE: LaSa lle SIT call? Big favor request.

    FYI, this is the latest info we have on the Columbia valves:

    HPCS-V-12 and V-15 passed diagnostic testing . On disassembly, HPCS-V-12 showed some very slight collar separation and some slight wear on the wedge pin. We have no new info on HPCS-V-15, but expect to know more today ar tomorrow.

    We understand you are contacting the CGS valve expert today to get more insight. We stand by to support in any way we can.

    As of Friday, 6/2/17, this is what we knew and shared (and is still valid, except that work on V-12 and V-15 was delayed):

    lnformation on the condition of the first of 3 Anchor-Darling (A-0) valves in the CGS HPCS system on!y developed in the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Here is a thumbnail bu!lets of what the CGS Residents currently know about HPCS-V-4 (HPCS injection valve):

    1. HPCS valve (V-4) traces consistent over life of valve (no anomalous traces)
    2. No stem rotation observed prior to auto start of HPCS on 5/25/2017
    a. On 5/25, due to an apparent l&C error during a maintenance activity, HPCS auto-started
    3. Diagnostic after auto start on 5/25/17 and prior to disassembly 6/1/2017 showed > 10 degrees rotation and open stroke failed trace
    a. The BWROG acceptance criteria for stem rotation is </= 5 degrees rotation
    4. Stem was connected to upper wedge with minor disp!acement from full insertion (threaded)
    5. Stem rotated freely by hand
    6. Wedge pin sheared but still in the wedge
    7. No FME in valve body
    8. Collar minor displacement from stem (mils)
    a. This is different than LaSalle who saw significant collar displacement
    9. Actuator tripped on thermals after auto start on 5/25/2017
    10. Magnesium rotor inspection - satisfactory 11 . Gear actuator possible gear damage awaiting inspection
    12. Traces, photos, video, and corrective actions for repair underway (same for V-12, and V-15)
    a. V-12 is the HPCS min-flow valve and V-15 is the HPCS suction transfer valve
    b. Work on V-12 and V-15 disassembly and inspection over this weekend.

    More to come as the CGS Residents get additional information as the licensee inspections continue. Of note - Greg and Lindsay have and continue do a great job following this, and other ongoing outage issues.

    Ryan D. Alexander Senior Project Engineer NRC Region IV, Div. of Reactor Projects Branch A (CPNPP, CGS, & DCPP) & "AII Things JLD" Regional POC 1600 E. Lamar Blvd, Arlington, TX 76011 Office: (817) 200-1 195

    ( ell: ._!

    <b_)(6_) _ _ __.

    Mark S. Haire Chief, Reactor Projects Branch A Nuclear Regufatory Commission, Region-lV 817-200-1148 office

    !<b)(6) celi From: Benjamin, Jamie Sent: Wednesday, June 07, 2017 10:17 AM To: Kolcum, Gregory <Gregory.Kolcum@n rc.gov>; Brandt, Lindsay <Lindsay.Brandt@nrc.gov>; Haire, Mark <Mar k.Haire@nrc.gov>; Alexander, Ryan <Ryan.Alexander@nrc.gov>; Farnan, M ichael

    <Michael.Farnan@nrc.gov>

    Cc: Jeffers, Ma rk <Mark,Jeffers@nrc.gov>; Stoedt er, Ka rla <Kar!a.Stoedter@nrc.gov>; Rod riguez,

    Lienei <Lionel.Rodriguez@nrc.gov>; Dunlop, Andrew <Andrew.Dunlop@nrc.gov>; Phillips, Charles

    <Charles Phillips@orqNY>

    Subject:

    RE: LaSa lle SIT call? Big favor request.

    Thanks Greg. We reached out to Columbia and they saiC: Bill could support a call at 11 centra! time. So we will just call him directly.

    Mike if you are available we will three way you in.

    Jamie From: Kolcum, Gregory Sent: Wednesday, June 07, 2017 10:05 AM To: Benjamin, Jam ie <Jamie.Benjamio@nrc.gov>; Brandt, Lindsay <Lindsay.Brandt@nrc.gov>; Haire, Mark <M ark.Ha1re@nrc.gov>; Alexander, Ryan <Ryan.Alexander@nrc.gov>

    Cc: Jeffers, Mark <Mark.Jeffers@n rc.gov>; Stoedter, Karla <Ka rla.Stoedter@nrc.gov>

    Subject:

    RE: LaSalle SIT call? Big favor request.

    Ryan Alexander or I can answer your questions.

    Below contact info available.

    Columbia (Energy Northwest) MOV Engineer Bill Trappet\

    Ph: 509-377-8284.

    ~ell : ...

    l(b_l(6_l _ _ _ ___

    From: Benjamin, Jamie Sent : Tuesday, June 06, 2017 3:44 PM To: Kolcu m, Gregory <Gregory,Kolcum@n rc.gov>; Brandt, Lindsay <Lindsay.Brandt@nrc.gov>;

    Groom, Jeremy <Jeremy.Groom@nrc.gov>; Alexander, Ryan <Ryan .Alexander@nrc.gov>

    Cc: Jeffers, Mark ; Stoedt er, Karla <Ka rla.Stoedter@nrc.gov>

    Subject:

    LaSal le SIT ca ll ? Big favor request.

    Hi Greg, the LaSalle SIT looking at the Flowserve Part 21 issue and LaSalle Unit 2 HPCS injection valve failure needs some first-hand information. 1 understand that you all are extremely busy with the outage. 1 used to be the Senior Resident lnspector at Braidwood so I can related .

    Would you be available to help our team get some information regarding the recent HPCS injection valve pin failure at your site? ldeally, we want to talk with an MOV expert at the site regarding to get some data and talk about what the parts looked like.

    Greatly appreciate any assistance that you and the Branch can help us with . We can share with ou an uestions that ou ma have with the LaSalle O Ex first hand.

    (b)(5) Deliberative Privlege V/R, Jamie Benjamin - LaSalle SIT Lead

    From: 1effers Mark To: Benlamio, 1amje Subj ect: Fwd: LaSalle STT Summary Date: Wednesday, June 07, 2017 6:24:47 PM See below for Bili's specific questions he is looking for. I believe we can answer all of thern.

    This should be our p1iority in the morning. We can add an addendum to the briefing sheet and directly aoswer these questions.

    Thanks, Mark Sent from my iPhone. Please forgive any typos.

    From: "O'Brien. Kenneth" <Kenoeth.O'Brien@nrc.gov>

    Subject:

    Fwd: LaSal1e SIT Summary Date: 07 June 2017 18:03 To: "Jeffers, Mark" <Mark.Jeffers@nrc.gov>

    FYI and our discussion From: "King, Michael" <Michael.King2@ru-c.gov>

    Subject:

    PW: LaSalle SIT Sununary Date: 07 June 2017 17 :55 To: "O'Brien, Kenneth" <Kenneth.O'Brien@nrc.gov>

    FYA ...

    From: Dean, Bil l Sent: Weclnesday, June 07, 2017 6:42 PM To: King, M ichael <M 1chaef.King2@nrc.gov>; Evans, M1chele <M ichele.Evans@nrc.gov>; McDermott, Brian <Brian.McDermott@nrc.gov>

    Cc: Lubinski, John <John.Lubinski @nrc.gov>; Coyne, Kevin <Kevin .Coyne@nrc.gov>; Mi ll er, Chris

    <Chrls.Ml ll er@ nrc.gov>

    Subject:

    RE: LaSa lle SIT Summary Well it will be imoortant for me to hear four thinqs: \

    b)(5) Deliberative Privilege 8/f

    From: King, M ichael Sent: Wednesday, June 07, 2017 6:22 PM To: Dean, Bill < Bill.Dean@nrc.gov>; Evans, Michele < Mche l e. Evans@nrc . gov>; McDermott, Brian

    <Bria n.M cDer mott@ nrc.gov>

    Cc: Lubi nski, John <John.Lubinski@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrq:ov>; M il le r, Chris

    <Chris Miller@nrc.gov>

    Subject:

    FW: LaSal le SIT Summary (b)(5) Deliberative Pri vilege Thanks, Mike From: O'Brien, Kenneth Sent: Wednesday, June 07, 2017 5:55 PM To: Coyne, Kevin <Kevin.Coyne@ nrc.gov>; King, M ichael <M ichael. King2@nrc.gov>

    Subject:

    FW: LaSal le SIT Summary From: Jeffers, Mark Sent: Wednesday, June 07, 2017 4:23 PM To: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shuaibi, Mo hammed

    <Mohammed.Sh ua ibi@nrc.gov>

    Cc: Stoedter, Karla <Karla ,Stoedter@nrq~ov>; Benjamin, Jamie <Jamie.Benjam in @nrc goy>

    Subject:

    LaSal le SIT Summary Ken ,

    Attached is the revised briefing sheet summarizing our conversation from today . Please Iet me know if you have any questions, comments, or concerns.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798

    From: 1effers Mark To: Q"Brjen Kenneth; Shuaibi Mohammed Cc: Stoedter. Karla; Beniamin. lamie

    Subject:

    LaSalle SIT Summary Date: Wednesday, June 07, 2017 4:23:31 PM Attachments: LaSalle SIT Briefing Sheet

    • DRAFT C.docx Ken ,

    Attached is the revised briefing sheet summarizing our conversation from today. Please Iet me know if you have any questions, comments, ar concerns.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 I x9798

    Benjamin, Jamie From: O'Brien, Kenneth Sent: Wednesday, June 07, 2017 10:15 AM To: Benjamin, Jamie

    Subject:

    RE: op eval was not completed yesterday Jamie Thanks Ken From: Benjamin, Jamie Se nt: Wednesday, June 07, 2017 9:04 AM To: O'Brien, Kenneth <Kenneth .O'Brien@nrc.gov>

    Subject:

    RE: op eval was not completed yesterday Mark here.

    Draft Op Evai don't go through PORC. Exelon PORV reviews Op Evals weeks after they are approved. No that doesn't make sense.

    It doesn't change our plans. We are done today.

    AII of your questions are pure enlightenment for us ali.

    From: O'Brien, Kennet h Sent: Wednesday, June 07, 2017 8:55 AM To: Benjamin, Jamie <Jamie.Benjamin@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Stoedter, Karla

    <Karla.Stoedter@nrc.gov>

    Subject:

    RE: op eval was not completed yesterday 1 am assuming Mark is there with you today.

    End of day or now?

    Have we seen the draft that is going thru PORC?

    Does this change our schedule and plans?

    Yes, lots of nosy questions?

    Thanks Ken From: Benjamin, Jamie Sent: Wednesday, June 07, 2017 8:53 AM 1

    To: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>; O'Brien, Kenneth

    <Kenneth.O'Brien@nrc.gov>

    Subject:

    op eval was not completed yesterday Licensee told us that they will have it approved today.

    2.

    From : Coyne. Kevin To: Cai....l.lJM Cc: Clark. Theresa; O"Brien. Kenneth

    Subject:

    RE: Req uest for presentation at Quarterly Strategic Alignment meeting Date: Wednesday, J une 07, 2017 2:13:49 PM Hi June-l've been working with Region 3/DRS on the LaSalle issue and gave Ken O'Brlen a heads up about the briefing request. Quick question - will Regional staff be able to connect to the meeting via Skype or teleconference? 1think Ken would like to have either his BC or LaSalle SI team leader support the briefing and Q&A's.

    Thanks!

    Kevin From: Cai, June Sent: Wednesday, June 07, 2017 1:03 PM To: Coyne, Kevin <Kevin.Coyne@ nrc.gov>

    Cc: Clark, Th eresa <Theresa.Cla rk @nrc.gov>

    Subject:

    Request for presentation at Qua rterly Strat egic Alignment meeti ng

    Kevin, ln developing the agenda for the next Quarterly Strategic Alignment Meeting, the topic of LaSalle SIT / Anchor-Darling double disc gate valves has been requested by the EDO/DEDOs, with NRR lead and RIII support. The meeting is on July 5th - see attached agenda for location and presentation time. The audience will be EDO/DEDOs/AO and ODs/RAs. We have 20 minutes slotted for this topic, including Qs and As . Given the length of time and the audience, suggest the presentation be fairly focused and high Ievel.

    Please Iet me know if you would be able to support and who to work with on the logistic details.

    Thanks so much in advance.

    June Cai Executive Technica l Ass1stant Office of the Executive Director for Operations U.S. Nuclear Regulatory Commission 301-415-1771 jun e.cai@nrc.gov

    From: Coyne. Kevin To: Q"Brien. Kenneth Cc: Shuaibi, Mohammed

    Subject:

    RE: Request for presentation at Quarterly Strategic Alignmen t meeting Date: Wednesday, J une 07, 2017 1 :50:26 PM Attachments: 7.5.17 guarterly strate gic meeting a genda.docx

    ... and should have sent the attachment to you too ... Attached.

    From: O'Brie n, Kenneth Sent: Wednesday, June 07, 2017 2:47 PM To: Coyne, Kevin <Kevin.Coyne@ nrc.gov>

    Cc: Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>

    Subject:

    RE: Request for presentation at Quarterly Strategic Alignment meeting Thanks for the heads up Kevin My initial thought would be to have the BC, Mark Jeffers, or the Team Lead, Jamie Benjamin to support from Region 111. Maybe have them there or online via Skype.

    From: Coyne, Kevin Sent: Wednesday, June 07, 2017 1:44 PM To: Cai, June <June.Cai@nrc.gov>

    Cc: Clark, Theresa <Theresa .Clark@nrc.gov>; Lubinski, John <John .Lubinskj@nrc.gov>; O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>

    Subject:

    RE: Request for presentation at Quarterly Strategic Alignment meeting June-1can support the meeting -you can work with me as the point of contact for NRR.

    Kevin From: Cai, June Sent: Wednesday, June 07, 2017 1:03 PM To: Coyne, Kevin <Keyin .Coyne@nrc.gov>

    Cc: Clark, Theresa <Theresa,Clark@nrc.gov>

    Subject:

    Request for presentation at Quarterly Strategic Alignment meeting

    Kevin, ln developing the agenda for the next Quarterly Strategic Alignment Meeting, the topic of LaSalle SIT/ Anchor-Darling double disc gate valves has been requested by the EDO/DEDOs, with NRR lead and RIII support. The meeting is on July 5th - see attached agenda for location and presentation time. The audience will be EDO/D EDOs/AO and ODs/RAs. We have 20 minutes slotted for this topic, including Qs and As. Given the length of time and the audience, suggest the presentation be fairly focused and high Ievel.

    Please Iet me know if you would be able to support and who to work with on the logistic details.

    Thanks so much in advance.

    June Cai Executive Technica l Assistant Office of the Execut1ve Director for Operations U.S. Nuclear Regulatory Commission 301-415-1771 june.cai@nrc.gov

    6/27/17 Quarterly Strategic Alignment Meeting Weds, July 5, 2017, 1:30 - 4:00 p.m.

    Room T-6A1 VTC to Regions

    Participants:

    EDO (direct report) Offices, OCIO, OCFO, OGC, OIP

    Purpose:

    Collaborative discussion of strategic challenges of agency-wide importance and interest, including follow-up on issues identified in the most recent Quarterly Performance Review (QPR) meeting and Strategic Leadership Meeting (SLM).

    Objective :

    1. Shared understanding of NRC Senior Leadership Team of issues affecting the agency in the next one to two year timeframe.
    2. NRC Senior Leadership Team have had an opportun ity to participate in the development of strategic direction setting and problem solving for items that cut across business lines and organizational units.
    3. Clear messaging on strategic issues is developed and all sen ior leaders use this messaging in communicating with their organizations and staff.

    Process:

    1. Opening Remarks - Victor McCree, EDO 1:30 - 1:35
    2. Safety Spotliqht 1:35 - 1:55 a . LaSalle SIT/ Anchor-Darling double disc gate valves - NRR/RIII
    3. Special Discussion Topies
    a. Strategic Workforce Planning - OEDO & OCHCO 1 :55 - 2:25
    b. Backfit - CRGR 2:25 - 2:55
    c. FY 2018-2022 Strategic Plan development - OEDO 2:55 - 3:25 d . SLS Project - OEDO 3:25 - 3:55

    From: Srone, AnnMarie To: Martine2. Nancy; Pelton David; Yerokun, llmi; Niek, roseph; franke Mark: Miller Mark; Desai, Bjnoy: Lara lulio:

    Shuaibi. Mohammed; Lipa, Christine: Lan tz. Ryan: Clark. eff; Howell. Linda; ones William Cc: Ferdas Marc; McKenna. Philip; Hlpschman Thomas: Garmoe. Alex: Lorson Raymond; Scott. Mlchael: Gody, IQ.nJ'.: Munday. oel: O"Brien. Kenneth: Louden. Patrick; Pruett, Troy: Vegel Anton

    Subject:

    RE: Solicita tion of Comments 6/6: Draft I N on anchor/darling double disc gate valve (TAC MF9698)

    Date: Wednesday, June 07, 2017 7:55:00 AM Attachments: fwd Draft loformation Notice on Anchor Darling DDGY failures msg

    Nancy, Region 111 concurs with the draft IN with the corrections as suggested from Kevin Coyne.

    Ann Marie From: Ma rti nez, Na ncy Sent: Monday, Jun e 05, 2017 7:18 AM To: Pelton, David <David.Pelton@nrc.gov>; Yerokun, Jim i <Jim i.Yeroku n@nrc.gov>; Niek, Josep h

    <Joseph.Nick@ nrc.gov>; Fra nke, Mark <M ark.Fran ke @nrc.gov>; Miller, Mark

    <Ma rk .Ml ller@nrc.gov>; Desai, Binoy <Binoy.Desai@nrc.gov>; La ra, Jul io <Jul1o.Lara@ nrc.gov>;

    Shuaibi, Mohammed <Moham med .Sh uaibi@nrc.gov>; Li pa, Christi ne <Christine.Lipa@nrc.gov>;

    Lant z, Ryan <Ryan.Lantz@ nrc.gov>; Clark, Jeff <Jeff.Cla rk@n rc.gov>; Howell, Linda

    <linda.Howell @nrc.gov>; Jones, Wil liam <Wil liam .Jones@nrc.gov>

    Cc: Ferdas, Ma rc <Ma rc. Ferdas@nrc.gov>; McKenna, Phi li p <Philip.McKenna@nrc.gov>; Stone, An nMa ri e <Ann Ma rie.Stone@ nrc.gov>; Hipschman, Thomas <Thomas. Hipschman@n rc.gov>;

    Garmoe, Alex <Alex.Garmoe@ nrc.gov>; Lorson, Raymond <Raymond.Lorson@nrc.gov>; Scot t, Michael <Michael.Scott@ nrc.gov>; Gody, Tony <Tony.Gody@nrc.gov>; M unday, Joe l

    <Joel.M unday@ nrc.gov>; O' Brien, Kenneth <Kennet h.O' Brien@nrc.gov>; Louden, Patr1ck

    <Patrick. Louden@nrc.gov>; Pruet t, Troy <Troy.Pruett@n rc.gov>; Vegel, Ant on

    <Anton.Vegel@n rc.gov>

    Subject:

    So li cit aton of Com ments 6/6: Draft IN on anchor/darling double disc gate valve (TAC MF9698}

    The NRR Generic Communications Branch has been working with the NRR/DIRS Operating Experience Branch to develop the attached/linked draft lnformation Notice (IN) discussing operating experience associated with anchor/darling double disc gate valve wedge pin shearing and wi ll promptly begin the formai concurrence process. Since these valves are used widely in various diverse safety systems (HPCI, HPCS, RHR, RCS, etc),

    the NRC staff is working towards issuing th is high priority IN within 2 weeks.

    The Regions will be part of the formai concurrence chain for this document and concurrence will be requested in the next couple of days from one of your Division Directors (DRP or DRS). You are receiving this e~mail to have an opportu nity to review the draft IN and provide comments prior to the formai concurrence process. Time spent reviewing this IN can be charged to TAG MF9698. To support prompt issuance of the IN , please provide any comments or questions to Nancy Martinez by COB Tuesday, June 6.

    The draft IN can be found in ADAMS ML17153A053.

    Thank you, Nancy Martinez Generic Communications Branch (PGCB)

    Division of Policy and Rulemaking (DPR)

    Office of Nuclear Reactor Regulation (NRR) 301 -415-2719 duo to previous page (GHC(

    From: Marti nez, Nancy Sent: Thursday, May 25, 2017 10:53 AM To: Pelton, David <Davjd .Pelton@nrc.gov>; Yerokun, Jimi <JimiYerokun@nrc.gov>; Niek, Joseph

    <Joseph.N ick@ nrc.gov>; Franke, Mark < Mark.Franke@nrc.gov>; M il ler, Ma rk

    <Mark.Mi ller@nrc.gov>; Desai, Binoy <Binoy.Desai@nrc.gov>; Lara, Julio <Julio.Lara@nrc.gov>;

    Shuaib i, Mohammed <Mohammed .Shua ibi@nrc.gov>; Lipa, Ch ri stin e <Christine.Lipa@nrc.gov>;

    Lant z, Ryan <Ryan. Lantz@nrc.gov>; Clark, Jeff <Jeff.Clark@nrc.gov>; Howel l, Unda

    <Linda.Howell @nrc.gov>; Jones, Wil liam <Wi ll iarn .Jones@nrc.gov>

    Cc: Ferda s, M arc <Marc.Ferdas@nrc.gov>; M cKenna, Phili p <Philip.McKenna@nrc.gov>; St one, An n Ma r e <AnnMarie.Stone@nrc.gov>; Hipschrna n, Thomas <Thomas.Hipschman@nrc.gov>;

    Stuchel l, Sheldon <Sheldon.Stuchell@nrc.gov>; Garmoe, Alex <Alex.Ga rmoe@nrc.gov>

    Subject:

    For Prom pt Awa reness: upcoming comm ent request o n an inform atio n notice (IN )

    Good Morning, An lnformation Notice is currently being developed pertaining to anchor/darling double disc gate valve wedge pin shearing. There is a need to inform the industry as quickly as possible since these valves are used widely in various diverse safety systems (HPCI, HPCS, RHR, RCS, etc) and two 10 CFR 21 reports issued in 2013 may not provide necessary information to address this problem.

    This is a heads up that we will be requesting a very prompt review from your organization. 1 currently do not have a draft of the lnformation Notice to share, but please be on the lookout for a comment request next week. lf you have any questions, please do not hesitate to contact me.

    Thank you ,

    Nancy Generic Communications Branch (PGCB)

    Division of Policy and Rulemaking (DPR)

    Office of Nuclear Reactor Regulation (NRR) 301-415-2719

    From: seotao1io Jamie To: Stone AnnMarle* O"fl'r len Kenneth; l.fil.i...l.u!i ouden Patr,ck~effes Mark; Stgedter Karla

    Subject:

    RE: Solicitation of Cornments 6/G: Draft IN on anchor/darling double disc gate va!Ve (TAC MF9698)

    Date: Wednesday,June 07, 201 7 8:37:51 AM Anachments: lma*e003.ong (b)(5) Deliberative Privflege (b)(5) Deliberative Privilege From: Stone, AnnMarie Sent: Tuesday, June 06, 2017 5:13 PM To: O'Brien, Kenneth <Kenneth.O' Brien@nrc.gov>; Lara, Julio <Julfo.Lara@nrc.gov>; Loud en, Patrick <Patrick.Loud en@nrc.gov>;

    Jeffers, Mark <Mark.Jeffers@nrc.gov>; Benj amin, Jamie <Jamie.Benjamin@nrc.gov>; Stoedter, Ka rla <Karla.Stoedter@nrc.gov>

    Subject:

    RE: Solicitation of Comments 6/6: Draft IN on anchor/darling double disc gate valve (TAC M F9698) lmportance: Hfgh AII, The email chain states there is a need to inform the industry as quickly as possible and two 10 CFR 21 raports issued in 2013 may not provide necessary information to address this problem.

    (b)(5) Deliberative Privilege

    (b)(5) Deliberative Privilege Please Iet me know if you can support the yellow highlight.

    Ann Marie From: M artinez, Nancy Sent: Monday, June 05, 2017 7:18 AM To: Pelton, David <Davjd Pelton@nrc gov>; Yerokun, Jimi <Jjmi Yerokun@nrc gov>; Niek, Joseph <Joseoh Nick@nrc gov>;

    Fra nke, Mark ; M iller, Mark ; Desai, Binoy <Binoy,DRsai@nrc gov>; Lara, Julio

    <Julio.Lara@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibi@nrqov>; Lipa, Christine <Chnstlne.Lipa@nrc.gov>; Lantz, Ryan <Ryan Lantz@nrc.gov>; Clar k, Jeff <Jet t.Clar k@nrc.gov>; Howell, Linda <Lmda.HoweU@nrc.gov>; Jones, W illiam

    <William Jones@nrc gov>

    Cc: Ferd as, Marc <Marc Ferdas@nrc goY>; McKenna, Philip <Philip McKenna@nrc.gov>; Stone, AnnMarie

    <AnnMarie.Stone@nrc.gov>; Hipschman, Thomas <Thomas.Hipschman@nrc.gov>; Gar moe, Alex <Al ex.Gannoe@nrc.gov>;

    Lorson, Raymond <Rayrnond Lorsoo@orc gov>; Scott, M ichael <M lchaeJ Scott@nrc gov>; Gody, Tony <Tony.Gody@nrc.gov>;

    Munday, Joel <J oel Munday@nrc gov>; O' Br ien, Kenneth <Kenneth.O'Brien@nrc.gov>; Louden, Patrick

    <Pa trick Louden@nrc.gov>; Pruett, Troy <Troy Pruett@nrc.gov>; Vegel, Anton <Anton Vegel@nrc gov>

    Subject:

    Solicitation of Comments 6/6: Dra ft IN on anchor/darling double disc gate va lve (TAC MF9698)

    The NRR Generic Communications Branch has been working with the NRR/DIRS Operating Experience Branch to develop the attached/linked draft lnformation Notice (IN) discussing operating experience associated with anchor/darling double disc gate valve wedge pin shearing and will promptly begin the formai concurrence process.

    Since these valves are used widely in various diverse safety systems (HPCI, HPCS, RHR, RCS, etc), the NRC staff is working towards issuing this high priority IN within 2 weeks.

    The Regions will be part of the formai concurrence chain for this document and concurrence will be requested in the next couple of days from one of your Division Directors (DRP or DRS). You are receiving this e-mail to have an opportunity to review the draft IN and provide comments prior to the formai concurrence process. Time spent reviewing this IN can be charged to TAC MF9698. To support prompt issuance of the IN, please provide any comments or queslions to Nancy Martinez by COB Tuesday June 6.

    The draft IN can be found in ADAMS ML17153A053.

    Thank you, Nancy Martinez Generic Communications Branch (PGCB)

    Division of Policy and Rulemaking (DPR)

    Office of Nuclear Reactor Regulation (NRR) 301-415-2719 dup to pre\iious pages (G HC)

    From: M artinez, Nancy Sent: Thursday, M ay 25, 2017 10:53 AM To: Pelton, David <Davl d Pelton@nrc.gov>; Yerokun, Jimi <Jimt.Yerokun@nrc.eov>; Niek, Joseph <Joseph Nick@nrc 1;ov>;

    Fra nke, Mark <Mark.[ranke@nrc,gov>; M iller, Mark <Mark.Miller@orc.gov>; Desai, Binoy <Bjnov,Desa1@nrc.gov>; Lara, Julio

    <Julio Lara@occ gov>; Shuaibi, Mohammed <Mohammed Shuaibi@nrc gov>; Lipa, Chr istine <Chrjstine I jpa@nrc gov>; Lant z, Ryan <Rvan.Lantz@ orc.gov>; Clark, Jeff <Jeff.Clark@nrc gov>; Howell, Linda <Lmda.Howell@nrc (;?OY>; Jones, W illiam

    <Wi lliam.Jones@nrc.gov>

    Cc: Ferdas, Marc <Marc Ferdas@nrc,gov>; McKenna, Philip <Pbilio,McKenna@nrc gov>; Stone, AnnMarie

    <AnnMane.Stone@nrc sov>; Hipschman, Thomas <Jhomas nipschman@rc gov>; Stuchell, Sheldon

    <Sheldon.Stuchell@nrc.{lov>; Garmoe, Alex <Alex.Garmoe@nrc.(loV>

    Subject:

    For Prompt Awareness: upcom ing comment request on an information notice (IN)

    Good Morning, An lnforrnation Notice is currently being developed pertaining to anchor/darling double disc gate valve wedge pin shearing. There is a need to inform the industry as quickly as possible since these valves are used widely in various diverse safety systems (HPCI, HPCS, RHR, RCS, etc) and two 10 CFR 21 reports lssued in 2013 may not provide necessary information to address this problem.

    This is a heads up that we will be requesting a very prompt review from your organization. 1 currently do not have a draft of the lnformatlon Notice to share, but please be on the lookout for a comment request next week. lf you have any questions, please do not hesitate to contact me.

    Thank you, Nancy Generic Communications Branch (PGCB)

    Division of Policy and Rulemaking (DPR)

    Office of Nuclear Reactor Regulation (NRR) 301-415-2719

    From: Dunlop, Andrew To: teffers Mark

    Subject:

    Thrust Review Date: Wednesday, June 07, 2017 3:12:00 PM Attachments: Th rust Review.docx

    From: Philjps Charles To: Kozak Laura

    Subject:

    FW: Update on laSalle MOV Issue and HQ LJC-504 Process Date: Wednesday, J une 07, 2017 9:40:00 AM Attachments: E170602t030957 NRC RA17-056.pdf a message fro.m Flowserve to LaSalle PM in NRRDORL vta PDR.msg From: Stoedter, Karla Sent: Tu esday, Ju ne 06, 2017 11:56 AM To: Phil lips, Charles <Cha rl es. Phi ll ips@n rc.gov>; Wojewoda, Jacquelyn

    <Jacq uelyn.Wojewoda@n rc.gov>

    Cc: Havertape, Joshua <Joshua.Have rtape@nrc.gov>

    Subject:

    FW: Update on LaSalle MOV lssue and HQ LIC-504 Process Here's the latest.

    Karla Stoedter, Chief Region 11 1Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: O'Brien, Kenneth Sent: Tu esday, Ju ne 06, 2017 11:35 AM To: Jeffers, Ma rk <Mark.Jeffers@nrc.gov>; Stoedter, Karla <Karla .Stoedter@nrc.gov>

    Subject:

    FW: Update on LaSa lle MOV lssue and HQ LIC-504 Process FYI From: Coyne, Kevin Sent: Tuesday, June 06, 2017 10:01 AM To: Miller, Chris <Chris.Miller@nrc.gov>; King, Michael <Michael. King2@nrc.gov>; Gavrilas, M irela

    <Mirela.Gavrilas@nrc.gov>; Helton, Sha na <Shana,Helton@nrc.gov>; Lubinski, John

    <John.Lubinski@nrc.gov>; Lund, Louise <Louise.Lund@nrc.gov>; Bowma n, Gregory

    <Gregory.Bowma n@n rc.gov>

    Cc: O'Brien, Kenneth <Kenneth .O'Brien@nrc.gov>; Shua ibi, Mohammed

    <Mohammed.Shuaibj@n rc.gov>; Fa rna n, M ichael <Michael.Fa rn an@nrc.gov>; Alley, David

    <David.A[ley@nrc.gov>; Benney, Brian <Brian.Benney@nrc.gov>; Wi lkins, Lynnea

    <Lynnea.Wil kins@nrc.gov>; Burke, John <John.Burke@ nrc.gov>; Krohn, Paul

    < Paul. Krohn@n rc.gov>; McGinty, Tim ; Dean, Bill <Bill.Dean@nrc.gov>;

    McDermott, Brian <Brian,McDermott@nrc.gov>; Evans, M ichele <Miche le,Evans@nrc gov>

    Subject:

    Update on LaSalle MOV lssue and HQ LIC-504 Process Folks-Spoke with Ken (Region 111) again this morning. Here's an update on the SIT activities and the LIC-504 implications:

    LaSaUe SIT

    • MPR provided Exelon the failure evaluation for the Unit 2 HPCS lnjection Valve on May
    30. This report was distributed to the LIC-504 team last week (Iet me know it you need a copy) . The failure analysis report provided some new information, including the role of stem collar slippage resulting in loss of stem torque preload (the resistance of the stem collar to movement appears to be less than the applied load and repeated loading cycles leading loosening of the stem-d isc connection and failure of the wedge pin. Of particular note is that if axial stem loads exceed the press fit collar resistance , the valve will lose preload (the MPR report concluded that the collar resistance was only about

    .* (b)(5) Deliberative Pri vilege PotenUal Generic lmplications for the LIC-504 Process

    • lf the role of stem collar slippage is verified , this is a condition that is not described in the Flowserve Part 21 (indicating that the Flowserve Part 21 may be deficient).

    Flowserve is apparently thinking along these lines as the QA manager from Flowserve just contacted the DORL PM to get information on the process to update/amend a Part

    21) - see attachment #2.
    • Vendor lnspection at Flowserve (NRO/DCIP) scheduled for week of July 16.
    • The lnformation Notice is on a fast track to be issued by June 16. We should revise some of the language in the draft IN be revised to avoid too narrow a focus on the pre-torque issue and the existing Part 21 (since it may not address the valve issue sufficiently). However, any change we make to the IN at this point should not impact the fast track schedule. DIRS is following up on these changes.
    • We are planning to have a public meeting in the near term (late June, early July) to gather information from industry on industry actions related to the recent valve issues and the Flowserve Part 21 . lf the issues described in the MPR report are verified , then the Part 21 may not completely describe the potential non-conformance and the corrective actions recommended by the Part 21 may not be sufficient to prevent recurrence of the failure. This would underscore the importance of holding this meeting as soon as possible (providing industry will be ready to provide quality information) to support continuation of the LIC-504 decision making process.
    • We are starting to get better sense of potential categorization of higher priority anchor darling valves - stil! preliminary1 but ( 1) press fit stem collar, (2) actuator output greater t han load capability of wedge pin, (3) safety function to open, (4) valve setup that requires high speed close operation, etc. As we get this better refined, we will be able to better focus on the subset of valves that are more susceptible to failure.

    Next Steps

    • Next LI C-504 meeting scheduled for Thursday, June 8 at 3:00 pm eastern time (we moved this up in response to the recent information from the MPR failure analysis)
    • Target issuance for IN June 16
    • Public Meeting late June/early July
    • Flowserve Vendor inspection - week of July 16.

    Kevin Coyne, Ph.D., P.E.

    Deputy Director, Acting Division of Engineering, Office of Nuclear Reactor Regu/ation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (301) 415-2478 (work)

    From: Pederson cvnthia To: Sotjroooulos Dina: Giessner lohn: Lara lulio: Lipa Christine: Louden Patrick: Walsh. Mary- Q"Brien Kenneth:

    Roberts. Darrell: Shuaibi Mohammed

    Subject:

    FW: [OUO-SII] Agency Mission Meeting Summary (06/7/17)

    Date: Thursday, June 08, 2017 7:25:54 AM Attachments: 6-7-17 summazy ouo-sn.oocx Couple things of note. Comm Meeting on EEO is being postponed until 6/22 due to confirmation hearings likely being 6/13.

    NRC highest agency for FEVS participation at 63%.

    There are a couple of errors in attached notes. No, the Staffing Plan call is not out yet.

    And NRR did not say RII was preparing for next JNRA cohort (lt's us).

    From: Cai, June Sent: Thursday, June 08, 2017 7:10 AM To: NRC_ODs_ DODs <NRC_ODs_ DODs@nrc.gov>

    Cc: EDO Distri bution <EDODistribut ion@nrc.gov>

    Subject:

    (OUO-SII] Agency M ission Meeting Summary {06/7 /17)

    The summary notes from this week's Agency Mission Meeting are attached.

    Thank you June Cai Executive Technica l Assistant Office of the Executive Director for Operations U.S. Nuclear Regulatory Commission 301-415-1771 ju ne.cai @nrc.gov

    From: Jeffers, Mark To: Benn ey, snan Cc: Benjam i !amie Oamie,Benjamjn@nrc.gov) subject: RE: ACTION - LaSa lle Communication Plan

    • June 2017. docx Date: Thursday,June 08, 2017 8:47:00 AM A couple of quick comments from a cursory lo,,....._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
    • *
    • ry fluid right now (b)(5) Deliberative Privilege (b)(5) Deliberative Privilege OU may j USt Wan t-r:O~ p =-u
    -:r-a=-:n

    -

    a-=

    sr:e::-::r~IS:"r."':n=-:e=-::X~ O

    '=""Tr=-=-~-r=""-r=""-r=-T'TC"e

    = ----'

    a 1 1s sub*ect to chan e.

    H (b)l5) De.liberative Prvilege Other than that, the paper looks good (from a quick read). Jamie, could you please help Brian out with some of the specifics?

    Thank You ,

    Mark Jeffers Branch Chief I RIII DRS EB2 x9798


    Origi nal Message-----

    From: Benney, Brian Sent: Thursday, June 08, 2017 8:31 AM To: Jeffers, Mark <Mark.Jeffers@nrc.gov>

    Subject:

    ACTION - LaSalle Communication Plan - June 2017.docx Mark (b)(5) Deliberative Privilege Thank you in advance tor your help, Brian Benney


    Original Message-----

    From: Farnan, Michael Sent: Thursday , June 08, 2017 8:25 AM To: Alley, David <David.A!ley@nrc.gov>; Benney, Brian <Brian .Benney@nrc.gov>;

    Woltgang , Robert <Bobert.Wolfgang@nrc.gov>

    Subject:

    RE: Emailing: LaSalle Communication Plan - June 2017.docx (b)(5) Deliberative Pri vilege Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Commission 301-415-1486


    Original Message-----

    From: Alley, David Sent: Wednesday , June 07, 2017 8:57 PM To: Benney, Brian <Brian.Benney@nrc.gov>; Farnan, Michael <Michael.Farnan@ nrc.gov>;

    Wolfgang , Robert <Robert. Wolfgang@nrc.gov>

    Subject:

    RE: Emailing: LaSalle Communication Plan - June 2017.docx Brian, It is 10 till nine Wednesdav niaht. 1 iust read the com olan. 1 b)(5) Deliberative Privilege 1

    Dave


    Original Message-----

    From: Benney, Brian Sent: Wednesday, June 07, 2017 1:53 PM To: Farnan, Michael <Michael.Farnan@nrc.gov>; Alley, David <David.Alley@nrc.gov>;

    Woltgang, Robert <Bobert.Wolfgang@nrc.gov>

    Subject:

    FW: Emailing : LaSalle Communication Plan - June 2017.docx Folks, l(bl<PJ Deliberati,e Prl"'"

    Thank you in advance, Brian Benney


    Original Message-----

    From: Circle, Jeff Sent: Wednesday, June 07, 2017 1:48 PM To: Benney, Brian <Brian.Benney@nrc.gov>; Ng, Ching <Ching.Ng@nrc.gov>

    Subject:

    RE: Emailing: LaSalle Communication Plan - June 2017.docx

    Brian, Ching's and my comments.

    Jeff.

    Jeff A. Circle Team Leader - PRA Modei Development PRA Operations and Human Factors Branch NRR/Division of Risk Assessment (301) 415-1152


    Original Message-----

    From: Benney, Brian Sent: Wednesday , Juhe 07, 2017 12:41 PM To: Ng, Ch ing <Ching.Ng@nrc.gov>; Circle, Jeff <Jeff.Circle@nrc.gov>; Thompson, John

    <John.Thompson@nrc.gov>

    Subject:

    FW: Emailing: LaSalle Communication Plan - June 2017.docx AII , 1 have some time to meet before 2:30. Are you available to assist?

    Brian


    Original Message----

    From: Bowman, Gregory Sent: Wednesday, June 07, 2017 8:29 AM To: Benney, Brian <Brjan,Benney@nrc.gov>; Morey, Dennis <Peoois,Morey@nrc.gov>

    Cc: Coyne, Kevin <Kevin.Coyne@nrc.gov>; Burnell, Scott <Scott,Burnell@nrc.gov>

    Subject:

    RE: Emailing: LaSalle Commun ication Plan - June 2017.docx 1 finally got some time to look this over this morning. 1 have some edits and comments (see attached). l'd like to have an updated version ready for me and Kevin to look over by COB tomorrow, such that we can hopefully have it "finalized" (recognizing that it'II be a living document) by the end of the week.

    Has Scott Burnell reviewed th is? There were a few places where the tone didn't appear to me to be OPA-polished. He could also help with the O&As - both in developing the Qs and helping come up with good As. With respect to the existing Q&As, the message below mentions referring the question on plant safety to the SIT, but l'd really prefer we (DE, DPR, and OPA) come up with an initial answer rather than just turning it over to Region 111.

    l'm getting ready to start into my daily raund of back-to-back meetings, but feel free to stop by if you want to discuss my comments

    Greg


    Original Message-----

    From: Benney, Brian Sent: Tuesday, June 06, 2017 5:10 AM To: Bowman, Gregory <Gregory.Bowman@nrc.gov>

    Cc: Morey, Dennis <Dennis.Morey@nrc.gov>

    Subject:

    FW: Emailing: LaSalle Communication Plan - June 2017.docx (b)(5) Deliberative Prfvilege

    {b)(5) Deliberative Prfvilege you,


    Original Message-----

    From: Morey, Dennis Sent: Monday, June 05, 2017 5:36 PM To: Benney, Brian <Brian.Benney@nrc.gov>

    Subject:

    RE: Emailing: LaSalle Communication Plan - June 2017.docx

    Brian, Please send it to Greg noting the missing info.
    Thanks, Dennis Morey

    Original Message-----

    From: Benney, Brian Sent: Monday, June 05, 2017 4:18 PM To: Morey, Dennis <Dennis,Morey@nrc.gov>

    Cc: Wilkins, Lynnea <ynnea.Wilki ns@nrc.gov>

    Subject:

    Emailing: LaSalle Communication Plan - June 2017.docx Dennis (b)(5) Deliberative Privilege

    The information notice that OE has put together is out for licensee comment for accuracy, and may also change language in the Comms Plan. Nancy Martinez is the lead for OE.

    There is a placeholder in OE's Sharepoint site for this Comms Plan once Greg is satisfied.

    The site is not easy to find . Here is the link to that site:

    http://fusion.nrc.gov/nrr/team/dirs/ioeb/anchor darling valve issue/default.aspx Do you want to send this to Greg, or attempt to get that answer that may change, first?

    Brian

    From: Pederson Cynthia To: Q"Brien Kenneth: Roberts DarreH Cc: Shuaibi Mohammed

    Subject:

    RE: Oean Comment s on LaSalle SIT Summary Date: Thursday, June 08, 2017 6:58:09 AM Thanks Ken . ls the team ready to answer Bill 's questions?

    From: O'Brien, Kenneth Sent: Th ursday, June 08, 2017 6:56 AM To: Pederson, Cynthia <Cynt hia.Pederson@ nrc.gov>; Roberts, Darrell <Darrell.Roberts@nrc.gov>

    Cc: Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>

    Subject:

    Dean Comments on LaSalle SIT Summary Cindy The below is Bill's initial response to the team's assessment. Mike King gave him a briefing based upon my discussion after our meeting.

    Thanks Ken From: Dean, Bil l Sent: Wednesday, June 07, 2017 6:42 PM To: King, M ichael <M 1chael.King2@nrc.gov>; Evans, Michele <Mlchele.Evans@nrc.gov>; McDermott, Brian <Brjan.M cDermot t @nrc.gov>

    Cc: Lubinski, John <John.Lubinski@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>; Mil ler, Chris

    <Chris.M ille r@nrc.gov>

    Subject:

    RE: LaSa lle SIT Summary (b)(5) Deliberative Pri vilege 8/ff From: King, M ichael Sent: Wednesday, June 07, 2017 6:22 PM To: Dean, Bill <Bill.Dean@nrc.gov>; Evans, Michele <M ichele.Evans@nrc.gov>; McDermott, Brian

    <Brian.McDermott @nrc.gov>

    Cc: Lubi nski, John <John.Lubjnskf@nrc.gov>; Coyne, Kevin <Keyjn.Coyne@nrc 1wv>; Mil ler, Chris

    <Cb ris.Mi ll er@n rc.gov>

    Subject : FW: LaSalle SIT Summary (b)(5) Deliberative Privilege

    Thanks, Mike

    From: Benjam i lamie To: Rodriguez Lionel: Punop Andrew: Pbillips Chares; Farnan Michael Cc: leffers. Mark; Stoedter. Karla; Skokowski. Richard

    Subject:

    RE: Ooes this example fit?

    Date: Thursday, June 08, 2017 2:34:14 PM

    {b)(5) Deliberative Privilege

    Benjamin, Jamie From: Jeffers, Mark Se nt: Thursday, June 08, 2017 10:03 AM To: Benjamin, Jamie Subje ct: Exit Meeting l was talkin!:! with Mobanuned this momin!:!. \

    b){5) Deliberative Privilege


    '\ Thoughts?
    Thanks, Mark Sent from my iPhone. Please forgive any typos.

    From: Kozak. Laura To: Benjami 1amie; leffers Mark Cc: Lara lulio; Louden. Patric; Hanna. lohn; O"Brien. Kenneth; Shuaibi Mohammed

    Subject:

    input o n risk analysis for LaSalle Unit 1 HPCS valve inoperability Date: Thursday, June 08, 2017 1 :23:27 PM Jamie, Mark Below is my input to answering Bill Dean's question about the risk significance of an inooerable HPCS injection valve. Let me know if you have any questions.

    )..aura (b)(5) Deliberatfve Privilege Risk analysis comparison to regulatory thresholds (b)(5) Deliberative Pri vilege

    From: farnan Michael To: Benjam i lamie; leffers Mark: Rodriguez Uonel; Punlop. Andrew; Pbilllps Chartes; O"Brien Kenneth Cc: Stoedter Karla

    Subject:

    RE: LaSalle Exit Date: Thursday, June 08, 2017 3:10:44 PM Thanks for the update. 1will be signing off when this 504 call ends. 1will be away next week at ASME OM Code meeting but available via celi phone if needed atl..(b_)C_6l_ _ ___,

    Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Comm ission 301-415-1486 From: Benjamin, Jamie Sent: Th ursday, June 08, 2017 4 :06 PM To: Jeffers, Ma rk <Mark.Jeffers@n rc.gov>; Rodriguez, Lionel <Lionel. Rodriguez@nrc.gov>; Dun lop, Andrew <Andrew.Du nl op@nrc.gov>; Phillips, Charles <Charles.Phillips@nrc.gov>; Farnan, M ichael

    <Michael. Farna n@n rc.gov>; O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>

    Cc: Stoedter, Karla <Karla.Stoedter@nrc.gov>

    Subject:

    RE: LaSa lle Exit Exit is set for tomorrow at 9am. Licensee is getting us a bridge line.

    1. Unit 2 HPCS injection valve SL 11, NOV, Design Control.
    2. URI on the Unit 1 HPCS injection valve.
    3. Several comments that may make it to the report.

    From: Jeffers, Mark Sent: Thursday, June 08, 2017 2:48 PM To: Benjamin, Jamie <Jamje Benjamio@orqNv>

    Cc: Stoedter, Karla <KarJa.Stoedter@n rc.gov>

    Subject:

    LaSalle Exit Jamie, From Bill Dean and Cindy, they are suppo11ive of exiting tomorrow. Please get with the licensee and schedule a time. Ken and I will be there. Preferably 9:00 AM.

    (b)(S) Deliberative Privile e am expecting to biief Mike Johnson and Bill Dean (.and every other SES in

    _c_y- o"'n Tuesday at noon. We will need to have the position paper (the full one) ready

    ......,.t...e......,_g-en by then.

    Thanks,

    Mark Sent from my iPhone. Please forgive any typos.

    From: Benjam i lamie To: O"Brien Kenneth

    Subject:

    RE: La Salle Exit Date: Thursday, J une 08, 2017 3:07:25 PM Understood. Thanks.

    From: O'Brien, Kenneth Sent: Thursday, June 08, 2017 3:07 PM To: Benja mi n, Jam ie <Jamie.Benjamin@nrc.gov>

    Subject:

    RE: LaSa lle Exit Jamie lntent is to be there From: Benjamin, Jamie Sent: Thursday, June 08, 2017 3:06 PM To: Jeffers, Ma rk <Mark.Jeffers@orc.tNY>; Rodriguez, Lionel <LioneLRodriguez@nrc.gov>; Dunlop, And rew <Andrew.Du nlop@nrc.gov>; Phillips, Cha rl es <Charles.Philljps@nrc.gov>; Farnan, Michael

    <Michae l.Farna n@nrc.gov>; O' Brien, Ken neth <Ken neth.O'Brien@nrc.gov>

    Cc: Stoedter, Karla <Karla.Stoedter@nrqi;Qv>

    Subject:

    RE: LaSa lle Exlt Exit is set for tomorrow at 9am. Ucensee ls getting us a bridge llne.

    1. Unit 2 HPCS inject,on valve SL 11, NOV, Design Control.
    2. URI on the Unit 1 HPCS injection valve.
    3. Several comments that may make it to the report.

    From: Jeffers, M ark Sent: Thursday, June 08, 2017 2:48 PM To: Benjamin, Jam ie <Jamje.Benjamin@nrqrnv>

    Cc: Stoedter, Ka rl a <Karla.Stoedter@nrc.gov>

    Subject:

    LaSal le Exit

    Jamie, Prom Bill Dean and Cindy, they are supportive of exiting tomorrow. Please get with the licensee and schedule a time. Ken and I will be there. Preferably 9:00 AM.

    am expecting to brief Mike Johnson aod Bill Dean (and every otber SES in t e gency on Tuesday at noon. We will need to bave the position paper (the full one) ready by then.

    Thanks, Mark Sent from my iPhone. Please forgive any typos.

    From: 1effers Mark To: Bowen leremy

    Subject:

    Fwd: LaSa lle SIT Summary Date: Thu rsday, June 08, 2017 3: 15;13 PM Attachments: LaSalle SIT Briefihg Sheet - DRAFT C. docx Jeremy; Please see attached regarding the SIT team's assessment of LaSalle's operability of the Unit 1 HPCS injeclion valve.

    Thanks, Mark Sent from my iPhone. Please forgive any typos.

    From: "Jeffers, Mark <Mark.Jeffers@mc.gov>

    Subject:

    LaSalle SIT Summary Date: 07 June 2017 16:23 To: "O'Brien, Kenneth" <Kenneth.O'Brien@nrc.gov>, "Shuaibi, Mohamrned (Mohammed.Shuaibi@nrc.gov)" <Mohammed.Shuaibi@nrc.gov>

    Cc: Stoedter, Karla (Karla.Stoedter@nrc.gov)" <Karla.Stoedter@nrc.gov>, "Benjamin, Jamie (]amie.Benjamin@nrc.gov)" <Jarnie.Benjamin@nrc.gov>

    Ken, Attached is the revised briefing sheet summarizing our conversation from today. Please Iet me know if you have any questions, comments , ar concerns.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798

    From: Ko2ak. Laura To: Benjam i lamie: Farnan Michae1

    • Pvoloo Andrew: Pbillips. Chares; Rod ri:uez Lionel Subj ect: RE: LaSalle SIT Summary Date: Thursday, J une 08, 2017 9: 11 :11 AM Yes but can you send me the briefing sheet and (b)(5) Deliberative Privilege From: Benjamin, Jamie Sent: Thursday, June 08, 2017 8:55 AM To: Farnan, Michael <Michael.Farnan@nrc.gov>; Dun lop, Andrew <Andrew.Dun lop@nrc.gov>;

    Phil lips, Charles <Charles.Phil lips@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Kozak, Laura <Laura.Koza k@nrc.gov>

    Subject:

    FW: LaSal le SIT Summary We are working in this. Laura can you help us with question 4?

    Team- 1have everything I need for questions # 1-3.

    From: Jeffers, Mark Sent: Wednesday, June 07, 2017 6:25 PM To: Benjarnin, Jamie <Jam ie. Benjamin @nrc.gov>

    Subject:

    Fwd: LaSalle SIT Summary See below for Bill 's specjfic questions he is look.ing for. I believe we can answer ali of them.

    This should be our priority in the morning. We can add an addendum to the briefing sheet and directly answer tbese questions.

    Thanks, Mark Sent from my iPhone. Please forgive any typos.

    From: O'Biien, Kenneth" <Kenneth.O"Brien @nrc.gov>

    Subject:

    Fwd: LaSalle SIT Summary Date: 07 June 2017 18:03 To: "Jeffers, Mark" <Mark.Jeffers@nrc.gov>

    FYI and onr discussion From: "K.ing, Michael" <Michae1.King2@ nrc.gov>

    Subject:

    FW: LaSalle SIT Summary Date: 07 June 2017 17 :55 To: "O'Brien, Kenneth" <Kenneth.O'Biien@nrc.gov>

    FYA ...

    From: Dea n, Bil l

    Sent: Wednesday1 June 07, 2017 6:42 PM To: King, M ichael <Mlchae1,King2@nrc.gov>; Evans, Michele <M ichele.Evans@nrc.gov>; McDermott, Brian <Brian .McDermott@nrc.gov>

    Cc: Lubi nski, John <John.Lubinski@nrc.gov>; Coyne, Kevin <Kevin .Coyne@nrc.gov>; M il ler, Chris

    <Ch ris.Mi ll er@ nrc.gov>

    Subject:

    RE: LaSa lle SIT Summary (b)(5) Deliberative Privilege 81!!

    From: King, Michael Sent: Wednesday, June 07, 2017 6:22 PM To: Dean, Bill <Bill.Dean@nrc.gov>; Evans, Michele <M ichele.Evans@nrc.gov>; McDermott, Brian

    <Brian.McDermott@nrc.gov>

    Cc: Lubl nski, John <John .Lubjnsk1@nrc.gov>; Coyne, Kevln <Kevin.Coyne@nrc.gov>; M il ler, Chris

    <Ch ris.M ill er@nrc.gov>

    Subject:

    FW: LaSal le SIT Summary (b)(5) Deliberative Privilege Thanks, Mike From: O'B rien, Kenneth Sent: Wednesday, June 07, 2017 5:55 PM To: Coyne, Kevin <Kevin .Coyne@ nrc.gov>; King, Michael <M ichael.King2@nrc.gov>

    Subject:

    FW: LaSal le SIT Summary From: Jeffers, M ark Sent: Wednesday, June 07, 2017 4:23 PM To: O'Brien, Ken neth <Kenneth.O'Brien@nrc.gov>; Shua ibi, Mohammed

    <M oham med .Shuaibi@nrc.gov>

    Cc: Stoedt er, Ka rl a <Karla .Stoedter@nrc.gov>; Benjamin, Ja mie <Jamje.Benjam jn@nrc.gov>

    Subject:

    LaSalle SIT Sum mary Ken ,

    Attached is the revised briefing sheet summarizing our conversation from today . Please Iet me know if you have any questions, comments, or concerns.

    Than k You, Mark Jeffers Branch Chief I RIII DRS EB2 1 x9798

    From: O"Brien. Kenneth To: Pederson. Cynthla; Roberts. Darrell Cc: Shuaibi. Mohammed

    Subject:

    FW: LaSalle SIT Summary Date: Thursday, June 08, 2017 6:54:26 AM Attachments: LaSal!e SIT Briefing Sheet

    • DRAFT C.docx Cindy and Darrell The attached is a summary of our discussion yesterday and the teams assessment.

    Thanks Ken From: Jeffers, Mark Sent: Wednesday, June 07, 2017 4:23 PM To: O'Brien, Kenn eth <Kenneth.O'Brien@nrc.gov>; Shua ibi, Mohammed

    <Moha mmed.Shuaibi@nrc.gov>

    Cc: Stoedter, Karla <Ka rla.Stoedte r@nrc.gov>; Benjamin, Jam ie <Jamie.Benjamin@nrc.gov>

    Subject:

    LaSal le SIT Summary

    Ken, Attached is the revised briefing sheet summarizing our conversation from today. Please Iet me know it you have any questions, comments, or concerns.

    Thank You, Mark Jeffers Branch Chlef I RIII DRS EB2 x9798

    From: Jeffers, Mark To: Benjam i 1amie Oamie Benjamin@nrc govl

    Subject:

    FW: LaSa lle SIT Summary Date: Thu rsday, J une 08, 2017 8:49:00 AM

    Jamie, 1am going in between meetings. 1started answering Bill's questions, but I need to go to a planning meeting and I do not want to get behind on this. 1know you guys are focusing on his questions as well. 1copied what I started drafting aut. 1have my phone and will be checking email regularly throughout my meetings. Could you continue to finalize these questions?

    (b)(5) Deliberati ve Pri vilege

    ~ J{SJ Detiberati,e eo,1,,,

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: O'Brien, Kenneth Sent: Wednesday, June 07, 2017 6:03 PM To: Jeffers, Mark <Mark,Jeffers@nrc.gov>

    Subject:

    Fwd : LaSalle SIT Summary FYI and our discussion From: "King, Michael " < Michael. King2@ nrc .gov>

    Subject:

    FW: LaSalle SIT Summary Date: 07 June 2017 17:55 To: "O'Brien, Kenneth" <Kenneth..O'Brien@nrc.gov>

    FYA..*

    From: Dean, Bi ll Sent: Wednesday, June 07, 2017 6:42 PM To: King, Michael <Mlchael.King2@nrc,gov>; Evans, M lchele <Michele.Evans@nrc.gov>; McDermott, Brian <Bria n.McDermott @nrc.gov>

    Cc: Lubinski, John <John.Lubinski@nrc.gov>; Coyne, Kevin <Kevrn.Coyne@nrc.gov>; M iller, Chris

    <Ch ris.Mi ller@ nrc.gov>

    Subject:

    RE: LaSa lle SIT Summa ry (b)(5) Deliberative Privilege 8/LL From: King, Michael Sent: Wednesday, June 07, 2017 6:22 PM

    To: Dean, Bill < Bill.Dea n @nrc.gov>; Evans, Michele <M ichele. Evans@nrc.gov>; McDermott, Brian

    <Bria o. McDermott@orc.gov>

    Cc: Lubi nski, John <John. Lubinski@nrc.gov>; Coyne, Kevin <Kevin .Coyne@nrc.gov>; M il ler, Chris

    <Ch ris.M iller@nrc.gov>

    Subject:

    FW: LaSal le SIT Summary (b)(5) Deliberative Pri vilege Thanks, Mil<e From: O'Brien, Kenneth Sent: Wednesday, June 07, 2017 5:55 PM To: Coyne, Kevin <Kevin.Coyne@n rc.gov>; King, M ichael <Michael. King2@nrc.gov>

    Subject:

    FW: LaSal le SIT Summary From: Jeffers, Mark Sent: Wednesday, June 07, 2017 4:23 PM To: O'Brien, Kenneth <Ken neth .O' Brien@nrc.gov>; Shuaibi, Mo hammed

    <M ohammed.Sh uaibi@nrc.gov>

    Cc: Stoedt er, Ka rla <Ka rla.St oedter@nrc.gov>; Benjamin, Jami e <Jamie. Benjamin @nrc.gov>

    Subject:

    LaSal le SIT Summary Ken ,

    Attached is the revised briefi ng sheet summarizing our conversation from today. Please Iet me know if you have any questions, comments, or concerns.

    Thank You, Mark Jeffers Branch Chfef I RIII DRS EB2 1X9798

    From: Jeffers, Mark To: Q"Brien Kenneth Cc: Stoedter Karla CKarla.Stoedter@nrc gov}; Beniamin. lamie Oamie,Benjamin@nrc.govl

    Subject:

    RE: LaSalle SIT Summary Date: Thursday, June 08, 2017 1 :50:00 PM Attachments: LaSalle SIT Briefing Sheet

    • DRAFT C docx Response to Ouestions.docx Ken, The "quick" answer to the questions posed by Bill can be found in the attached document.

    will take the action to "cleanup" the two documents into a concise format.

    Thank You, Mark Jeffers Branch Chef I RIII DRS EB2 1x9798 From: O'Brien, Kenneth Sent: Wednesday, June 07, 2017 6:03 PM To: Jeffers, Mark <Mark.Jeffers@nrc.gov>

    Subject:

    Fwd : LaSalle SIT Summary FYI and our discussion From: "King, Michael " <Michae1.King2@nrc.gov>

    Subject:

    FW: LaSalle SIT Summary Date: 07 June 2017 17 :55 To: "O'Brien, Kenneth" <Kenneth.O'Brien@nrc.gov>

    FYA ...

    From: Dea n, Bil l Sent: Wednesday, June 07, 2017 6:42 PM To: King, Michael <M ichaeLKing2@nrc.gov>; Evans, Michele <M ichele.Evans@nrc.gov>; McDermott, Brtan <Brfan.McDermott@nrc gov>

    Cc: Lubinski, John <John.Lubinski@nrc.gov>; Coyne, Kevin <Kevin .Coyne@mc.gov>; M il ler, Chris

    <Chris.Mi ller@n rc.gov>

    Subject:

    RE: LaSa lle SIT Summary

    {b)(5) Deliberative Privilege

    (b)(5) Deliberative Privilege 8/f From: King, Michael Sent: Wednesday, June 07, 2017 6:22 PM To: Dean, Bill < Bill.Dean@nrc.gov>; Evans, Michele <Michele.Evans@nrc.gov>; McDermott, Brian

    <Brian .McDer mott@nrc.gov>

    Cc: Lubi nski, John <John.Lubinsk@nrc. gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>; Mil ler, Chris

    <Ch ris.Mi lfer@orc.gov>

    Subject:

    FW: LaSal le SIT Summary (b)(5) Deliberative Privilege Thanks, Mike From: O'Brien, Kenneth Sent : Wednesday, June 07, 2017 5:55 PM To: Coyne, Kevin <Kevin.Coyne@nrc.gov>; King, M ichael <M ichael.King2@nrc.gov>

    Subject:

    FW: LaSal le SIT Summary From: Jeffers, M ark Sent: Wednesday, June 07, 2017 4:23 PM To: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shuaibi, Mohammed

    <Mohammed.Shuaibi@nrc.gov>

    Cc: Stoedter, Karla <Karla.Stoedter@nrc.gov>; Benjamin, Jam ie <Jamie.Benjamin@nrc.gov>

    Subject:

    LaSal le SIT Summary Ken ,

    Attached is the revised briefing sheet summarizing our conversation from today. Please Iet me know if you have any questions, comments, or concerns.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798

    From: Stoedter Karla To: Pbi11ips Charles; Wojewoda lacouelyn Cc: Hayertape. oshua Subj ect: FW: LaSalle SIT Summary Date: Th ursday, J une 08, 2017 7 :14:26 AM Attachments: LaSal!e SIT Briefing Sheet - DRAFT C docx Here is the current SIT position. Please keep in mind that this is draft, pre-decisional and may change.

    Karla Stoedter, Chief Region 11 1Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Jeffers, Mark Sent: Wednesday, June 07, 2017 4:23 PM To: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shuaibi, Mohammed

    <Moham med .Sh ua ibi@nrc.gov>

    Cc: Stoedter, Karla <Karla.Stoedter@nrc.gov>; Benjamin, Jam ie <Jamie.Benjamin@nrc.gov>

    Subject:

    LaSal le SIT Summary Ken ,

    Attached is the revised briefing sheet summarizing our conversation from today. Please Iet me know if you have any questions, comments, or concerns.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798

    From: O"Brien. Kenneth To: Pederson. Cynthla; O"Brien Kenneth; Shuaibi. Mohammed: Louden Patrick: Lara luilo; Roberts. Darrell

    Subject:

    Re: LaSalle SIT update2 [OUO

    • Pre-Oecisional Inspection/Enforcement Date: Thu rsday,June 08, 201710:32:06 PM Thanks Kenneth G. O'Brien, DiJ*ector Division of Reactor Safety Region III Kenneth.OBrien@NRC.Gov 630-829-9700 On: 08 June 20 17 22:11, 1'Pederson, Cynthia" <Cynthia.Pederson@nrc.gov> wrote:

    I also filled Fred Brown in when he called me.

    From: "McCree, Victor" <Victor.McCree@ nrc.gov>

    Subject:

    Re: LaSalle. SIT update2 [OUO - Pre-Decisional Inspection/Enforcement]

    Date: 08 .Tune 2017 20:00 To: "Clark, Theresa" <Theresa.Clark@nrc.gov>, ".Tohnson, Michael"

    <.Michael..Tohnson@mc.gov>, "Brown, Frederick" <Frederick.Brown@nrc.gov>, "Dean, Bill" <Bill.Dean@nrc.gov>, "Pederson, Cynthia" <Cynth.ia.Pederson@nrc.gov>

    Cc: "Lewis, Robert" <Robert.Lewis@nrc.gov>, "Bowen, Jeremy"

    <Jeremy.Bowen@nrc.gov>

    Thanks Theresa.

    These 3 key messages seem reasonable for tbe discussion with the CAs. l b)(5) Deliberative Privilege

    \

    Vic On: 08 June 2017 17:25, "Clark, Theresa" <Theresa. Clark@nrc.gov> wrote:

    Hot off the presses (may be weirdly formatted from phone). They are very high Ievel, which I think is appropriate at this stage. Let me know if you need rnore. Thanks.

    The LaSalle special inspection team has completed the information gathering phase and is exiting with the licensee (Exelon) 0 11 Frütay 6/9.

    The team has concerns with the licensee' s justification for the operability of the Unit 1 HPCS injection valve, and a potential vioJation related to design control.

    Next steps will be coordinated with Regional management, and Region fll continues to engage with NRR in the LIC-504 process to assess generic impbcations .

    Thanks, Theresa On: 08 June 2017 18: 11, "McCree, Victor <Victor.McCree@mc.gov> wrote:

    Ok, thanks Theresa. 1 look forward to seeing the key messages (before they are shared witl1 the CAs).

    Vic From: Clark, Theresa Sent: Thursday, June 08, 2017 4 :54 PM To: McCree, Victor <Victor.McCree@nrc.gov>; Johnson, Michael <Michael.J ohnson@nrc.gov>;

    Brown, Frederick <Frederick.Brown@nrc.gov>

    Cc: Lewis, Robert <Robert.Lewis@nrc.gov>; Bowen, Jeremy <Jeremy.Bowen@nrc.gov>; Dean, Bill

    <Bi ll. Dean@nrc.gov>

    Subject:

    LaSal le SIT update2 [OUO - Pre-Decisional lnspection/Enforcement]

    Thanks foryour patience whi le I got more info.

    After conversations with Region 111, NRR, Bill, and Fred, there appears to be comfort with the SIT exit tomorrow to convey the ~ concerns regarding the licensee's basis for operability, at the completion of the SIT's information gathering phase. Next steps or generic implications are not expected to be discussed. NRR/Mike are to be briefed on Tuesday while M ike is in Region 11 1.

    As for communications - Region 111 does not have a comm plan ready. They do have the list of operabi lity-evaluation-related concerns t hat they wi ll use to ta lk at the exit, but it is very deta iled. 1 am confirming some key messages with Ken O'Brien and plan to share those with you when re.ady, as well as with the CAs at our routine meeting at 10am tomorrow (same time as exit) .

    Thanks again.

    Theresa Valentine Clark Executive Technica l Assistant (Reactors)

    U.S. Nuclear Regulatory Commission Theresa.Clark@nrc.gov 1 301-415-4048 1 0 -16C33

    From: clark. Theresa To: O"Brien. Kenneth S ubj ect: Re: LaSalle SIT Date : Thursday, J une 08, 2017 2:48:39 PM Ok. Have a couple things to check and will call you within half an hour.

    Thanks.

    From: ciark. Theresa To: O"Brien. Kenneth

    Subject:

    Re: LaSalle SIT Date: Thursday,June 08, 2017 2:29:15 PM I sent an email to Vic (and Mike and Fred) recommending no brief before the exit. Let tne give h im a bit Jonger to confi rm and 1'11 call you before l Jeave.

    Note tbat Mike is not back in office tiJJ Weds through I think Vic is in Monday.

    Either way the earlier we can get some key messages the better.

    Thanks much.

    Theresa On: 08 June 2017 15:23. "O'Brien, Kenneth" <Kenneth.O'Brien@mc.gov> wrote:

    Theresa Just talked with Cindy Pederson, who just chatted with Sili Dean.

    Bill indicated that he was ok with the Region SIT exiting tomorrow with a briefing of Bill and Mike Johnson on Tuesday.

    Do you think we should wait for further dialogue / insights from Vic?

    Thanks Ken

    From: Clark. Theresa To: O"Brien. Kenneth

    Subject:

    Re: messages Date: Thursday, J une 08, 2017 5:27:07 PM I appreciate the quick response. Have a good night.

    On: 08 June 2017 18: 14, "O'Brien, Kenneth" <Keooeth.O'Brien @nrc.gov> wrote:

    Theresa Y ou are correct.

    Thx Ken Kenneth G. O'Brien, Director Division of Reactor Safety Region IIJ Kenneth..OBrien @NRC.Gov 630-829-9700 On: 08 June 2017 16:52, "Clark, Theresa" <Theresa .Clark@nrc .gov> wrote:

    Hi Ken - 1know you don't have a comrn plan ready. Any way l can get key rnessages on what is expected for tomorrow? 1have a routine CA meeting at the same t ime as your exit and wou ld like to give them a heads up. 1t hi nk the key points are:

    • The LaSalle special inspection team has completed the information gathering phase and is ex1ti ng w ith t he licensee (Exelon) on Friday 6/9.
    • The team has concerns with the licensee's justification for the operability of t he Unit 1 HPCS injection valve, and a potential violation relat ed to design control.
    • Next steps w ill be coordinated w ith Regional management, and Region 111 continues to engage with NRR in the LIC-504 process to assess generic implications.

    Thanks aga in.

    Theresa Valentine Clark Executfve Technica l Ass1stant (Reactors)

    U.S. Nuclear Regulatory Commission Theresa.Clark@nrc.gov 1 301-415-4048 0 -16(33

    Benjamin, Jamie From: Thompson, John Sent.: Thursday, June 08, 2017 11:18 AM To: Benjamin, Jamie

    Subject:

    RE: MPR evaluation Jamie, (b)(5) Deliberative Privilege We will mentioned this on the 504 call this afternoon.

    john From: Benjamin, Jamie Sent.: Wednesday, June 07, 2017 4:13 PM To: Thompson, John <John.Thompson@nrc.gov>

    Subject:

    RE: MPR evaluation (b)(5) Defi berative Privilege From : Thompson, John Sent.: Wednesday, June 07, 20171:45 PM To: Benjamin, Jamie <Jamie.Benjamin@nrc.gov>

    Cc: Thomas, Eric <Eric.Thomas@nrc.gov>

    Subject:

    RE: MPR evaluation Jamie, (b)(S) Deliberative Privilege l

    l(b)(5) Deliberative Privilege Thoughts?

    john From: Benjamin, Jamie Se nt: Wednesday, June 07, 20171 :39 PM To: Thompson, John <John .Thompson@nrc.gov>

    Subject:

    RE: MPR evaluation Yes they have. Matter of fact, LaSalle is expecting a letter from Flow Serve today to document what they have already discussed. There is a design issue. Flowserve has reached aut to NRC PM to ask the best way to provide the info (i. e. a new Part 21 or revise the old Part 21 ).

    1'11 share the letter with you when I get a copy.

    Ucensee has fully accepted the MPR evaluation. They have no issues wlth it.

    From: Thompson, John Se nt: Wednesday, June 07, 2017 12:36 PM To: Benjamin, Jamie <Jamie.Benjamin@nrc.gov>

    Subject : MPR evaluation Jamie, (b)(5) Deliberative Privilege 1 have requested DORL set up a conference call to ask this question. 1 want to keep you in the loop on this.

    john 2

    From: farnan Michael To: Benjam i lamie: Rodri1:uez Lionel; Dunlop Andrew; Pblllios Charles

    Subject:

    RE: Possible Exit Tomorrow Date: Thu rsday, J une 08, 2017 2 :02:54 PM Let me know if and when . 1will be traveling tomorrow to my Code meeting and gone ali next week.

    Michael F. Farnan Mechanical Engineer US. Nuclear Regulatory Commission 301-415-1486 From: Benjamin, Jamie Sent: Thursday, June 08, 2017 2:31 PM To: Rodriguez, Lionel <Lionel.Rodriguez@n rc.gov>; Farnan, Michael <Michael.Farnan@nrc.gov>;

    Dun lop, Andrew <Andrew.Dunlop@nrc.gov>; Phill ips, Charles <Cha rles.Phillips@nrc.gov>

    Subject:

    Possible Exit Tomorrow Chuck please do not share this with the licensee, yet.

    Possible exit tomorrow.

    (b)(5) Deliberative Pri vilege RIII senior management final decision on when to exit is coming in the next hour or two.

    Everyone available?

    From: O"Brien. Kenneth To: Pederson. Cynthla; O"Brien Kenneth; Shuaibi. Mohammed: Louden Patrick: Lara luilo; Roberts. Darrell S ubj ect: Re: LaSalle SIT update2 [OUO

    • Pre-Oecisional In spection/Enforcement Date : Thursda y, J une 08, 201710:32:04 PM Thanks KenneLh G. O'Brien, Director Division of Reactor Safery Region Ill Kennet.h.OBiien@NRC.Gov 630~829-9700 On: 08 Jane 2017 22:11, "Pederson, Cynthia" <Cynthia.Pederson@nrc.gov> wrote:

    1 also filled Fred Brown in when he called me.

    From: "McCree, Victor <Victor.M cCree@mc.gov>

    Subject:

    Re , LaSaJJe SIT update2 [OUO - Pre-Decisional lnspection/EnforcementJ Date: 08 June 2017 20:00 To: "Clark, Theresa" <Theresa.Clark@mc.gov>, "Johnson, Michael" <Mjchael.Johnson@nrc.gov>, "Brown, Freclerick <Frederick.Brown@nrc.gov>, Dean, BilJ" <Bill.Dean@nrc.gov>. Pederson, Cynthia"

    <Cynthia.Pederson@mc.gov>

    Cc: "Lewis. Robert" <Robert.Lewis@urc.gov>, Bowen, Jeremy" <leremy.Bowen@nrc.gov>

    Thanks Theresa.

    These 3 kev messages seem reasonable for the discussion with the CAs. l b)(5) Deliberattve Privilege Vic On: 08 Jnne 2017 17:25. "Clark, Theresa" <Tberesa. Clark@nrc.gov> wrote:

    Hot off the presses (may be weü*dly formatted from pho11e). T bey are very high Ievel, whicb I thinkis approp,iate at th'is stage. Let me know if you need more. Thanks.

    The LaSalle special inspection team bas completed the infonnation gat'heringphase and is exiling with the licensee (Exelon) on F1iday 6/9.

    The team has concems with the licensee's justification for the operability of tbe Unit 1 HPCS injection valve, and u potential violat'ion related to design conn*ol.

    Next steps will be coordinated wüh Regional management, aud Region III continues to engage with NRR in the LIC-504 process to assess generc implications.

    Thanks, Theresa On: 08 June2017 18:11. "McCree, Victor" <Vjctor.McCree@nrc.gov> wrote:

    Ok. thanks Theresa. I look forward to seeing the key messages (before tbey are shared with the CAs).

    Vic From: Clark. Theresa Sent: Thursday, June 08, 2017 4:54PM To: McCree, Victor <Victor.McCree@nrc.gov>; Johnson, Michael <Michael.Johnson@nrc,gov>; Brown, Freclerick

    <Frederick.Brown@nrc.gov>

    Cc: Lewis, Robert <Robert.Lewis@nrc.gov>; Bowen, Jeremy <Jeremy.Bowen@nrc.gov>; Dean. Bill

    <fü1l.Dean@nrc.gov>

    Subject:

    LaSalle SIT update2 [OUO - Pre-Decisional Iospection/Enforcement]

    Thanks for your parience while 1 got more info.

    After conversations with Region m. NRR, BilJ, and Fred, there appears to be comfort with the SIT exit tornorrow to convey the team *s concerns regarcling the licensee's basis for operabilily, at the completion of tbe SIT' s information garhering phase. Next steps or generic implications are not expected to be discnssed. NRR/Mike are to be briefed on Tuesday wbile Mike is in Region III.

    As for communicalions-Region III does not have a comm plan ready. They do have the Iist of operability-evaluation-related concems that they will use to talk at füe exit, but it is very detailed. f am confirming some key messages witb Ken O'Brien and plan to sbare those with you wben ready, as well as witb tbe CAs ai our rouline meeting at I Oam tomorrow (sarne time as exit).

    Thanks again.

    Theresa Valentine Clark Executive TechnicaJ Assistanl (Reactors)

    U.S. Nuclear Regulatury Commission Theresa.Clark@nrc.gov<majho:Theresa.C}ark@nrc.gov> 1301-415-4048 10 -16C33

    From : Rodriguez. Lienei To: Benjam i 1amie Cc: Dynlop. Andrew: Farnan. Mich ae: Philips. Charles

    Subject:

    Valve Cycle Assessment.doc)(

    Date: Thursday, J une 08, 2017 4:26:50 PM Attachments: Va lve Cycle Assessment.docx Hello Jamie, Th is is the more detailed assessment on the valve cycles, in case you needed more detail.

    Let me know if you need anything else on this particular topic.

    Uonel Rodriguez NRC/RIII/DRS/EB2 630-829-9609

    From: Ben jami lamie To: Q"Brien Kenneth

    Subject:

    FW: Columbia Anchor/Darling Update 6/9/17 Date: Friday, J une 09, 2017 2 :59:52 PM Attachments: Externa l Sender HPCS-V-12.msg External Sender HPCS-V-15 discovey. msg From: Haire, Mark Sent: Friday, June 09, 2017 11:53 AM To: Benjami n, Jam ie <Jamie.Benjamin@n rc.gov>; Kolcum, Gregory <G regory.Kolcum@nrc.gov>;

    Brandt, Lindsay <Lin dsay.Brandt@nrc.gov>; Alexander, Ryan <Ryan .Alexander@nrc.gov>; Farnan, Michael <Michael.Fa rnan@nrc.gov>

    Cc: Jeffers, Ma rk <Mark.Jeffers@nrc.gov>; Stoedter, Ka rla <Karla.Stoedter@ nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Dunlop, And rew <Andrew.Dun lop@nrc.gov>; Philli ps, Cha rles

    <Cha rl es.Phi ll ips@nrc.gov>; Stott, Chad <Chad.Stott@nrc.gov>; Speer, Chris <Chris.Speer @nrc.gov>

    Subject:

    Colu mbia Anchor/Darling Update 6/9/17 Latest info on Columbia's A/0 valves V-12 and V15 attached.

    Mark 5. Haire Chief, Reactor Projects Bronch A Nucleor Regulatory Commission, Region-lV 817-200-1148 office (b)(6) fe/i From: Haire, Mark Sent: Wednesday, June 07, 2017 10:28 AM To: Benjami n, Jam ie <Jamie.Benjamin@nrc.gov>; Kolcum, Gregory <Gregory.Ko!cum@nrc.gov>;

    Brandt, Lindsay <Lindsay.Brandt@nrc.gov>; Alexander, Ryan <Ryan.Alexander@nrc.gov>; Farnan, Michael <M ichael.Farnan@nrc.goy>

    Cc: Jeffers, Ma rk <Mark,Jeffers@nrc.gov>; Stoedter, Ka rl a <Kar!a.Stoedter@nrc.gov>; Rod riguez, Lionel <Uonel.Rodriguez@nrc.gov>; Dunlop, And rew <Andrew,Dunlop@nrc.g:ov>; Phil lips, Charles

    <Charles.Phi ll ips@nrc.gov>; Stott, Chad <Chad .Stott@nrc.gov>; Speer, Ch ris <Chris.Speer@n rc.gov>

    Subject:

    RE: LaSa lle SIT call? Big favor request.

    FYI, this is the latest info we have on the Columbia valves:

    HPCS-V-12 and V-15 passed diagnostic testing. On disassembly, HPCS-V-12 showed some very slight collar separation and some slight wear on the wedge pin. We have no new info on HPCS-V-15, but expect to know more today or tomorrow.

    We understand you are contacting the CGS valve expert today to get more insight. We stand by to support in any way we can.

    As of Friday, 6/2/17, this is what we knew and shared (and is stili valid, except that work on V-12 and V-15 was delayed):

    lnformation on the condition of the first of 3 Anchor~Darling (A-0) valves in the CGS

    HPCS system only developed in the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Here is a thumbnail bullets of what the CGS Residents currently know about HPCS-V-4 (HPCS injection valve):

    1. HPCS valve (V-4) traces consistent over life of valve (no anomalous traces)
    2. No stem rotation observed prior to auto start of HPCS on 5/25/2017
    a. On 5/25, due to an apparent l&C error during a maintenance activity, HPCS auto-started
    3. Diagnostic after auto start on 5/25/17 and prior to disassembly 6/ 1/2017 showed > 10 degrees rotation and open stroke failed trace
    a. The BWROG acceptance criteria for stem rotation is <I= 5 degrees rotation
    4. Stem was connected to upper wedge with minor displacement from full insertion (threaded)
    5. Stem rotated freely by hand
    6. Wedge pin sheared but sti ll in the wedge
    7. No FME in valve body
    8. Collar minor displacement from stem (mils)
    a. This is different than LaSalle who saw significant collar displacement
    9. Actuator tripped on thermals after auto start on 5/25/2017
    10. Magnesium rotor inspection - satisfactory
    11. Gear actuator possible gear damage awaiting inspection
    12. Traces, photos, video, and corrective actions for repair underway (same for V-12, and V-15)
    a. V-12 is the HPCS min-flow valve and V-15 is the HPCS suction transfer valve
    b. Work on V-12 and V-15 disassembly and inspection over this weekend .

    More to come as the CGS Residents get additional information as the licensee inspections continue. Of note - Greg and Lindsay have and continue do a great job following this , and other ongoing outage issues.

    Ryan D. Alexander Senior Project Engineer NRC Region IV, Div. of Reactor Projects Branch A (CPNPP, CGS, & DCPP} & "AII Things JLD" Regional POC 1600 E. Lamar Blvd, Arlington, TX 76011 Office: (817) 200-1195

    ell. l(b)(6) 1

    Mark 5. Haire Chief Reactor Projects Branch A Nuclear Regufatory Commission, Region-JV 817-200-1148 office l(b)(6) ~

    From: Benjamin, Jamie Sent: Wednesday, June 07, 2017 10:17 AM To: Kolcum, Gregory <Gregory.Kolcum@nrc.gov>; Brandt, Lindsay <Lindsay.Brandt@nrc.gov>; Haire, Mark <Mark. Haire@nrc.gov>; Alexander, Ryan <Ryan.Alexander@nrc.gov>; Farnan, Michael

    <Mkha e1.Farna o@orc.gov>

    Cc: Jeffers, Ma rk <Mark.Jeffers@nrc.gov>; Stoedter, Ka rla <Karla .Stoedter@nrc.gov>; Rodriguez, Lienei <Lionel.Rodriguez@nrc.goy>; Dunlop, Andrew <Andrew.Dunlop@nrc.gov>; Phi llips, Charles

    <Charles.Phi ll ips@nrc.gov>

    Subject:

    RE: LaSa lle SIT call? Big favor request.

    Thanks Greg. We reached out to Columbia and they said .Bill :;ould support a call at 11 centra! time. So we will just call him directly.

    Mike if you are available we will three way you in.

    Jamie From: Kolcum, Gregory Sent: Wednesday, June 07, 2017 10:05 AM To: Benjamin, Jam ie <Jamie,Benjamin@nrc.gov>; Brandt, Lindsay <Lindsay,Brandt@nrc.goy>; Ha ire, Mark <Mark.Haire@nrc.gov>; Alexander, Ryan <Ryan.Alexander@nrc.gov>

    Cc: Jeffers, Ma rk <Mark.Jeffers@nrc.gov>; Stoedter, Ka rla <Karla.Stoedt er@nrc.gov>

    Subject:

    RE: LaSa lle SIT call? Big favor request.

    Ryan Alexander or I can answer your questions.

    Below contact info available.

    Columbia (Energy Northwest) MOV Engineer Bill Traooet\

    Ph: 509<F7-8284 ell : ....

    l<b_ J<6_

    J _ _ __,,

    From: Benjamin, Jamie Sent: Tuesday, Jun e 06, 2017 3:44 PM To: Kolcum, Gregory <Gregory.Kolcum@nrc.gov>; Brandt, Lindsay <Lindsay.Brandt@nrc.gov>;

    Groom, Jeremy <Jeremv.Groom@nrc.gov>; Alexa nd er, Rya n <Ryan.Alexander@nrc.gov>

    Cc: Jeffers, Mark <Mark.Jeffers@ nrc.gov>; Stoedt er, Karla <Karla.Stoedter@nrc.gov>

    Subject:

    LaSalle SIT ca ll? Big favor request.

    Hi Greg, the LaSalle SIT looking at the Flowserve Part 21 issue and LaSalle Unit 2 HPCS injection valve failure needs some first-hand information. 1understand that you all are extremely busy with the outage. 1 used to be the Senior Resident lnspector at Braidwood so I can related.

    Would you be available to help our team get some information regarding the recent HPCS injection valve pin failure at your site? ldeally, we want to talk with an MOV expert at the site regarding to get some data and talk about what the parts looked like.

    Greatly appreciate any assistance that you and the Branch can help us with . We can share with vou anv auestions that vou mav have with the LaSalle Oo Ex first hand. 1 (b)(5) Deliberative Pri vilege

    \

    V/R, Jamie Benjamin - LaSalle SIT Lead

    From: Stone AnnMarie To: Pedersoo Cynthla Cc: Chyu. Doris; Mitlyng. Viktoria; Chandrathil. Prema; Stoedter. Karla; e ffers Mark; O"Brien. Kenneth; ~

    Mohammed; Lara. u lio; Louden. Patrick; Roberts Darrell

    Subject:

    RE: Da ily Note for Lasa lle Date: Friday, June 09, 20171 1:04:45 AM yes From: Pederson, Cynthia Sent: Friday, June 09, 2017 11:00 AM To: Stone, AnnMarie <AnnMarie.Stone@nrc.gov>

    Cc: Chyu, Doris <Doris.Chyu@nrc.gov>; Mitlyng, Viktoria <Viktoria.MitJyng@nrc.gov>; Cha ndrathil, Prema <Prema.Chandrathi l@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>; Jeffers, Mark

    <Mark.Jeffers@nrc.gov>; O'Brlen, Kenneth <Kenneth.O'Brien@nrc.gov>; Shuaibl, Mohammed

    <Mohammed.Shuaibi@ nrc.gov>; La ra, Jul io <Julio.Lara@nrc.gov>; Louden, Patrick

    <Patrick.Louden@nrc.gov>; Roberts, Darrell <Darrell.Roberts@nrc.gov>

    Subject:

    RE: Dai ly Note for LaSal le 1suggest re-characterizing "several concerns with "significant concerns". Thanks. Will this be in today"s publication ?

    From: Stone, AnnMarie Sent: Friday, June 09, 2017 10:47 AM To: Pederson, Cynthia <Cynthia .Pederson@nrc.gov>

    Cc: Chyu, Doris <Dorfs.Chyu@ nrc.gov>; M it lyng, Viktoria <Viktoria.M it lyng@nrc.gov>; Chandrathil, Prema <Prema.Cha ndrathi l@nrc.gov>; Stoedter, Ka rl a <Ka r! a.St oedter@nrc.gov>; Jeffers, Mark

    <Ma rk.Jeffers@nrc.gov>

    Subject:

    Daily Note for LaSalle lmportance: High

    Cindy, Please Iet me know if you would like any changes to the proposed bullet:

    On June 9, 2017, Region 111 conducted an exit meeting for the Special lnspection at the LaSalle County Nuclear Generating Station. The Special lnspection was initiated on April 24th in response to a Unit 2 High Pressure Core Spray injection valve stem-to-disc separation and the potential generic applicability of the failure mode. The team exited with one Apparent Violation concerning Design Control involving an inadequate 1990 weak link analysis. ln addition, the team identified several concerns with respect to the licensee's operability evaluation of the Unit 1 injection valve and exited with an unresolved item pending further internai discussions of potential regulatory actions.

    Thanks!

    Ann Marle

    From : Benjam i lamie To: teffers Mark Cc: Rodrjguez. Lionel; Farnan. Michael: Phillips. Charles; Qunlop. Andrew

    Subject:

    inoperability position paper Date: Friday, June 09, 2017 2:59:57 PM

    . . . (b)(5) Deliberative Attachments: LaSalle rnt 1 HPCS In ect1on Valve Privile e Attached. 1understand we are under a time crunch . lf this doesn't meet your needs, please Iet me know and I will work it this weekend.

    LaSalle SIT Anchor Darling Double Disc Gate Valve Part 21 Position Paper SIT Assessment Summary:

    (b)(5) Deliberative Privilege The most ike y ailure mechanism 1s

    ~u==r=,"""""~n"""'~n=""""~=~,c~-~~y.,..,,=s==~~gree of confidence. Based upon the team's detailed review of the valve design, operational history, and operating experience failure could happen on the next valve stroke, next several valve strokes.

    Special lnspection Team's ldentified lnadeguacies for Unit 1 HPCS Operability

    1. Valve has been cycled numerous times since it was replaced in 1987 at closed thrust stem conditions that would have expected to have relaxed any existing pre-torque , broken the wedge pin, plastically deformed the wedge threads and loosening the stem to wedge joint from axial Ioading, and deformed/damaged/broken wedge threads from torsional rotation.

    There is no substantial difference in the failed Unit 2 HPCS operating and stem loading history compared to the in-service Unit 1 HPCS injection valve. (Attachment 1 - detailed information that supports this assessment)

    2. Historic MOV traces have been proven to be unreliable in detecting stem to wedge thread degradation based upon the team's review of the Unit 2 HPCS injection valve traces.

    (Attachment 2 - detailed information that supports this assessment)

    3. MOV stem rotation checks have been proven to be an unreliable method in detecting stem to wedge thread degradation. This assessment was based upon the team's review of the Unit 2 HPCS injection valve stem diagnostics, method inaccuracy, method being performed in only one direction for just of the beginning of the stroke, lack of historical information, and based upon the licensee's MPR failu re analysis report that concludes degradation could have been occurring with minimum rotation (i.e. less than 5 degrees). {Attachment 3 -

    detailed information that supports this assessment) 4 . lndustry Operating Experience (specifically LaSalle Unit 2 HPC injection valve, Columbia HPCS injection valve, Duke small valves) confirms that for high thrust applications a broken pin and wedge thread degradation including failure can be expected. (Attachment 4 -

    detailed information that supports this assessment)

    (b)(5) Deliberative Privilege l(bXS) DeliberaU,e PtiWlege

    . Unit 1 HPCS injection valve number of cycles and cycle loading compared to Unit 2 HPCS injection valve

    1. of cycles roughly of the same The information available on the number of valve stroke cycles is readily available only for the last nine refueling outages for each unit. The number of valve cycles for nine outages for U1 is 93 cycles, and the average is 10.333 cycles per outage. Extrapolating this information to account for five additional refueling outages (assumed outages since new valve stem installation in 1987) the total number of cycles would increase to 145 cycles. This total number of cycles does not account for one known thermal cycle (actual system demand). It it is assumed that the thermal cycle only cycled the valve once, the total cycles for U1 would increase to 146 cycles. This number does not include cycles during a long outage between 1998 and 1999 for which no information is available.

    A similar assessment is performed for the U2 valve. The number of valve cycles for nine outages for U2 is 86 cycles, and the average cycles per outage is 9.555. Extrapolating this information to account for six additional refueling outages (assumed outages since U2 startup) the total number of cycles would increase to 143 cycles. This total number of cycles does not account for two known thermal cycles. lf it is assumed that a thermal cycle only cycled the valve once. the total cycles for U2 would increase to 145 cycles. This number does not include cycles during a long outage between 1998 and 1999 for which limited information is available.

    Therefore, based on known operational cycles, and extrapolating the data for the unknown history of the valves , it can be assumed that the U1 valve has cycled 1 more time than the U2 valve during operation of the units. However, since U2 was subjected to pre-operational testing ,

    U2 could have more cycles than U1 . The licensee, through anecdotal data, assumes the U2 valve was cycled about 40-50 times during pre-operational testing . Using the lower end of the anecdotal data, the U2 valve may have had 39 additional cycles compared to the U1 valve.

    A similar assessment was performed by the licensee, and they concluded the U2 valve could have as much as 51 additional cycles compared to the U1 valve. T he differences come from manipulation of the data used to develop the averages, and the number of cycles extrapolated for outages for which there is no available information.

    It is important to note that the number of valve cycles during an outage could vary from 1-20 cycles. Therefore, the uncertainty of the average can be significant with only nine data points to compare the average to. Applying a rough uncertainty, the tinat number of total cycles could be off by 7-1 O valve cycles. Using this information, in addition to the fact that only anecdotal data exists for the pre-operational cycles of the U2 valve, the team does not believe that there is a significant difference in the number of cycles between the U1 and the U2 valves.

    To summarize. the difference in valve cycles between U1 (si nce 1987) and U2 (since unit startup in about 1984) is not sig nificant, or within the margln of error. The only significant difference in valve cycles between the units can be attributed to pre-operational testing . Since only anecdotal data exists for pre-operational testing , there is no certainty associated with how man additional c cles the U2 valve had over the U 1 valve. (b)(5) Deliberative Privilege (b)(5) Deliberative Pri vilege

    l(b)(5) Deliberative Privilege Stem thrust in closed direction roughly the same for life of plant Both the Unit 1 and Unit 2 HPCS injection valves had roughly the same open and closed torque and thrust loadings over the life of the plant. This was not a surprise since the valves have an identical design and perform the same safety function. Most significantly was that the close thrust loadings had routinely exceeded over 200 kips which had been determine sufficient to slide the collar up and axial deform the wedge threads loosening the joint. Once the joint loosens, subsequent strokes result in torsional loading and additional wedge thread damage. A detailed discussion from the licensee's MPR failure analysis is provided below and demonstrates that routinely exceeding over 200 kips closed stem thrust will lead to valve failure.

    From the MPR report.

    The lab results indicate that the wedge pin failed in torsional shear during closing and that the failure occurred early in the valve's service life.

    As mentioned above, the wedge pin is installed after the stem is threaded into the upper wedge and preloaded. As such, the stem threads would be in tension such that the pin would react in a direction to prevent unthreading. During a closing stroke, the stem axial thrust would be reacted by the collar, while the torque is reacted by a combination of friction under the collar and friction in the threads. The pin also contributes to the torque reaction if no clearances exist. lf the axial loads exceed the collar slip capacity, then the preload is lost and some of the axial load is transferred to the pin. Without a collar preload, during each subsequent opening and closing stroke, the torque is reacted by the pin and any friction in the threads, while during each closing stroke, the axial load is carried by the pin and collar until movement through the thread clearances is achieved.

    During the period when the collar and pin are moving through the thread clearances, they share the reaction to the full axial load applied by the stem. For a 0.5 inch diameter pin made from A306-60 carbon steel (Reference 3), the pin double shear capacity at 0.6 times the ultimate strength is 17 kips (=0.6 times 72 ksi times twice the pin cross-sectional area) based on a maximum specified tensile strength of 72 ksi (Reference 18). The pin material's ultimate strength is estimated to be about 125 ksi based on the average of the as-found hardness reported in the lab report. Using this estimated ultimate strength, the double shear capacity increases to 29 kips. Combining this with the maximum estimated collar resistance of 130 kipsv the total axial capacity is approximately 160 kips, which is still well below the 200+ kip axial loads normally applied. As such, the combined collar and pin axial capacity is not sufficient to prevent further collar axial slip and movement through the thread clearances . ln the process, the movement through the clearance may or may not result in any plastic deformation of the pin.

    With collar movement allowing axial motion through the thread clearances, further closing axial loads are reacted by the collar, pin and threads; however, the collar reaction may not occur if the stem experienced any unthreading during prior opening stroke(s). Similarly, the closing torque loads are reacted by collar friction, thread friction , and the wedge pin; however the collar friction may not exist if there was unthreading or collar movement. It is noteci that during the closing stroke, the contribution of the friction is directly related to the axial foad, which is increasing as the torque is increasing, and these loads ramp up quickly as the valve closes

    against the seats. ln this dynamic reaction with varying friction conditions , the distribution of the torsional load between the pin and the frictional forces can be indeterminate.

    For the nominal 2.25 inch stem diameter at the threads (Reference 3), the pin shear capacities above convert to torsional capacities ranging from 1550 ft-lbs (for minimum specification required ultimate strength) to 2760 ft-lbs (for estimated ultimate strength based on hardness testing) . For torque loads typically above 4000 ft-lbs (as shown in Attachment B), the potential to exceed the pin torsional capacity existed without sufficient thread friction developed. Based on the lab results, the pin failure mode is consistent with these loads.

    Per Reference 14, the wedge pin margin was calculated for valve 2E22-F004 to be -1 .7%

    (negative 1.7%) using the 2015 as-found measured closing thrust and torque of 220,390 lbf and 4,516.6 ft-lbf because these closing loads resulted in the minimum pin failure margin. The applied closing torque was assumed to be shared by the stem-to-wedge threads and the pin only.

    A stem-to-wedge thread COF of 0.117 (based on test data) and a pin material ultimate strength of 67.5 ksi were used. However, the calculated margin cannot be relied upon due to previous degradation of the wedge pin (e.g., reduction in pin cross-sectional area) caused by the previous loads, including the undocumented loads experienced by valve 2E22-F004.

    (Historic MOV traces have been proven to be unreliable in detecting stem to wedge thread degradation based upon the team's review of the Unit 2 HPCS injection valve traces.)

    Kalsi Engineering was contracted to review the 2015 Unit 2 HPCS injection valve open trace anomaly to determine if a third party would have reached a similar conclusion that the licensee did. Specifically, the anomalies was not indicative of stem to wedge valve degradation and explainable by another mechanism. Kalsi determined that it was appropriate to dispositioned the unlock stem nut anomalies during stem decompression as not an issue related to the part

    21. The licensee later provided this letter to the SIT to support their position that a performance deficiency did not exist based upon the licensee's review of historic Unit 2 HPCS injection valve historic traces.

    The licensee then changed their opinion part way through the inspection following the team's assessment that the 2015 Unit 2 HPCS injection valve trace (or older traces) did not detect stem to wedge degradation and therefore valve failure could not be foreseen from testing indicators.

    Kalsi Engineering was contracted again to provide an assessment if the 2015 anomalies was indicative to stem to wedge threaded connection degradation and, this time , reached a different conclusion based upon the same information.

    The team's MOV experts reviewed the data and spoke with Kalsi Engineering and MPR directly several times . The team's conclusion is that there is no evidence, and no adequate explanation that explained how the licensee could reach the conclusion that "pre-hammer blow" data could detect a degraded stem to wedge threaded connection since torque and or thrust is not yet applied to the stem (i.e. worm gear and drive sleeve are not yet connected.) Additionally, the team did not identify any other anomalies in the historic Unit 2 HPCS injection traces that could be correlated to stem to wedge degradation. The team did challenge two Unit 1 HPCS injection valve traces that may be indicative of stem degradation but much like the Unit 2 traces, we just don't know based upon a lack of operating experience.

    ,. (MOV stem rotation checks have been proven to be an unreliable method in detecting stem to wedge thread degradation.)

    The licensee Unit 2 HPCS injection valve stem rotation demonstrates acceptable results . At the time, the acceptance criteria was less than 5-10 degrees of rotation . The Unit 2 HPCS injection valve stem rotational results all met this acceptance criteria . The method is not accurate as described below under the best field circumstances.

    Stem Rotation Accuracy 2.375" - Compass Diameter (Q 25-0) 2.25 - 1(2)E22-F004 HPCS lnjection Valves 1.5" -1E51-F013 RCIC lnjection Valve 1 .375" -1(2)E22-F012 HPCS M in. Flow Va lves

    .21

    ~.21

    1.1875"

    ~ .21" 1.125" 270°

    ~ .21" 0.75"

    • ~ .21"

    .6875" Valve Compass 1(2)E22-F004 1E51-F013 1(2)E22-F012 Diameter (in) 2.375 2.25 1.5 1.375 Stem Deflection Stem Rotation Degrees ( 0 )

    Length (in) 0.025 1 1 2 2 0.05 2 3 4 4 0.075 4 4 6 6

    0.1 5 5 8 8 0.125 6 6 10 10 0.15 0.175 0.2 0.225 0.25 0.275 0.3 0.325 0.35 0.375 0.4 0.425 0.45 0.475 0.5 The information above demonstrates that for a given stem deflection length, the degrees of rotation are dependent on the stem diameter. The smaller the stem, the more degrees of rotation for a given stem deflection length. The diagram also shows the degrees of stem rotation for a given deflection (.21 ") representing 10° on the Compass diameter.

    The table below provides the stem deflection length required to be measured in order to detect the given degrees of stem rotation . Note that for all stems a deflection length of 1/16"-1/8" would need to be measured to detect 5° of stem rotation.

    The licensee explained to the team that they marked the stem and aligned an RWP trip ticket against the stem prior to valve stroke. During the initial part of the valve stroke, the individual performing the test would eyeball any stem rotation and mark it on the trip ticket. The trip ticket and associated two dots would then been compared on a fixed degree wheel to obtain stem rotation degrees. The degree wheel used did not account for different size stems and therefore there measurement was done wrong. The stem rotation check was performed in only one direction based upon the as-found position of the valve and only for the initial part of the stroke.

    Additionally, the stem rotation checks have only started recently and are not performed every time the valve is cycled.

    The licensee's MPR fa ilure ana lysis report determined that even minimal rotational movement per stroke (e.g., less than 5 degrees) can increase thread wear and degradation.

    (lndustry Operating Experience (specifically LaSalle Unit 2 HPC injection valve, Columbia HPCS injection valve, Du ke) confirms that for high thrust applications a broken pin and wedge thread degradation including fa ilure can be expected.)

    There is no discernable difference between the Unit 2 HPCS injection valve that failed and the Unit 2 HPCS injection valve currently in service regarding valve design, operational history, and torque and thrust loadings. The licensee's failure analysis determined a logical and reasonable explanation for why the Unit 2 valve had failed. Using this operating experience, it is nota matter of "if' but rather, "when the Unit 2 HPCS injection valve will fail inservice.

    Columbia's HPCS injection valve wedge pin had failed. The licensee informed the team that the wedge threads had not been evaluated for degradation. The stem threads look good. The Columbia licensee estimated that valve had cycles approximately 200 times since installation which was the same rough estimate for the LaSalle HPCS valves. The Columbia licensee informed the team that he bel ieved the wedge pin had broken a long time ago and identified that the pressfit collar had been pushed up (confirming the design issue for high closed thrust applications). Based upon information from the LaSalle licensee and Columbia licensee, the closed thrust operational conditions was somewhat lower (170-200 kips) as compared to LaSalle 200-230 kips which would explain the difference in the stem to wedge threaded connection.

    The 22 + duke valves reviewed as part of the Op Ex did not have any broken pins but did have the press fit collar pushed up. These valves were much smaller 6 inches or smaller as comparted to the 12 inch HPCS injection valves. Based upon the team's review, stem to wedge threaded connection would not have been expected to be degraded or degraded substantially.

    (t'.l)(cr) flelr13eratlv.e Privilege:

    From: Wilkins Lynnea To: Benney Bnan: Helton Shana; Gavrias Mirela: oesterle. Eric; Hickey. fames; AUey David* Farnan Michael:

    Thompson. oh n; Miller Chris; King. Michael; Weerakkody, Suni!; Giitter. oseph ; Bowen. eremy ; effers. Mark; Stoedter. Karla; O"Brien Kenneth: Casto. Greg; Circle eff; Benjamin amie: Leech Matthew; Shuaibi Mohammed; Lara. tulio: McGintv. nm: Krohn. Paul: Burke. l obo: Kavanagh. Kerri: Herrity. Jhomas: Rodriguez.

    1.iQofil; corujo-Sandin torge; Louden Patrjck: Kozak Laura: Ng. Ching: MilJer Ed; Lubjnski tobo: Hsueh. Keyin:

    Stuchell Sheldon; a rmoe Alex: Bowmah regory: Lund. Louise; Chernoff Harald; Scarbrough Thomas:

    Gascot Lozada. Ramon: Purn ell. Blake: Clark. Theresa; Coyne. Kevin; Vaidya. Bhalchandra; Wrona. David; Whitman. tennifer: Jilton. caroline: Mcintyre. Dayid: BurnelL Scott: Morey. Dennis; Martjnez Nancy

    Subject:

    RE: LaSalle 504 internai follow up Date: Friday, June 09, 2017 2:47:24 PM

    • typo, moved to the 14th *

    Original Appointment-----

    From: Wi lkins, Lynnea Sent: Friday, June 09, 2017 3:46 PM To : Benney, Brian; Helton, Shana; Gavrilas, Mirela; Oesterle, Eric; Hickey, James; Alley, David; Farnan, Michael; Thompson, John; Miller, Chris; King, Michael; Weerakkody, Sunil; Gi itter, Joseph; Bowen, Jeremy; Jeffers, Mark; Stoedter, Karla; O'Brien, Kenneth; Casto, Greg; Circle, Jeff; Benjamin, Jamie; Leech, Matthew; Shua ibi, Mohammed; Lara, Julio; McGinty, Tim; Krohn, Paul; Burke, John; Kavanagh, Kerri; Herrity, Thomas; Rodriguez, Lienei; Corujo-Sandin, Jorge; Louden, Patrick; Kazak, Laura; Ng, Ching; Miller, Ed; Lubinski, John; Hsueh, Kevin; Stuchell, Sheldon; Garmoe, Alex; Bowman, Gregory; Lund, Louise; Chernoff, Harold; Scarb rough, Thomas; Gascot Lozada, Ramon; Purnell, Blake; Clark, Theresa; Coyne, Kevin; Vaidya, Bhalchandra; Wrona, David; Whitman, Jennifer; Tilton, Caroline; Mclntyre, David; Burnel l, Scott; Morey, Dennis; Martinez, Nancy

    Subject:

    Canceled: LaSal le 504 internai fol low up When : Thursday, June 15, 2017 9 :00 AM-10:00 AM (UTC-05:00) Eastern Time (US & Canada) .

    Where: HQ-OWFN-12B04-25P lmportance: High

    • moved to the 13th, see scheduler trom Brian
    • Prevjous Agenda is attached for reference, but will be updated.

    866-659-541 L Participant oasscode:....<b_ l<6_l _ __,

    << File: Agenda_June 1_ 2017.docx >>

    From: Heck lared To: Shualbi Mohammed

    Subject:

    RE: OGC INVOVLEMENT IN LASALLE Date: Friday, J une 09, 2017 12:57:25 PM Yes, Sar~~~l.l,(..ll~=~-~"'-"1~..:..io.~.:.:.:.~~l,l,,;,l;l...:aa~n:..:.:d:...:o"-lu a~tl1.in

    . 1.~e~d:..:tal.l h~e..:ab~a~s~

    i c:...:l~el;l,:a

    ~I-__,

    uestion.

    b)(5) Deliberativ e Priv ile e (b)(5) Deliberative Privilege 1explained to her that the RA, Director of NRR, and DEDO will meet next week to go over the technical info and determine a path forward. 1said t would update her after that. No work has begun in OGC at this point.

    Jared From : Shua ibi, Mohammed Sent: Friday, June 09, 2017 11:17 AM To: Heck, Jared <Jared.Heck@nrc.gov>

    Subject : OGC INVOVLEMENT IN LASALLE Jared, 1understand from Cindy that you're going to be reaching out to OGC to engage them on the outcome of the LaSalle SIT and facilitate support on a path forward . ln conversations with Mark, he did share with me that an attorney by the name of Sara is working with him .. .. 1assume its Sara Kirkwood. Maybe you can start there and see if in fact she's the one that been engaged and how much is happening on her end on this item.

    Thanks, Mohammed

    From: Mjller Chrjs To: Clark. leff: Franke Mark; Gody Jony: King Mjchael; Lantz Ryan: Lara lulio; Lorson Raymond; WJ.l!en.

    Patric: Miller. Chris; Miller Mark; Munday. oel; O"Brien Kenneth: Pelton David: Pruett. Troy: Scott Michael:

    Shuaibi Mohammed; Vegel. Anton : Yerokun. i mi Subj ect: FW: Presentation on AD OD valves Date: Friday, J une 09, 2017 11 :48:23 AM Attachments: Spring 201 z Counterparts Region rv.ootx Per the request on the call today.

    chris From: Pa nn ier, Stephen Sent: Friday, June 09, 2017 12:46 PM To: Miller1 Chris <Chris .M iller@nrc.gov>

    Cc: Chernoff, Harald <Harold .Chernoff@ nrc.gov>; King, M ichael <Michael.King2@nrc.gov>

    Subject:

    RE: Presentation on AD OD va lves Hf Chris, Thank you for the positive feedback. Attached is a copy of the presentation I used in Region IV. My presentation was in the DRS track.

    Steve

    From: Benjam i lamie To: Pederson Cynthla; Roberts. Darrell; O"Brien. Kenneth; Shuaibi Mohammed: Louden. Patrick: Lara tullo; .wflli..

    Mark: Stoedter, Karla; Ruiz, Robert; Chandrathil Prema; Mitlyng, Viktoria; Loga ras, Harral; Rodriguez, Lienei:

    Farnan. Mithael: Phillips, Charles: Dunlop Andrew; Corujo-Sandin. orge ; Skokowski Richard; Kazak Laura

    Subject:

    RE: Summary of LaSalle SIT Exit Meetlng Date: Friday, June 09, 2017 2:59:46 PM Attachments: SJJmm.a.r:y_o_U.aS_a_e_SU_exi.t..d.o_cx, Typo corrected in last sentence, and highlighted.

    From: Benjamin, Jamie Sent: Ftiday, June 09, 20L7 11:48 AM To: Pederson, Cynthia <Cynthia.Pederson@nrc.gov>; Roberts, DarreJl <Da1Tell.Roberts@nrc.gov>; O'Biien, Kennelh <Kenneth.O'Brien@nrc.gov>; Sbuaibl, Mohammed <Mohamrned.Shuaibi@m*c.gov>; Louden, Patrick

    <Patrick.Louden@nrc.gov>; Lara, JuLio (Julio.Lara@nrc.gov) <Julio.Lara@nrc.gov>; Jeffers, Mark

    <Mark.Jeffers@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>; Ruiz, Robert <Robert.Ruiz@nrc.gov>;

    Chandrathil, Prema <Prerm1.Cha11drathil@11rc.gov>; Mitlyng, Viktoria <Viktoria.Mitlyng@nrc.gov>; Logaras, Han*al <Harra1.Logaras@nrc.gov>; Rodriguez, Lionel <LioneLRodriguez@nrc.gov>; Farnan, Michael

    <Michael.Farnan@ntc.gov>; Phillips, Cbarles <Charles.Phillips@nrc.gov>; Dunlop, Andrew

    <Andrew.Dunlop@nre.gov>; Corujo-Sandin, Jorge <lorge.Corujo-Sandin@nrc.gov>; Skokowski, Richard

    <Ricbard.Skokowski@nrc.gov>; Kozak, Law*a <Law*a.Kozak@nrc.gov>

    Subject:

    Sumrnary ofLaSalle SIT Exit Meeting Attached.

    V/R, Jarnie

    l=rom: ~

    To: Bs:nni;v Bnon* t,vcih<> Mlrk Qc:c;ti;r!c 1*nc* tJdtun Shnnu* JLc-kn Jnrne:~* ~ f'.amon M1~b,,s1; 1tmmn"n, Tohn* ~ Kinv Mu:hae-1; ~

    fuu!I!; 1iue:r Jost:uh; Bowen Js;:remy* ~ Stucdu.*r .Karl:a; O"Bfo:n K<!tutcth* Cshto G1~**: Cirl.t,; J;;,tT.* 8\.*niamin Junue.i ! t*.:d1 \.ttth s;;w

    • Stu.raibj Muh;:u111111.*t1*

    ~ ~*k Gmh Jim* ~  ;~ j k avi.ln;)**h l{cm~ Heml\. Thun11J'i' R(*dnl,"u Ljund; C'orui11;!fandm fo* 11 l-; 1.01.nf,;n t'ittnc-

    • Kw:,i!.: ,1uro: ~

    ~ WiU~j11'i Lynoc;i; l,ubin-.k,[ John: H.sot:11 eyi; Stu *\t'I) She!d,,u* Ga11nt1.:.t Alca,: Jlowrrum Gn.:"*:it\'* u nd Loyjsl!* Chcmoff H:11:otd'- S!.'iu-tm->u"h. TJu*m.u,-;- ~

    H(Ji~ \ lbmu; hlmdl (ifa\c: Ch,rk Thi;[l.'!>jt' V.t)jJ,,4 llh0,lt..1)3Jgp.* W.w:1111 OavlJ* Wh1llDao Jt!nntfor Tihuo C*u'lllmt: M1.1l9l}a; Pe1,viJ* Bums-11 -n'ol(; Mron:'c tknnis; Mftrlint;z N*1nc:v-Th<nm 111 1<.'.: ~ Yt:j*tl Aot<m; ~ Pelllll1 Pav1d' SOOH -Michad; ll t'-01t. RaYmüod* ~ ; ~

    1 1 Subj ect: 5~mmary .ofj une 8 HQ LIC-504(;,II on L;,S~lle MOV lssues Date: Friday, June 09, 2017 11:11:56 AM Attachments: l.J1~r.l<': Sit' ttr1~1'im1 ShCf PRAP[ <:J>Ot'X El70f>U210.l09S'I I\ RC RA17-0~6.nd(

    A*,end.i ,1um; 8 10 ? .<Js-*,.*x Thanks to all who supported Thursday's call. Here's a summary of the discussions (and please feel free to provide and corrections or comments on items I may have missed).

    Highlights:

    • NRR/DIRS and NRR/DPR continue to expedite issuance of lnformation Notice on the Anchor Darling Double Disc Gate Valve issue. Goal is to issue IN by June 16. DIRS is resolving comments on the IN (current challenge is balancing desire to include new information from Columbia Operating Experience and Exelon MPR failure report with the expedited schedule).
    • NRR/DPR continuing preparations for a public meeting to discuss the industry response to the Flowserve Part 21 and recent operating experience. Meeting will be coordinated with owners groups, Flowserve, and NEI and will assist the staff in assessing the need for further regu latory action following issuance of the lnformation Notice. The objective of this meeting will be to solicit input from industry on recent actions taken with regard to the Flowserve Part 21 in light of LaSalle valve failure. This lnformation will be used to inform the LIC-504 decision-making process. An NEI point of contact has been identified and NEI is willing to support the meeting - a planning call will be conducted in the near future to discuss meeting logistics with NEI.
    • R_egion 111 Sp.ecial lnspection T~am exiting on Friday, June 9 (te * * *

    . mitigation measures for a potential failure of the Unit 1 HPCS system (e.g., guarding ROIC and ADS), (2) rnspecting the Unlt 1 HPCS valve at the next Mode 4 entry, and (3) inspecting other valves whose operability was questioned by the SIT at the next outage. Exelon's letter is attached.

    • NRO/DCIP to conduct vendor inspection at Flowserve durlng the week of ,July 16, 2017
    • NRR/DIRS has set up a SharePoint site to collect information -

    lu.ttr//fusion nrc 1;ov/nrr/team/dirs/ioeb/anchor darJing valvc issuc/default.aspx

    • Next HQ LIC -504 meetlng will be scheduled for Wednesday, June 14 .

    Detailed Summary Meeting cornmenced at 3:00 pm on Thursday, June 8. Representatives trom the following organizations were represented:

    • NRR/DE
    • NRR/DRA
    • NRR/DSS
    • NRR/DPR
    • NRR/DIRS
    • NRO/DCIP
    • Regions 111 and IV

    Purpose:

    Continue discussion of LIC-504 process to address generlc implicatlons arrsing from LaSalle special inspection.

    Focus areas for discussion will be:

    • Status ot IN development process (target completion 6/16)
    • Discuss planning for Follow-up Public Meeting This is the eighth meeting held on the LaSalle LIC-504 lssue - previous meetlngs were held on May 3, May 5, May 1o, May 11 , May 18, May *24, and June 1. Agenda is attached.

    Status Reports:

    • LaSalle Special lnspection (M. Jetters & J. Benjamin, Region 111) - SIT onsite this week. Focus of team's effort has been on evaluating information in the MPR failure analysis for the Unit 2 HPCS injection valve and operating experience from Columbia. Specific items mentioned include:

    Columbia identifled a number of anchor darling double disc gates valves to inspect durlng their ongoing outage, including the HPCS injection valve (similar in design and function to the LaSalle Unit 1 HPCS injection valve). The licensee for Columbia performed an as-found test of the HPCS injection valve and all results were satisfactory (stem rotation check and MOV diagnostics). Subsequent to this testing, there was an inadvertent actuation of the HPCS system, resu lting in a valve operation. Follow-up testing of the valve produced abnormal results for both the stem rotatlon check and MOV dlagnostics. Post testing disassembly and inspection revealed that the wedge pin had sheared and the stem rotated freely in the disc. Exelon acknowledged the slmilarity tn valve design/function to the LaSalle Unit 1 HPCS injection valve, bul concluded

    that although the wedge pin falled and the stem was untorqued, the valve could stili stroke and perform its safety function .

    Flowserve has indicated their intention to update the Part 21 to reflect the potential loss of pre-torque due to slippage of the press-fft stem collar. As described in the MPR fai lure analysis, ifthe motor actuator has sufficient capability to slip the stem collar (determined to be approximately 50% of normai operating va,lve forces in the case of the Unit 2 LaSalle valve tailure), the slippage will result in loss of stem/disc pre-torque (and would potentially negate any corrective actions performed per the current Part 21 notification).

    Region 3 received the "reverse Confirrnatory Action Latter" frorn Exelon (dated June 2) - the letter (attached) commits Exelon to repair the Unit 1 HPCS inJection valve during the next Mode 4 entry, to limit elective unavailability of redu ndant systems (e.g., ADS/ LPSI, RCIC), and inspect/repair other affected valves during the next outa e.

    (b)(5) Deliberative Privilege eg on managemen p ans o in orm e e inspec 10n resu s an ex1t on Friday, June 8.

    A teleconferencewith Region 111 and NRR senior managernent is scheduled forTuesday, June 13.

    (Update from June 8 DIRS/Regional Division Oirector Call - Per J. Lara, the SIT is exiting with an apparent violation for the Untt 2 HPCS infection valve that will be handled under traditional enforcement. The

    • i in it hi i i f r nf r m n i r . i n b)(5) Deriberative Privlege ai these resu ts are prelim,nary an su Ject to further management review.]

    Exelon rs scheduled for a drop-in meetings today in HQ

    • lnteractions with PWROG/BWROG (B. Benney, L. Watkins, NRR/DPR) - PWROG has requested permission trom the QBWROG tor approval to send Revision 3 of the BWROG A/0 OD Disc Valve guidance to the PWROG members. Have requested DPR to verify the revision number for the BWROG guidance since there have been several versions drculated recently.
    • lnteractions with Flowserve (J. Burke, NRO/DCIP)- J. Burke (NRO/DCIP) noted that a vendor inspection will be conducted ai Flowserve the week ot July 16. NRO/ DCIP has been in communication wrth Flowserve and reported that Flowserve intends to supplement/amend the previous Part 21 report to reflect recent lnsights regarding the role of slippage of the press fit stem collar Fn the loss of valve pre-torque.
    • lnteractions with INPO (E. Thomas, NRR/DIRS) - Nothing new to report.
    • lnteractions with NEI (G. Bow man, NRR/DPR)- K. Coyne reported on G. Bowman's behalf, the following : G. Bowman met with Greg Krueger from NEI earller this week for a quick kickoff discussion. G. Krueger indicated that NEI is very much aware oi the LaSalle issue and they've been coordinating with the OGs, INPO, and others on indus1ry actions. As adata point, NEI indicated that he's been brlefing NEI senior managers on a recurrfng basis. G. Bowman discussed plans for the public meeting later this month and NEI seemed very receptive to helping coordinate the industry's presentation. DPR noted that once we have a good handle on the information we need from the industry, NRC would set up a plann1ng call With him to run through that, such tllat they're prepared to gve us what we need.
    • Risk Assessment (J. Circle NRR/DRA L. Kazak Reaion 111) .\

    I H lf (b)(5) Deliberative Privilege u

    u LIC-504 ORics:

    • Re-affirmed Qualitatlve Risk Assessment (K. Covne, NRR/DE\ -1 b)(5) Deliberative Privilege LIC-504 Decision Options (K. Coyne, NRR/DEj - The team next discussed the following topies:

    Schedule tor lssuance of IN - NRR/DIRS (J. Thompson) reported that DIRS is address1ng comments on the draft IN. DIRS noted that they may have some chalfenges in resolving ali comments in accordance with the schedule rnilestone of Friday, June 8 , but the team stressed the importance oi keeping the IN on track for issuance on Fiday June 16. DPR (N. Martinez) noted that if DIRS is slightly delayed, the schedule could stili be maintained if Division concurrence can be accelerated (the IN will require the concurrence from approximately 7 Divisions and the Regions).

    Emphasized to ali team members that once the IN is ready for concurrence, it needs to be turned around quickly.

    The IN is written at a high Ievel and provides an overview of recent operating experience (LaSalle, Browns Ferry, Surry, River Bend).

    Status of Public Meeting - NRR/NRR (K. Coyne) discussed the planning goals for pubHc meeting with industry to discuss recent actions taken to address anchor darling valve fatlures . This meeting wlJI be used to gather information to support the NRC's LIC-504 process. The goal of this interaction is to gather information about industry actlons in response to recent anchor darling valve issues. This information will be used to assess and implement the most appropriate regulatory response (e.g., monitor voluntary industry initiative, generic communication, etc.). The team discussed the meeting to schedute this meeting as soon as posslble (balancfng urgency against the need to ensure that industry counterparts have sufficient prep time to provide quality information). Briefly discussed preliminary questions for industry and requested team members to provfde feedback/correctlons/revisions/additions as soon as possible. The prellminary questions are included in the agenda and provided below:

    • Characterization of Anchor Darling double disc gate valve population Number in service in safety-related or risk-significant functions?
    • Wllat industry actions have been taken in fesponse to Part 21 issue?

    Failure evaluations?

    lnspections?

    Repairs/ modifications?

    - Schedule for future acUons?

    • What corrective actions are needed to address degraded condition?
    • What factors increase susceptibility to valve failure?

    What characteristics, design considerations, or service conditlons can be used to prioritize follow-up activities

    • What testing procedures can be used to identify degraded condtion or incipient failure?
    • Adequacy of available i nlormaton on valve degradation (e.g., Part 21s, guidance documents)
    • A ny plans for future industry initiatlves to address valve issues?
    • Communication Plan (B. Benney, NRR/.DPR)- DPR has developed a draft communications plan - it is now posted on the DIRS SharePoint site (ht1p*1/fo~in11 nrc gov/mr/t1.1an,/djr~/iol!l1/;111chnr dal'lm~ valvL, jssut;/Sh:11Nl1.,,20Documenr..1LaSalle%20C.11n1n11nic:1tin11%10Plan% ~o-

    '(cWJunc!.lr ~m1-2l/J 7 docx )

    • Next Meeting (K. Coyne, NRR/DE) - ln light of recent progress and need to focus on the development and issuance of the IN, the schedule for the next meeting was discussed, Consequenlly, the next meetng has been scheduled for Wednesday, June 14 ai 3 pm (eastern). A follow-up LIC-504 meeting will be scheduled for team alignment Just prior to the public meeting.

    Next Meeting: the next LIC-504 meeting wlll be scheduled for the week of 6/12.

    Action ltems:

    ALL

    • Provide potential questions for Flowserve to NRO/DCIP (John Burke) for possible inclusion in the Flowserve vendor

    inspectlon plan.

    • Provide input for LIC-504 decision options and information needs as appropriate.
    • Support expedited concurrenoe process for IN - Due date for IN issuance is June 16
    • Provide teedback on communication plan to 8rian 8enney (NRR/DPR)

    (hup-//fusiun on:..gov/nrr/1eam/djrs/joeb/anchor darling valve. jssue/Shared'f. '.!ODop11nents/LaSaHef/i 20Communjcation9f,10Plan% ~n-

    %2lJ.hmc'!? 208-2017do..:x ).

    • Provide feedback on information needs for public meeting (i.e., what information do we want industry to address) -

    provide to K. Coyne (NRR/DE) by Monday, June 12.

    NRR/DE

    • SeRd out Aegior, 111 SIT sumffleuy infurfflatiOfl (1(. Goyne) attaehed to this efflail NRR/DIRS
    • Resolve comments on dratt IN as expeditiously as possible (J. Thornpson, E. Thomas, H. Chernoff) - Dlle to DPR by Friday June 8 NRR/DPR:
    • lmplement acc1erated schedule for issuance of IN (N. Martinez) - Due to be issued Friday, June 16
    • Clarify which revision of the BWROG guidance that the PWROG has asked to provide to their member (8. 8enney)
    • Set up logistical planning call with NEI in support of public meeting once key information needs are finalized (G.

    8owman)

    • Continue development of Communication Plan (8. 8enney)
    • Begin planning activities for public meeting with industry representatives to discuss response to Flowserve Part 21 and related operating experience (L .Wilkins)
    • Develop draft agenda for public meeting (L Wilkins)

    NRR/DRA

    • Document generic risk assessment activities (C. Ng, M. Leech)

    NRR/DSS

    • Jim Hickey will take the lead on documenting the LIC-504 assessment Thanks again for your support of this process -

    Kevin Kevin Coyne, PE, PhD Deputy Director (Acting), Division of Engineering OHice ot Nuclear Reactor Regu/atlon Kevia Qovne@nrc.gov (301) 415-2478

    From: Benjamin lamie To: O"Brien. Kenneth

    Subject:

    RE: Summary of LaSalle SIT Exit Meetrng Date: Friday, J une 09, 2017 2:59:36 PM 111 fix it. thanks From: O'Brien, Kenneth Sent: Friday, June 09, 2017 11:51 AM To: Benjamin, Jam ie <Jamie.Benjamin@nrc.gov>

    Subject:

    Re: Summary of LaSalle SIT Exit Meeting Jamie I think you mean the unit l calve in the last item Thanks Ken Kenneth G . O'Brien, Director Division of Reactor Safety Region III Kenneth.OBrien@NRC.Go, 630-829-9700 On: 09 June 2017 11:47, "Benjamin, Jamie" <Jamie.Beojamin@nrc.gov> wrote:

    Attached.

    V/R, Jamie

    From: Benjam i lamie To: Pederson Cynthla; Roberts. Darrell; O"Brjen Kenneth: Shuaibi Mohammed: Louden. Patrick: Lara lullo: .wtfil.

    Mark: Stoedter. Karla; Ruiz. Robert; Chandrath il Prema; Mitlyng, Viktoria; Loga ras, Harra l; Rodriguez, Lionel:

    Farnan. Michael: Philllps Charles: Dunlop Andrew: Corujo-Sandin. orge ; Skokowski Richarct; Kazak. Laura

    Subject:

    RE: summary of LaSalle SIT Exit Meeting Date: Friday, J une 09, 2017 2:59:46 PM Attachments: surnmary of LaSalle SJT exit.docx Typo corrected in last sentence, and highlighted.

    From: Benjamin, Jamie Sent: Friday, Ju ne 09, 2017 11:48 AM To: Pederson, Cynthia <Cynthia .Pederson@nrc.gov>; Roberts, Darrell <Darrell.Roberts@n rc.gov>;

    O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shua ibi, Mohammed

    <Mohammed.Shua ibi@n rc.gov>; Louden, Patrick <Patrick.Louden@n rc.gov>; Lara, Julio (J ulio. Lara@nrc.gov) <J ulio. Lara@ nrc.gov>; Jeffers, M ark <M ark.Jeffers@nrc.gov>; Stoedter, Kar la

    <Ka rl a.Stoedter@n rc.gov>; Ruiz, Robert <Robert.Ruiz@nrc.gov>; Cha ndrathtl, Prema

    <Prema.Cha ndrat hil@nrc.gov>; M it lyng, Viktoria <Vikt oria. M it lyng@nrc.gov>; Logaras, Harral

    <Harra l.Logaras@nrc.gov>; Rodriguez, Lionel <Lionel. Rodriguez@nrc.gov>; Farnan, M ichael

    <M ichael. Farnan@ nrc.gov>; Phi ll ips, Charles <Charles. Phil lips@nrc.gov>; Dun lop, Andrew

    <Andrew.Dun !op@nrc.gov>; Corujo-Sand in, Jorge <Jorge.Corujo-Sa ndin@n rc.gov>; Skokowski, Richard <Rlchard .Skokowski@ nrc.gov>; Kozak, La ura <Laura.Kozak@ nrc.gov>

    Subject:

    Summary of LaSa lJ e SIT Exit M eeting Attached .

    V/R, Jamie

    From: Shuaibi, Mohammed To: OBrien Kenneth <Kenneth OBrien@nrc eov>

    Subject:

    CJNDY BRJEFJNG Date: Monday, June 12, 2017 2:38:00 PM We're briefing Cindy at 3:00 on the SIT slides for use with Mike J and Sili Dean tomorrow.

    Let me know it you want to be on.

    From: 1efters Mark To: Yaidya Bhakhandra: Benjami famje Cc: Benney. Brian; Gavrilas. Mirela: Oesterle. Eric: Helton. Shana: Hjckey. lames: Alley. David; Farnan Michael; Thompson. ohn ; Miller Chris; King Michael; Weerakkody. Sunil; Giitter oseph; Bowen leremy: Stoedter.

    JSgm; O"Brien. Kenneth; Casto. Greg: Circle eff; Ben jamin. l amie; Leech. Matthew; Shuaibi. Mohammed; Lara.

    J.uliQ; McGlnty. Jim* Krohn Paul; Burke lohn; Kayanagh Kerri; Herriw Jhomas: Rodriguez Lionel; ~

    Sandin. orge* Louden Patrick: Kozak Laura; Ng Ching* Miller Ed; Wjlkins Lynnea; Lubinski l oba: !:!sY.e.b.

    Kevin; Stuchell Sheldon; Garmoe Alex; Bowman Gregory: Lund Louise; Chernoff Harold; Scarbrough Thomas; Gascot Lozada. Ramon; Purnell. Blake; Clark. Theresa; Wrona. David; Whitman. ennifer; Tilton. Caroline; Mclntyre. David; Burnell Scott: Morey, Dennis; Martinez. Nancy: Thomas. Erjc; Clark leff; Yegel. Anton; S19ll..

    c.!lsQ; Pelton David; Scott Michael; Lorson. Raymond; Gody. Tony; Munday. oel

    Subject:

    RE: Flowserve doc Date: Monday, June 12, 2017 10:27:1 7 AM Bhalchandra, Flowserve has not submitted any document directly to the SIT. The Flowserve documents that were discussed were documents that were subm itted to the site and then the site provided them as proprletary information to the SIT. lf we want to include the document in the lnformation Notice, 1would recommend contacting Flowserve. lf you have any questions, please contact me at (630) 829-9798.

    Thank Yau, M ark Jeffers Branch Chief I RIII DRS EB2 1 x9798 From: Vaidya, Bhalcha nd ra Sent: Mand ay, Jun e 12, 2017 9:31 AM To: Benjamin, Jam ie <Jamie.Benjamin@nrc.gov>

    Cc: Benney, Brian <Brian .Benney@nrc.gov>; Gavri las, Mirela <Mire la.Gavril as@nrc.gov>; Oesterle, Eric <Eric.Oesterle@nrc.gav>; Helt an, Shana <Shana .Heltan@nrc.gav>; Hickey, James

    <James.Hickey@nrc.gov>; Alley, David <David.Alley@nrc.gov>; Fa rnan, M ichael

    <M ichae l. Farnan@nrc.gav>; Thompson, Jahn <Jahn.Thompsan@nrc.gav>; M iller, Chris

    <Ch ris.Miller@nrc.gav>; King, M ichael <M ichael.King2@nrc.gov>; Weerakkady, Su ni!

    <Su ni l.Weerakkady@nrc.gav>; Giitter, Joseph <Joseph.Giitter@nrc.gov>; Bowen, Jeremy

    <Jeremy.Bawen@nrc.gav>; Jeffers, Mark <M ark.Jeffers@nrc.gov>; St aedter, Karla

    <Ka rla.Stoedter@nrc.gov>; O' Brien, Ken neth <Kenn eth .O'Brien@nrc.gov>; Casto, Greg

    <Greg.Casto@nrc.gov>; Circle, Jeff <Jeff.Circle@nrc.gov>; Benja min, Jamie

    <Jamie.Benjami n@nrc.gav>; Leech, Matthew <Matt hew.Leech@nrc.gov>; Shuaibi, Mahammed

    <Mahammed.Shua ibi@nrc.gav>; Lara, Julia <Jul ia. Lara@ nrc.gav>; McGinty, Tim

    <Tim .McGinty@n rc.gov>; Krohn, Paul <Pa ul.Krohn@nrc.gav>; Bu rke, John <Jahn.Burke@ nrc.gav>;

    Kavanagh, Kerri <Kerri. Kavanagh@ nrc.gov>; Herrity, Thamas <Thomas.Herrity@ nrc.gav>; Radriguez, Lionel <Lione l. Rodriguez@nrc.gav>; Coruj a-Sandin, Jorge <Jorge.Corujo-Sandin@nrc.gov>; louden, Patrick <Patrick.Lauden@n rc.gav>; Kazak, Lau ra <Laura.Kazak@ nrc.gav>; Ng, Ch ing

    <Ch ing.Ng@nrc.gav>; Miller, Ed <Ed.Miller@nrc.gav>; Wi lkins, Lynnea <Lynnea.Wilkins@nrc.gov>;

    Lubinski, Jahn <John.Lubinski@nrc.gov>; Hsueh, Kevin <Kevin.Hsueh@n rc.gov>; Stuchell, Sheldon

    <Sheldon.Stuchell@nrc.gav>; Garmae, Alex <Alex.Garmoe@nrc.gov>; Bawma n, Gregary

    <Gregary.Bawman@nrc.gav>; Lund, Lauise <Lauise.Lund@ nrc.gav>; Chernaff, Ha rald

    <Harold.Chernoff@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@ nrc.gov>; Gascot Lozada, Ramon <Ramon.GascotLozada@nrc.gov>; Purn el l, Bla ke <Blake.Purnell@nrc.gov>; Cla rk, Theresa

    <Theresa.Clark@ nrc.gov>; Vaidya, Bhalchandra <Bhalcha ndra.Vaidya@ nrc.gov>; Wrona, David

    <David.Wrona@ nrc.gov>; Whit ma n, Jennif er <Jennifer.Wh itman@nrc.gov>; Tilt on, Caroline

    <Caroline.Tilton@nrc.gov>; Mclntyre, David <David.Mclntyre@nrc.gov>; Burnel l, Scott

    <Scott.Burnel l@nrc.gov>; Morey, Dennis <Denn is.Morey@nrc.gov>; M artinez, Nancy

    <Na ncy.Martinez@ nrc.gov>; Th omas, Eric <Eric.Thomas@nrc.gov>; Clark, Jeff <Jeff.Clark@ nrc.gov>;

    Vegel, Anton <Ant on.Vegel@nrc.gov>; St ott, Chad <Chad .St ott@nrc.gov>; Pelton, David

    <David.Pelton@nrc.gov>; Scott, Michael <M ichael.Scott@ nrc.gov>; Lorson, Raymond

    <Raymond. Lorson@nrc.gov>; Gody, Tony <Tony.Gody@n rc.gov>; Munday, Joel

    <Joel.M unday@ nrc.gov>

    Subject:

    RE: Flowserve doc

    James, 1 think, the SIT should make the decision whether the NRC wants the document submitted "on Docket. "

    LaSalle told me essentially, the same thing, even though the letter was sent to LaSalle. 1 believe, SIT received the Letter from LaSalle asa part of SIT.

    Bhalchandra K. Vaidya Licensing Project Manager NRC/NRR/D0RL/LPL3 (301 )-415-3308 (0) bhalchandra.vaidya@nrc.gov From: Benjamin, Jamie Sent: Monday, Jun e 12, 2017 10:23 AM To: Vaidya, Bhalchandra <Bhalchandra Vaidya@nrc.gov>

    Subject:

    Flowserve doc You had asked about the flowserve document not on our document. You will need to call Flowserve directly and ask them regarding release of it through ou r docket.

    From: O"Brien Kenneth To: Shuaibi Mohammed: le[ers Mark: Benjami 1amje

    Subject:

    Fwd: Information Notice "Anchor/Darling Gate Valve Wedge Pin and Stem-Disc Separation Failures."

    Date: Monday.June 12, 2017 11:02:38 AM Attachments: ml17153a053.docx Comment Resolution on IN anchor darling .pdf FYI Kenneth G. O'B1ien, Director Division of Reactor Safety Region TU Kenneth.OBrien@NRC.Gov 630-829-9700 From: ".Martinez, Nancy" <Nancy.Martinez@nrc.gov>

    Subject:

    lnformation Notice "Anchor/Darling Gate Valve Wedge Pin and Stem-Disc Separation Failures."

    Date: 12 June 2017 10:55 To: "Stone, AnnM,u-ie" <AnnMarie.Stone@nrc.gov>

    Cc: "O'Brien, Kenneth" <Kenneth.O'Brien@nrc.gov>

    Good morning Ann Marie, Attached and linked below is lnformation Notice "Anchor/Darling Gate Valve Wedge Pin and Stem-Disc Separation Failures." The lnformation Notice has been revised to address comments provided during the early review and concurrence of the lnformation Notice. AII comments provided on the draft lnformation Notice during parallel review have been dispositioned; 1 am attaching a file that identifies how comments were addressed. On June 7, 2017~NRR/DPR/PGCB received concurrence from Ken O'Brien. No further action is necessary, 1 just wanted to provide the revised lnformation Notice.

    https://adamsxt.nrc,gov/AdamsXT/content/downloadContent,faces?

    objectStoreName=Mainlibrary&vsld={E43103B0-9058-4B3A-9936-43A5634A 7947}&ForceBrowserDownloadMgrPrompt=false Thank you, Nancy

    From: Jeffers, Mark To: O"Brjen Kenneth; Shuaibi Mohammed

    Subject:

    RE: laSalle SIT Summary Date: Monday, J une 12, 2017 12: 16:00 PM Attachments: LaSalle SIT Recommendation.ppt x We are proofing it now. Attached is the current draft.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: O'Brien, Kenneth Sent: Monday, June 12, 2017 12:01 PM To: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>;

    O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>

    Subject:

    Re: LaSalle SIT Summary Mark May I ask if you could share our products with me before the meeting, if possible?

    Thx Ken On : 12 June 2017 11:10, "Jeffers, Mark" <Mark.Jeffers@ nrc.gov> wrote:

    1asked Jirn to setup a rneeting today with Cindy. Jamie and I are finalizing the presentation now.

    Than k You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: Shuaibi, Mohammed Sent: Monday, June 12, 2017 10:56 AM To: 0 1Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Jeffers, Mark <M ark,Jeffers@ nrc, ov>

    Subject:

    RE: LaSalle SIT Summary Please include me as well on the drafts before we get to Ci ndy.

    Thanks, Mohammed

    From: O'Brien, Kenneth Sent: Monday, June 12, 2017 10:49 AM To: Jeffers, Mark <Mark,Jeffers@ nrc.gov>

    Cc: Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>

    Subject:

    Re: LaSalle SIT Summary Mark As we discussed last week and I also ta]ked with Cindy, she would like to she a draft of our "white paper" , "talking points", witb the meat on the bones, that we will use to support our conversations with a BiJl and a Mike.

    She asked to see our draft sometime today.

    Thanks Ken Kenneth G. O'Brien, Director Division of Reactor Safety Region III Kenneth.OBrien@NRC.Gov 630-829-9700 On: 12 June 2017 08:35, "Jeffers, Mark" <.Mark.Jeffers@nrc.g*ov> wrote:

    Please let me know jf you have any difficulties opening the document.

    Thanks, Mark Sent from my iPhone. Please forgive any typos.

    From: "Jeffers, Mark" <Mark.Jeffers@nrc.gov>

    Subject:

    RE: LaSalle SIT Sumrnary Date: 08 June 2017 13:50 To: "O'Brien, Kenneth" <Kenneth.O'Brien@nrc.gov>

    Cc: "Stoedter, Karla (Karla.Stoedter@nrc.gov)" <Karla.Stoedter@nrc.gov>, "Benjami:n, Jarnie (Jamie.Benjamin@nrc.gov)" <Jamie.Beojamin@nrc.gov>

    Ken, The "quick" answer to the questions posed by Bill can be found in the attached document.

    will take the action to "cleanup" the two documents into a concise format.

    Thank You,

    Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: O'Brien, Kenneth Sent: Wednesday, June 07, 2017 6:03 PM To: Jeffers, Ma rk <Ma rk.Jeffers@n rc.gov>

    Subject:

    Fwd: LaSalle SIT Summary FYI and our discussion From: "King, Michael" <Michael.King2@nrc.gov>

    Subject:

    FW: LaSalle SIT Summary Date: 07 June 2017 17:55 To: "O'Brien, Kenneth" <Kenneth.O'Brien@nrc.gov>

    FYA .. .

    From: Dea n, Bil l Sent: Wednesday, June 07, 2017 6:42 PM To: King, M ichael < Michael.King2@ nrc.gov>; Evans, Michele <Michele.Evaos@nrc.gov>; McDermott, Brian <Brian .McDermott@nrc.gov>

    Cc: Lubi nski, John <John.Lubinski@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>; Mil le r, Chris

    <Chis.Mi ll er@nrc.gov>

    Subject:

    RE: LaSal le SIT Summary (b)(5) Deliberative Privilege 8/LL From: King, M ich ael Sent: Wednesday, June 07, 2017 6:22 PM To: Dean, Bill <Bill Dean@nrc.gov>; Evans, Michele <M1chele,Evans@nrc.gov>; McDerm ott, Brian

    <Bria n.McDermott@nrc.gov>

    Cc: Lubi nski, John <John.Lubinski@nrc.gov>; Coyne, Kevin <Kevin .Coyne@nrc.gov>; M il ler, Chris

    <Chris.Mi ll er@nrc.gov>

    Subject:

    FW: LaSal le SIT Summary

    {b){5) Deliberative Privilege Thanks, Mike From: O'Brien, Kenneth Sent: Wednesday, June 07, 2017 5:55 PM To: Coyne, Kevin <Kevin.Coyne@nrc.gov>; King, M ichael <Michael.King2@nrc.gov>

    Subject:

    FW : LaSal le SIT Summary From: Jeffers, M ark Sent: Wednesday, June 07, 2017 4:23 PM To: O"Brien, Kenneth < Kenneth.O"Brien@nrc.gov>; Shua ibi, Mo ha mmed

    <Mohammed .Shuaibi@nrc.gov>

    Cc: Stoedter, Ka rla <Karla.Stoedter@nrc.gov>; Benjamin, Jam ie <Jamje.Benjamjn@nrc.gov>

    Subject:

    LaSal le SIT Summary Ken ,

    Attached is the revised briefing sheet summarizing our conversation from today . Please Iet me know if you have any questions, comments, ar concerns.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1 x9798

    From: Shuaibi, Mohammed To: O"Brien Kenneth Subj ect: RE: LaSalle SIT Summary Date: Monday, June 12, 20171:58:00 PM Thanks boss .. ..are you supposed to be off today?

    From: O'Brien, Kenneth Sent: Monday, June 12, 2017 1:04 PM To: Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; O'Brien, Kenneth

    <Kenneth .O' Brien@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>

    Subject:

    Re: LaSalle SIT Summary Like the ideas Kenneth G. O'Brien, Director Division of Reactor Safety Region III Kenneth.OBrien@N RC,Goy 630-829-9700 On: 12 June 2017 12:46, "Shuaibi, Mohammed" <Mohammed,Shuaibi@nrc.gov> wrote:

    One thought and couple of edits .. .

    (b)(S) Deliberati ve Privilege From: O'Brien, Kenneth Sent: Monday, Ju ne 12, 2017 12:25 PM To: Jeffers, Mark <Ma rk.Jeffers@ nrc.gov>; O'Brien, Ken net h <Kenneth.O'Brien@nrc.gov>; Sh uaibi, Mohammed <Mohammed.Shu aibi@ nrq~ov>

    Subject:

    Re: LaSalle SIT Summary Mark

    A thought for your consideration.

    (b)(5) Deliberative Pri vilege Thanks Ken Kenneth G. O'Brien, Director Division of Reactor Safety Region III Kenneth.OBrien@N RC.Gov 630-829-9700 On: 12 June 2017 12:16, "Jeffers, Mark" <Mark.Jeffers@ nrc.gov> wrote:

    We are proofing it now. Attached is the current draft.

    Thank You ,

    Mark Jeffers Branch Chief I RIII DRS EB2 x9798 From: O'Bri en, Kenneth Sent: Monday, Jun e 12, 2017 12:01 PM To: Jeffers, Ma rk <Ma rk.Jeffers@nrc.gov>; Shuaibi, Moha mmed <M ohammed.Shua ibi@nrc.gov>;

    O'Brien, Kennet h <Kennet h.O'Brien@nrc.gov>

    Subject:

    Re: LaSalle SIT Summary Mark May I ask if you could share our products with me before the meeting , if possible?

    Thx Ken On: 12 June 2017 11:10, "Jeffers, Mark" <Mark.Jeffers@nrc.gov> wrote:

    1asked Jim to setup a meeting today with Cindy. Jamie and I are finalizing the presentation now.

    Thank You, M ark Jeffers Bra nch Chief I RIII DRS EB2 1x9798 From: Shuaibi, Mohammed Sent: Monday, June 12, 2017 10:56 AM To: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Jeffers, M ark <Mark.Jeffers@nrcgov>

    Subject:

    RE: LaSa lle SIT Summary Please include me as well on the drafts before we get to Cindy.

    Thanks, Mohammed From: O'Brien, Kenneth Sent: Monday, June 12, 2017 10:49 AM To: Jeffers, Mark <Ma rk.Jeffers@nrc.gov>

    Cc: Sh uaibi, Mohammed <Mohammed.Shua ibi@orc.gov>

    Subject:

    Re: LaSalle SIT Summary Mark As we discussed last week and I also talked with Cindy, she would like to she a draft of our "white paper , "talking points", with the meat on the bones, that we will use to support our conversations with a Bill and a Mike.

    She asked to see our draft sometime today.

    Thanks Ken Kenneth G. O'Brien, Director Division of Reactor Safety Region ITI Kenneth,OBrien@NRC.Gov 630-829-9700 On: 12 June 2017 08:35, "Jeffers, Mark" <Mark.Jeffers@nrc.gov> wrote:

    Please let me know if you have any difficulties opening the document.

    Thanks, Mark

    Sent from my iPhone. Please forgive any typos.

    From: "Jeffers, Mark" <Mark.Jeffers@nrc.gov>

    Subject:

    RE: LaSalle SIT Sununary Date: 08 June 2017 13:50 To: "O'Brien, Kenneth" <Kenneth.O'Brien@nrc.gov>

    Cc: "Stoedter, Karla (Kar1a.Stoedter@ nrc.gov)" <Karla.Stoedter@nrc.gov>, "Benjarnin, Jamie (J amie.Benjamin @nrc.gov)" <Jamie.Benjami n@nrc.gov>

    Ken, The quick" answer to the questions posed by Bill can be found in the attached document.

    will take the action to "cleanup" the two documents into a concise format.

    Tha nk You, M ark Jeffers Branch Chief I RIII DRS EB2 I x9798 From: O'Brien, Kenneth Sent: Wednesday, June 07, 2017 6:03 PM To: Jeffers, Mark <Mark.Jeffers@nrc.gov>

    Subject:

    Fwd : LaSalle SIT Summary FYI and our discussion From: "King, Micbael" <Michae1.Ki.ng2@nrc.gov>

    Subject:

    FW: LaSalle SIT Sumrnary Date: 07 June 2017 17:55 To: "O'Brien, Kenneth" <Kenneth.O'Brien@nrc.gov>

    FYA ...

    From: Dea n, Bil l Sent: Wednesday, June 07, 2017 6:42 PM To: King, Michael <Michael.King2@nrc.gov>; Evans, Michele <Michele.Evans@nrc.gov>; McDermott, Brian <Brian.McDermot t@o rc.gov>

    Cc: Lubinski, John <John.Lubinski@nrc.gov>; Coyne, Kevin <Kevin .Coyne@nrc gov>; Mil ler, Chris

    <Chris.Mi ll er@nrc.gov>

    Subject:

    RE: LaSa lle SIT Summary (b)(5) Deliberative Pri vflege

    81!!

    From: King, M ichael Sent: Wednesday, June 07, 2017 6:22 PM To: Dean, Bill <Bill.Dean@nrc.gov>; Evans, Michele <M ichele.Evans@nrc.gov>; McDermott, Brian

    <Brian.McDermott@nrc.gov>

    Cc: Lubinski, John <John .Lubjnski@nrq~ov>; Coyne, Kevin <Keyin .Coyne@nrc gov>; Mil ler, Chris

    <Ch ris.Mi 11 er@n rc.gov>

    Subject:

    FW: LaSal le SIT Summary (b)(5) Deliberative Privilege Thanks, Mike From: O"Brien, Kenneth Sent: Wednesday, June 07, 2017 5:55 PM To: Coyne, Kevin <Kevin.Coyne@ nrc.gov>; King, M ichael <M ichael.King2@nrc.gov>

    Subject:

    FW: LaSal le SIT Summa ry From: Jeffers, Mark Sent: Wednesday, June 07, 2017 4: 23 PM To: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shuaibi, Mohammed

    <Mohammed Shuaibi@nrc.gov>

    Cc: Stoedter, Ka rl a <Ka rla.St oedter@n rc.gov>; Benjamin, Jam ie <Jamje.Benjamin@nrc.gov>

    Subject:

    LaSal le SIT Summa ry Ken, Attached is the revised briefing sheet summarizing our conversation from today. Please Iet me know if you have any questions, comments, or concerns.

    Thank You1 Mark Jeffers Branch Chief I RIII DRS EB2 x9798

    From: Shualbi, Mohammed To: leffers Mark: O"Brien Kenneth Subj ect: RE: laSalle SIT Summary Date: Monday, J une 12, 2017 12:47:00 PM BTW ... can we speak to next steps and coordination on those steps? Maybe right after conclusion From: Jeffers, Mark Sent: Monday, June 12, 2017 12:16 PM To: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shuaibi, Mohammed

    <Mohammed .Shua ibi@nrc.gov>

    Subject:

    RE: LaSa lle SIT Summary We are proofing it now. Attached is the current draft.

    Thank You, M ark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: O'B rien, Kenneth Sent: Monday, June 12, 2017 12:01 PM To: Jeffers, Mark <Ma rk.Jeffers@ nrc.gov>; Shuaibi, Mohammed <M oha mmed.Shua ibi@ nrc.gov>;

    O'Brien, Kenneth <Kenneth .O'Brien@nrc.gov>

    Subject:

    Re : LaSalle SIT Summary Mark May I ask if you could share our products with me before the meeting , if possible?

    Thx Ken On: 12 June 2017 11 :10, "Jeffers, Mark" <Mark.Jeffers@ nrc.gov> wrote:

    1asked Jim to setup a meeting today with Cindy. Jamie and I are finalizing the presentation now.

    Thank You, Mark Jeffers Branch Chlef I RIII DRS EB2 1x9798

    From: Shuaibi, Mohammed Sent: Monday, June 12, 2017 10:56 AM To: O'Brien, Kenneth <Kenneth .O'Brien@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc,gov>

    Subject:

    RE: LaSa lle SIT Summary Please include me as well on the drafts before we get to Cindy.

    Thanks, Mohammed From: O'Brien, Kenneth Sent: Monday, June 12, 2017 10:49 AM To: Jeffers, Mark <Mark.Jeffers@nrc.gov>

    Cc: Shuaibi, Mohammed <Mohammed.Shuaibi@orc.gov>

    Subject:

    Re: LaSalle SIT Summary Mark As we discussed last week and 1 also talked with Cindy, she would like to she a draft of our "white paper", "talking points", with the meat on the bones, that we will use to support our conversations with a Bill and a Mike.

    She asked to see our draft sometime today.

    Thanks Ken Kenneth G. O'Brien, Director Division of Reactor Safety Region III Kenneth.OBrien@NRC.Gov 630-829-9700 On: 12 June 2017 08:35, "Jeffers, Mark" <Mark.Jeffers@nrc.gov> wrote:

    Please let me know if you have any difficulties opening the document.

    Than.ks, Mark Sent from my iPhone. Please forgive any typos.

    From: "Jeffers, Mark" <Mark.Jeffers@nrc.gov>

    Subject:

    RE: LaSaUe SIT Summary Date: 08 June 2017 13:50

    To: "O'Brien, Kenneth " <Kenneth.O'Brien@nrc.gov>

    Cc: "Stoedter, Karla (Kar1a.Stoedter@nrc.gov)" <Karla.Stoedter@nrc.gov>, "Benjamin, Jamie (Jamie.Benjamin@nrc.gov)" <Jamie.Benjamin@nrc.gov>

    Ken, The "quick" answer to the questions posed by Bill can be found in the attached document.

    will take the action to cleanup" the two documents into a concise format.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: O'Brie n, Kenneth Sent: Wednesday, June 07, 2017 6:03 PM To: Jeffers, Ma rk <Mark.Jeffers@nrc.gov>

    Subject:

    Fwd: LaSalle SIT Summary FYI and our discussion From: "King, Michael" <Michael.King2@nrc.gov>

    Subject:

    FW: LaSalle SIT Summary Date: 07 June 2017 17 :55 To: "O'Brien, Kenneth" <Kenneth.O'Brien@nrc.gov>

    FYA ...

    From: Dea n, Bil l Sent: Wednesday, June 07, 2017 6:42 PM To: King, M ichael <Michael.King2@nrc.gov>; Evans, Michele <Miche le.Evans@nrc.gov>; McDermott, Brian <Brian .McDermott@n rc.gov>

    Cc: Lubinski, John <John Lubinski@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>; Miller, Chr is

    <Chris Miller@nrq::ov>

    Subject:

    RE: LaSalle SIT Summary

    {b){5) Deliberatfve Privilege 8/LL

    From: King, M ichae l Sent: Wednesday, June 07, 2017 6:22 PM To: Dean, Bill <Bill.Dean@nrc.gov>; Evans, Michele <Michele.Evaos@nrc.gov>; McDermot t, Brian

    <Brian.McDermott@nrc.gov>

    Cc: Lubinski, John <John.Lubinski@nrc.gov>; Coyne, Kevin <Kevin .Coyne@nrc.gov>; M il ler, Chris

    <Chris .Mil ler@nrc.gov>

    Subject:

    FW: LaSal le SIT Summary (b)(5) Deliberati ve Privilege

    Thanks, Mike From: O'Brien, Kenneth Sent: Wednesday, June 07, 2017 5:55 PM To: Coyne, Kevin <Kevin .Coyne@nrc.gov>; King, M ichael <MichaeLKfng2@nrc.gov>

    Subject:

    FW: LaSal le SIT Summary From: Jeffers, M ark Sent: Wednesday, June 07, 2017 4:23 PM To: O'Brien, Ke nn et h <Kenneth.O' Brien@nrc.gov>; Sh uaibi, M ohammed

    <Mohammed.Shua ibi@nrc.gov>

    Cc: Stoedter, Ka rl a <Karla.Stoedter@n rc.gov>; Benjamin, Jamie <Jamie.Benjamio@nrc.gov>

    Subject:

    LaSal le SIT Summa ry

    Ken, Attached is the revised briefing sheet summarizing our conversation from today. Please Iet me know if you have any questions, comments, or concern s.

    Than k You, Mark Jeffers Branch Chief I RIII DRS EB2 1x979 8

    From: J effers, Mark To: Q"Bcieo Kenneth Cc: Louden. Patrick CPatrick.Louden@nrc.gov>

    Subject:

    LaSalle SIT Summary Date: Monday, June 12, 2017 6:21:00 PM Attachments: LaSalle SIT Recom mendation - DRAFT B.pptx Lasaue SIT Recommendatioo - DRAFI A,pptx Ken/Pat Please see attached for the LaSalle SIT Recommendation presentation . Draft A are the slides that were used to brief Cindy. Draft B are the slides that were revised to include some of Cindy's comments, as well as to add some reference / back up slides. Please Iet me know it you have any questions.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798

    From: 1effers Mark To: Q"Brien Kenneth

    Subject:

    Fwd: LaSalle STT Summary Date: Monday,June 12, 2017 8:35:35 AM Attachments: LaSalle SIT Briefing: Sheet

    • DRAFT C docx Response to Ouestions,docx Please Iet me know if you have any difficulties opening the document.

    Thanks, Mark Sent from my iPhone. Please forgjve aoy typos.

    From: "Jeffers, Mark" <Mark.Jeffers@nrc.gov>

    Subject:

    RE: LaSalle SIT Summary Date: 08 June 2017 13:50 To: "O'Brien, Kenneth" <Kenneth.O'Brien@mc.gov>

    Cc: "Stoedter, KarJa (Karla.Stoedter@nrc.gov)" <Karla.Stoedter@nrc.gov>, "Benjamin, Jamie (Jamie.Benjamin@nrc.gov)" <Jamie.Benjamin@nrc.gov>

    Ken, The "quick" answer to the questions posed by Bill can be found in the attached document.

    will take the action to "cleanup" the two documents into a concise format.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: O'Brien, Kenneth Sent: Wednesday, June 07, 2017 6:03 PM To: Jeffers, Ma rk <Mark.Jeffers@nrc.gov>

    Subject:

    Fwd: LaSalle SIT Summary FYI and our discussion From: "King, Micbael" <Michael.King?@mc.gov>

    Subject:

    FW: LaSalle SIT Summary Date: 07 June 2017 17:55 To: "O'Brien, Kenneth" <Kenneth.O'Brien@nrc.gov>

    FYA ...

    From: Dean, Bill Sent: Wednesday, June 07, 2017 6:42 PM

    To: King, Michael < Mich ae. K i ng2@nrc.gov>; Evans, Michele <M ichele.Eva ns@nrc.gov>; McDermott, Brfan <Brfan .M cDermott@nrc gov>

    Cc: Lubi nski, John <John.Lubinski@nrc.gov>; Coyne, Kevin <Kevin .Coyne @nrc.gov>; Miller, Chris

    <Chris.M iller@n rc.gov>

    Subject:

    RE: LaSa lle SIT Summary (b)(5) Deliberative Privilege 8/LL From: Ki ng, Michael Sent: Wednesday, June 07, 2017 6:22 PM To: Dean, Bill <Bill.Dea n@nrc.gov>; Evans, Michele <M ichele.Evans@ nrqrnv>; McDermott, Brian

    <Brian .McDermott@n rc.fWY>

    Cc: Lubi nski, John <John. Lubinski@nrc.gov>; Coyne, Kevin <Kevin .Coyne@nrc.gov>; Mil ler, Chris

    <Chris.Mill er@n rc.gov>

    Subject:

    FW: LaSal le SIT Summary (b)(5) Deliberative Privilege Thanks, Mike From: O'Brien, Kenneth Sent: Wednesday, June 07, 2017 5:55 PM To: Coyne, Kevin <Kevin.Covne@nrc.gov>; King, Michael <M ichael. King2@nrc.gov>

    Subject:

    FW: LaSal le SIT Summary From: Jeffers, M ark Sent: Wednesday, June 07, 2017 4:23 PM To: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Sh uaibi, Mohammed

    <M ohammed.Shua ibi@nrc.gov>

    Cc: Stoedter, Karla <Karla.Stoedter@nrc.gov>; Benjamin, Jamie <Jamje.Benjamjn@nrc.gov>

    Subject:

    LaSalle SIT Su mmary Ken ,

    Attached is the revised briefing sheet summarizing our conversation trom today. Please Iet me know if you have any questions, comments, or concerns.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 x9798

    From:

    To:

    Cc:

    Subject:

    Date: Monday, June 12, 2017 10:22:39 AM Attachments: {b)(5) Deliberative Privilege j Jamie (b)(5) Deliberative Privilege Laura

    From: J<ozak Laura To: Benjamln. 1amie Cc: Hanna, ohn subject: SDP ba sis document Date: Monday, J une 12, 2017 9:49:26 AM Jamie Just FYI. Here is an excerpt from the SDP basis document - IMC 0308 Attachment

    , 3. This is what I was referrinq to this mornino./

    b)(5) Deliberative Privilege Laura (b){5) Delfberative Privilege

    From: O"Brlen. Kenneth To: Klnc; Michae : MUler Chris: O"Brien. Kenneth: Louden Patrick: Lara lulio: Shuaibi. Mohammed

    Subject:

    Re: SIT exit at laSalle Date: Monday, June 12, 2017 7:37:56 AM Chris Exited with a traditional violation of Crite1ion UI, Design Control, associated with the Unit 2 HPCS valve aod its design being inappropriate for the cbosen application, base in part on the licensee's MPR analysis. No severity level identified and no PD associated with the violation.

    Also exited with an URI associated with the licensee' handling of the remainder of the AD vales, most significantly the Unit l HPCS valve and operability evaluation. This will allow us to define a final course of action as we brief up the management chain. Currently have a brief of Bi11 and Mike Johnson scheduled fir Tuesday, noon my tie.

    Thx Ken Kenneth G. O'Biien, Director Division of Reactor Safety Region IU Kennetb.0Brien@NRC.Gov 630-829-9700 On: 12 June 2017 07:27, "King, Michael" <Michael.King2@nrc.gov> wrote:

    Ken ... Did you exit with a preliminary finding?

    Thanks!

    Mike From: Mi ll er, Chris Sent: Monday, June 12, 2017 8:26 AM To: O'Brien, kenneth <kenneth.O'Brien@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>; Lara ,

    Ju lio <Julio .Lara@nrc.gov>i Shua ibi, Mohammed <Mohammed .Shuaibi@nrc.gov>

    Cc: King, M ichael <Michael.King2@nrc.gov>

    Subject:

    RE: SIT exit at LaSalle Thanks Ken From: O'Brien, Kenneth Sent: Monday, June 12, 2017 8:15 AM To: Miller, Chris <Chris.Mjller@nrc.gov>; O'Brien, Kenneth <Kenneth.O'Brien@n rc.gov>; Louden, Patrick <Patrick.Louden@nrc,gov>; Lara, Julio <Julio .La ra@nrc.gov>; Shuaibi, Mohammed

    <Mohammed.Sh uaibi@nrc:.gov>

    Cc: J<ing, M ichael <Mjchael. King2@nrc.gov>

    Subject:

    Re: SIT exit at LaSa lle Chris Exit went we]l.

    No specific or additiona] commitments.

    Side, hypothetical conversation on how the agency may respond if the licensee chose to shutdown voluntarily in the near future, out of an abundance of caution, to open the valve and undertake any necessary repairs. The thought was paired with the licensee identifying a good point in the weather over the next few weeks.

    Also -inquired as to the likely time line it may take to issue an order.

    Otherwise, relatively straightforward exit.

    Thanks Ken Kenneth G. O'Blien, Director Division of Reactor Safety Region III Kem1eth.0Brien@NRC.Gov 630-829-9700 On: 12 June 2017 06:59, "Miller, Chris" <Cbris Mil)er@nrc.gov> wrote:

    Any news from licensee actions promi.sed at the exit. Did they commit to better address operability ar discuss intent to enter any TS action statements?

    chris Christopher G MilJer Director, Division of lnspection and Regional Support Office of Nuclear Reactor Regulation United States Nuclear Regu latory Commission 301-415-1004

    From: Stoedter, Karla To: Havertape loshua

    Subject:

    FW: Summary of LaSal le SJT Exit Meeting Date: Monday, June 12, 2017 5:31:00 AM Attachments: Summary of LaSall e SIT exit.docx FYI Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Benjamin, Jam ie Sent: Friday, June 09, 2017 3:00 PM To: Pederson, Cynthla <Cynt hia .Pederson@nrc.gov>; Roberts, Darrell <Darrell.Roberts@n rc.gov>;

    O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shua ibi, Mohammed

    <Mohammed.Shua ibi@nrc.gov>; Louden, Patrick <Patrick. Louden@ nrc.gov>; La ra, Julio

    <J ulio. Lara@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Stoedter, Karla

    <Karla. Stoedter@nrc.gov>; Ruiz, Robert <Robert.Ruiz@ nrc.gov>; Chandrathi l, Prema

    <Prema.Chan drathil @nrc.gov>; Mitlyng, Viktoria <Viktoria. M itlyng@nrc.gov>; Logaras, Ha rra l

    <Ha rra l.Logaras@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Fa rna n, M ichael

    <Michael.Fa rnan@nrc.gov>; Phillips, Cha rles <Charles.Philli ps@nrc.gov>; Dunlop, Andrew

    <Andrew.Dunlop@nrc.gov>; Corujo-Sandin, Jorge <Jorge.Corujo-Sandin@nrc.gov>; Skokowski, Richard <Richard.Skokowski@nrc.gov>; Koza k, Laura <Laura. Koza k@nrc.gov>

    Subject:

    RE: Summary of LaSalle SIT Exit M eeting Typo corrected in last sentence, and highlighted.

    From: Benjamin, Jamie Sent: Friday, June 09, 2017 11:48 AM To: Pede rson, Cynthia <Cynth ia.Pederson@nrc.gov>; Roberts, Darrell <Darrell.Roberts@nrc.gov>;

    O'Brien, Kenneth <Kenneth.O'Brie n@nrc.gov>; Shuaibi, Mohammed

    < Mohammed.Shuaibi@orc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>; La ra, Julio (Ju ljo.Lara@nrc.gov) <Ju!io. Lara@n rc.gov>; Jeffers, Mark <Ma rk.Jeffers@nrc.gov>; Stoedter, Karla

    <Karla.Stoedter@ nrc.gov>; Ruiz, Robert <Robert.Ruiz@n rc.gov>; Chan drathil, Prema

    <Prema.Chandrathil@orc.gov>; M it lyng, Vi ktoria <Viktoria.Mjtlyng@nrc.gov>; Logaras, Harral

    <HarraLLogaras@nrc.gov>; Rodriguez, Lienei <Lionel.Rodriguez@nrc,gov>; Farnan, Michael

    <Michael. Fa rn an@nrc.gov>; Ph il lips, Charles <Charles.Phillips@ nrc.gov>; Du nlop, And rew

    <Andrew Dunlop@nrc.gov>; Corujo-Sandin, Jorge <Jorge.Coru jo-Sandin@nrc.gov>; Skokowski, Richard <Richard.Skokowski@nrq~ov>; Kaza k, Laura <Laura.Kozak@ nrc.gov>

    Subject:

    Summary of LaSa ll e SIT Exit Meeting Attached.

    V/R, Jamie

    From: Shuaibi, Mohammed To: Benjam i 1amie Subj ect: RE: Summary of LaSalle SIT Exit Meeting Date: Monday, J une 12, 2017 7:59:00 AM Hey Jamie .... l got this same message last week from you. Not sure why it sent again. 1 got it. 1think the words "was based upon management review" leaves me thinking that it was already reviewed by management. Subject to management review says that management review is stil i coming. The latter is what l'm used to hearing at exits. As long as it was clear to everyone.

    From: Benjamin, Jam ie Sent: Monday, June 12, 2017 7;57 AM To: Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>

    Subject:

    RE: Summary of LaSalle SIT Exit Meet ing 1think we are saying the same th ing. This is what we say for all exit meetings. The intent is to inform the licensee that the information presented at the exit is not final until management's review which is typically the report being signed out.

    lf I could have rewritten that I would have said what you wrote. The licensee understood it.

    From: Sh uaibi, Mohammed Sent: Friday, June 09, 2017 11:56 AM To: Benjamin, Jam ie <Jamie.Benjamin@nrc.gov>

    Subject:

    RE: Summary of LaSalle SIT Exit M eeting Thanks Jamie. The heading says "the team made it clear to the licensee that info presented was based upon management review" ls this what was made clear or was it that the info was subject to management review once its brought back to the region?

    From: Benjamin, Jamie Sent: Friday, Jun e 09, 201711:48 AM To: Pederson, Cynthia <Cynthia.Pederson@nrc.gov>; Roberts, Darrell <Darrell.Roberts@nrc.gov>;

    0 1Brien, Kenneth <Kenneth .O'Brien@nrc.gov>; Sh uaibi, Mo hammed

    <Mohammed.Shuaibi@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>; Lara, Julio

    <Julio.Lara@nrc.gov>; Jeffers, Ma rk <Ma rk.Jeffers@nrc.gov>; Stoedter, Ka rla

    <Karla.Stoedter@nrc.gov>; Ru iz, Robert <Robert.Ru iz@nrc.gov>; Chandrathil, Prema

    <Prema.Chandrathil@nrc.gov>; Mitlyng, Viktoria <Viktorja.Mitlyng@nrc.gov>; Logaras, Ha rral

    <Harral.Logaras@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Fa rna n, M ichael

    <Michael.Farnan@nrc.gov>; Phi ll ips, Charles <Charles.Phi ll ips@nrc.gov>; Dunlop, Andrew

    <Andrew.Dun lop@nrc.gov>; Corujo-Sandin, Jorge <Jorge.Corujo-Sandin@nrc.gov>; Skokowski, Richard <Richard .Skokowski@o rc.gov>; Kaza k, La ura <Laura.Kozak@nrc.gov>

    Subject:

    Summary of LaSa ll e SIT Exit Meeting

    Attached.

    V/R, Jamie

    From: Stone AnnM arie To: Al.l.....lU

    Subject:

    Daily Morning Meeting News 06 2017.docx Date: Tuesday,June 13, 2017 7:31:09 AM Attachments: 12_aily Mprn in_g__Meeting_News 06-12-201Z.do_x The Daily Morning Meeting News for Monday June 12, 2017 Regional Duty Officer: Bob Orlikowski Teleconference Number. kSOO) 779-9565: Passcode:<bl(5 l Note: This newsletter maycontain pre-dec1s1ona1 into. uo not distribute outside the NRC.

    Behaviors That Matter - We cooperate with others. We work effectively as a team to achieve organizational and individual success Support lssues:

    RA: Seminar week. Key speakers include Commissioner Bums (Wednesday),

    Michael Johnson {T uesday), David Castelvetter (Wednesday) , and Eugene Dacus DRP: Welcome John Hanna to the Region 111 team! John joins us as an SRA and is already fully engaged. Welcome back Billy Dickson from an EDO rotation .

    Welcome back Stu Sheldon - glad to see you on your feet!

    DRS:

    DNMS : Will be supporting the Annual Communicators Round Table. There will be a presentation on reactor decommissioning.

    DRMA: Diversity Dialog Cohort Meeting today EICS:

    STATES:

    PAO: See NRC in the News Today Materials Events/lssues:

    EN 52799: Agreement State (W I) Report - lrradiator Drawer Stuck in lntermediate Position. Problem occurred with retrieving the sample from the irradiator. State of W isconsin is following up.

    Reactor Events: EN 52800: Manual Reactor Seram due to Loss of Feedwater Heating (Clinton)

    Part 21 : Update to EN 52756: Part 21 - Potential Defect in Grayboot Socket Contacts.

    Updated with list ot affected purchase ordered and associated sites/customers. Affected Region 111 sites included Clinton , Davis Besse, Duane Arnold, Kewaunee, LaSalle, Point Beach , Quad Cities, and Zion Plant Status BRANCH 1-Clinton: Mode 2 with expectation to be at full power on Wednesday . Operators manually scrammed the reactor on Saturday due to a loss of feedwater heating. Licensee identified a circuit card failure.

    DAEC:

    Quad Cities:

    LaSalle: Configuration control issue on Friday. lndividual operated equipment on wrong unit. No impact to plant. S IT - exited with one apparent violation (Traditional Enforcement) and one URI. More to come on operabi lity decision .

    BRANCH 2 Fermi:

    DC Cook: Residents are reviewing the Operability Evaluation for the 21 Reactor Coolant Pump thermal barrier heat exchanger. Call on Thursday with NRR.

    Prairie lsland:

    Monticello:

    BRANCH 3 Byron:

    Braidwood: Radiation Protection issue related to release of tritium. Water from the Circulating Water Blowdown (CW B/D) valve building had been pumped onto the ground outside the CW B/D building during a maintenance activity. The sump in the CW B/D building has a sump pump discharge hose that had been routed outside to the ground near the outfall canal rather than to the permitted outfall path. This path was outside Permit area so licensee will report to State .... and 50 .72 coming. Coordination with OPA, Branch, and PSB Palisades :

    BRANCH 4 Point Beach: Unit 1:

    Unit 2:

    Davis Besse:

    Perry:

    Dresden:

    NRR:

    Additional Support lssues -

    • EWRA sign up for Wheels and W ieners !
    • JNRA: June 26, Japanese Gourmet Wagon! Sign up in each Admin Area.
    • JNRA: Also, preserve your insights in a calendar! Complete a 3x5 card with your insights/thoughts and stories to pass on to our Japanese regulators!

    Other lssues -

    Personnel News -

    Daily Notes/Preliminary Notification -

    One Week Look Ahead -

    Post 8:15 Meeting Topies -

    From: ieffers. Mark To: Stoedter. Karla CKarla.Stoedter@nrc.gov>: Kirkwood. sara: Lambert. Kenneth CKenneth.Lamberc@nrc gov>: llli.k.

    l ared (la red Heck@nrc.goy}; Marshfield Mark; Vajdya. Bhalchandra

    Subject:

    LaSalle SIT Next Steps Start: Monday, J une 19, 2017 1:30:00 PM End: Monday, June 19, 2017 2:30:00 PM Location: Bridgeline: 888-826-8523 Passcode: ~

    (b)(5) Deliberative Pri vilege 1 wi ll be sendiog out another email lhis morning wi1b rite bridgeline number w call. lf lhereare any ques1ions. commems. or coucerns. please let me know .

    Thank You, Mark Jeffers

    Branch Cb.ief I Rlli DRS EB2 1X9798

    From: J effers, Mark To: coyne. Keyin

    Subject:

    LaSalle SIT Presentation Date: Tuesday,June 13, 2017 7:14:00 AM Attachments: LaSalle SIT Recom mendation - Rev O.pptx

    Kevin, 1believe that you are on the LaSalle "Mgmt Discussion" meeting at 12:30 today. 1have a presentation (attached) that I will be going over and am trying to find the best way of getting the cepies to HQ management Do you have any recommendations on who I can contact to get the slides printed for the HQ staff?

    Thank You, Mark Jeffers Branch Chief I Rllf DRS EB2 1x9798

    From: 1effers Mark To: Shualbi. Mohammed; O"Brlen e nn eth Cc: Louden. Patrick; Lara. lulio

    Subject:

    Re: LaSalle SIT Summary Date: Tuesday, June 13, 2017 7:51 :06 AM Attachments: LaSalle SIT Recommendation - Rev O.potx Please see attached. The slides are updated to include the comments from Cindy.

    Thanks, Mark Sent from my iPhone. Please forgive any typos.

    On: 13 June 2017 07:23, "Shuaibi , Mohammed" <Mohammed.Shuaibi@nrc.gov> wrote:

    Mark .. .

    Gan you send me the new set.

    Thanks ,

    Mohammed From: O'Brie n, Kenneth Sent : Monday, June 12, 2017 7:33 PM To: Jeffers, Ma rk <Mark.Jeffers@ nrc.gov>; O'Brien1 Kenneth <Kenneth.O'Brien@nrc.gov>

    Cc: Louden, Patrick <Patricl<.Louden @n rc.gov>; Shuaibi, Mohammed

    <Mohammed.Shuaibi@nrc.gov>; Lara, Julio <Julio.Lara@ nrc.gov>

    Subject:

    Re: LaSalle SIT Summary Thanks Mark Kenneth G. O'Brien, Director Division of Reactor Safety Region Ill Kem1eth.0Brien@NRC.Gov 630-829-9700 On: 12 June 2017 18:2 1, "Jeffers, Mark" <Mark.Jeffers@nrc.gov> wrote:

    Ken/Pat

    Please see attached for the LaSalle SIT Recommendation presentation. Draft A are the slides that were used to brief Cindy. Draft B are the slides that were revised to include some of Cindy's comments, as well as to add some reference / back up slides. Please Iet me know if you have any questions.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798

    From: Shuaibi Mohammed To: Q"Brjen Kennetb

    Subject:

    Re: LaSalle SIT Summary Date: Tuesday,June 13, 2017 6:26:20 AM Could you enphasize to Mark to include me on these emails. I really appreciate you including me but 1 don't know why I keep getting missed.

    On: 12 June 2017 19:32, "O'Brien, Kenneth" <Kenneth.O'Brien@nrc.gov> wrote:

    Thanks Mark Kem1eth G. O'Brien, Director Division of Reactor Safety Region III Kenneth.0Brien@NRC.Gov 630-829-9700 On: 12 June 2017 18:21, "Jeffers, Mark" <Mark.Jeffers@nrc.gov> wrote:

    Ken/Pat Please see attached for the LaSalle SIT Recommendation presentation. Draft A are the slides that were used to brief Cindy. Draft B are the slides that were revised to include some of Cindy's comments, as well as to add some reference / back up slides. Please Iet me know if you have any questions.

    Thank You, M ark Jeffers Branch Chief I RIII DRS EB2 1x9798

    From: Sh uaibi, Mohammed To: Looez Crystal: White-tackson ioan Subj ect: FW: LaSa lle SIT Summary Date: Tuesday, J une 13, 2017 7:55:00 AM Attachments: LaSalle SIT Recommendation - Rev O.pptx Grystal/Joan, Gan you print me a copy of the attached? 1only need slides, 1don't need the notes. 1'11 pick it up on break. Gan I get one slide per page, double sided?

    Thanks ,

    Mohammed From: Jeffers, Mark Sent: Tu esday, June 13, 2017 7:51 AM To: Shuaibi, Mohammed <Mohammed.Shua ibi@nrc.gov>; O'Brien, Kenneth

    <Kennet h.O'Brien@nrc.gov>

    Cc: Louden, Patrick <Patrick. Louden@nrc.gov>; Lara, Ju lio <J ul io.Lara@nrc.gov>

    Subject:

    Re: LaSalle SIT Summary Please see attached. The slides are updated to include t he comments from Cindy.

    Thanks, Mark Sent from my iPhone. Please forgive any typos.

    On : 13 June 2017 07:23, "Shuaibi, Mohammed" <Mohamm ed.Shuaibi@nrc.gov> wrote:

    Mark ...

    Gan you senci me the new set.

    Thanks ,

    Mohammed From: O'Brien, Kenneth Sent: Monday, June 12, 2017 7:33 PM To: Jeffers, Mark <Mark.Jeffers@nrc.gov>; O'Brien, Kenneth <Kenneth .O'Brien@nrc.gov>

    Cc: Louden, Patrick <Patrick.Louden@nrc.gov>; Shuaibi, Mohammed

    <Mohammed .Sh uaibi@nrc.gov>; Lara, Julio <Julio.Lara@nrc.gov>

    Subject:

    Re: LaSalle SIT Summary

    Thanks Mark Kenneth G. O'Brien, Director Division of Reactor Safety Region III Kenneth.OBrien@NRC. Gov 630-829-9700 On: 12 June 2017 18:21, "Jeffers, Mark" <Mark.Jeffers@nrc.gov> wrote:

    Ken/Pat Please see attached for the LaSalle SIT Recommendation presentation. Draft A are the slides that were used to brief Cindy. Draft B are the slides that were revised to include some of Cindy's comments, as well as to add some reference / back up slides. Please Iet me know if you have any questions.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798

    From: Lara. u lio To: Pederson Cynthla* Roberts. Darrell Cc: Louden. Patrick; O"Brien. Kenneth; Shualbi. Mohammed subject: LaSalle Date: Tuesday, June 13, 20171 1:38:14AM AU

    ,ince I will not be at toctay*s briefing on LaSalle. I thou l!ht I'd share som e thoughts.,

    (b)(5) Deliberatve Privilege thanks Julio

    From : Dunlop, Andrew To: Benamln. lamie

    Subject:

    RE: need for report Date: F(iday, J une 16, 2017 1:29:00 PM 1sent my list on 5/30 From: Benjamin, Jamie Sent: Friday, June 16, 201 7 1:27 PM To: Farnan, M ichael <M ichael.Farnan@nrc.gov>; Phill ips, Charles <Charles.Phillfps@nrc.gov>;

    Du nlop, And rew <And rew.Dun lop@n rc.gov>; Rodriguez, Lionel <Lionel. Rodriguez@nrc.gov>

    Subject:

    need for report List of docs reviewed. 1 only have Chuck's.

    Additionally, 1'11 do my best to tncorporate the team 's assessment in the report. 1 do not need any write-ups at this point. However, if there is something specific that you want in the report and is something that we talked about at the exit then please send me that as well.

    Deadline is by next Friday. June 16, 2017.

    You all will get a week to comment on the report before I send it to Mark.

    Thanks everyone!

    From: Coyne Kevjn To: Q"Brjen Kenneth

    Subject:

    FW: AD va lve failure rates Date: Wednesday, June 14, 20171:32:31 PM Importance: High From: Coyne, Kevin Sent: Tu esday, Jun e 13, 2017 6:45 PM To: Lane, John <John. Lane@nrc.gov>

    Cc: Nakoski, John <John.Nakoski@nrc.gov>; Schroeder, John <john.schroeder@in l.gov>; M arksberry, Don <Don.Marksberry@nrc.gov>; Ng, Ching <Ching. Ng@nrc.gov>; Thompson, John

    <John.Thompson@nrc.gov>; Circl e, Jeff <Jeff.Circle@nrc.gov>; King, M ichael

    <M ichael.King2@n rc.gov>; Miller, Chris <Chris.M iller@nrc.gov>; Cheok, M ichael

    <Michael.Cheok@nrc.gov>; Thaggard, Mark <Mark.Thagga rd@n rc.gov>; Chernoff, Harald

    <Harold .Chernoff@ nrc.gov>; Lubi nski, John <John.Lubinski@nrc.gov>; Thomas, Eric

    <Eric.Thomas@ nrc.gov>

    Subject:

    RE: AD valve fa ilure rates lmportance: High John-Another high priority data question - can we get a better sense of the contribution to the anchor darling valve failure rate from large valves (e.g., say greater than 6-8" in size) vs smaller valves (e.g., less than 6"). This is becoming a key question in the LIC-504 assessment - we are trying to determine if we have any evidence that would substantiate that the stem/disc separation issue (or wedge pin failure) is more closely correlated with larger size valves. Any insights we might have about the size breakdown for the population of anchor darling valves vs the observed failures would be useful. For example (to make up some numbers ... ), if large valves only make up 10% ot the anchor darling valve population but account for 90% of the observed failures, that would be a good data point for consideration for the generic LIC-504 question. 1 know there is a limit to what INL can extract from the INPO data feed, but any quick insights would be appreclated. And we're obviously focusing on mechanical failure of the valves (e.g., stem disc separation or degradation) rather than other failure causes (limit switch, electrical, etc.). 1think folks in NRR/DIRS can also assist as needed (Harald Chernoff would be a good contact).

    Thanks!

    Kevin From: Lane, John Sent: Monday, May 22, 2017 6:41 PM To: Circle, Jeff <Jeff.Circle@nrc.gov>

    Cc: Nakoski, John <John.Nakoski@nrc.gov>; Schroeder, John <john.schroeder@ inl.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>; Marksber ry, Don <Don.Marksberry@nrc.gov>; Ng, Ch ing

    <Ching.Ng@nrc.gov>; Thompson, John <John.Thompson@nrc.gov>

    Subject:

    FW: AD va lve fail u re rates Jeff From John Schroeder and using INPO ICES OpE data we have a starting point for Anchor Darling valve mechanical failure rates:

    .-..1 E-03/yr for Anchor Darling MOVs

    - 4E-04/yr for non-Anchor Darling MOVs.

    Let us know where you would like to go from here.

    Thanks.

    jel From: Schroeder, John [mallto:1ohn.schroeder@inl.gov]

    Sent: Wednesday, M ay 17, 2017 4:32 PM To: Lane, Jahn <John.Lane@nrc.gov>

    Cc: Coyne 1 Kevin <l<evin.Coyne@nrc.gov>; St Germa in, Shawn W <shawn.stgermaio@in l.gov>; Circle, Jeff <Jeff.Circle@nrc.gov>; Marksberry, Don <Don.Marksberry@nrc.gov>; Ng, Ching

    <Chi ng.Ng@ nrc.gov>; Thompson, John <Joh n.Th ompson@nrc.gov>

    Subject:

    [External_Sender] AD valve fa ilure rat es

    John, I think I have a series of queries set up that I can use to produce failure rates based on a number of different specifications working on manufacturer and valve type/subcomponent.

    It looks to me like we really don't need reliability information on the valves because we can use calendar years for some period in the denominator. This allows me to cast a much larger net for failures reported in ICES. When I do thi s for just valve subcomponent failures for AD gate valves l get 38 faiJures (includ.i.ng aJJ failure modes). We bave about 38,726 calendar years of valve operation with this valve population since 1998. This yields a failure rate of about l.lE-7/hr.

    When I use the same queries to get valve subcomponent failures for ali MOVs that are gate valves and not AD valves, I get 55 failures in 150,376 calendar years of valve operation for a failme rate of about 4.2E-8/hr So it looks like AD gate valve failures are, generally speaking, about 2.7 times as likely as non-AD gate valve failures ( again, removing failures related to the actuator where possible).

    There are many possible ways to slice and dice to refine this result. Probably some caveats I should be mentioning as well. So it is bard to know where to go nexl without some additional discussion.

    Justa reminder, I am away from work Thursday through Mo nday . Shawn is also away, but

    for somewhat ]onger.

    ~ohn A. Schroede1*

    fdaho Nat1onal Laboratnrv BatteUe Ene:rgy Alliance. LLC P.O. Box 1625 ldaho Fail s, ID 83415-385(

    Ph: 208-526-8755.

    FAX: 208-526-2930

    From: Coxne KeYio To: Benncx Bnno* Qrivifn~ Mjc;la* Qcsti:rlc Enc* Hdton Shana* Hickc:v Jiam,.,* ~ famao M1t:bnd: Thomn"PO John* ~ Kin M1cb:iel; ~

    ~ iiucr JC).'.t'.'ph* owe_n k -rcnw* Jeffcr:- Mark* Stoedter Karla; O" Bren Kem1e1h* C;1$IQ GI"('*** ~ Benjamn J,111115:; Lt:1."<:h Mmtht*,\** Shuaibi Mul anum::cl

    • Ltra Julio* Mc:Qint:)' Jim; Krnhn P;iul; Burkt' Juhn; Kavana"h Kqyi; Hcrril) Thumas* Rüdri**uet. Lionel; Coruju-Sandin Jur*)c."'* oudc;n Pat ric
    • Ko?:ak &ura; Ng Ching*

    1 Mjllcr fü

    • Wilkin'\ Lyc;:a
    • Lubinski J,1hn; Hs@h. Kevin* Slu::hel Shi:dou; Qarrnuc A le'.\
    • Bowman rt<ty
    • und. Luuist'.'* Chcmoff HtmtJJ* Sl.'.m'buµuh Tl1u111=1s* ~

    l.u...i,du Ramon: Pumtll Blt1kc:* C l ak jH.:{(lla* Vaid\14 Bhakh;mdra: W,9na DayiJ* Whitm,m Js;nmfrr Tilton C4mlinc* ~frlt yrg DaviJ* llurcll $cotr Morey Qen i li i Marlin-:z N;mc:;v* Thoni, Eri; ~ Far11h()h.1. J11om:.\s: ~

    Cc: foynr Kovio* Md>c:rmoH Bri;m* Vem,~! An1on* ~ ~ Lorwn K:1,'lnnnd* Yr;rokun hmr ~~

    Subject : Agenda for l aSalle 504 Follow-up meeung Uune 14, 3 pm (eastern))

    Date: Wednesday, June 14, 201 7 7:38: 19 Al.1 Attachments: t'N>:ud*, June 14 2012 drx::x Sumnrio* of fu& 1o1 HO I IC.* ';1'>4 Call flO I aSalle MQV is'"IWS mc:1*

    , AOf*NFI .Juoo..fx F ~~ A.ncb:MD:1f jg (i-:i1cV!llvc 1 . .pl )f Folks -

    Please see attached agenda for this afternoon's LIC-504 meeting. A couple of noies:

    • Please take a look ai lhe safety assessment (pages 6 and 7) - there has been a lot of new tnformation developed asa result of the great work being done by the LaSalle Speclal lnspection Team and we want to make sure the assessment is staying current.
    • A high priority for the LIC-504 effort is setting up the public meeting with industry to gather critical information needed to support future regulatory decision-making on the generic part of this issue. To that end, we have a working list of questions we want lndustry to come prepared to discuss. Working draft of the question list is on pages 3 -4 (and thanks for the comments on the earlier version). l'd like to finaljze these at this afternoon's meeting so we can move forward with coordinating the pubfic meeting wilh industry slakeholders.
    • DIRS/IOEB has been mainlaining a SharePoint site with Anchor Darling MOV information - greal resource and includes a lol of the documenlalion thal has been passed along in emails over the last several weeks. The site is localed at:

    http://fus ion.nrc.gov/nrr/team/dirs/ioeh/a nchor clarling va lve issue/default.a.~px .

    • DPR has pulled logether a good working draft of the communication plan (Brain Benney is coordinating). The latest is on SharePoint (hJJp*//fu~ion nre.gov/nrr/team/dirs/ioeh/anchor darling valve jssue/Shared%-20Documents/LaSa)Je%,20Co1111nunica1j<m'k-?OPlan%? ().

    %?0June%2013%202017.docx ) - please review and provide any comments you have.

    • l've also attached the summary from last week's meeting - please review the action items at the end of the summary and be prepared to discuss status.
    • Finally, l've attached a Flowserve advertisement lor a "design enhancement" to eliminate torsional loads on the valve disc pack and "improve its reliable operation". The design enhancement eliminates the threaded stem disc connection (using a t-connection) and adds a slotted stem with an anti-rotation collar. The advertisemenl is dated 2014 .. .

    Thanks to ali for the tremendous support of thls effort -

    Kevin

            • Original Appointment-**-

    From: Benney, Brian Sent: Thursday, June 08, 2017 4:19 PM To: Benney, Brian; Gavrilas, Mirela; Oesterle, Eric; Helton, Shana; Hickey, James; Alley, David; Farn an, Michael; Thompson, John; Miller, Chris; King, Michael; Weerakkody, Sunil; Giitt er, Joseph; Bowen, Jeremy; Jeffers, Mark; Stoedter, Karla; O'Bnen, Kenneth; Casto, Greg; Circle, Jeff; Benjamin, Jamie; Leech, Matthew; Shuaibi, Mohammed; Lara, Julio; McGinty, Tim; Krohn, Paul; Burke, John; Kavanagh, Kerri; Herrity, Thomas; Rodriguez, Lionel; Corujo-Sandin, Jorge; Louden, Patrick; Kozak, Laura; Ng, Ching; Miller, Ed; Wilkins, Lynnea; Lubinski, John; Hsueh, Kevin; Stuchell, Sheldon; Garmoe, Alex; Bowman, Gregory; Lund, Louise; Chern off, Harold; Scarbrough, Thomas; Gascot Lozada, Ramon; Purnell, Blake; CJark, Theresa; Coyne, Kevin; Vaidya, Bhalchandra; Wrona, David; Whitman, Jennifer; Tilton, Caroline; Mclntyre, David; Burnell, Scott; Morey, Dennis; Mart inez, Nancy; Thomas, Eric; Vegel, Anton; Pruett, Troy; Clark, Jeff; Lantz, Ryan; Farnholtz, Thomas; Stott, Chad

    Subject:

    LaSalle 504 Follow-up meeting When : Wednesday, June 14, 2017 3:00 PM-4:00 PM (UTC-05:00) Eastern Time (US & Canada).

    Where: HQ-OWFN*12B04*25P Pre-mPPting to r.over any last minute corrections to the IN.

    aaa-455-1734

    • articipant passcode tcb_H_6)_ __.

    From: Benney. Brian To: Gavrilas Mirela: Oesterle. Eric: Helton. Shana; Hickey lames; Alley. Dayid: Farnan Michael: Thompson lohn:

    Miller. Chris: King Michael: Weera kkody Sunil; Giitter. oseph ; Bowe n. lere my; le ffers. Mark; Stoedte r. Karla:

    O"Brien. Ke nneth; Casto. Greg; Crcle. eff; Be njamin. am i e; Leech Matthew; Sh uaibi. Mohammed; Lara. u lio; McG inty. Tim; Krohn Paul; Bu rke oh n; Kavanagh . Kerri; Herrity. Thomas; Rodriguez. Lione l: Corujo-Sandin

    ~ Louden. Patrick; Kozak. Laura: Ng. ChJng; Miller. Ed: Wilkins. Lynnea: LubJnski. lohn: Hsueh. Kevin; Stuchell. Sheldon; Ga rmoe Alex; Bowma n Gregory; Lund, Louise; Chernoff Harald: Scarbrough. Thomas*

    Gascot Loz:ada Ramon: Purnell Bla ke : Clark Theresa; Coyne Kevin; Vaidya. Bhalcha ndra; Wrona David; Whitman. enn ifer; Til ton . Caroline; Mclntyre. David; Burnell. Scott; Morey. Denn is; Martinez. Nancy; Thomas.

    f.d.c.: Yegel. Anton: Pruett. Troy: Clark. leff: Lantz. Ryan; Farnholtz. Thomas: stott. Chad Cc: felts Russell: DE Calendar Resource

    Subject:

    La Salle 504 Follow-u p meeting Start: Wedn esday, J une 14, 201 7 2:00:00 PM End: Wednesday, J une 14, 2017 3:00:00 PM Location: HQ-OWFN -12804-25P Attachments: Agenda u ne 14 2017.docx summary or luoe 8 HO u c -so4 Call on LaSalle MOY Issues.msg CADENFL J ooo-oom -AnchorDarlJn g GateVa ve LR. PDF B88-455- t 734 f'amc1panr passcode:.. l(_b )_(6_ )_ __,

    Folks -

    Please see attached agenda for this afternoon's LIC-504 meeting. A couple of notes:

    • Please take a look at the safcry assessmcnt (pages 6 and 7) - therc has been a lot of new information dcvcloped as a rcsulr of thc great work being done by the LaSalle SpeciaJ Inspection Team and we wam to make sure the assessment is staying current.
    • A high prioriry for the LIC-504 effort is sening up ihe pub li c meering with industry to gather critical information needed to support furure regulatory decision-making on 1]1e generic part of this issue. To that encl, we have a working list of questions wc want indusuy to come prepared to discuss.

    Worki ng clraft of tbc questioo lis t is oo pagcs 3-4 (and thanks for thc comments oo the earlier versioo). r d like to finalize thcsc at tlus aftcmoon* s meeting so we can move forwanl with coordinating. lhe pubJjc meeting_ with induslry stakeholclers.

    • DJRS/!OEB has been maintaining a SharePoint sile with Anchor Darling MOV infonnation - great resource and inclucles a lot of the documentation ll1at has been pa.~sed along in emails ovenhe la.st several weeks. The site is locaied ai :

    llllp://fusion.nre. gov/nrr/team/d irs/i oeb/anchor_darli ng_val ve_issue/defaull .a,px .

    • DPR bas puJJed togetber a good working dmft of the conummlci11ion pl an (Brain Bermey is coordinating). The latest is Oll SharePoint (hltp://fusion.nrc.gov/nrr/team/dirs/ioeb/ru1chor_darling_valve_issue/Shared%20DocumenL~/LaSaJle%20Communication%20Plan%20-

    %20June%20 13%2020 17.clocx )- please review and provicle any comments you have.

    • l've also attached the summary from last weck" s 111ecting - plcase rev icw thc actiou itcms ,\1 thc cnd of the summary aud bc prepared lO discuss status .
    • Finall y. l've attached a Plowserve advertisementfor a '*design enhancement" to eliminate torsional loads on the ,*alve disc pack and " improve its rel.iablc operation**. Tbe design eohancement eliminates the threaded stem disc connection (using a t-connection) ancl adds a slocted ,~tem with ao anti-1*otatio11 collar. Tbe advcrüscmcnt is dated 20 14 ...

    Thanks to ali for tbe lremendous support of this effort -

    Kevin

    From: Phillips, Charles To: Benjam i . 1amie Subj ect: RE: LaSalle HPCS injection vaive meeting Da te: Wednesday, J une 14, 20~7 7:51:00 AM Yes l'd llke to listen to the hone call. (b)(5) Deliberative Privilege (b)(5) Deliberati ve Privilege From: Benjamin, Jamie Se nt : Tuesday, June 13, 2017 3:31 PM To: Dun lop, Andrew <And rew. Dunlop@nrc.gov>; Phil lips, Charles <Charles.Phi llips@nrc.gov>;

    Rodriguez, Lione l <Lionel.Rod riguez@ nrc.gov>; Farnan, M ichael <Michael. Farnan@n rc.gov>

    Subject:

    LaSal le HPCS injection va lve meeting (b)(5) Deliberative Prfvil.ege Jamie

    /-a- ln: Coyne. Kevjn To: O"Brien. Kenneth

    Subject:

    Fwd: NRR Key Messages for LaSalle HPCS Operability Question Date: Wednesday, June 14, 20H 7:43:18 PM Ken -

    Not sure if I'm breaking any NRR protocols here, but wanted you to be aware of key messages we've pulled together for the ET.

    Kevin Begin Forwarded Message:

    From: "Coyne, Kevin" <Kevin.Coyne@ nrc.gov>

    Subject:

    RE: NRR Key Messages for LaSalle HPCS Operability Question Date: 14 June 201 7 17:15 To: "McDermott, Brian" <Brian.McDermott@nrc.gov>

    ... and just heard back from DORL- no substantive comment.

    From: Coyne, Kevin Sent: Wednesday, June 14, 2017 5:11 PM To: McDermott, Brian <Brian.McDermot t@ nrc.gov>

    Cc: Dean, Bill <Bill. Dean@nrc.gov>; Evans, M ichele <Mi*chele.Evans@n rc.gov>; M iller, Chris

    <Chris. Mil ler@nrc.gov>; King, Michael <Michael .King2@ nrc.gov>; Lubinski, John

    <Joh n.Lubinsk1@ nrc.gov>; Gavri las, Mlrela <M1re1a.Gavri las@nrc.gov>; Helton, Sha na

    <Sha na. Helton @nrc.gov>; Bowman, Gregory <Gregory.Bowman@nrc.gov>; Lu nd, Louise

    <Louise. Lu nd@nrc.gov>; Ross-Lee, MaryJane <MaryJa ne.Ross-Lee@nrc.gov>; Brock, Kath ryn

    <Kathryn .Brock@nrc.gov>; Benner, Eric <Eric.Benner@nrc.gov>; Felts, Russell

    <Russell.Felts@nrc.gov>; Giitter, Joseph <Joseph .Giit ter@nrc.gov>; Weerakkody, Suni!

    <Su nil.Weerakkody@nrc.gov>

    Subject:

    NR R Key Messages for LaSa lle HPCS Operabil ity Question Brian -

    Here's a rundown on the key messages you requested - has been vetted through DE, DSS, DIRS, and DPR.

    (b)(5) Deliberative Pri vilege

    • The LaSall.e Special lnspection Team (SIT) has done excellent work and raised significant questions about the operability of the Unit 1 HPCS injection valve. ln particular, the SIT's conclusion that valve actuator forces are sufficient to shear the valve wedge pin and degrade the threaded connection have not been adequately addressed by Exelon's operability evaluation. Exelon should revise/update their operability evaluation to address the questions raised by the SIT and provide assurance of continued operability of the Unit 1 HPCS valve.
    • Although shearing of the valve wedge pin represents a degraded condition for the valve, operating experience indicates that there is a latency period between wedge pin failure and stem-disc separation. Based on the MPR failure analysis conducted for the Unit 2 HPCS injection valve, the most likely failure sequence following wedge pin failure involves thread degradation and wear over multiple valve operating cycles. The latency eriod between wed e in shearin and valve failure m
    • b)(5) Deli berative Privil ege
    • Although there have been recorded failures of anchor darling double disc gate valves in the operating experience over the last several years, l'-""...-14.:u.~~.a.u.u.u..u.L..u.u.LCi.Uw.a.iLLlL.._

    im _acted valves has not been s ecificall identified.

    ( )(5) Deliberative Privilege

    • A risk assessment conducted by Region 3 assuming complete failure of the Unit 1 HPCS valve during an 8 month exposure window resulted in an incremental conditional core damage probability of 1.?E-05 (1.3E-05 when Exelon 's compensatory measures of reducing elective maintenance on ADS, RC IC, RHR and LPCS were modeled by decreasing T&M unavailability by a factor of 10). Although this risk estimate does not include contributions from external events or fires, there is significant margin to the stated LIC-504 risk metric threshold for "high" risk impact of ICCDP on the order of or greater than SE-05. Use of a more realistic failure probability for the HPCS injection valve would further increase available margin to this th reshold.
    • The loss of HPCS injection does not result in a significant loss of defense in depth as other means exist to provide makeup water to the reactor (e.g., RCIC or low pressure injection following depressurization).
    • 1(b)(S) Deliberati,e P,i, ileg,

    (b)(5) Deliberative Prvllege

    • The HO LIC-504 effort will continue to evaluate the issue and any eventual outcome would apply to the LaSalle plant.

    Kevin

    From: Pederson. Cynthla To: Sotiropoulos Dina: Gjessner. lohn: Lara. lul;o: Lipa. Christine: Louden Patrick: Walsh. Mary: O"Brien Kenneth:

    Roberts. Darrell: Shuaibi. Moha mmed

    Subject:

    FW: [mffl!!!TTJ Agency Mission Meeting Summary (06/14/17)

    Date: Thu rsday, June 15. 2017 10:07:20 AM Attachments: 6 17 summary OUO-SII.docx From: inverso, Tara Sent: Wednesday, June 14, 2017 3:19 PM To: NRC_ODs_DODs <NRC_ODs_DODs@nrc.gov>

    Cc: EDO Distribution <EDODistribution@nrc.gov>

    Subject:

    [@oel9 *~ Agency M ission Meeting Summary {06/14/17)

    QFFl"Ab WSE 9PJI!'/ 5EPJ51Tfl/E IP4,fftNAL lff POIUOIA flOIQ Good afternoon, Please see attached for summary notes from today's Agency Mission Meeting.

    Thank you!

    Tara OFEICIAI I ISF ONI Y SFNSIIIVE ID:IIERNAI ID:IFORMOIIOM

    From: McDerrnott Brian To: Coyne. Kevio: oean BIII Cc: Lubinski. lohn; Miller. Chrjs: in g. Mlchael; Chernoff. Harold; Lane. lohn; Nakoski. lohn; Cheok. Mjchael:

    Thaggard. Mark; O" Brien, Kenneth : Shuaibi Mohammed: l effers Mark S ubject: Re: Anchor Darling DDGVs - Data insights on failure rate vs. Valve Size Date: Friday, J une 16, 2017 5:53:44 AM I would also note that not all stem to disk failures are the result of the over torque issue. Flow induced vibration appears to be been tbe cause in some number of the cases.

    On: 15 June20 17 19:1 4, "Coyne, Kevin" <Kevin.Coyne@ nrc.gov>wrote:

    ... should have added another bullet to give the data a little more context...

    • The raw INPO data does not have much in the way of descriptive information - so while we can filter for "gate" valves, it is not possible to further differentiate the data. So, these results may include other gate valve types than just double disc gate valves. We also do not have any specific information about the valve internais (e.g., stem collar design, threaded stem, etc.).

    We should be able to get more clarity on this issue during the upcoming public meeting.

    Kevin From: Coyne, Kevin Sent: Th ursday, Ju ne 15, 2017 7 :00 PM To: Dean, Bill <Bill.Dean@nrc.gov>; McDermott, Brian <Brian.McDermott@nrc.gov>

    Cc: Lubi nski, John <John.Lubinski@nrc.gov>; Mi ll er, Chris <Chris.M il ler@nrc.gov>; King, Michael

    <M ichael. Ki ng2@ nrc.gov>; Chernoff, Harald <Harold.Chernoff@nrc.gov>; Lane, John

    <Joh n.Lane@nrc.gov>; Nakoski, John <John. Nakoski@nrc.gov>; Cheok, M ichael

    <M ichae l.Cheok@nrc.gov>; Thaggard, Ma rk <Ma rk.Thagga rd@ nrc.gov>; O'Brien, Kenneth

    <Kennet h.O'Brien@nrc.gov>; Shuai bi, Mohammed <Mohammed .Shua ibi@nrc.gov>; Jeffers, Mark

    <Mark.Jeffers@n rc.gov>

    Subject:

    Anchor Darling DDGVs - Data insights on failu re rate vs. Va lve Size Bill, Brian-RES/DRA and INL worked with the INPO data feed and came up with some population estimates based on the sizing of Anchor Darling DDGVs. This is preliminary information as there are stili a few questions about the completeness of the INPO data (RES is running these down), but here's a quick summary of what we have right now (... detailed data is attached):

    Valve Size # of valves # of failures Calendar Year Failure Rate (CV) (exposure) /CY

    .5"-2" 38 1 686.17 1.5E-03 2"- 4" 251 8 4276.50 1.9E-03 4 -12" 1163 18 20737.67 8.7E-04

    12" -20" 430 4 7769 5.1 E-04 20" -40" 229 7 4348.67 1.6E-03 A couple of quick observations -

    • These include all failure causes for the valve - fail to open/close, and leakage (so stem-disc separation failure events would be lower). Actuators are excluded from the failure counts.
    • With the exception of the 20 - 40" valves (which generally seem to be steam stops, loop isolations, containment sumps, or RHR inlets), the larger valves have a sl ightly lower failure rate than the smaller valves . Although we don't have a lot of resolution in the 4-12" size range , this data does not seem to support a general conclusion that larger valves are more susceptible to failure.
    • For the range of most interest for the LaSalle issue (4-12"), the 18 failures seem to be associated with the following valve types:
    i.,. HPCI Main Steam Line lsolation Valve (7)
    i.,. HPCI Discharge to Feedwater lsolation Valve (1)
    i.,. LPCS Discharge To Reactor Spray lsolation Valve (1)
    i.,. lsolation Condenser Condensate Containment lsolation Valve (3)
    i.,. Aux/Emerg Feedwater Pump Alternate Source Suction Valve (1)
    i.,. Containment Spray Discharge to Header lsolation Valve (1)
    i.,. SI Pump Suction lsolation (1)
    i.,. Primary Containment lsolation Valve (2)
    i.,. RHR Discharge lsolation Valve (1)

    My guess is that most of these valves are at the larger end of the 4" - 12" spectrum. It is noteworthy that 6 of these fai lures are associated with only two valves.

    • There is more art than science in interpreting some of the INPO data fields, but this at least gives us a ballpark for the population - approximately 2, 100 valves in service with valves 12" or greater accounting for about 1/3 of the population (659) and -1/3 of the recorded failures (11 ).

    Many thanks to John Lane in RES/DRA and John Schroeder out at INL for pulling this information together -

    Kevin

    From: 1effers Mark To: Benjam i lamie: Stoedter Karla

    Subject:

    Fwd: Ancho r Darling DDGVs - Data insights on failure rate vs. Valve Size Date: Thursday, June 15, 2017 6:27:33 PM See below. Does not provide much info1mation, but does provide another data pojnt albeit absent any real substantive information.

    Thanks, Mark Sent from my iPhone. Please forgive any typos.

    From: "Coyne, Kevin <Kevin.Coyne@nrc.gov>

    Subject:

    RE: Anchor Darling DDGYs - Data insights on fai lure rate vs. Valve Size Date: ] 5 .Tune 201 7 18: 14 To: "Dean, Bill" <Bill.Dean@nrc.gov>, "McDermott, Brian" <Brian.McDe1mott@nrc.gov>

    Cc: "Lubinski, .Tobn" <Jobn.Lubinski@nrc.gov>, "Miller, Chris" <Chris.Miller@nrc.gov>,

    "King, Micbael" <Michael.King2@ nrc.gov>, "Chernoff, Harold"

    <Harold.Chemoff@mc.gov>, "Lane, John" <John.Lane@nrc.gov>, "Nakoski, .Tohn"

    <John.Nakoski@nrc.gov>, "Cheok, Michael" <Michae1.Cheok@nrc.gov>, "Thaggard, Mai*k"

    <Mark.Thaggard @nrc .gov>, "O'Brien, Kenneth " <Kenneth.O'Brien@nrc.gov>, "Shuaibi, Moham.med" <Mobammed.Shuaibi@nrc.gov>, ".Teffers, Mark" <Mark.Jeffers@nrc.gov>

    ... should have added another bullet to give the data a little more context. ..

    • The raw INPO data does not have much in the way of descriptive information - so while we can filter for "gate valves, it is not possible to further differentiate the data. So, these results may include other gate valve types than just double disc gate valves. We also do not have any specific information about the valve internais (e.g., stem collar design, threaded stem, etc.).

    We should be able to get more clarity on this issue during the upcoming public meeting.

    Kevin From: Coyne, Kevin Sent: Th ursday, June 15, 2017 7 :00 PM To: Dean, Bill <Bill.Dean@nrc.gov>; McDermott, Brian <Brian. M cDermott@nrc.gov>

    Cc: Lubinski, John <John.Lubinskf@nrc.gov>; Mil ler, Ch ris <Chris.M ille r@ nrc.gov>; King, Michael

    <M ichael.K ing2@ nrc.gov>; Chernoff, Harald <Harold.Chernoff@nrc.gov>; Lane, John

    <John.Lane@nrc.gov>; Na koski, John <John .Nakoski@nrc.gov>; Cheok, Mfchael

    <M icha el.Cheok@nrc.gov>; Thaggard, Ma rk <Ma rk.Thaggard@nrc.gov>; O'Brien, Kenneth

    <Kenneth.O'Bri en@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shua ibi@nr c.gov>; Jeffers1 Mark

    <Mark.Jeffers@nrc.gov>

    Subject:

    Anchor Darl ing DDGVs - Data insights on fa ilu re rate vs. Valve Size Bill, Brian -

    RES/DRA and INL worked with the INPO data feed and came up with some population estimates based on the sizing of Anchor Darling DDGVs. This is preliminary information as there are still a few questions about the completeness of the INPO data (RES is running these down), but here's a quick summary of what we have right now ( ... detailed data is attached) :

    Valve Size # of valves # of failures Calendar Year Failure Rate (CV) (exposure) /CY

    .5" -2" 38 1 686.17 1.5E-03 2" -4" 251 8 4276.50 1.9E-03 4"-12" 1163 18 20737.67 8.7E-04 12" -20" 430 4 7769 5.1 E-04 20"- 40" 229 7 4348.67 1.6E-03 A couple of quick observations -

    • These include all failure causes for the valve - fail to open/close , and leakage (so stem-disc separation failure events would be lower). Actuators are excluded from the failure counts .
    • With the exception of the 20 - 40" valves (which generally seem to be steam stops, loop isolations, containment sumps, or RHR inlets), the larger valves have a sl ightly lower failure rate than the smaller valves. Although we don't have a lot of resolution in the 4-12" size range, this data does not seem to support a general conclusion that larger valves are more susceptible to failure.
    • For the range of most interest for the LaSalle issue (4-12"), the 18 failures seem to be associated with the following valve types:

    }., HPCI Main Steam Line lsolation Valve (7)

    }., HPCI Discharge to Feedwater lsolation Valve (1)

    }., LPCS Discharge To Reactor Spray lsolation Valve (1)

    }., lsolation Condenser Condensate Containment lsolation Valve (3)

    }., Aux/Emerg Feedwater Pump Alternate Source Suction Valve (1)

    }., Containment Spray Discharge to Header lsolation Valve (1)

    }., SI Pump Suction lsolation (1)

    }., Primary Containment lsolation Valve (2)

    }., RHR Discharge lsolation Valve (1)

    My guess is that most of these valves are at the larger end of the 4" - 12" spectrum. It is noteworthy that 6 of these failures are associated with only two valves.

    • There is more art than science in interpreting some of the INPO data fields , but this at least gives us a ballpark for the population - approximately 2, 100 valves in service with valves 12" or greater accounting for about 1/3 of the population (659) and -1/3 of the recorded failures (11).

    Many thanks to John Lane in RES/DRA and John Schroeder out at INL for pulling this

    information together -

    Kevin

    From: Shuaibi, Mohammed To: Q"Brien Kenneth Subj ect: RE: Columbia DDGV Date: Thursday, June 15, 2017 3:25:00 PM Do they have to consider past operability?

    From: O'Brien, Kenneth Sent: Thursday, Ju ne 15, 2017 12:37 PM To: Jeffers, Mark <Mark.Jeffers@ nrc.gov>; Benjamin, Jamie <Jamie .Benj amin@nrc.gov>; Stoedter, Karla <Karla.Stoedter@ nrc.gov>

    Cc: Shuaibi, Moham med <Mohammed.Shua ibi@nrc.gov>

    Subject:

    FW: Colu mbia DDGV From: King, Michael Sent: Th ursday, June 15, 2017 11:35 AM To: Coyne, Kevin <Kevin.Coyne@nrc.gov>; Miller, Chris <Ch ris. Miller@ nrc.gov>; O'Brien, Ken neth

    <Kenneth.O'Brien @nrc.gov>

    Subject:

    FW: Colu mbia DDGV lnteresting ... Columbia attributed the pin shearlng to "prompt reversai of direction" of the actuator.

    From: La ntz, Rya n Sent: Thursday, June 15, 2017 12:25 PM To: King, M ichael <Michael.King2@nrc.gov>

    Subject:

    FW: Colu mb ia DDGV Mike, more detail than you probably need, but see answer to your Q below ...

    From: Alexander, Ryan Sent: Th ursday, Ju ne 15, 2017 10:43 AM To: Lantz, Ryan <Rya n. Lantz@nrc.gov>

    Cc: Ha ire, Mark <Mark.Haire@nrc.gov>

    Subject:

    RE: Columbia DDGV Ryan:

    Per NRR/0/RS' request The short answer to the question is NO, CGS did not declare HPCS-V-4 inoperable when they found the wedge pin sheared, but this was because the HPCS system was already inoperable for maintenance and was not rel ied upon for shutdown risk. (LPCI-A and LPCS were the two credited ECCS systems to meet TS 3.5.2 at the time.) More details below:

    ln Oecember 2016, the licensee monitored for stem rotation (2 year frequency) on HPCS-V-4 (HPCS injection valve - an Anchor-Darling DDGV) and did NOT identify any abnormalities. On 8/ 19/2011 , the licensee conducted a diagnostic test & trace (6 year trequency) for the HPCS-V no anomalies were noted, and there no stem rotation was noteci.

    CGS entered its current refueling outage during the weekend of 5/13/2017.

    CGS entered Mode 4 at 1234 on 5/13/17, and Mode 5 at 1342 on 5/14/2017.

    Upon entry in to Mode 4, TS 3.5.2 "ECCS - Shutdown became applicable, requiring IwQ ECCS injection/spray subsystems shall be OPERABLE." At CGS, the ECCS injection/spray subsystems are defined as the three Low Pressure Core lnjection (LPCI) subsystems, the Low Pressure Core Spray (LPCS) System, and the High Pressure Core Spray (HPCS) System. LPCI-A, LPCI-C, and LPCS were protected for shutdown risk.

    On 5/25/2017, during l&C inadequate maintenance on a common reference leg, HPCS auto-started due to an invalid insertion of a Level 2 signal into the system concurrent with an actual Level 8 signal sealed in. The cavity was flooded up with the fuel pool gates removed. HPCS-V-4 started to open a couple of turns, but when the inadvertent Level 2 signal cleared, the Level 8 logic "caught up" and the motor made a prompt reversai in direction to close the valve. The motor then tripped on thermals. The licensee stated the prompt reverse torque applied by the motor o erator to close the valve was the cause o~

    the sheared pin. A diagnostic test for HPCS-V-4 on 5/31 /2017 showed > 1O degrees of stem rotation. On 6/ 1/17, the licensee disassembled HPCS-V-4 and found the wedge pin sheared.

    As of 6/12/17, licensee had replaced the internais for HPCS-V-4, including using an lnconel pin and with the valve stem torqued to the upper disc in accordance with the vendor recommendations. Further, the licensee has verified that the MOV Motor torque is set such that it is less than the combined stem-to-upper disc torque plus the lnconel pin torque limit, thereby mitigating the risk of the internai valve component failure.

    From: Lantz, Ryan Sent: Th ursday, Ju ne 15, 2017 8:00 AM To: Alexander, Rya n <Ryan.Alexander@nrc.gov>; Ha ire, Mark <Mark.Haire@nrc.gov>; Kolcum, Gregory <Gregory. Kolcum@nrc.gov>

    Subject:

    FW: Columbia DDGV Please send me a TS focused answer to Mike's Qs.

    Ryan From: King, M ichael Sent: Thursday, June 15, 2017 7:15 AM To: Lantz, Ryan <Ryan. Lantz@nrc.gov>

    Cc: Miller, Chris <Chris.Miller@nrc.gov>

    Subject:

    Colu mbia DDGV

    Hi Ryan, Quick question ... Did Columbia consider the DDGV which was discovered with a broken pin to be "inoperable"? lf I recall they were shutdown ... so perhaps not?

    Thanks!

    Mike King Deput y Director, Division of lnspection and Regiona l Support Office of Nuclear Reactor Regulation US Nuclear Regu latory Commission 301-415-1004

    Heck, Jared From: Pederson, Cynthia Sent: Thursday, June 15, 2017 6:54 AM To: Roberts, Darrell; O' Brien, Kenneth

    Subject:

    FW: Anchor Darling Valve Issue From: Dean, Sili Sent: Wednesday, June 14, 2017 4:29 PM To: Pederson, Cynthia

    Subject:

    FW: Anchor Darling Valve lssue As we discussed -there is a series of emails here. start at the bottom.

    8/LL From: Chernoff, Harold Sent: Wednesday, June 14, 2017 1:32 PM To: Dean, Bill <Bill.Dean@nrc.gov>

    Cc: King, Michael <M ichael.King2@nrc.gov>; Thompson, John <John.Thompson@nrc.gov>; Thomas, Eric

    <Eric.Thomas@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>; Miller, Chris <Chris.Mi ller@nrc.gov>

    Subject:

    RE: Anchor Darling Valve lssue No we do not know the population size.

    We do not have a source of information that provides the number of valves used at each site or the total population of the valves in service.

    We would either need to formally request the information from licensees; have inspectors gather the information; or toster an industry initiative to gather the information. [note the manufacturer could provide information of numbers sold but that doesn't readily translate in to #s installed at plants - think about spares and sub-tier suppliers].

    hkc From: Dean, Bill Sent: Wednesday, June 14, 201712:59 PM To: Chernoff, Harald <Harold.Chernoff@n rc.gov>

    Cc: King, Michael <M ichael.King2@nrc.gov>; Thompson, John <John.Thompson@nrc.gov>; Thomas, Eric

    <Eric.Thomas@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>; M iller, Chris <Chris.Mil ler@nrc.gov>

    Subject:

    RE: Anchor Darling Valve lssue So a question that remains is this is out of a population of X. can we determine what X is?

    8/LL 1

    From: Chernoff, Harald Sent: Wednesday, June 14, 2017 8:23 AM To: Dean, Bill <Bill. Dean@nrc.gov>

    Cc: King, Michael <Michael.King2@nrc.gov>; Thompson, John <John.Thompson@nrc.gov>; Thomas, Eric

    <Eric.Thomas@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>; Miller, Chris <Chris.Miller@nrc.gov>

    Subject:

    RE: Anchor Darling Valve lssue Bill ,

    Below are some quick answers to your questions via Eric Thomas.

    hkc

    Harold, Here is what I can glean from the table ( can take a close look at each when I am back in the office ).

    This is over what time frame and how many resulted in inoperab/e valves?

    1993- 2017 Pretty sure they were all valve failures.

    And do we have info that shows whether issues were found in periodic testing!inspection or where result of a demand failure?

    Looks like about 7 were during maintenance, 4 during operations (Demand), and 2 that I couldn't figure out from the table (probably maintenance though)

    Eric From: Dean, Bill Sent: Tuesday, June 13, 2017 6:12 PM To: Chernoff, Harald <Harold.Chernoff@nrc.gov>; Miller, Chris <Chris.Miller@nrc.gov>

    Cc: King, Michael <M ichael.King2@nrc.gov>; Thompson, John <John .Thompson@nrc.gov>; Thomas, Eric

    <Eric.Thomas@nrc.gov>

    Subject:

    RE: Anchor Darling Valve lssue Awesome , please help me interpret. This is over what time frame and how many resulted in inoperable valves?

    And do we have info that shows whether issues were found in periodic testing/inspection or where result of a demand failure?

    BILL From: Chernoff, Harald Sent: Tuesday, June 13, 2017 4 :47 PM To: Dean, Bill <Bill.Dean@nrc.gov>; Miller, Chris <Chris.Miller@nrc.gov>

    Cc: King, Michael <Michael.King2@nrc.gov>; Thompson, John <John .Thompson@nrc.gov>; Thomas, Eric

    <Eric.Thomas@nrc.gov>

    Subject:

    Anchor Darling Valve lssue 2

    Bifl, Chris came by and asked that I summarize the OpE information on Anchor-Darling (A-0) double disc gate valve failures that we extracted from our data sources (primarily ICES) .
    • We found a total of 13 items that appear at least partially related to the LaSalle Unit 2 issue.
    • 11 of these involved A-0 double disc gate valves.

    We ranked these from A to C based on relevance of the information to the LaSalle Unit 2 issue (i. e., A-0 DDGV with stem separation "A"; A-0 DDGV with degraded stem connection (e.g., thread wear, pin failure) B";

    other similar valves with pin failures or stem separation "C")

    • "A" Ranked Valves - total of 4 0 2-32

    0 1 - 20" 0 1 -12"

    • "B" Ranked Valves - total of 7 0 2-20" 0 4-10" 0 1 - 4"
    • "C" Ranked Valves - total of 2 o 1 - size reported as 4"-12" nota DDGV o 1 - size reported as 2"-4" A-0 parallel disc gate valve We do not have a source of information that provides the number of valves used at each site or the total population of the valves in service.

    Below l've included a link to the spreadsheet that compiles the data l've described above. It is located on the Sharepoint site built to aggregate information on this issue.

    http://fusion.nrc .gov/nrr/team/dirs/ioeb/anchor darling valve issue/Shared%20Documents/Anchor%20Darling

    %20Valve%20Failure%20Examples 5-18-2017 .xlsx hkc 3

    From: O"Brien. Kenneth To: Lubinski loba: King. Michael: Garmoe Alex; Benney. Brlan; Gavr!Jas Mire Ja; Oesterle Eric; Helton Shana:

    Hickey. ames; Alley. Oavid; Farnan. Michael; Thompson. John; Miller. Chrs; Weerakkody Sunl; Glitter. oseph :

    Bowen eremy; effers Mark: Stoedter Karla: Casto Greg: Circle. leff; Ben jamin. l amie; Leech. Matthew; Shuaibi. Mohammed; Lara. l vlio; McGlnt,y. Tim: Krohn. PauJ; Burke oh n ; Kavanagh. Kerri; Herritv. Thomas; Rodrgue z. uonel; Corujo-Sandin rorge; Louden Patrjck: Kozak Laura; Ng, Ch!ng; ~  ; Wilkins Lynnea; Hsueh. Kevin; Stuchell Sheldon; Bowman. Gregoy; Lund, Loulse; Chernoff. Harold; Scarbrough Thomas; Gascot Lozada. Ramon; Purnell, Blake; Clark. Theresa; Valdya. Bhalchandra; Wrona. David; Whitman. lennife r; Tilton. caroljne; Mclntyre, payjd: BurnetJ. Scott Morey, Dennjs; MartJnez. Nancy; Thomas, Eric: Lantz. Ryan; farnholtz Jhomas; Stott Chad Cc: Dean. Bill; Evans Michele; McDermott Brian

    Subject:

    RE: Information Notlce 2017-03 (LaSalle) Signed and Being Issued Date: Thursday, June 15, 2017 12:29:23 PM Outstanding !

    Those with great memories may recall a pizza offer if we made the issuance by Friday.

    Well , you all out did you rselves.

    Teli me where and how to deliver and I will make it so!

    Thanks Ken From: Lubinski, John Sent: Thursday, June 15, 2017 12:11 PM To: King, Michael <Michaet.King2@nrc.gav>; Garmae, Alex <Alex.Garmoe@nrc.gav>; Benney, Brian

    <Brian.Benney@nrc.gav>; Gavrllas, Mirela <M irela.Gavrllas@nrc.gav>; Oesterle, Eric

    <Eric.Oesterle@nrc.gav>; Heltan, Shana <Shana .Helton@n rc.gav>; Hickey, James

    <James.H ickey@nrc.gov>; Alley, David <David.Alley@nrc.gov>; Fa rnan, Michael

    <M ichael. Farnan@ nrc.gav>; Thampsan, John <.Jahn.Thompson@nrc.gav>; M iller, Chris

    <Chris.Mil ler@nrc.gav>; Weerakkady, Sun il <Sun il,Weerakkady@nrc.gav>; Giitter, Jaseph

    <Joseph.Glitter@nrc.gav>; Bawen, Jeremy <.Jeremy.Bawen@nrc.gov>; Jeffers, Mark

    <Ma rk.J effers@n rc.gov>; Stoedter, Karla <Karla .Staedter@n rc.gov>; O' Brien, Ken neth

    <Kenneth .O'Brien@nrc.gav>; Casta, Greg <Greg.Casta@nrc.gav>; Circle, Jeff <Jeff.Circle@nrc.gav>;

    Benjamin, Jamie <Jamie.Benjamin@nrc.gov>; Leech, Matthew <Matthew.Leech@n rc.gav>; Shuaibi, Mahammed <Mahammed .Shuaibi@nrc.gav>; Lara, Ju lia <Julio.Lara@nrc.gov>; McGinty, Tim

    <Tim.McGinty@nrc.gov>; Krohn, Paul <Paul.Krohn@nrc.gov>; Burke, John <Jahn.Burke@nrc.gav>;

    Kavanagh, Kerri <Kerri.Kavanagh@nrc.gav>; Herrity, Thamas <Thamas.Herrity@ nrc.gav>; Rodriguez, Lianel <Lianel.Radriguez@nrc,gav>; Caruja-Sandin, Jarge <Jarge,Caruja-Sandin@nrc.gav>; lauden, Patrick <Patrick.Louden@nrc.gav>; Kazak, Lau ra <Laura.Kazak@nrc.gav>; Ng, Ching

    <Ch ing.Ng@nrc.gov>; Miller, Ed <Ed .Miller@nrc.gav>; Wi lkins, Lynnea <Lynnea.Wil kins@nrc.gav>;

    Hsueh, Kevin <Kevin.H sueh@nrc.gov>; Stuchell, Sheldan <Sheldan.Stuche ll@nrc.gav>; Bawman, Gregary <Gregary.Bawman@nrc.gav>; Lund, Louise <Lauise.Lund@nrc.gav>; Chernoff, Harald

    <Harald.Chernoff@nrc.gav>; Scarbrough, Thomas <Thamas.Scarbrough@nrc.gav>; Gascot Lazada, Raman <Ramon.Gascotlozada@nrc.gav>; Purnell, Blake <Blake.Purnell@nrc.gov>; Clark, Theresa

    <Theresa.Clark@nrc.gav>; Vaidya, Bha lchandra <Bhalchandra.Vaidya@ nrc.gav>; Wrona, David

    <David.Wrana@nrc.gav>; Whitman, Jennifer<Jen nifer.Whitman@nrc.gav>; Tiltan, Caroline

    <Caraline.Tiltan@nrc.gov>; Mclntyre, Davrd <Davfd.Mclntyre@ nrc.gov>; Burnel l, Scott

    <Scott.Bu rnel l@nrc.gov>; Morey, Denn is <Dennis .Morey@ nrc.gov>; M artinez, Nancy

    <Na ncy.Martinez@ nrc.gov>; Th omas, Eric <Eric.Thomas@nrc.gov>; La ntz, Rya n

    <Rya n.la ntz@ nrc.gov>; Farnholtz, Thomas <Thomas.Farnholtz@ nrc.gov>; Stott, Chad

    <Chad.St ot t@n rc.gov>

    Cc: Dean, Bill <Bill.Dean@nrc.gov>; Evans, M ichele <Michele.Evans@n rc.gov>; McDermott, Brian

    <Bria n.McDermott@n rc.gov>

    Subject:

    RE: lnformation Notice 2017-03 (LaSa lle) Signed and Being lssued Kudos to all !!!

    From: King, M ichae l Sent: Th ursday, Ju ne 15, 2017 1:04 PM To: Garmoe, Alex <Alex.Garmoe@nrc.gov>; Ben ney, Bria n <Brian.Benney@nrc.gov>; Gavri las, M irela

    <Mirela.Gavrilas@nrc.gov>; Oesterl e, Eric <Eric.Oesterle@nrc.gov>; Helton, Sha na

    <Shana.Helton@nrc.gov>; Hickey, James <James.Hickey@nrc.gov>; Alley, David

    <David.Alley@nrc.gov>; Farna n, M ichael <Michael.Farnan@nrc.gov>; Thompson, John

    <John.Thompson@nrc.gov>; M iller, Chris <Chris.Miller@nrc.gov>; Weerakkody, Sun il

    <Sun il.Weerakkody@nrc.gov>; Gi itter, Joseph <Joseph.Giitter@nrc.gov>; Bowen, Jeremy

    <Jeremy.Bowen@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Stoedter, Karla

    <Kacla.Stoedter@nrc.gov>; O'Bri en, Kennet h <Ken neth.O'Brien@nrc.gov>; Casto, Greg

    <Greg.Casto@nrc.goy>; Circle, Jeff <Jeff.Circle@nrc.gov>; Benjami n, Jam ie

    <Jam ie.Benjamin@nrc.gov>; l eech, Matt hew <Matthew.Leech@nrc.gov>; Shua ibi, Mohammed

    <Mohammed.Shuaibi@ nrc.gov>; Lara, Julio <Julio.Lara@nrc.gov>; McGi nty, Tim

    <Jim.McGinty@nrc.gov>; Krohn, Pau l <Paul.Krohn@nrc.gov>; Burke, John <John.Burke@nrq~ov>;

    Kavanagh, Kerri <Kerrj.Kavanagh@nrc.gov>; Herrit y, Thomas <Thomas.Herrity@nrc.gov>; Rod riguez, Lionel <Lionel.Rodriguez@nrc.gov>; Coruj o-Sand in, Jorge <Jorge.Corujo-Sandin@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>; Kozak, Laura <Laura.Kozak@nrc.gov>; Ng, Chi ng

    <Ch1ng.Ng@nrc.gov>; Miller, Ed <Ed.M iller@nrc.gov>; Wil kins, Lynn ea <Lynnea .Wil kins@nrc.gov>;

    Lubi nski, John <John. Lubinski@nrc.gov>; Hsueh, Kevin <Kevin .Hsueh@nrc.gov>; St uchell, Sheldon

    <Sheldon.Stuchell@nrc.gov>; Bowman, Gregory <Gregory.Bowman@nrc.gov>; Lun d, Louise

    <Louise. Lund@nrc.gov>; Chernoff, Harold <Harald Chernoff@nrc gov>; Scarbrough, Thomas

    <Thomas.Scarbrough@nrc.gov>; Gascot Lozada, Ramon <Ramon.Gascotlozada@nrc.gov>; Purnell, Blake <Blake.Purnell@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>; Vaidya, Bhalchand ra

    <Bha lchandra.Vaidya@nrc.gov>; Wrona, David <David.Wrona@nrc.gov>; Wh itman, Jenn ifer

    <Jennifer.Whitman@nrc.gov>; Tilton, Carol in e <Carol ine.Tilton@nrc.gov>; Mclntyre, David

    <Davjd.Mclntyre@nrc.gov>; Burnell, Scott <Scott.Burnell@nrc.gov>; Morey, Denn is

    <Dennis.Morey@nrc.gov>; Mart inez, Nancy <Nancy.Martinez@nrc.gov>; Thomas, Eric

    <Eric.Thomas@nrc.gov>; La nt z, Ryan <Ryan.Lantz@nrc.gov>; Farnholtz, Thomas

    <Thomas.Farnholtz@nrc.gov>; Stott, Chad <Chad.Stott@nrc.gov>

    Cc: Dean, Bill <Bill.Dean@nrc.gov>; Evans, Michele <Michele.Evans@nrc.gov>; McDermot t, Bria n

    <Bria n. M cDermott@nrc.gov>

    Subject:

    RE: lnformat ion Notice 2017-03 (LaSa lle) Sign ed and Being lssued Well done Team!

    From: Garmoe, Alex Sent: Th ursday, Ju ne 15, 2017 12:51 PM To: Benney, Brian <Brian.Benney@nrc.gov>; Gavri las, M irela <Mire!a.Gavrilas@nrc.gov>; Oest erle, Eric <Eric.Oesterle@nrc.gov>; Helt on, Sha na <Shana.Helton@nrc.gov>; Hickey, James

    <James.H ickey@nrc.gov>; Alley, David <David.Alley@nrc.gov>; Farna n, M ichael

    <Michael.Farnan@nrc gov>; Thompson, John <John.Thompsoo@nrc.gov>; Miller, Chris

    <Chris.Mi ller@nrc.gov>; King, M ichael <Michae1.King2@nrc.gov>; Weerakkody, Su nil

    <Sunil.Weerakkody@ nrc.gov>; Gi itter, Joseph <Joseph.Giitter@nrc.gov>; Bowen, Jeremy

    <Jeremy.Bowen@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Stoedter, Karla

    <Karla.Stoedter@nrc.gov>; O'Bri en, Kennet h <Ken neth.O'Brien@nrc.gov>; Cast o, Greg

    <Greg.Casto@nrc.gov>; Circl e, Jeff <Jeff.Circle@nrc.gov>; Benjami n, Jam ie

    <Jamie.Ben jamin@n rc.gov>; Leech, Mat t hew <Matthew.Leech@nrc.gov>; Shua ibi, Mohammed

    <Mohammed.Shuaibi@nrc.gov>; Lara, Julio <Julio.Lara@nrc.gov>; McGi nty, Tim

    <J im.McGinty@nrc.gov>; Krohn, Pau l <Paul,Krobo@nrc.gov>; Burke, John <John.Burke@nrc,gov>;

    Kavanagh, Kerri <Kerri.Kavanagh@ nrc.gov>; Herrity, Th omas <Thomas.Herrity@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Corujo-Sand in, Jorge <Jorge.Corujo-Sandin@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>; Kazak, Lau ra <Laura.Kozak@nrc.gov>; Ng, Chi ng

    <Ching Ng@nrc gov>; Miller, Ed <Ed.Miller@nrq~ov>; Wil kins, Lynn ea <Lynnea .Wilkins@nrc.gov>;

    Lubi nski, John <John.Lubinski@nrc.gov>; Hsueh, Kevin <Kevin.Hsueh@nrc.gov>; St uchell, Sheldon

    <Sheldon.Stuchell@nrc.gov>; Ga rmoe, Alex <Alex.Garmoe@nrc.gov>; Bowma n, Gregory

    <Gregory.Bowman@nrc.gov>; Lund, Lou ise <Louise .Lund@nrc.gov>; Chernoff, Harald

    <Haro!d.Chernoff@nrc.gov>; Sca rbrough, Thomas <Thomas.Scarbrow~h@nrc.gov>; Gascot Lozada, Ramon <Ramon.GascotLozada@nrc.gov>; Purnel l, Bla ke <Blake.Purnell@nrc.gov>; Clark, Theresa

    <Theresa.Clark@nrc.gov>; Vaidya, Bha lchandra <Bhalchandra.Vaidya@nrc.gov>; Wrona, David

    <David .Wrona@nrc.gov>; Whitman, Jenn ifer <Jennifer.Whitman@nrc.gov>; Tilton, Caroli ne

    <Caroline.Tilton@orc.gov>; Mclntyre, David <David.Mclntyre@nrc.gov>; Burnell, Scott

    <Scott.Burnell@nrc.gov>; Morey, Dennis <Dennis.Morey@nrc.gov>; Mart inez, Nancy

    <Nancy.Martinez@nrc.gov>; Thomas, Eric <Eric.Thomas@nrc.gov>; Lantz, Rya n

    <Ryan.Lantz@nrc.gov>; Farnholtz, Thomas <Thomas. Farnholtz@nrc.gov>; Stott, Chad

    <Chad.Stott@orqNv>

    Cc: Dean, Bill <Bill.Dean@nrc.gov>; Evans, Michele <Michele.Evans@nrc.gov>; McDermot t, Bria n

    <Brian.McDermott@nrc.gov>

    Subject:

    lnformation Notice 2017-03 (LaSal le) Signed and Being lssued Good afternoon, lnformation Notice 201 7-03, "Anchor/Darling Double Disc Gate Valve Wedge Pin and Stem-Disc Separation Failures," has been signed by Louise Lund and Tim McGinty and is in the process of being issued. It wi ll soon be publicly available in ADAMS (ML17153A053) and on the public website and will be distributed via ListServe to roughly 7,000 recipients.

    Thank you to everyone involved for the very prompt support in developing and issuing this IN.

    Alexander D. Garmoe Acting Branch Chief Generic Communi cati ons Branch Dvisi on of Pol icy and Rul emaki ng Office of Nuclear Reactor Regul ation Al ex.Garmoe@nrc.gov l 301-415-3814

    From: Jeffers. Mark To: coyne. Kevio Cc: Benja min. 1am ie Oamie.Ben jamjn@nrc.goy}; Stoed ter. Karta CKarla.Stoedter@nrc.gov\

    Subject:

    LaSalle Options Date: Thursday, J une 15, 2017 6:02:00 PM Attachments: Options Paper.docx Kevin ,

    Please see attached for a 11rough" draft of options going forward with LaSalle. 1use the term "rough" loosely. We met in the Region today (the team lead, EICS, and myself) to put our thoughts on paper. So it is very raw data, but I wanted to provide to you so that we can discuss tomorrow morning to refine and get ready to provide to everyone. Please Iet me know if you have any questions, comments , or concerns.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798

    From: Coyne, Kevin To: Benncy Bjnn ; Qavri)as Mircla; Oe41ec)c Eric; Hchoa Shana; Hlckcy Jarncs; AUcv Davjd; Famaa Mjchacl*

    Thompson, fohn: Miller Chrjs; K,ng., M ichael; Weernkkod.y. Sunil; GiiHer Joseph; Bowen. Jercmy; kft'ers Mark; Stoed1*e r Karla: OBrien. Kenoerh.: Casto Gre~ ; Circle .leff; Benjamin famie; Leech Matthew; Shuaibi. Mohammed:

    Lar., lu i p; McQin1y. Tim; Kmbo Paul; Burke JoJrn; Kavam,0 h Kerrj; fü1riy Th,ma,s; Rorrigue2 LjoneJ: Corn jo-Sandin loge; Louden Patm:k; Kozal, L;uu-a: Ng Chjng; Mjller Ed: Wilkjns Lymwa: Lubinski John; Hsueh Kevin; Stuchell. Sheldon; Gannoe Alex; Bowman. Greoory~ Lund . l.ouise; Chemoff. Hm*okJ* Searhrough. Thomas; Gascot 1.oz,1<Jp Ramnn; Purnel) BJokc; ar Thercsa: Vnidya Bhalchandra; Wrona Davjcl; WJ1j1nrnn Jennjfor: Iiliil.11.

    ~  : Mclntyre. pvut; l311tnell. St,ou; Morey. Dcnnl:,: M;u"linez. Nancy: Thomas. Erjc: Cl pr MC Ve2eJ. Anton:

    StntL Chad; PeltoTL.David : Scort. Michael: Lorson. Raymond : Oody, Tony; Munday. Joel

    Subject:

    Summary of June 14 HQ LIC-504 Call on LaSalle MOV I ssues (Attachment contains proprietary information)

    Date: Thursday, June 1S, 2017 11:58:33 AM Attachments: Ag~nda !Hac 14 2017 cJocx TPJ7- -l J? VTG F)nwservc Pur 1 J Rev2 pdf

        • Note that attachment (TP 17-1-112) contains proprietary information ****

    Thanks to all who supported Wednesday's call. Here's a summary of the discussions (and please feel free to provide and corrections or comments on items I may have missed).

    Highlights:

    • lssuance of lnformation Notice on the Anchor Darling Double Disc Gate Valve issue is on track for issuance on Thursday, June 15 (ahead of schedule). Being coordinated with update to the Communication plan. Thanks to all who supported this milestone.
    • NRR/DPR continuing preparations for a public meeting to discuss the industry response to the Flowserve Part 21 and recent operating experience. Meeting will be coordinated with owners groups, Flowserve, and NEI and will assist the staff in assessing the need for further regu latory action following issuance of the lnformation Notice. The objective of this meeting is to solicit industry input on recent actions taken with regard to the Flowserve Part 21 in light of LaSalle valve failure. This information will be used to inform the LIC-504 decision-making process. An NEI point of contact (Greg Krueger) has been identified and NEI is will ing to support the meeting - a planning drop-in meeting will be conducted with NEI on Thu rsday, June 15, to facilitate logistics for the public meeting.
    • Region 111 Special lnspection Team exited on Friday, June 9. The SIT exited with the following preliminary issues (subject to management review and approval): (1) an apparent violation for design control issue associated with the Unit 2 HPCS injection valve failure (will be handled under traditional enforcement process), and (2) an unresolved issue (URI) associated with the adequacy of the licensee's operability evaluation for the Unit 1 HPCS injection valve. Region 111 and NRR are in the alignment process for addressing the URI.
    • NRO/DCIP to conduct vendor inspection at Flowserve during the week of July 16, 2017
    • NRR/DIRS has set up a SharePoint site to collect information -

    http :/Jfusion.mc.gov/nrr/tearn/dirs/ioeb/auchor darli ng valve issue/default. asp.x

    • Next HO LIC-504 meeting will be scheduled a few days prior to the public meeting mentioned above (late June, early July).

    Detailed Summary Meeting commenced at 3:00 pm on Wednesday, June 14. Representatives from the following organ izations were represented :

    • NRR/DE
    • NRR/DRA
    • NRR/DSS
    • NRR/DPR
    • NRR/DIRS
    • NRO/DCIP
    • Regions 111 and IV
    • OEDO

    Purpose:

    Continue discussion of LIC-504 process to address generic implications arising from LaSalle special inspection. Focus areas tor discussion will be:

    • Status of IN development process (target completion 6/16)
    • Discuss planning for Follow-up Public Meeting Th is is the ninth meeting held on the LaSalle LIC-504 issue - previous meetings were held on May 3, May 5, May 10, May 11 , May 18, May 24, June 1, and June 8. Agenda is attached.

    Status Reports:

    • LaSalle Special lnspection (M. Jeffers, Region 111)- Special lnspection Team exited on Friday, June 9. The SIT exited with the following preliminary issues (subject to management review and approval): (1) an apparent violation for design control issue associated with the Unit 2 HPCS injection valve failure (will be handled under traditional enforcement process), and (2) an unresolved issue (URI) associated with the adequacy of the licensee's operability evaluation for the Unit 1 HPCS injection valve. Region 111 and NRR are in the alignment process for addressing the URI.
    • lnteractions with PWROG/BWROG (B. Benney, L. Watkins, NRR/DPR) - PWROG received permission from the BWROG to send Revisions 2 and 3 of the BWROG A/D OD Disc Valve guidance to the PWROG members. Per the BWROG, the, varrous report revisions are ldentified as:

    Original Release "BWROG-TP-13-006".

    Revision 1 - Update to incorporate Operating Experience based on industry inspections -Addendum 1. (Distributed as TP16-1-112 r1 due to BWROG document naming convention change).

    Revision 2 - Revision to incorporate lessons learned and recommendations resulting from a stem/disc separation event that occurred at Exelon's LaSalle Station in February 2017. The document has been rewritten to better integrate the latest operating experience and recommendations. Addendum 1 has been eliminated with applicable information incorporated into the body of the report. (Distributed as TP17-1-112 but should have been TP1 6-1 -112 r2). This report is attached for information.

    Revision 3 - Update to incorporate comments from Flowserve and others to facilitate formai Flowserve Corporation endorsement of the updated Topical Report. (TP16-1 -1 12 r3) . A copy of this guidance is currently not available to staff.

    The BWROG has indicated that their preference for supporting a public meeting was July 18. This date later than needed to support a timely decision making process and conflicts with planned vendor inspection activities at Flowserve. More discussion follows later in this summary.

    • lnteractions with Flowserve (J. Burke, NRO/DCIP) -J. Burke (NRO/DCIP) noted that

    a vendor inspection will be conducted at Flowserve the week of July 16. Andy Dunlop and Lionel Rodriguez from Region 111 will also be supporting the vendor inspection.

    • lnteractions with INPO (E. Thomas, NRR/DIRS) - Nothing new to report.
    • lnteractions with NEI (G. Bowman, NRR/DPR)-A logistical planning drop in with NEI is scheduled for Thursday, June 15. The goal is to communicate NRC goals and objectives for the public meeting to ensure industry will be prepared to provide needed information. There was discussion on need to address information collection 0MB requirements. NRR/DPR will follow-up on process controls needed to ensure appropriate information collection. NEI has expressed a willingness to coordinate industry actions on this issue.
    • Risk Assessment (J. Circle, NRR/DRA) - NRR/DRA is continuing to work on documentation for risk analysis.

    LIC-504 Topies:

    • Re-affirmed Qualitative Risk Assessment (K. Coyne, NRR/DE) - The team discussed the risk assessment supporting the conclusion that there was not a need for immediate regulatory action per the guidance in LIC-504 and reaffirmed that this issue does not require immediate regulatory action. The assessment was modified as follows:

    Preliminary Assessment

    1. Anchor Darling Double Disc Gate Valves (DDGVs) are used in safety-related and risk-significant applications at over 40 plant sites. These valves are used in both PWR and BWR plant applications, including emergency core cooling, residual heat removal, and service water systems.
    2. The under-torqued stem condition described in the TVA and Flowserve Part 21 reports may have existed since initial plant construction. ln addition, for valves with a press fit stem collar, slippage of the collar (due to operating forces greater than the resistance from the collar) can result in loss of stem pre-torque.
    3. Although the under-torqued stem condition can lead to wedge pin shearing and eventual valve failure, the staff has identified that only a small portion of the in-service valves have known failures due to wedge pin shearing. Based on adata analysis conducted by INL, the estimated failure rate based on operating experience for A/D DDGVs is approximately 1E-03/year, slightly worse than the non-ND valve population (note that this estimate pools all anchor darling valves regardless of size and includes all failure modes). However, there is uncertainty about the correlation between valve size and susceptibility to failure - this remains an open question.
    4. Limiting the shear stress applied to the wedge pin by either (1) the use of a motor actuator incapable of generating sufficient torque, or (2) by valve setup (e.g., setting of torque switches at a low enough value) may prevent wedge pin and subsequent failure of valve.
    5. Failure of wedge pin does not immediately lead to valve failure. Based on operating experience, there appears to be a latency period following wedge pin failure before gross failure of the valve occurs.
    6. Operating experience from Duke disassembly and inspection of more than 23 valves indicated that all but two valves were untorqued. However, none of the under-torqued valves had a sheared wedge pin; stem or disc damage; or was in a failed condition prior to disassembly. This operating experience was associated with smaller sized anchor darling valves.
    7. A risk assessment conducted for 11 plants using conservative assumptions (e.g. ,

    increase in fai lure rate of all MOVs by a factor of -11) indicates that the increase in CDF associated with the degraded valve conditions constitutes a small increase in CDF (approximately less than 1 E-05/yr).

    8. The staff is not aware of any other information at this time that would require immediate regulatory action Therefore , the preliminary conclusion is that wh ile reliability of the affected valves may be degraded, the condition identified in the Part 21 notifications and related design defect associated with the potential for stem collar slippage does not result in an immediate safety concern .
    • LIC-504 Decision Options (K. Coyne, NRR/DE) - The team next discussed the following topies:

    - Schedule for lssuance of IN - NRR/DPR (N. Martinez) reported that all concurrences have been received on the draft lnformation Notice and it is currently ahead of schedule. The IN could be issued as early as Thu rsday, June 15.

    - Status of Public Meeting - NRR/ NRR (K. Coyne) discussed the planning goals for public meeting w ith industry to discuss recent actions taken to address anchor darling valve failures. This meeting will be used to gather information to support the NRC's LIC-504 process. The goal of this interaction is to gather information about industry actions in response to recent anchor darling valve issues. This information will be used to assess and implement the mast appropriate regulatory response (e.g., monitor voluntary industry initiative, generic commun ication, etc.). The team finalized a list of questions to focus the upcoming public meeting discussions:

    • Characterization of the population of Anchor/Darling Double Disc Gate Valves (DDGVs) with threaded stem-disc connections in nuclear service

    - Total number in service

    - Distribution by valve size (e.g. , percentage of population in each size sub-group)

    - Actuators typically paired with various valves sizes

    - Systems where valves are used

    • What valve characteristics or operating conditions increase susceptibility to wedge pin failure and subsequent stem disc separation failure?

    - How shou ld valve characteristics/conditions be used to prioritize resolution of issues for Anchor/ Darling DDGVs.

    • What corrective actions are needed to resolve the Anchor/ Darling DDGV pre-torqueing and design issues?
    • What industry actions have been performed (or are planned) in response to Anchor/ Darling DDGV issues (e.g., Part 21 notifications, recent operating experience)?

    - Failure evaluations

    - lnspections

    - Repairs/modifications

    - Schedule for future actions

    • What testing or inspection procedures (if any) can be used to identify a degraded condition or incipient failure without valve disassembly (beyond stem rotation checks and MOV diagnostics whose effectiveness are currently being questioned by the NRC)?
    • Has the extent of condition been evaluated for other valve or actuator types (e.g., Anchor/Darling DDGVs with T connection, other supplier valves with threaded stem-disc connection)?
    • Perspectives and insights related to the risks associated with continued operation with a potential degraded condition for Anchor Darling DDGVs

    - lndustry plans and schedule for updating Anchor/Darling DDGV guidance documents (e.g., Part 21s, BWROG guidance)

    - lndustry wide guidance for inspection/repair of affected valves To facilitate logistics for the public meeting, G. Bowman (NRR/DIRS), K. Coyne (NRR/ DE), M. King (NRR/DIRS), and K. O'Brien (Region 111/DRS) plan to have a drop in meeting with NEI (G. Krueger) to discuss the purpose and objectives for the meetings and scheduling considerations. This drop-in is scheduled for Thursday ,

    June 15. With regard to scheduling the publ ic meeting, NRO (J. Burke) requested that the week of July 17 be avoided due to conflict with the planned vendor inspection at Flowserve.

    • Communication Plan (B. Benney, NRR/DPR} - The draft communications plan is posted on the DIRS SharePoint site (http:Ufusion.nrc.gov/nrr/team/Jjn,/joeb/anchor darling valve jssue/uefault aspx: ). The plan will be updated periodically. The team was encouraged to review the plan and provide any comments or suggestions to Brian Benney who will continue to coordinate the comm plan. Jn particular, the section on Questions and Answers can use further development.
    • Next Meeting (K. Coyne, NRR/DE) - The next LIC-504 meeting will be scheduled prior to the public meetng to ensure staff alignment prior to meeting with external stakeholders.

    Next Meeting: tbd (but will be scheduled several days before the public meeting with industry stakeholders)

    Action ltems:

    ALL

    • Provide potential questions for Flowserve to NRO/DCIP (John Burke) for possible inclusion in the Flowserve vendor inspection plan.
    • Provide input for LIC-504 decision options and informatlon needs as appropriate.
    • Provide feedback on communlcation plan to Brian Benney (NRR/DPR)

    (hup ://fusion. nrc. gov /nrr/lca.m/<l irs/ioeb/:mchor_ darl ing_ vai ve_iss ue/<ldaul t.aspx ).

    NRR/DE

    • Follow-up with RES to determine if there is more A/D DDGV data to differentiate reliability history vs. size (K. Coyne).

    NRR/DPR:

    • lmplement accelerated schedule for issuance of IN (N . Martinez) - Due to be issued Friday, June 16
    • Continue development of Communication Plan (B. Benney)
    • Begin planning activities for public meeting with industry representatives to discuss response to Flowserve Part 21 and related operating experience (L .Wilkins)
    • Develop draft agenda for public meeting (L. Wilkins)
    • Follow-up on information collection requirements with OIS (B. Benney)

    NRR/DRA

    • Document generic risk assessment activities (C. Ng, M. Leech)

    NRR/DSS

    • Jim Hickey will take the lead on documenting the LIC-504 assessment Thanks again for your support of this process -

    Kevin Kevin Coyne, PE, PhD Oeputy Director (Acting), Division of Engineering Office of Nuc/ear Reactor Regulation Kevin.Coyne@nrc.gov (301) 415-2478

    Benjamin, Jamie From: Rodriguez, Lionel Sent: Thursday, June 15, 2017 9:23 AM To: Ben*amin Jamie Subje ct: (b)(5) Deliberative Privilege l listened to this morning's presentation on the Ops Center by Bern Stapleton. He stated the NRC is a very collegial organization, which he then said means a lot of people are consulted before a decision is made. Post 9/11, they had to change their process for decisions that needed to be made in a very short time frame. Effectively, they limited the decision maker to 1 person in order for the decision to be made in a timely manner.

    (b)(5) Deliberative Privilege Lienei R.

    From : Benjamin, Jamie Sent: Thursday, June 15, 2017 9:15 AM To: Rodriguez, Lionel <Lionel.Rodri ov>

    Subject:

    RE : (b)(5) Deliberative Privilege 1 did the same and did the same with Ken. Ken is looking for complete agreement and partnership with everyone, i.e. NRR.

    From: Rodriguez, Lionel Sent: Thursday, June 15, 2017 9:13 AM To: Ben*amin Jamie <Jamie.Ben*amin ov>

    Subject (b)(5) Deliberative Privilege By the way, 1 talked to M. Jeffers about this at length yesterday. 1 told him we need to be talking to the right people (Oirector of OE) since it seems they are the decision maker. ln other words, invest our time and effort in the people we need that will be making the decision.

    From: Benjamin, Jamie Sent: Thursday, June 15, 2017 9:11 AM To: Rodri uez Lionel <Lionel. Rodri uez Subject (b)(5) Deliberative Pri vilege Got it, thanks.

    From: Rodriguez, Lionel Sent: Thursday, June 15, 2017 9:10 AM To: Benjamin, Jamie <Jamie.Ben *amin nrc. ov>

    Subject:

    RE: (b)(5) Deliberative Privilege 1

    l(b){S) Deliberati,e P,t.tege Hope this helps.

    Fro m: Benjamin, Jamie Sent: Thursday, June 15, 2017 9:06 AM To:Ro~*~~.1.11.~;.i.:....i.~~~~i=-~.IJ.l,j~i.v..;:;..,

    2.

    From: coyne. Kevin To: O"Brien. Kenneth Cc: Lubinski. ohn subject: A couple of LaSalle Items Date: Friday, J une 16, 2017 4:05:24 PM Ken-Thanks again for working with me on the options Table this afternoon - thought we had a good dialogue. And getting a chance to work again with Region 111 has been a highlight of the rotation for me so I appreciate the candid dialogue we've been able to have on this. A couple of items I just wanted to run by you (and 1'11 be in the office for a little bit more if you want to Skype) :

    • When you draft up the key messages for the calls Mike J and Cindy will be making (you took away that action, correct ©), can you send them to both me and John?

    Slnce 1'11 be on leave, John will take a quick look. Also, 1think Mlke was looking at making the call on Tuesday1 rather than Monday, to allow a little more time for Region 111/NRR alignment on the messages.

    • We're on the hook for the July 5 presentation for the safety spotlight during the OEDO Quarterly Strategic Alignment Meeting. l'm planning to cobble together about 5 slides or so - heavy on graphics to support a 10 minute discussion. As far as the SIT and LIC-504, 1wasn't going to go into many details - maybe just put a bullet for current status we can speak to for each effort. 1'11 try to send you something to take a look at in the next day or two to keep the ball rolling.

    1'11 be out of the office for the next two weeks, but will be checking emails periodically -

    particularly ones related to A/0 valves - and will likely be going to the June 29 public meeting regardless.

    Hope you have a good weekend -

    Kevin

    From: McDermott Brian To: O"Brien Kenneth Subj ect: RE: Anchor Darling DDGVs - Data insights on fa llure rate vs . Valve Size Date: Friday, J une 16, 2017 9:05:46 AM Quick question/thought- was there a performance deficiency regarding the licensee's weak-link analysis? Was there a problem with how the LaSalle plant did its analysis for the HPCS valves or is there some "new information" that would lead us to believe that there is a generic issue with how weak-link analyses are being performed across the industry?

    lf plants do the weak-link analysis properly, following their established MOV programs, 1 would not expect failures resulting from setting a torque switch in a way that overloads the valve.

    From: O'B ri en, Kenneth Sent: Friday, June 16, 2017 7:45 AM To: McDermott, Brian <Brian. McDermott@nrc.gov>; Coyne, Kevin <Kevin.Coyne@ nrc.gov>; Dean, Bill <Bill.Dean@nrc.gov>; Pederson, Cynthia <Cynthia. Pederson@nrc.gov>; Roberts, Da rrell

    <Darrell.Roberts@nrc.gov>

    Cc: Lubi nski, John <John.Lubinski @nrc.gov>; M ill er, Chris <Chris.Mil ler@nrc.gov>; King, Michael

    <M ichael.King2@n rc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; Jeffers, Mark

    <Mark.Jeffers@n rc.gov>

    Subject:

    RE: Anchor Darling DDGVs - Data insights on fa ilure rat e vs. Valve Size Brian (b)(5) Deliberative Privilege

    (b)(5) Deliberative Privilege Thanks Ken From: McDermott, Brian Sent: Friday, June 16, 2017 5:54 AM To: Coyne, Kevin <Kevin.Coyne@n rc.gov>; Dean, Bill <Bill.Dean@ nrc.gov>

    Cc: Lubinski, John <.Joh n.Lubinski@ nrc.gov>; M iller, Chris <Chris.M iller@ nrc.gov>; King, Michael

    <MichaeLKing2@nrc.gov>; Chernoff, Harold <Harold.Chernoff@nrc.gov>; Lane, Joh n

    <John. Lane@nrc.gov>; Nakoski, Jo hn <John.Nakoski@nrc.gov>; Cheok, M ichael

    <Michael.Cheok@ nrc.gov>; Thaggard, Ma rk <M ark .Thagga rd@nrc.gov>; O'Brien, Kenn eth

    <Kenneth.O'Brien@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; Jeffers, Mark

    <Mark.Jeffers@nrc gov>

    Subject:

    Re: Anchor Da rl ing DDGVs - Data insights on fa il ure rat e vs. Valve Size I would also note that not all stem to disk fai lures are the result of the over torque issue. Flow induced vibration appears to be been the cause in some number of the cases.

    On: 15 June 2017 19:14, "Coyne, Kevin" <Kevin.Coyne@nrc.gov> wrote:

    ... should have added another bullet to give the data a little more context. ..

    • The raw INPO data does not have much in the way of descriptive information - so while we can tilter for "gate" valves, it is not possible to further differentiate the data. So, these results may include other gate valve types than just double disc gate valves. We also do not have any specific information about the valve internais (e.g., stem collar design, threaded stem, etc.) .

    We should be able to get more clarity on th is issue during the upcoming public meeting.

    Kevin From: Coyne, Kevin Sent: Thursday, Ju ne 15, 2017 7:00 PM To: Dean, Bill <Bill.Dean@nrc.gov>; McDermott, Brian <Brian .McDermott@n rc.gov>

    Cc: Lubinski, John <Joh n.Lubjnskj@nrc.gov>; Mi ller, Chris <Chrjs M iller@ nrc.gov>; King, M ichael

    <Michael.King2@nrc.gov>; Chernoff, Harald <Harold.Chernoff@nrc.gov>; Lane, John

    <John.Lane@nrc.gov>; Nakoski, John <John.Nakoski@nrc.gov>; Cheok, M ichael

    <Michael.Cheok@n rc.gov>; Thaggard, Mark <Mark.Thaggard@nrc.gov>; O'Brien, Kenneth

    <Kennet h.O' Brien @nrc.gov>; Shuai bi, Moham med <Mohammed.Shua ibi@nrc.gov>; Jeffers, Mark

    Subject:

    Anchor Darling DDGVs - Data insight s on fa ilu re rate vs. Va lve Size Bill, Brian -

    RES/DRA and INL worked with the INPO data feed and came up with some population estimates based on the sizing of Anchor Darling DDGVs. This is preliminary information as there are still a few questions about the completeness of the INPO data (RES is running these down), but here's a quick summary of what we have right now (... detailed data is attached):

    Valve Size # of valves # of failures Calendar Year Failure Rate

    {CV) {exposure) /CY

    .5" -2" 38 1 686.17 1.5E-03 2" -4" 251 8 4276.50 1.9E-03 4" -12" 1163 18 20737.67 8.7E-04 12" -20" 430 4 7769 5.1 E-04 20" -40" 229 7 4348.67 1.6E-03 A couple of quick observations -

    • These include ali failure causes for the valve - fail to open/close , and leakage (so stem-disc separation failure events would be lower). Actuators are excluded from the failure counts.
    • With the exception of the 20 - 40" valves (which generally seem to be steam stops, loop isolations, containment sumps, or RHR inlets), the larger valves have a slightly lower failure rate than the smaller valves . Although we don't have a lot of resolution in the 4-12" size range, this data does not seem to support a general conclusion that larger valves are more susceptible to failure.
    • For the range of most interest for the LaSalle issue (4-12"), the 18 failures seem to be asso.ciated with the following valve types:

    ~ HPCI Main Steam Line lsolation Valve (7)

    ~ HPCI Discharge to Feedwater lsolation Valve (1)

    ~ LPCS Discharge To Reactor Spray lsolation Valve (1)

    > lsolation Condenser Condensate Containment lsolation Valve (3)

    >> Aux/Emerg Feedwater Pump Alternate Source Suction Valve (1 )

    )"' Containment Spray Discharge to Header lsolation Valve (1)

    };.> SI Pump Suction lsolation (1)

    ~ Primary Containment lsolation Valve (2)

    >> RHR Discharge lsolation Valve (1 )

    My guess is that most of these valves are at t he larger end of the 4" - 12" spectrum. It is noteworthy that 6 of these failures are associated with only two valves.

    • There is more art than science in interpreting some of the INPO data fields, but this at least gives us a ballpark for the population - approximately 2, 100 valves in

    service with valves 12" or greater accounting for about 1/3 of the population (659) and -1/3 of the recorded failures (1 1).

    Many thanks to John Lane in RES/DRA and John Schroeder out at INL for pulling this information together -

    Kevin

    From: oean Bill To: McDermott Brian- coyne Keyin Cc: Lubinski. lohn; Miller. Chris; King. Michael; Chernoff. Harald; Lane. lohn; Nakoski. lohn: Cheok. Michael*

    Thaggard. Mark; O" Brien. Kenneth: Shuaibi Mohammed; l effers Mark

    Subject:

    RE: Anchor Darling DDGVs - Data insights on fa ilure rate vs. Valve Size Date: Friday,Jun e 16, 2017 7:15:46 AM Great stuff and thanks to RES for helping get data that at least gives us some perspectives on performance of AD DDGVs - will help us in terms of at least knowing the population out there and hopefully be able to further focus on those sub elements of this group that have the characteristics identified by region 111 that seem to have contributed to the la salle failures. It at least tells us there are a lot of these valves out there with a very low failure rate.

    8/

    From: McDermott, Brian Sent: Friday, June 16, 2017 6:54 AM To: Coyne, Kevin <Kevin.Coyne@nrc.gov>; Dean, Bill <Bill.Dean@ nrc.gov>

    Cc: Lubinski, John <John.Lubinski@nrc.gov>; Mil ler, Chris <Chris.Mil ler@nrc.gov>; King, Michael

    <Michael.King2@n rc.gov>; Chernoff, Harald <Ha rold .Chernoff@nrc.gov>; La ne, John

    <John.Lane@nrc.gov>; Nakoski, John <John.Nakoski@nrc.gov>; Cheok, M ichael

    <Michael.Cheok@nrc.gov>; Thaggard, Mark <Mark.Thaggard@nrc.gov>; O'Brien, Kenneth

    <Kenneth.O'Brien@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; Jeffers, Mark

    <Mark.Jeffers@nrc.gov>

    Subject:

    Re: Anchor Darling DDGVs - Data insights on failure rate vs. Valve Size I would also note that not all stem to disk fai lures are the result of the over torque issue. Flow induced vibration appears to be been the cause in some number of the cases.

    On: 15 June 2017 19:14, "Coyne, Kevin" <Kevin.Coyne@ nrc.gov> wrote:

    ... should have added another bullet to give the data a little more context ...

    • The raw INPO data does not have much in the way of descriptive information - so while we can filter for "gate" valves, it is not possible to further differentiate the data. So, these results may include other gate valve types than just double disc gate valves. We also do not have any specific information about the valve internais (e.g. , stem collar design, threaded stem, etc.).

    We should be able to get rnore clarity on this issue during the upcoming public meeting.

    Kevin From: Coyne, Kevin Sent: Thursday, June 15, 2017 7:00 PM To: Dean, Bill <Bill.Dean@nrc.gov>; McDermott, Brian <Brian .McDermott@nrc.gov>

    Cc: Lubinski, John <John,Lubinski@nrc.gov>; M il le r, Chris <Chris.Miller@nrc.gov>; King, Michael

    <Michael.King2@nrc.gov>; Chernoff, Harald <Harold.Chernoff@nrc.gov>; Lane, John

    <John.Lane@nrc.gov>; Nakoski, Jo hn <John .Nakoski@nrc.gov>; Cheok, Michael

    <Michae l.Cheok@nrc.gov>; Thaggard, Ma rk <Mark.Thaggard@nrc.gov>; O'Brien, Kenneth

    <Kenneth .O'Brien@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibi@nrc,gov>; Jeffers, M ark

    <Mark.Jeffers@nrc.gov>

    Subject:

    Anchor Darling DDGVs - Data insights on failure rat e vs. Va lve Size Bill, Brian -

    RES/DRA and INL worked with the INPO data feed and came up with some population estimates based on the sizing of Anchor Darling DDGVs. This is preliminary information as there are still a few questions about the completeness of the INPO data (RES is running these down), but here's a quick summary of what we have right now (... detailed data is attached):

    Valve Size # of valves # of failures Calendar Year Failure Rate (CV} (exposure) /CY

    .5"- 2" 38 1 686 .17 1.5E-03 2" -4 251 8 4276.50 1.9E-03 4"- 12" 1163 18 20737.67 8.7E-04 12" - 20" 430 4 7769 5.1 E-04 20" -40" 229 7 4348.67 1.6E-03 A couple of quick observations -

    • These include ali failure causes for the valve ~ fail to open/close , and leakage (so stem-disc separation failure events would be lower). Actuators are excluded from the failure counts.
    • With the exception of the 20 - 40" valves (which generally seem to be steam stops, loop isolations, containment sumps, or RHR inlets), the larger valves have a sl ightly lower failure rate than the smaller valves. Although we don't have a lot of resolution in the 4-12" size range , this data does not seem to support a general conclusion that larger valves are more susceptible to failure.
    • For the range of most interest for the LaSalle issue (4~12"), the 18 failures seem to be associated with the following valve types:

    )- HPCI Main Steam Line lsolation Valve (7)

    )> HPCI Discharge to Feedwater lsolation Valve (1)

    )- LPCS Discharge To Reactor Spray lsolation Valve (1)

    )"" lsolation Condenser Condensate Containment lsolation Valve (3)

    )- Aux/Emerg Feedwater Pump Alternate Source Suction Valve (1)

    )- Containment Spray Discharge to Header lsolation Valve (1) j., SI Pump Suction lsolation (1)

    ~ Primary Containment lsolation Valve (2)

    )- RHR Discharge lsolation Valve (1)

    My guess is that most of these valves are at the larger end of the 4" - 12" spectrum. It is noteworthy that 6 of these failures are associated with only two valves .

    • There is more art than science in interpreting some of the INPO data fields, but this at least gives us a ballpark for the population - approximately 2, 100 valves in service with valves 12" or greater accounting for about 1/3 of the population (659) and - 1/3 of the recorded failures (11 ).

    Many thanks to John Lane in RES/DRA and John Schroeder out at INL for pulling this information together -

    Kevin

    From: 1effers Mark To: Q"Brjen Kenneth; Shualbi. Mohammed Cc: Benjam i . lamie Subj ect: FW: Anchor Darling DDGVs

    • Data insights on failure rate vs. Valve Size Date: Friday, J une 16, 2017 6:34:23 AM (b)(5) Deliberative Privilege Thank You, Mark Jeffers Bra nch Chlef I RIII DRS EB2 x9798 From: McDermott, Brian Sent: Friday, June 16, 2017 5:54 AM To: Coyne, Kevin <Kevin.Coyne@nrc.gov>; Dean, Bill <Bill.Dean@nrc.gov>

    Cc: Lubinski, John <John.Lubinski@nrc.gov>; Mi ll er, Chris <Chris.M iller@nrc.gov>; King, Michael

    <Michael.King2@nrc.gov>; Chernoff, Harald <Harold .Chernoff@nrc.gov>; Lane, John

    <John .Lane@nrc.gov>; Nakoski, John <John.Nakoski@nrc.gov>; Cheok, Michael

    <M ichael.Cheok@nrc.gov>; Thaggard, Mark <Mark.Thaggard@nrc.gov>; O'Brien, Kenneth

    <Kenneth.O'Brien@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; Jeffers, Mark

    <Ma rk.Jeffers@nrc.gov>

    Subject:

    Re: Anchor Darling DDGVs - Data insights on failure rate vs. Valve Size I would also note that not all stem to disk fai lures are the result of the over torque issue. Flow induced vibration appears to be been the cause in some number of the cases.

    On: 15 June 2017 19:14, "Coyne, Kevin" <Kevin.Coyne@nrc.gov> wrote:

    ... should have added another bullet to give the data a little more context. ..

    • The raw INPO data does not have much in the way of descriptive information - so while we can filter for "gate" valves, it is not possible to further differentiate the data. So, these results may include other gate valve types than just double disc gate valves. We

    aJso do not have any specific information about the valve internais (e.g. , stem collar design, threaded stem, etc.).

    We should be able to get more clarity on this issue during the upcoming publ ic meeting.

    Kevin From: Coyne, Kevin Sent: Thursday, June 15, 20 17 7:00 PM To: Dean, Bill <Bill.Dean@nrc.gov>; M cDermott, Brian <Brian .McDermott@nrc.gov>

    Cc: Lubi nski, John <John,Lubinski@nrc.gov>; M il ler, Chris <Cbris.Miller@nrc.gov>; King, M icha el

    <M ichae l. King2@nrc.gov>; Chernoff, Ha rald <Harold.Chernoff@nrc.gov>; Lane, John

    <John. Lane@nrc.gov>; Na koski, John <John .Nakoski@nrc.gov>; Cheok, M ichael

    <Mjchae l.Cheok@nrc.gov>; Thaggard, Ma rk <Mark.Thaggard@nrc.gov>; O'Brien, Kenneth

    <Kenneth .O' Brien@nrc.gov>; Shuai bi, Moham med <Mohammed.Shuajbj@nrc,gov>; Jeffers, M ark

    <Mark.Jeffers@n rc.gov>

    Subject:

    Anchor Darl ing DDGVs - Dat a insight s on failu re rat e vs. Valve Size Bill, Brian-RES/DRA and INL worked with the INPO data feed and came up with some population estimates based on the sizing of Anchor Darling DDGVs. This is preliminary information as there are still a few questions about the completeness of the INPO data (RES is running these down), but here's a quick summary of what we have right now ( ... detailed data is attached):

    Valve Size # of valves # of failures Calendar Year Failure Rate (CV} (exposure) /CY

    .5" -2" 38 1 686.17 1.5E-03 2"- 4" 251 8 4276.50 1.9E-03 4"-12" 1163 18 20737.67 8.7E-04 12" - 20" 430 4 7769 5.1 E-04 20" - 40" 229 7 4348.67 1.6E-03 A couple of quick observations -

    • These include ali failure causes for the valve - fail to open/close , and leakage (so stem-disc separation failure events wou ld be lower). Actuators are excluded from the failure counts.
    • With the exception of the 20 - 40" valves (which generally seem to be steam stops, loop isolations, contai nment sumps, or RHR inlets), the larger valves have a slightly lower failure rate than the smaller valves . Although we don't have a lot of resolution in the 4-12" size range, this data does not seem to support a general conclusion that larger valves are more susceptible to failu re .
    • For the range of most interest for the LaSalle issue (4-12"), the 18 failures seem to be associated with the following valve types :
    >> HPCI Main Steam Line lsolation Valve (7)
    >> HPCI Discharge to Feedwater lsolation Valve (1)
    >> LPCS Discharge To Reactor Spray lsolation Valve (1)
    >> lsolation Condenser Condensate Containment lsolation Valve (3)
    >> Aux/Emerg Feedwater Pump Alternate Source Suction Valve (1)

    > Containment Spray Discharge to Header lsolation Valve (1)

    > SI Pump Suction lsolation (1)

    >> Primary Containment lsolation Valve (2)

    > RHR Discharge lsolation Valve (1)

    My guess is that most of these valves are at the larger end of the 4" - 12" spectrum. It is noteworthy that 6 of these failures are associated with only two valves.

    • There is more art than science in interpreting some of the INPO data fields, but this at least gives us a ballpark for the population - approximately 2,100 valves in service with valves 12" or greater accounting for about 1/3 of the population (659) and -1/3 of the recorded failures (11 ).

    Many thanks to John Lane in RES/DRA and John Schroeder out at INL for pulling this information together -

    Kevin

    From: Coyne. Kevin To: Q"Brien Kenneth

    Subject:

    RE: Anchor Darling DDGVs - Data insights on failure rate vs. Va lve Size Date: Friday. J une 16, 2017 7:45:10 AM 1did - 1agree with some of your points and disagree with others. The failure rate is a surrogate measure to make some relative comparisons. 1agree that this is a demand tailure scenario, but industry does not provide demands (please fix that if you can!) - we only get exposure time. So while I agree with that point, we also should not ignore tens of thousands of years of operating history for these valves (particularly since they are generally demanded on similar frequencies across the industry (and the differences between LaSalle and Columbia are relatively minor when dealing with large data sets like this)). The data includes all failure modes, so the specific failure mode of interest is a portion of the total.

    1'11 write more later, but working on the options Mark sent late yesterday ...

    Kevin From: O'Brien, Kenneth Sent: Friday, June 16, 2017 8:36 AM To: Coyne, Kevin <Kevin.Coyne@nrc.gov>

    Subject:

    RE: Anchor Darling DDGVs - Data insights on fa ilu re rate vs. Valve Size Kevin Please see my email back to Brian.

    Thanks Ken From: Coyne, Kevin Sent: Thursday, June 15, 2017 6: 14 PM To: Dean, Bill <Bill.Dean@nrc.gov>; McDermott, Brian <Brian .McDermott@nrc.gov>

    Cc: Lubinski, John <John.Lubinski@nrc.gov>; M il ler, Chris <Chris Miller@nrc.gov>; King, M icha el

    <M ichael.King2@nrc.gov>; Chernoff, Harold <Harold.Chernoff@nrc.gov>; Lane, John

    <John.Lane@nrc,ov>; Nakoski, John <Joh n.Nakoski@nrc.gov>; Cheok, Michael

    <Michael.Cheok@nrc.gov>; Thaggard, Mark <Mark.Thaggard@nrc.gov>; O'Brien, Ken net h

    <Kenneth .O'Brien@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; Jeffers, Mark

    <Mark.Jeffers@nrc.gov>

    Subject:

    RE: Anchor Darling DDGVs - Data insights on fai lu re rate vs. Valve Size

    ... should have added another bullet to give the data a little more context. ..

    • The raw INPO data does not have much in the way of descriptive information - so while we can filter for "gate** valves, it is not possible to further differentiate the data. So, these results may include other gate valve types than just double disc gate valves. We

    aJso do not have any specific information about the valve internais (e.g. , stem collar design, threaded stem, etc.).

    We should be able to get more clarity on this issue during the upcoming publ ic meeting.

    Kevin From: Coyne, Kevin Sent: Thursday, June 15, 20 17 7:00 PM To: Dean, Bill <Bill.Dean@nrc.gov>; M cDermott, Brian <Brian .McDermott@nrc.gov>

    Cc: Lubi nski, John <John,Lubinski@nrc.gov>; M il ler, Chris <Cbris.Miller@nrc.gov>; King, M icha el

    <M ichae l. King2@nrc.gov>; Chernoff, Ha rald <Harold.Chernoff@nrc.gov>; Lane, John

    <John. Lane@nrc.gov>; Na koski, John <John .Nakoski@nrc.gov>; Cheok, M ichael

    <Mjchae l.Cheok@nrc.gov>; Thaggard, Ma rk <Mark.Thaggard@nrc.gov>; O'Brien, Kenneth

    <Kenneth .O' Brien@nrc.gov>; Shuai bi, Moham med <Mohammed.Shuajbj@nrc,gov>; Jeffers, M ark

    <Mark.Jeffers@n rc.gov>

    Subject:

    Anchor Darl ing DDGVs - Dat a insight s on failu re rat e vs. Valve Size Bill, Brian-RES/DRA and INL worked with the INPO data feed and came up with some population estimates based on the sizing of Anchor Darling DDGVs. This is preliminary information as there are still a few questions about the completeness of the INPO data (RES is running these down), but here's a quick summary of what we have right now ( ... detailed data is attached):

    Valve Size # of valves # of failures Calendar Year Failure Rate (CV} (exposure) /CY

    .5" -2" 38 1 686.17 1.5E-03 2"- 4" 251 8 4276.50 1.9E-03 4"-12" 1163 18 20737.67 8.7E-04 12" - 20" 430 4 7769 5.1 E-04 20" - 40" 229 7 4348.67 1.6E-03 A couple of quick observations -

    • These include ali failure causes for the valve - fail to open/close , and leakage (so stem-disc separation failure events wou ld be lower). Actuators are excluded from the failure counts.
    • With the exception of the 20 - 40" valves (which generally seem to be steam stops, loop isolations, contai nment sumps, or RHR inlets), the larger valves have a slightly lower failure rate than the smaller valves . Although we don't have a lot of resolution in the 4-12" size range, this data does not seem to support a general conclusion that larger valves are more susceptible to failu re .
    • For the range of most interest for the LaSalle issue (4-12"), the 18 failures seem to be associated with the following valve types :
    >> HPCI Main Steam Line lsolation Valve (7)
    >> HPCI Discharge to Feedwater lsolation Valve (1)
    >> LPCS Discharge To Reactor Spray lsolation Valve (1)
    >> lsolation Condenser Condensate Containment lsolation Valve (3)
    >> Aux/Emerg Feedwater Pump Alternate Source Suction Valve (1)

    > Containment Spray Discharge to Header lsolation Valve (1)

    > SI Pump Suction lsolation (1)

    >> Primary Containment lsolation Valve (2)

    > RHR Discharge lsolation Valve (1)

    My guess is that most of these valves are at the larger end of the 4" - 12" spectrum. It is noteworthy that 6 of these failures are associated with only two valves.

    • There is more art than science in interpreting some of the INPO data fields, but this at least gives us a ballpark for the population - approximately 2,100 valves in service with valves 12" or greater accounting for about 1/3 of the population (659) and -1/3 of the recorded failures (11 ).

    Many thanks to John Lane in RES/DRA and John Schroeder out at INL for pulling this information together -

    Kevin

    From: Benjamjn. lamje To: Corujo-Srrndin lorge

    Subject:

    did we ask for Date: F(iday, J une 16, 2017 10:31 :01 AM Operator time critical action procedure and list?

    From: 1effers Mark To: Coyne. Kevo

    Subject:

    Fwd: Draft Ta lking Points for Discussions Relative to laSalle SIT lssues Date: Friday,June 16, 2017 4:35:21 PM Attachments: Document1 /002).docx As discussed, please find the attached talking points.

    Thanks, Mark Sent from my iPhone. Please forgi ve any typos.

    From: "O'Brien, Kenneth" <Keuneth.O'Brien @nrc.gov>

    Subject:

    FW: Draft Talking Points for Discussions Relative to LaSalle SIT Issues Date: 16 June 201 7 15:31 To: ".Teffers, Mark" <Mark..Teffers@ nrc.gov>

    fyi From: O'Brien, Kenneth Sent: Friday, Jun e 16, 2017 3:31 PM To: Pederson, Cynthia <Cynt hia .Pederson@nrc.gov>

    Cc: Lara, Ju lio <Jul io,Lara@nrc.gov>

    Subject:

    Draf t Ta lking Po1nts for Discussions Relative to la Salle SIT lssues Cindy The attached are for your consideration and use. Julio and I have both worked to ensure a balanced approach.

    Thanks Ken

    From : Benjam i lamie To: Dunlop Andrew: Rodriguez Lionel: farnan Michael: Pbillips Charles

    Subject:

    FW: LaSalle Options Date: Friday. J une 16, 2017 8:36:44 AM Attachments: Option NRR Revision un e 16.docx Importance: High Fyi.

    From: Coyne, Kevin Sent: Friday, Ju ne 16, 2017 8:28 AM To: Jeffers, Ma rk <Mark.Jeffers@ nrc.gov>

    Cc: Benja mi n, Jam ie <Ja mie.Benjamin@n rc.gov>; Stoedter, Ka rla <Karla.St oedter@n rc.gov>

    Subject:

    RE: LaSa lle Options lmportance: High Hi Mark-How about this version as a startina ooint for further discussion.l (b)(5 Deliberative Privilege See what you think - 1'11 call in a couple of minutes.

    Kevin From: Jeffers, M ark Sent: Thursday, June 15, 20 17 7 :03 PM To: Coyne, Kevin <Kevin.Coyne@ nrc.gov>

    Cc: Benj ami n, Jamie <Jam ie. Benj amin@nrq~ov>; St oedt er, Karla <Karla.Stoedter@nrc. gov>

    Subject:

    LaSal le Options Kevin ,

    Please see attached for a "rough" draft of options going forward with LaSalle. 1use the term "rough" loosely. We met in the Region today (the team lead, EICS, and myself) to put

    our thoughts on paper. So it is very raw data, but I wanted to provide to you so that we can discuss tomorrow morning to refine and get ready to provide to everyone. Please Iet me know it you have any questions, comments, or concerns.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798

    From: Jeffers, Mark To: coyne. Kevio

    Subject:

    FW: LaSalle Options Date: Friday. J une 16, 2017 11 :27:00 AM Attachments: Option NRR Revision un e 16 REV 4.docx

    Kevin, 1received some comments from my leadership team in the Region. 1trieci to incorporate the comments quickly into the attached revised the document. 1will be sharing with my leadership team here shortly. Please Iet me know if you have any questions, comments, or concerns.

    Thank You 1 Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: Jeffers, Mark Sent: Friday, Ju ne 16, 2017 9:20 AM To: O'Brien, Kenneth <Kenneth .O'Brien@nrc.gov>; Sh uaibi, Mohammed (Mohammed.Shu aibi@nrc.gov) <Mohammed.Shuaibi@nrc.gov>

    Cc: Stoedter, Karla (Karla.Stoedter@nrc.gov) <Karla.Stoedter@nrc.gov>; Benjamin, Jamie (Jamie.Benjam in@nrc.gov) <Jamie .Benjamin@n rc.gov>

    Subject:

    RE: LaSa lle Options Kevin and I cleaned up the Options paper this morning. Please see attached for the most recent revision. lf there are any questions, comments, or concerns , please Iet me know.

    Thank You, Mark Jeffers Branch Ch ef I RIII DRS EB2 1 x9798 From: Jeffers, Mark Sent: Thursday, June 15, 2017 6:03 PM To: Coyne, Kevin <Kevin.Coyne@nrc.gov>

    Cc: Benjami n, Jam ie (Jamie . Ben jam o @nrc.gov) <J amje . Be n jamo@nrc.gov>; Stoedter, Karla (Karla.Stoedt er@nrc.gov) <Karla .Stoedt er@nrc.gov>

    Subject:

    LaSal le Options

    Kevin, Please see attached for a "rough" draft of options going forward with LaSalle. 1use the term "rough" loosely. We met in the Region today (the team lead, EICS, and myself) to put our thoughts on paper. So it is very raw data, but I wanted to provide to you so that we can

    discuss tomorrow morning to refine and get ready to provide to everyone. Please Iet me know it you have any questions, comments, or concerns.

    Thank You, Mark Jeffers Branch Chfef I RIII DRS EB2 x9798

    From: Jeffers, Mark To: O"Brjen Kenneth; Shuaibi Mohammed cMohammed Shuaibi@nrc gov>

    Cc: Stoedter Karla <Karla.Stoedter@nrc gov); Beniamin. lamie Oamie,Benjamin@nrc.gov>

    Subject:

    RE: l aSalle Options Date: Friday, June 16, 2017 9:19:00 AM Attachments: Option NRR Revision i une 16 REV 3 clean.docx Kevin and I cleaned up the Options paper this morning. Please see attached for the mast recent revision. It there are any questions, comments, or concerns, please Iet me know.

    Tha nk You, Mark Jeffers Branch Chief I RIII DRS EB2 x9798 From: Jeffers, M ark Sent: Thursday, June 15, 2017 6:09 PM To: O'Brien, Kenneth <Kenneth .O'Brien@nrc.gov>; Shua ibi, Mohammed (Mohammed.Shu aibi@ nrc.gov) <Mohammed .Shuaibi@nrc.gov>

    Subject:

    FW: LaSal le Options FYI. This is the rough draft of the options going forward. There is still work to be done, but it provides a base to work off of. 1will be working with Kevin tomorrow to refine.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: Jeffers, M ark Sent: Thursday, Ju ne 15, 2017 6:03 PM To: Coyne, Kevin <Kevin.Coyne@ nrc.gov>

    Cc: Benjamin, Jam ie (Jam ie Benjamio@ nrc gov) <Jamje.Be njam io@nrc gov>; Stoedter, Karla (Karla.Stoedt er@nrc.gov) <Ka r!a.Stoedt er@nrc.gov>

    Subject:

    LaSal le Options

    Kevin, Please see attached for a "rough" draft of options going forward with LaSalle. 1use the term "rough" loosely. We met in the Region today (the team lead, EICS, and myself) to put our thoughts on paper. So it is very raw data, but I wanted to provide to you so that we can discuss tomorrow morning to refine and get ready to provide to everyone. Please Iet me know it you have any questions, comments , or concerns.

    Thank You,

    Mark Jeffers Branch Chief I Rlll DRS EB2 1x9798

    From: J effers, Mark To: O"Brjen Kenneth; Shuaibi Mohammed tMohammed Shuaibi@nrc gov>

    Subject:

    RE: LaSalle Options Date: Friday, J une 16, 2017 11 :38:00 AM Attachments: Options Briefi ng Sheet.docx Also, attached is the "coversheet" from the original Options paper updated with options from the other sheet.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: Jeffers, Mark Sent: Friday, June 16, 2017 11:31 AM To: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shua ibi, Mohammed (Mohammed.Shua ibi@nrc.gov) <Mohammed.Shua ibi@nrc.gov>; Pederson, Cynth ia (Cynthia.Pederson@nrc.gov) <Cynthia.Pederson@nrc.gov>; Lara, Julio (Ju lio.Lara@ nrc.gov)

    <Jul io.Lara@nrc.gov>; Louden, Patrick (Patrick.Louden@nrc.gov) <Patrick. Louden@nrc.gov>

    Cc: Stoedter, Karla (Karla .Stoedter@nrc.gov) <Karla .Stoedter@nrc.gov>

    Subject:

    FW: LaSalle Options

    Ali, Please find the attached revision to the Options paper to address the comments from this morning. 1have shared it with headquarters (i.e. , Kevin Coyne) and he is still reviewing; however, 1wanted to share with everyone as soon as possible to correct any discrepancies. lf there are any questions, comments, or concerns, please Iet me know.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798

    From: O"Brien Kenneth To: teffers Mark* Shuaibi Mohammed; Pederson Cynthia; Lara tulio; Louden Patrick Cc: Stoedter Karla

    Subject:

    RE: laSalle Options Date: Friday, J une 16, 2017 12:23:41 PM AII We made some minor adjustments to this version in order to reach alignment with HO ...... 1 will send and bring cepies to our meeting.

    Thanks Ken From: Jeffers, Mark Sent: Friday, Ju ne 16, 2017 12:16 PM To: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shua ibi, Mohammed

    <Mohammed.Shuaibi@nrc.gov>; Pederson, Cynthia <Cynthia.Pederson@nrc.gov>; Lara, Julio

    <Ju lio.Lara@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>

    Cc: Stoedter, Karla <Karla.Stoedter@nrc.gov>

    Subject:

    RE: LaSalle Options Updated the Options paper to address a couple additional comments. Please note that NRR does not support these changes from the original that was presented this morning.

    Kevin Coyne is currently discussing these discrepancies with Ken now.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 I x9798 From: Jeffers, Mark Sent: Friday, Jun e 16, 2017 11:31 AM To: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shua ibi, Mohammed (Mohammed.Shuaibi@nrc.gov) <Mohammed.Shu aibi@nrc.gov>; Pederson, Cynthia (Cynt hia .Pederson@nrc.gov) <Cynt hia.Pederson@nrc.gov>; Lara, Julio (Ju lio.La ra@ nrc.gov)

    <Ju Iio. La ra@n rc.gov>; Louden, Patrick (Patrick.Louden@nrc.gov) <Patrick.Louden@nrc.gov>

    Cc: Stoedter, Karla (Kar!a.Stoedter@nrc goy) <Kada.Stoedter@nrc.gov>

    Subject:

    FW: LaSalle Options

    Ali, Please find the attached revision to the Options paper to address the comments from this morning. 1have shared it with headquarters (i.e., Kevin Coyne) and he is still reviewing; however, 1wanted to share with everyone as soon as possible to correct any discrepancies. lf there are any questions, comments, or concerns, please Iet me know.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798

    From: 1efters Mark To: Chernoff Harotd: Vaidya Bhakhandra Cc: Benjam i . lamie; Stoedter, Karla

    Subject:

    RE: LaSa lle SIT Next Steps Date: Friday, J une 16, 2017 3:37:53 PM Harold/Bhalchandra, b)(5) Deliberative Privilege 1will be setting up a call on Monday ppropriate stakeholders. lf there are Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: Jeffers, M ark Sent: Friday, May 12, 2017 8:03 AM To: Chernoff, Harold <Harold.Chernoff@nrc.gov>

    Cc: Vaidya, Bhalchandra <Bhalchandra .Vaidya @nrc.gov>

    Subject:

    LaSalle SIT Next St eps

    Harald, b)(5) Deliberative Pri vilege Thank You, Mark Jeffers Branch Chief I RIJI DRS EB2 1x9798

    From: Jeffers, Mark To: Logaras Harral; Barker Allan: Heck tared: Skokowsk; Rjchard <Richard Skokowski@nrc gov}: Chandrathil Prema (Prema.Chandrat hil@nrc.gov); Mitlyng. Viktoria /Viktoria.Mitlyng@nrc.gov); Lambert . Kennet h 1Kenneth.Lambert@nrc. gov}

    Cc: Benjamin. am ie ( amie. Benjamn@nrc.govl: Stoedter. Karla I Karla.Stoedter@nrc.govl

    Subject:

    RE: LaSalle SIT Update Date: Friday,June 16, 2017 3:27:00 PM Attachments: EJ70602t030957 NRC RAJ 7-056,pdf To keep everyone in the loop, Cindy, Bill Dean, and Mike Johnson met this afternoon to discuss options going forward with the unresolved issue at LaSalle (i.e., the operability assessment of the Unit 1 HPCS injection valve). From that meeting, the direction we receivi.u=:..u..u.u..i.J.U.1QI..U..ui:IJ.Q.=U,J;.u..ia~- - - - - - - - - - - - - - - - - - - - - - - .

    1.

    (b)(5) Deliberative Privilege 1 will probabl 1.

    ~-

    3. (b)(5) Deliberative Privilege

    ~.

    lf anyone has any questions, please Iet me know.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 x9798 From: Jeffers, M ark Se nt: Thursday, Ju ne 08, 2017 4:02 PM To: Logaras, Harral <Harra l. Logaras@nrc.gov>

    Cc: Ba rker, Allan <Allan .Ba rker@nrc.gov>; Heck, Jared <Jared .Heck@nrc.gov>; Benjamin, Jamie (Jamie.Benjam in@nrc.gov) <Jam ie.Benjami n@nrc.gov>; Chandrat hi l, Prema (Prema .Chandrat hil@ nrc.gov) <Prema.Cha nd rath il@nrc.gov>; M it lyng, Viktoria

    {Viktoria.Mitlyng@nrc.gov) <Vi ktoria.M it lyng@n rc.gov>

    Subject:

    RE: LaSalle SIT Update Just to keep everyone in the loop, we are planning on exiting with LaSalle tomorrow morning. The team reviewed the updated analysis which provided some additional insight on the actual violation . Specifically, the failure analysis performed by an independent vendor combined with the effort done by the Special lnspection Team identified a design flaw in the valve itself (i.e., originally, this was a manufacturing defect by the vendor, but now the vendor has determined it to be a flaw in the design of the valve itself). The vendor

    (Flowserve) is in the process of revising the 2013 Part 21 notification to include this design flaw.

    The team is exiting with an apparent violation of 10 CFR 50, Criterion 111, "Design Control."

    It will be dispositioned under traditional enforcement since no performance deficiency exists (i.e., it was not within the ability of the licensee to foresee and correct) . Specifically, it would be unreasonable for the licensee to have identified th is desi n flaw of the valve from the vendor.

    b)(5) Deliberativefl'!""-aall'!"""""""!'

    Privilege _ _ _ _ _ _ _ _ _ _""""'!"'_ _- ._ _ __ ~-~-----.--'

    .,...,...., _I attacherl .=i "~1,mm.=irv" of the kev ooints that the team makes with respect to thE oerabilitv of the valve The next steps in the order process are to be brieting senior leadersh1p (1.e., c 1ndy, Sili Dean, etc.) on the recommendation.

    lf anyone has any questions, please Iet me know.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: Jeffers, Mark Sent: Tuesday, June 06, 2017 8:03 AM To: Logaras, Harral <Harral. Lo garas@nrc. gov>

    Cc: Barker, Allan <Allan .Barker@nrc.gov>; Heck, Jared <Jared .Heck@nrc.gov>; Benjamin, Jamie (Jamie.Ben jam in@nrc.gov) <Jamie.Benjamin@nrc.gov>; Chandrathil, Prema (Prema .Chandrathil@nrc.gov) <Prema .Chandrathi!@nrc.gov>; Mitlyng, Viktoria (Viktoria.Mitlyng@nrc.gov) <Yiktoria.Mitlyng@nrc.gov>

    Subject:

    RE: LaSa lle SIT Update The only remaining inspection activities for the LaSalle SIT include inspecting the operability of the Unit 1 High Pressure Core Spray injection valve (i.e. , the opposite unit's valve to the one that failed). The team has gone back and forth with the licensee on the development of information that would provide reasonable assurance of operability. The licensee has continuously been updating their operability based on new information developed/provided by the BWROG, the valve vendor, specialty engineering firms, and an independent lab performing the failure analysis evaluation. The most recent delay was due to the delivery of the failu re analysis report that was completed last Wednesday . The team is currently reviewing/inspecting the report and discussing the issues with the licensee.

    The team is scheduled to make their recommendation on the operability of the Unit 1 valve by Wednesday. Depending on the recommendation, we will then schedule the exit meeting. Please Iet me know if you have any questions.

    Additionally, for your awareness, headquarters entered into the LIC-504 process (i.e., risk informed decision making procedure developed after Davis Besse) to address the generic implications of the failure. Some actions to be completed include:

    - DIRS is working to get an lnformation Notice out within the next few weeks to highlight the failure at LaSalle and similar other failures of this specific type of valve .

    - DIRS is evaluating the need for other forms of generic communications (e.g.,

    Generic Letter, Bulletin, etc.) to require licensees to respond to the agency.

    - Vendor lnspection branch will be going out to the vendor (Flowserve) for an inspection and Region 111 will supplement that inspection with SIT members familiar with the most recent issue.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: Logaras, Harra l Sent: Tu esday, June 06, 2017 7:26 AM To: Jeffers, Mark <Ma rk.Jeffers@nrc.gov>

    Cc: Barker, Allan <Allan.Barker@nrc.goy>; Heck, Jared <Jared .Heck@nrc.gov>

    Subject:

    LaSa lle SIT Update

    Mark, 1wonder it I could get update information on the LaSalle SIT exit plans. 1have been working to keep some of our counterparts up to speed and I find the last such update I got was Wednesday, last week. Please tell me it there will be any such information sharing that 1can sit in on so you don't have to do the work again just for the RSLO. Thank you.

    Ha rra l Logaras, M BA U. S. NRC Region 111 Regiona l Govern ment Liaison 630-829-9659 NRC 24 hour Operations Center 301-816-5100 l' J. '". ~

    . . .~' .t .

    Eight State Flags of Region-111

    • IA IL IN Ml MN MO OH WI

    Link to the Award Winning NRC lnformat ion Digest {Click Here for the Latest Editionl Link to the NRC Web Log or Blog http://public-blog.nrc-gateway.gov/

    Link to NRC Fact Sheets and Brochures http://www.nrc.gov/reading-rm/doc-collections/fact-sheets/

    From: Benjam i lamie To: farnan Michaef: Dunlop Andrew* Pbillips, Charles* Rodriiuez. Lionel

    Subject:

    LaSalle SIT Date: Friday. J une 16, 2017 9:21 :24 AM RIII is workina with NRR to exolore all options to address this issue. (b)(5) Del i beratve Privilege 1 suspect that we will make that dec1s1on nex wee (b)(5) Defi.berative Privilege 1'11 keep everyone updated as I get information.

    Jamie

    From: McDermott Brlan To: O"Brlen. Kenneth Cc: Lubinski. lohn; coyne. Keyin

    Subject:

    Meeting wlth Mike J Date: Friday, J une 16, 2017 7:44:25 AM Importance: High Bill says that Mike is free after 10, 1 told him we'd have a first draft of the options by noon based on our discussion.

    1 believe Kevin is out next week and may be out today. John is in the office today.

    From: Benjam i larnie.

    To: Dunlop Andrew

    Subject:

    RE: need for report Date: Friday, J une 16, 20171 :59: 46 PM Found it, thanks.

    From: Dunlop, Andrew Sent: Friday, June 16, 2017 1:30 PM To: Benjamin, Jam ie <Jamie.Benjamin@n rc.gov>

    Subject:

    RE: need for report 1sent my list on 5/30 From: Benjamin, Jamie Sent: Friday, June 16, 2017 1:27 PM To: Farnan, M ichael <M ichaeLFarnan@nrc.gov>; Phill ips, Charles <Charles.Pbillips@nrc.gov>;

    Dunlop, Andrew <Andrew.Dunlop@n rc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>

    Subject:

    need for report List of docs reviewed . 1only have Chuck's.

    Additionally, 1'11 do my best to incorporate the team's assessment in the report. 1do not need any write-ups at this point. However, if there is something specific that you want in the report and is something that we talked about at the exit then please send me that as well.

    Deadline is by next Friday. June 16, 2017.

    You all will get a week to comment on the report before I send it to Mark.

    Thanks everyone!

    From: Jeffers, Mark To: coyne. Keyin

    Subject:

    RE: Option Paper Date: Friday. J une 16, 2017 9:03:00 AM Attachments: Option NRR Revision un e 16 REV 2.docx A few small changes to Option 1. 1 have Track Changes on to see the changes .

    Otherwise, 1think we are good.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: Coyne, Kevin Sent: Friday, June 16, 2017 8:57 AM To: Jeffers, Mark <Mark.Jeffers@ nrc.gov>

    Subject:

    Option Paper Rev 1 attached

    From: Coyne Kevin To: McDermott Brian: Dean BIII; Lubinskl lohn; Pederson. Cynthia: O"Brien Kenneth; Shuaibi Mohammed; Roberts. Darrell Cc: i effers. Mark: CJark. T heresa ; Evans Michele

    Subject:

    Option Table for LaSalle Special Inspection Date: Friday,June 16, 2017 12:31:25 PM Attachments: Option NRR Revjsion iune 16 REV s Clean,docx Folks -

    Just worked through a few issues with Ken - so here's the latest/last version of the options Table for LaSalle. 1'11 bring hardcopies for people in HQ.

    Kevin

    From: O"Brien. Kenneth To: Lara. lulio

    Subject:

    Quick shot at Brief talking points LaSalle SIT Date: Friday.June 16, 2017 2:46:00 PM (b)(5) Deliberative Privilege

    From: Coyne Kevio To: Q"Brien Kenneth

    Subject:

    rev 5 Date: Friday. J une 16, 2017 12:23:49 PM Attachments: Option NRR Revision u n e 16 REV 5 Clean.docx Importance: High

    From: Benjamio, lamie To: teffers Mark: QBrien Kenneth

    Subject:

    (b)(5) Deliberative Privilege Date: Friday,June 16, 2017 8:52:01 AM FYI. 1needed to pass this along.

    l'm going to provide the team an update today so they can see where we are at and where we are headed.

    l(b)(5) Deliberative Privilege V/R, Jamie From: Rod riguez, Lionel Sent: Th ursday, June 15, 2017 9:23 AM To: Benjam in, Jam ie <Jam ie.Benjamin@nrc.gov>

    Subject:

    l(b)(5) Deliberative Privilege 1listened to this morning's presentation on the Ops Center by Bern Stapleton. He stated the NRC is a very collegial organization, which he then said means a lot of people are consulted before a decision is made. Post 9/11, they had to change their process for decisions that needed to be made in a very short time frame. Effectively, they limited the decision maker to 1 person in order for the decision to be made in a timely manner.

    (b)(5) Deliberative Privilege Lionel R.

    From: Benj am in, Jamie Sent: Thursday, June 15, 2017 9:15 AM To: Rodriguez, Lionel <LioneL Rodrjguez@nrc.gov>

    Subjectj(b)(5) Deliberative Privilege

    From: Rod riguez, Lionel Sent: Thursday, June 15, 2017 9:13 AM To: Benjam in, Jam ie <Jam ie.Ben jamin@nrc.gov>

    Subject(b)(5) Deliberative Pri vilege (b)(5) Deliberative Privilege From: Benja min, Jamie Sent: Th ursday, June 15, 2017 9 :11 AM To: Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>

    Subjecti(b)(5) Deliberative Pri vilege Got it, thanks.

    From: Rod riguez, Lionel Sent: Thursday, Ju ne 15, 2017 9:10 AM To: Benjam in, Jam ie <Jamie.Benjamin@nrc.gov>

    Subject:

    j(b)(5) Deliberative Privilege l(b)(S)Deliberati,e Priolege Hope this helps.

    From: Benjamin, Jamie Sent: Thursday, June 15, 2017 9 :06 AM To: Rod ri uez, Lionel <L1one l. Rodri

    Subject:

    (b)(5) Deliberative Privilege

    From: Benjami 1amie To: Rodriguez Lionel

    Subject:

    RE: {b)(5) Deliberative Pri vilege Date: Friday. June 16, 2017 8:58:05 AM 1passed your email onward to both Mark and Ken. 1agree with your overall message but wouldn't directly related this to event response where people's life are in immediate danger. 1 also wouldn't related this issue to normai business processes. We need to be timely in making a decision and moving forward. We are on the same page overall.

    l(b)(S) Deliberab,e ea.1,,,

    1may propose that the team would support an open door policy if anyone from NRR would like to talk with us as a group. i.e. reverse open door.

    From: Redriguez, Lienei Sent: Thursday, June 15, 2017 9:23 AM To: Benjamin, Jam ie <Jamie.Ben*amin@nrc. ev>

    Subject (b){5) Deliberative Pri vilege 1listened to this morning's presentation on the Ops Center by Bern Stapleton. He stated the NRC is a very collegial organization, which he then said means a lot of people are consulted before a decision is made. Post 9/ 11 , they had to change their process for decisions that needed to be made in a very short time frame. Effectively, they limited the decision maker to 1 person in order for the decision to be made in a timely manner.

    )

    Lionel R.

    From: Benjamin, Jamie Sent: Th ursday, June 15, 2017 9:15 AM To: Redriguez, Lienei <Lienel.Redriguez@nrc.gev>

    Subject:

    (b)(5) Deliberative Privilege l(b)(S) Deliberali,e Pri, tl ege From: Red riguez, Lienei Sent: Th ursday, Ju ne 15, 2017 9:13 AM To: Benjamin, Jam ie <Jamie.Benjamin@nrc.gov>

    Subject(b)(5) Deliberative Privilege (b)(5) Deliberative Privilege From: Benjamin, Jamie Sent: Thursday, June 15, 2017 9:11 AM To: Rodriguez, Lionel <LioneLRodriguez@nrc.gov>

    Subject(b)(5) Deliberative Privilege Got it, thanks.

    From: Rod riguez, lionel Sent: Th ursday, June 15, 2017 9:10 AM To: Benjamin, Jam ie <Jamie.Benjamin@nrc.gov>

    ~ubject: l(b){5) Deliberati ve Pri vilege

    ~ XSJ Dehberati,e Prt,11,,,

    Hope this helps.

    From: Benjamin, Jamie Sent: Th ursday, June 15, 2017 9:06 AM To: Rodri uez Lionel < io e .

    Subject* (b)(5) Deliberative Pri vilege

    From: Pederson, Cynthla To: O"Brien Kenneth Cc: Lara ulio ; Roberts, Qarrell subject: Re: Draft Talking Po ints for Discussions Relative to LaSalle SIT Issues Date: Saturday,June 17, 2017 10:38:45 AM Go ahead and work on Kevio's comments to !!ain afü!Junent with NRR.\

    (b)(5) Deliberative Privilege

    /

    Tbanks for yours, Mark's and Julio's work on this.

    On: 16 June 2017 15:31. "O'Brien. Kerrnetl( < Kenneth.O'Brien@nrc.gov> wrote:

    Cindy Tbe attached are for your consideration and use . Julio aod I bave both worked to ensure a balanced approach.

    Thanks Ken

    From: Coyne Kevio To: Q"Brien Kenneth Cc: Lubinski. lohn

    Subject:

    FW: Request for presentation at Quarterly Strategic Alignment meeting Date: Saturday,June 17, 2017 1:40:21 PM Attachments: 7.5.17 guarterly strategic meeting agenda.docx Safety Spotlight - AD DDGV luly 5 2017.pptx Ken-Here's a first cut at the safety spotlight briefing on anchor darling valves/LaSal le. The tota l time s 20 minutes, wit h about half ded icated to Q&A's. So the slides are pretty high Ievel and graphic heavy. 1 left the status as just high Ievel bullets for LaSal le and LIC-504 since they are both fast moving targets.

    Let me know what comments, revisions, questons you have. Tha nks for support ing the ta lk.

    Kevin From: Cai, Ju ne Sent: Wednesday, June 07, 2017 1:03 PM To: Coyne, Kevin <Kevin .Coyne@nrc.gov>

    Cc: Clark, Theresa <Theresa.Clark@nrc.gov>

    Subject:

    Request for presentation at Quarterly Strategic Alignment meet ing

    Kevin, ln developing the agenda for the next Quarterly Strategic Alignment Meeting, the topic of LaSalle SIT / Anchor-Darling double disc gate valves has been requested by the EDO/DEDOs, with NRR lead and RIII support. The meeting is on July 5th - see attached agenda for location and presentation time. The audience will be EDO/DEDOs/AO and ODs/RAs. We have 20 minutes slotted for this topic, including Qs and As. Given the length of time and the audience, suggest the presentation be fairly focused and high Ievel.

    Please Iet me know it you would be able to support and who to work with on the logistic details.

    Thanks so much in advance.

    June Cai Executlve Technical AssistaM Office of the Executive Director for Operations U.S. Nuclear Regulatory Commission 301-415-1771 june.cai@nrc.gov

    From: Lubinski tohn To: O"Brien. Kenneth; coyne. Kevin

    Subject:

    RE: Draft Talking Points for Discussions Relative to laSalle SIT Tssues Date: Monday, J une 19, 2017 7: 16:04 AM Thanks From: O'Brien, Kenneth Sent: Monday, June 19, 2017 8:13 AM To: Lubinski, John <John.Lubinski@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>

    Subject:

    RE: Draft Talking Points for Discussions Relative to LaSalle SIT lssues John Thanks for the comments.

    1 will be sending you a revision shortly.

    Ken From: Lubinski, John Sent: Monday, June 19, 2017 6:03 AM To: Coyne, Kevin <Kevin .Coyne@nrc.gov>; O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>

    Subje ct: RE: Draft Talki ng Points for D1scussions Relative to LaSalle SIT lssues Ken and Kevin, Thanks for pulling these together. 1agree with Kevin's comments. 1would add that we should delete bullet 2 since the call with Exelon is about LaSalle, not about our perspectives on the lndustrv resoonse. 1aaree with the order of bullets orooosi::.rl bv Kevin. I l:l)(5) Deliberative Privilege 1 \

    (b)(5) Deliberative Privilege From: Coyne, Kevin Sent: Saturday, June 17, 2017 7:19 AM To: O'Brien, Kenneth <Kenneth .O'Brien@nrc.gov>

    Cc: Lubinski, John <John.Lubinski@nrc.gov>

    Subje ct: Re: Draft Talking Points for Discussions Relative to LaSalle SIT lssues

    (b)(5) Deliberative Privilege WIII Reglon 3 be addressing the oher comments and sending an updated version of the talking points?

    Hope yourweekend is going well -

    Kevin On : 16 June 2017 20:34, "O'Brien, Kenn eth" <Kenneth .O'Brien@nrc.gov> wrote:

    Kevin Thanks for the thoughts .

    (b)(5) Deliberatve Privile.ge Just my in itial reaction.

    Oh yes, not looking to attract any flfes other than to swat t hem.

    -)

    Ken

    Kenneth G. 0 1Brien, Director D vision of Reactor Safety Region 11 1 Kenneth .OBrien@NRC.Gov 630-829-9700 On : 16 Jun e 2017 18:02, 11 Coyne, Kevin" <Kevjn .Coyne@nrc.gov> wrote :

    Ke n -

    Thanks for taking a cut at the first draft of the talking points. Some comments for conside ration:

    General:

    {b)(5) Deliberative Privilege

    (b)(5) Deliberative Privilege Kevin Begin Forwarded Message :

    From : "Jeffers, M ark" <Mark.Jeffers@nrc.gov>

    Subje ct: Fwd: Draft Talki ng Points for Discussions Relat ive to LaSalle SIT lssues Date: 16 June 2017 17:35 To: "Coyne, Kevin <Kevin.Coyne@nrc.gov>

    As discussed, please find the attached talking points.

    Thanks, M ark Sent from my iPhone. Please forgive any typos.

    From: "O'Biien, Kenneth" <Kenneth.O'Brien@nrc.gov>

    Subject:

    PW: Draft Talkin g Points for Discussions Relati ve to LaSalle SIT Issues

    Date: 16 June 201 7 15 :3 1 To: " Jeffers, Mark" <Mark.Jeffers@nrc.gov>

    fyi From: O'Brien, Kenneth Sent: Friday, Jun e 16, 2017 3:31 PM To: Pederson, Cynth ia <Cynt hia.Pederson@nrc.gov>

    Cc: Lara, Jul io <Jul io.Lara@nrc.gov>

    Subject:

    Draft Ta lking Point s for Discussions Relative to LaSa lle SIT lssues Cindy The attached are for your consideration and use. Julio and I have both worked to ensure a balanced approach.

    Thanks Ken

    Heck, Jared From: Shuaibi, Mohammed Sent: Monday, June 19, 2017 12:16 PM To: Roberts, Darrell

    Subject:

    FW: LaSa lle Talking Points 6 19 17 Rev 4.docx Attachments: LaSalle Talking Points 6 19 17 Rev 4.docx As we discussed ... here's the latest draft. Pretty close to final.

    From: Lubinski, John Sent: Monday, June 19, 2017 12:08 PM To: Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; McDermott, Brian <Brian.McDermott@nrc.gov>

    Cc: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Lara, Julio <Julio.Lara@nrc.gov>; Louden, Patrick

    <Patrick.Louden@nrc.gov>; Alley, David <David.Alley@nrc.gov>

    Subject:

    RE: LaSalle Talking Points 6 19 17 Rev 4 .docx

    Mohammed, Thanks for the discussion on our attached comments. Looks good.
    Brian, We (DE and RIII) discussed and believe it is still important to have a meeting "outside" the inspection process.

    Any comments on the attached?

    From: Shuaibi, Mohammed Sent: Monday, June 19, 2017 12:42 PM To: Lubinski, John <John.Lubinski@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>; Jeffers, Mark

    <Mark.Jeffers@nrc.gov>

    Cc: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Lara, Julio <Julio.Lara@nrc.gov>; Louden, Patrick

    <Patrick.Louden@nrc.gov>

    Subject:

    LaSalle Talking Points 6 19 17 Rev 4.docx AII ,

    l've taken a shot at making modifications to the talking points based on my conversation with Ken on the topic.

    Please see attached and provide any comments ASAP so we can prep for Mike's use.

    Thanks ,

    Mohammed

    From: Benjam i lamie To: Pbillips Charles; Dunlop Andrew: Rodriguez Lionel: Farnao Michael Cc: leffers. Mark; Stoedter. Karla

    Subject:

    RE: LaSalle Shutdown Date: Monday, J une 19, 2017 12:36:01 PM Please treat this information as proprietary and not to be shared within NRC unless there is a need to know. Please do not share externally. We do not want this information going public based upon our communication at this point.

    lt's proprietary because it could result in someone gaining insider trading information and or power purchase leverage Thank Team, Jamie From: Phillips, Charles Sent: Monday, June 19, 2017 11:58 AM To: Benj amin, Jamie <Jamie.Benjamin@nrc.gov>; Dun lop, Andrew <Andrew.Dun lop@nrc.gov>;

    Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Farnan, M ichael <Michael.Farnan@nrc.gov>

    Subject:

    LaSal le Shutdown

    FYI, The SVP told me today that LaSalle is going to shutdown Unit 1 sometime in the next two weeks and repair the valve.

    Chuck

    From: farnan Michael To: Pbil!ips Charles; Benjami 1amie; Dunlop. Andrew: Rodrii:uez Lionel Subj ect: RE: laSalle Shutdown Date: Monday. J une 19, 2017 12:06:07 PM Thank.s for the update Chuck.

    Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Commission 301-415-1486 From: Phfllips, Cha rles Sent: Monday, June 19, 2017 12:58 PM To: Benjami n, Jarnie <Jamie.Benjamin@n rc.gov>; Dun lop, Andrew <Andrew.Dun lop@nrc.gov>;

    Rodriguez, Lionel <Lione l.Rodriguez@nrc.gov>; Farnan, Michael <Michael.Farnan@nrc.gov>

    Subject:

    LaSal le Shutdown

    FYI, The SVP told me today that LaSalle is going to shutdown Unit 1 sometime in the next two weeks and repair the valve.

    Chuck

    From: Stoedter, Karla To: Pbillips Charles: Wojewoda lacguelyn Cc: Ruiz Robert

    Subject:

    FW: LaSalle SIT Update Date: Monday, June 19, 2017 5:41:00AM Attachments: E170602t030957 NRC RA17-056.pdf imageOOl .jpg Here's the latest.

    Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Jeffers, Mark Sent: Friday, June 16, 2017 3:27 PM To: Logaras, Harral <Harra l. Loga ras@ nrc.gov>; Barke r, Allan <Allan.Barker@nrc.gov>; Heck, Jared

    <Jared .Heck@nrc.gov>; Skokowski, Richard <Richard .Skokowski@nrc.gov>; Chandrathil, Prema

    <Prema .Chandrathil @nrc.gov>; M it lyng, Viktoria <Viktoria.Mitlyng@nrc.gov>; Lambert, Kenneth

    <Ken neth.Lambert@nrc.gov>

    Cc: Benjam in, Jam ie <Jamie.Benjamin@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>

    Subject:

    RE: LaSa lle S!T Update To keep everyone in the loop, Cindy, Bill Dean, and Mike Johnson met this afternoon to discuss options going forward with the unresolved issue at LaSalle (i.e., the operability assessment of the Unit 1 HPCS injection valve). From that meeting, the direction we e.

    (b)(5) Deliberative Privilege (b)(5) Deliberati ve Privilege B.

    t1.

    lf anyone has any questions, please Iet me know.

    Thank You, Mark Jeffers Branch Chief I Rlll DRS EB2 1x9798 From: Jeffers, Mark

    Sent: Thursday, June 08, 2017 4 :02 PM To: Logaras, Harral <Harral. Logaras@nrc.gov>

    Cc: Ba rker, Allan <Allan .Barker@nrc.gov>; Heck, Jared <Jared.Heck@nrc.gov>; Benjamin, Jamie (Jamie.Benjamin@nrc.gov) <Jam ie.Ben jamin@nrc.gov>; Chandrath il, Prema (Prema.Chandrathi l@nrc.gov) <Prema.Chandrathil@nrc.gov>; M it lyng, Viktoria (Yiktorja.Mitlyog@nrc gov) <Yiktoria.Mitlyng@nrc gov>

    Subject:

    RE: LaSa lle SIT Updat e Just to keep everyone in the loop, we are planning on exiting with LaSalle tomorrow morning. The team reviewed the updated analysis which provided some additional insight on the actual violation . Specifically, the failure analysis performed by an independent vendor combined with the effort done by the Special lnspection Team identified a design flaw in the valve itself (i.e., originally, this was a manufacturing defect by the vendor, but now the vendor has determined it to be a flaw in the design of the valve itself). The vendor (Flowserve) is in the process of revising the 2013 Part 21 notification to include this design flaw.

    The team is exiting with an apparent violation of 10 CFR 50, Criterion 111 , "Design Control."

    It will be dispositioned under traditional enforcement since no performance deficiency exists (i.e., it was not within the ability of the licensee to foresee and correct). Specifically, it would be unreasonable for the licensee to have identifi *

    • from the vendor.

    b)(5) Deliberative Pri vilege lf anyone has any questions, please Iet me know.

    Than k You, M ark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: Jeffers, Mark Sent: Tuesday, June 06, 2017 8:03 AM To: Logaras, Harral <Harral.Logaras@ nrc.gov>

    Cc: Ba rker, Allan <Allan.Barker@n rc.gov>; Heck, Jared <Jared.Heck@nrc.gov>; Benjamin, Jamie (Jamie .Benjamin@nrc.gov) <Jam ie.Ben jam in @nrc.gov>; Chandrath il, Prema (Prema .Chandrath il @nrc.gov) <Prema .Cha ndrathil@nrc.gov>; M it lyng, Viktoria (Viktoria.Mitlyng@nrc.gov) <Viktoria.Mit lyng@nrc.gov>

    Subject:

    RE: LaSa lle SIT Updat e The only remaining inspection activities for the LaSalle SIT include inspecting the operability of the Unit 1 High Pressure Core Spray injection valve (i.e., the opposite unit's valve to the one that failed). The team has gone back and forth with the licensee on the development of information that would provide reasonable assurance of operability. The

    licensee has continuously been updating their operability based on new information developed/provided by the BWROG, the valve vendor, specialty engineering firms, and an independent lab performing the failure analysis evaluation. The most recent delay was due to the delivery of the failure analysis report that was completed last Wednesday. The team is currently reviewing/inspecting the report and discussing the issues with the licensee. The team is scheduled to make their recommendation on the operabil ity of the Unit 1 valve by Wednesday. Depending on the recommendation, we will then schedule the exit meeting. Please Iet me know if you have any questions.

    Additionally, for your awareness, headquarters entered into the LIC-504 process (i.e. , risk informed decision making procedure developed after Davis Besse) to address the generic implications of the failure. Some actions to be completed include:

    DIRS is working to get an lnformation Notice out within the next few weeks to highlight the failure at LaSalle and sim ilar other failures of this specific type of valve.

    DIRS is evaluating the need for other forms of generic communications (e.g.,

    Generic Letter, Bulletin, etc.) to require licensees to respond to the agency.

    Vendor lnspection branch will be going out to the vendor (Flowserve) for an inspection and Region 111 will supplement that inspection with SIT members familiar with the most recent issue.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1 x9798 From: Logaras, Harral Sent: Tu esday, Jun e 0 6, 2017 7:26 AM To: Jeffers, M ark <Mark.Jeffers@nrc.gov>

    Cc: Barker, Allan <Allan .Barker@nrc.gov>; Heck, Ja red <Jared.Heck@nrc.gov>

    Subject:

    LaSal le SIT Update

    Mark, 1 wonder if I could get update information on the LaSalle SIT exit plans. 1 have been working to keep some of our counterparts up to speed and I find the last such update I got was Wednesday, last week. Please teli me if there will be any such information sharing that I can sit in on so you don't have to do the work again just for the RSLO. Thank you.

    Harral Logaras, MBA U. S. NRC Region 111 Regiona l Government Lia ison 630-829-9659 NRC 24 hour Operations Center 301-816-5100

    ~ I

    Eight State Flags of Region-111

    • IA IL IN Ml MN MO OH WI

    Link to the Award Winning NRC lnformation Digest (Click Her e for the Latest Edition)

    Link to the NRC Web Log or Blog http://publjc-blog.nrc-gateway.gov/

    Link to NRC Fact Sheets and Brochures http://www.nrc.gov/read jng-rm/doc-coUectjons/fact-sheets/

    From: O"Brlen. Kenneth To: Pederson Cynthla; Roberts. Darrell Cc: Shuaibi. Mohammed; Lara. 1ullo: Lollden. Patrrck

    Subject:

    LaSalle Ta lking Points 6 19 17 Rev 1.docx Date: Monday,J une 19, 2017 8:30:38 AM Attachments: LaSalle Tall<ing Polnts 6 19 17 Rev 1 do cx Cindy and Darrell Attached please find the latest version of the proposed talking points.

    1have forwarded them onto John L. and Kevin C. for their thoughts and comments.

    1hope to have a near tinal version for sharing with the EDOs office later this morning or afternoon, as they have asked for a chance to see them .

    Thanks Ken

    From: O"Brlen. Kenneth To: Pederson Cynthla; Roberts. Darrell Cc: Shuaibi. Mohammed; Lara. 1ullo: Lollden. Patrrck

    Subject:

    LaSalle Ta lking Points 6 19 17 Rev 1.docx Date: Monday, J une 19, 2017 8:30:38 AM Attachments: LaSalle Talking Polnt s 6 19 17 Rev 1 do cx Cindy ancl Darrell Attached please find the latest version of the proposed talk:ing points.

    1have forwarded them onto John L, and Ke-Vin C. for their thoughts and comments.

    J hope to have a near final version for shari ng with the EDOs office Jater this moming or afternoon, as they have asked for a chance to see t11em.

    Thanks Ken

    LaSalle HPCS Valve Talking Points for Midwest CNO (Hanson) and VP Midwest Ops (Enright)

    • (b)(5) Oeliberative Privilege 1

    From : Lubinski I oho To: O"Brien Kenneth; Coyne. Kevin

    Subject:

    RE: laSalle Talking Points 6 19 17 Rev 1.docx Date: Monday. June 19, 2017 8:50:08 AM Ken ,

    Thanks. 1llke the revision. 1believe bullets 5 and 6 are a choice for Cindy and Mlke to align on one or the other, not both. No other comments. 1 have not shared with Brian McDermott yet (Bill Dean is aut today) but Brian would like to see them before they are sent to Theresa. Do you want me to share this revision, wait for another, or do you want to provide to Bnan?

    Thanks From: O'B ri en, Kenneth Sent: Monday, June 19, 2017 9:29 AM To: Lubi nski, John <John.Lubinski @nrc.gov>; Coyne, Kevin <Kevin .Coyne@ nrc.gov>

    Subject:

    LaSal le Talking Points 6 19 17 Rev 1.docx lmportance: High John and Kevin 1 have made adjustments to the first draft of the talking points.

    Thanks for your thoughts and inputs, they added a great deal of value to the very rough first effort.

    Let me know your thoughts.

    1 think we ali saw a note from Theresa looking for an opportunity to get a look at that points sometime today. 1 offered an expectation for sharing them late this morning ar early this afternoon.

    Thanks Ken

    From: O"Brlen. Kenneth To: Lubinskl lohn: Coyne Kevio

    Subject:

    LaSalle Talking Points 6 19 17 Rev 1.docx Date: Monday, June 19, 2017 8:28:33 AM Attachments: LaSalle Talking Points 6 19 17 Rev 1.docx Importance: Hlgh John and Kevin 1have made adjustments to the first draft of the talking points.

    Thanks for your thoughts and inputs, they added a great deal of value to the very rough first effort.

    Let me know your thoughts.

    1think we all saw a note from Theresa looking for an opportunity to get a look at that points sometime today. 1offered an expectation for sharing them late this morning or early this afternoon.

    Thanks Ken

    From : Lubinski I oho To: Q"Brien Kenneth; leffers Mark Cc: Coyne Kevin* McDermott. Brian

    Subject:

    RE: LaSalle Talking Points 6 19 17 Rev 3.docx Date: Monday, J une 19, 2017 11 :20:03 AM Attachments: LaSaUe Talking Polnts 6 19 17 Rev 3 (002) .docx Based on the latest from Ken (that LaSalle plans to shutdown in the next few weeks), see attached proposed cornments.

    From: O'Bri en, Kenneth Sent: Mond ay, Jun e 19, 2017 10:19 AM To: Lubinski, John <John.Lubinski @nrc.gov>

    Cc: Coyne, Kevin <Kevin.Coyne@ nrc.gov>

    Subject:

    LaSa lle Talking Points 6 19 17 Rev 3.docx John The latest revision with title changed.

    Please share this one with Brian.

    1plan to leave the office for a trip to Perry and Davis Besse in the next hour.

    You can reach me on my ce11, ...  !(b_)<_

    6l_ _ _ __.

    Thanks Ken

    LaSalle HPCS Valve Talking Polnts For Discussions with Midwest CNO (Hanson) and Sr. VP Midwest Ops (Enright)

    (b)(5) Deliberative Priv11ege

    From: McDermott Brian To: Lubinski lohn: Q" Bien Kenneth: reffers. Mark Cc: Coyne Kevjn

    Subject:

    RE: LaSalle Talki ng Points 6 19 17 Rev 3.docx Date: Monday, J une 19, 2017 11:40:49 AM Talkin ood. With the new information (b)(5) Deliberative Privilege (b)(5) Deliberative Privilege From: Lubinski, John Sent: Monday, June 19, 2017 12:20 PM To: O"Brien, Kenneth <Kenneth.O"Brien@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>

    Cc: Coyne, Kevin <Kevin.Coyne@nrc.gov>; McDerrnott, Brian <Brian.McDerrnott@nrc.gov>

    Subject:

    RE: LaSalle Talking Points 6 19 17 Rev 3.docx Based on the latest from Ken (that LaSalle plans to shutdown in the next few weeks), see attached proposed comments.

    From: O"Brien, Kenneth Sent: Monday, Ju ne 19, 2017 10:19 AM To: Lubi nski, John <John. Lubinski@nrc.gov>

    Cc: Coyne, Kevin <Kevin.Coyne@nrc.gov>

    Subject:

    LaSal le Talking Points 6 19 17 Rev 3.docx John The latest revision with title changed.

    Please share this one with Brian.

    1plan to leave the office for a trip to Perry and Davis Besse in the next hour.

    You can reach me on my ce11, !(b_ ... l<_6l_ _ _ ___.

    Thanks Ken

    From: O"Brlen. Kenneth To: Roberts DarreU; Pederson Cynthia

    Subject:

    LaSalle Ta lking Polnts 6 19 17 Rev 3.docx Date: Monday, June 19, 2017 9:22:17 AM Attachments: LaSalle_Jalki.og_Poi.!lts 6_J 9 17 Rev 3.docx.

    The )atest version.

    1 will be 1eaviog for Perry and Davis Besse in the oext hour or so.

    Mark Jeffers basa copy and can support changes jf necessary.

    1 am awaiting further feedback from NRR>

    Thanks Ken

    LaSalle HPCS Valve Talking Polnts For Discussions with Midwest CNO (Hanson) and Sr. VP Midwest Ops (Enright)

    (b)(5) Deliberative Prrvifege

    From: Lubinskl. 1oho To: O"Brien. Kenneth Cc: Coyne. evin subject: RE: laSalle Talking Points 6 19 17 Rev 3.docx Date: Monday, J une 19, 2017 10:03:42 AM Got it. Will share with Brian. Thanks From: O'Brien, Kenneth Sent: Monday, Jun e 19, 2017 10:19 AM To: Lubinski, John <John.Lubinski @nrc.gov>

    Cc: Coyne, Kevin <Kevin.Coyne@ nrc.gov>

    Subject:

    l aSalle Talking Points 6 1917 Rev 3.docx John The latest revision with title changed.

    Please share this one with Brian.

    1plan to leave the office for a trip to Perry and Davis Besse in the next hour.

    You can reach me on my cell ... l(b-)(-6)_ _ _ _ ___.

    Thanks Ken

    Fr om : O"Brien Kenneth To: Shuaibj Mohammed; Louden Patrjck: Lara lvlio Cc: 1effers. Mark

    Subject:

    FW: LaSa lle Talking Po ints 6 19 17 Rev 3.docx Date: Monday, J une 19, 2017 9:20:54 AM Attachments: LaSalle Talking Polnts 6 19 17 Rev 3.do cx Gentlemen This is the latest version.

    1will be leaving for Perry and Davis Besse in the next hour or so. Mark Jeffers has a copy of this latest version if changes are needed.

    Thanks Ken From: O'Brien, Kenneth Sent: Monday, June 19, 2017 9: 19 AM To: Lubi nski, John <John.Lubinski @nrc.gov>

    Cc: Coyne, Kevin <Kevin.Coyne@ nrc.gov>

    Subject:

    LaSal le Talking Points 6 19 17 Rev 3.docx John The latest revision with title changed.

    Please share this one with Brian.

    1 plan to leave the office for a trip to Perry and Davis Besse in the next hour.

    You can reach me on my celll...(b_l<_6)_ _ _ _ __.

    Thanks Ken

    From: McDermott Brian To: Lubinski lohn: Shuajbi. Mohammed; Coyne Kevin; leffers Mark Cc: O"Brien. Kenneth; Lara, 1uio; Louden. Patrjck; Alley. David Subj ect: RE: LaSalle Talki ng Points 6 19 17 Rev 4.docx Date: Monday, J une 19, 2017 2:52:06 PM Got it. Thanks.

    From: Lubinski, John Sent: Monday, June 19, 2017 1:08 PM To: Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>;

    Jeffers, Mark <Mark.Jeffers@nrc.gov>; McDermott, Brian <Brian.McDermott@nrc.gov>

    Cc: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; La ra, Jul io <Julio.Lara@n rc.gov>; Louden, Patrick

    <Patrick.Louden@nrc.gov>; Alley, David <David.Alley@nrc.gov>

    Subje ct: RE: LaSa lle Talking Points 619 17 Rev 4.docx

    Mohammed, Thanks for the discussion on our attached comments. Looks good.
    Brian, We (DE and RIII) discussed and believe it is stili important to have a meeting "outside" the inspection process. Any comments on the attached?

    From: Shuaibi, Mohammed Sent: Monday, Ju ne 19, 2017 12:42 PM To: Lubinski, John <John. Lubinski@nrc.gov>; Coyne, Kevin <Kevin .Coyne@nrc.gov>; Jeffers, Mark

    <Mark.Jeffers@nrc.gov>

    Cc: O'Brien, Kenneth <Kenneth .O'Brien@nrc.gov>; La ra, Julio <J ujo Lara@nrc.gov>; Louden, Patrick

    <Patrick.Louden@orc.gov>

    Subje ct: LaSal le Talking Points 6 19 17 Rev 4.docx

    AII, l've taken a shot at making modifications to the talking points based on my conversation with Ken on the topic.

    Please see attached and provide any comments ASAP so we can prep for Mike's use.

    Thanks, Mohammed

    From: Shuaibi Mohammed To: Robeas Darreu: Pederson Cynthja; McDermou. Brian Cc: Lubinski. lohn: O"Brien. Kenneth; Louden. Patrick; Lara. lulio: leffers. Mark; Aley, Dayid; Coyne. Kevin

    Subject:

    LaSalle Ta lking Points 6 19 17 Rev 5.docx Date: Monday, J une 19, 2017 12:47:07 PM Attachments: LaSalle Talking Polnts 6 19 17 Rev 5.do cx

    Ali, Attached is a clean version of the talking points that we have aligned on with NRR/DE.

    Please let us know if you have any questions/comments/suggestions.

    Thanks, Mobammed

    LaSalle HPCS Valve Talking Points For Discussions with Midwest CNO {Hanson) and Sr. VP Midwest Ops {Enright)

    • fb}/5) Delfberative Privi1e9e

    From: Shuaibi Mohammed To: lohnson Michael: Pederson. Cynthia: Dean Willjam; Bowen 1eremy; Clark Jheresa Cc: Roberts Darrell: McQermott. Brjan; Lubinski. lohn; O"Brien Kenneth; Louden Patrick; Lara. lulio; leffers Mark; Alley. David; Coyne. Kevin

    Subject:

    LaSalle Talking Points Date: Monday, June 19, 2017 2:14:28 PM Attachments: Lasalle Talking Points 6 19 17 Rev s.docx

    Ali, Attached for your use are the final set of talking points for LaSalle's HPCS valve issue. Tlüs set incorporates the latest info from Exelon, regarding their intent to shut down Unit l to perform an inspection of the valve in question.

    P1ease Iet me know if you bave any questions.

    Tban.ks, Mohammed

    LaSalle HPCS Valve Talking Points For Discussions with Midwest CNO (Hanson) and Sr. VP Midwest Ops {Enright)

    • (b)(5) Deliberative Prvtlege

    From: Clark Theresa To: Pederson Cynthla; OBrien. Kenneth Cc: Bowen leremy subject: messages Date: Monday, J une 19, 2017 6:16:38 AM Good morn ing! Mike asked t hat we have a chance to t ake a look at the path-forwa rd messages com [ng out of Friday afternoon's meeting. 1know you guys were working on them ... l'm not sure if you've already shared t hem with Jeremy, but if not could you pass them along when you have t ime?

    Nota huge rush - 1th ink Mike was lean ing toward a cal l on Tuesday.

    Tha nks aga in !

    Theresa Valentine Clark Executive Technica l Assistant (Reactors)

    U.S. Nuclear Regulatory Comm ission T he resa.Clak@nrc.gov 1 301-415-4048 1 0 -16C33

    From: farnan Michael To: Benjam i lamie: Phillips Charles; Dunlop. Andrew: Rodriguez Lionel

    Subject:

    RE: need for report Date: Monday. June 19, 2017 6:34:43 AM FYI -1 am back from my trip and currently working at home. Not su re how much more ass1stance you need from me but I am available. Sorry if I missed any important emails. 1 couldn't es ta bls h a secure and rel iable web connection due to poor wifi at the hotels I stayed at.

    Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Comm ission 301-415-1486 From: Benjamin, Jamie Sent: Friday, June 16, 2017 2:27 PM To: Farnan, Michael <Michael.Farnan@nrc.gov>; Phill ips, Charles <Charles.Phil lips@ nrc.gov>;

    Dunlop, Andrew <Andrew.Dunlop@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>

    Subject:

    need for report List of docs reviewed. 1only have Chuck's.

    Additionally, 1'11 do my best to incorporate the team 's assessment in the report. 1do not need any write-ups at this point. However, if there is something specific that you want in the report and is something that we talked about at the exit then please send me that as well.

    Deadline is by next Friday. June 16, 2017.

    You ali will get a week to comment on the report before I send it to Mark.

    Thanks everyone!

    From: Pederson. Cynthla To: O"Brien. Kenneth; Roberts. DarreH Cc: Shuajbi Mohammed; Lara. µllo: Louden, Patrrck subject: Re: LaSalle Ta lking Points 6 19 17 Rev 1.docx Date: Monday, J une 19, 2017 8:55:30 AM Thanks. Couple of suggestions.

    Check Enrigbt's title. 1 think it is Senior VP...

    Delete 6th bullet and add sentence in 5th,(b)(5) Deliberative Privilege ln 5th and last bullet, strike adequate protectioo . To ensure public health and safety .

    Tbaoks much for working on this. Please keep roe posted oo timing. I can either call Eoright today ortomorrow.

    Oo: 19 June 2017 08:30. "O'Brien, Kermeth" <Keoneth.0'l3rien@nrc.gov> wroce:

    Cindy and Darrell Attached please find the Jatest versjon of rbe proposed talking points.

    J have forwarded them onto John L ancl Kevin C. for tbeir thoughts and comments.

    1 bope to have a near final version for sbaring with tbe EDOs office later this morn.ing or afterooon, as they have askecl for a chance to see them.

    Thaoks Ke11

    From: Roberts Darrell To: Pederson Cynthla: Shuaibi, Mohammed Cc: Lubinski, ohn: O"Brien, Kenneth; Louden Patrjck; Lara. ulio; effers. Ma rk; Alley, Dayid; Coyne. Keyin; McDerm ott. Brian

    Subject:

    RE: LaSalle Talking Points 6 19 17 Rev 5.docx Date: Monday,June 19, 2017 2:03:00 PM lmportance: High Nor do I.

    Mo please forward to OEDO (including Mik e Johnson) and olher parties as per the em*lier plan.

    Thx.

    DJR F rom: Pederson, Cynthia Sent: Monday. June J9, 2017 l :59 PM To: Shuaibi, Mohammed <Mobanuned.Slmaibi@nrc.gov>; Roberts, Darrell <DmTeJLRoberts@nrc.gov>:

    McDermott, Brian <l3rian.McDerrnott@nrc.gov>

    Cc: Lubi.nski.John<lohn.Lubinski@nrc.gov>; O'Brien, Kenneth <Kennetb.O'Btien@nrc.gov>; Louden, P atrick

    <Patrick.Louden@nrc.gov>; Lcu*a, .Julio <Julio.Lara@nrc.gov>; Jeffers. Mark <Mark.Jeffers@nrc.gov>; Alley, Dav id <David.Alley@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>

    Subject:

    Re: LaSalle Talking Points 6 l 9 J7 Rev 5.docx l have no furtber comments.

    On: l 9 June 20 l 7 12:47, "Shuaibi, Mohanuned" <Moharnmed.Shuaibi @nrc.gov> wrote:

    Ali, Artached fs a clean version of the talking points that we have afigned on with NRR/DE.

    Please Ietus know if you have any questions/comments/suggestions.

    Thmlks, Mohammed

    From: Pederson. Cynthla To: Roberts Darrell Cc: OBrien. Kenneth; Shuaibi. Mohammed; H ec, lared; 1effers. Mark; Lambert. Keoneth s ubj ect: Re: LaSalle Ta lking Point s Date: Monday, J une 19, 2017 3:09:55 PM lt was nota commitment but a plan l..(b_)_cs_)_D_e_lib_e_r_

    at-iv_e_P_ri_v_

    i1e_g_e_____________,

    Oo: l9 June 20 l 7 14:57, "Roberts, Darrell " <DarrelJ.Roberts@nrc.gov> wrote~

    Cindy, Witb todav*s news re: noteotial sbutdown, the statf (Mark J. and Keo L.) iofo.rmed me rJ1ad b)(5) Deliberative Prfvilege 1

    Tbe next step is for the staff to get wth you Tuesday and gatber tbat info as well as gain your alignment on the proposed path forward.

    l(b)(5) Deliberative Prfvilege J've asked Mark to inform OEDO staff (Jeremy Bowen, etc.) of this reconunendation from OE, for completeness in communications.

    DJR From: Shuaibi, Mohammed Sent: Monday, June 19, 2017 2:14PM To: Johnson, Michael <Micbael.Johnson@nrc.gov>; Pederson, Cynthia <Cynthia.Pederson@nrc.gov>: Dean, Birt

    <.Bill.Deau@nrc.gov>; Bowen, Jeremy <Jeremy.Bowen@nrc.goV>; Clark, Theresa <Theresa.Clark@nrc.gov>

    Cc: Roberts, Da1Tel1 <Da1TeU.Roberts@nrc.gov>; McDerrnott, Brian <Brian.McDermo1t@nrc.gov>; Lubinski, John

    <John.Lubinski@nrc.gov>; O'Brien, Kenneth <Keruiet11.0'Brien@nrc.gov>; Louden, Pat1i.ck

    <Patrick.Louden@nrc.gov>; Lara, Julio <Julio.Lara@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Alley, Davjd <David.AJley@nrc.gov>; Coyne, Kevin <Kevjn.Coyne@nrc.gov>

    Subject:

    LaSalle Talking Points AJI, Attached for your use are the final set of talking points for LaSalle' s HPCS val ve issue. Tbis set incorporates the latest info from Exelon, regardiug the.ir intent to shut down Un.it* 1 to perform an inspection of the valve in question.

    Please let me know if you have any questious.

    Thanks, Mohammed

    From: Lara ulio To: Pederson Cynthla; Louden Patrick: O"Brjen. Kenneth; Shuaibi Mohammed: Stoedter, Karla Cc: Roberts Darrell

    Subject:

    RE: Discussions with LaSalle Date: Tuesday, June 20, 2017 11 :50:50 AM 1just talked with Glenn Kaegi.

    They are working on the letter and have our comments. Their goal is to issue the letter COB today.

    4 day shutdown to address HPCS valve repair; nota forced outage worklist scope but could wrap in small work which fits into the 4 day window From: Pederson, Cynth ia Sent: Tuesday, June 20, 2017 10:53 AM To: Lara, Julio <J ulio.Lara@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>; O'Brien, Kenneth

    <Kenneth.O'Brien@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shua ibi@nrc.gov>; Stoedter, Karla

    <Karla.Stoedter@nrc.gov>

    Cc: Roberts, Darrell <Darrell.Roberts@nrc.gov>

    Subject:

    RE: Discussions with LaSalle Thanks Karla. Do we know anything about the scope/duration of the planned outage?

    Fro m: La ra, Julio Sent: Tu esday, Jun e 20, 2017 10:46 AM To: Pederson, Cynthia <Cynthia.Pederson@nrc.gov>; Louden, Patrick <Patnck.Louden@nrc.gov>;

    O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shuaibi, Mo hammed

    <Mohammed.Shuaibi@nrc.gov>

    Subject:

    FW: Discussions with LaSa lle FYI From: Stoedter, Karla Sent : Tuesday, Ju ne 20, 2017 9:41 AM To: Lara, Jul io <Julio.Lara@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Kozak, Laura

    <Laura.Kozak@nrc.gov>; Hanna, John <John.Hanna@nrc.gov>

    Subject:

    Discussions w ith LaSa lle 1spoke with reg affairs regarding the items we discussed this morning. They plan to consider our suggestions and Iet us see the draft letter prior to issuance. It also sounds like they are attempting to have the letter finalized by the end of the day today. They were not sure about a press release. They indicated that they normally issue one for maintenance outages, but they are checking with their communications folkds.

    1'11 keep you posted when I hear more, Karla

    From: Stoedter Karla To: Pederson Cynthla; Lara ulio; Louden. Patrick: O"Brien enneth : Shuaibl. Mohammed Cc: Roberts Darrell

    Subject:

    RE: Discussions with LaSa lle Date: Tuesday, June 20, 2017 12:36:37 PM We don't have a duration yet. They are working on a schedule today. They will work the HPCS valve, but this is the only valve to be worked since they do not have parts. They also plan to do some other items that are not anchor/darling related.

    Fro m: Pederson, Cynthia Sent: Tuesday, June 20, 2017 10:53 AM To: Lara, Julio <.lu lio. Lara@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>; O'Brien, Kenneth

    <Kenneth .O'Brien@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; Stoedter, Karla

    <Karla .Stoedter@nrc.gov>

    Cc: Roberts, Darrell <Darrell.Roberts@nrc.gov>

    Subject:

    RE: Discussions with LaSalle Thanks Karla. Do we know anything about the scope/duration of the planned outage?

    From: La ra, Julio Sent: Tuesday, June 20, 2017 10:46 AM To: Pederson, Cynth a <Cynt h ia. Pederson@nrc.gov>; Louden, Patrick <Pa trick. Louden@nrc.gov>;

    0 1Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shuaibi, Mohammed

    <Mohammed.Shua ibi@nrc.gov>

    Subject:

    FW: Discussions with LaSalle FYI From: Stoedter, Karla Sent: Tuesday, June 20, 2017 9:41 AM To: Lara, Ju lio <Juli o.Lara@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Kazak, Laura

    <Laura.Koza k@nrc.gov>; Hanna, Joh n <John.Hanna@nrc.gov>

    Subject:

    Discussions with LaSa lle 1spoke with reg affairs regarding the items we discussed this morning. They plan to consider our suggestions and Iet us see the draft letter prior to issuance. It also sounds like they are attempting to have the letter finalized by the end of the day today. They were not sure about a press release. They indicated that they normally issue one for maintenance outages, but they are checking with their communications folkds.

    1'11 keep you posted when I hear more, Karla

    From: Stoedter. Karla To: Lara. tullo

    Subject:

    draft letter from LaSalle Date: Tuesday, J une 20, 2017 4:04:00 PM Attachments: Untitled.msg Ali-Attached is the draft letter from LaSalle. Please Iet me know of comments so that I can provide them in the morning.

    Thanks, Karla

    From: 1effers Mark To: Stoedter. Karla; Chandrathli Pcema: Mltlyng. Viktoria Cc: Benjamin. lamie: Lara. tulio; O"Brien. Kenneth; Shuaibl. Mohammed; Louden. Patrck

    Subject:

    LaSalle Communication Plan Date: Tuesday, June 20, 201 7 3:33:58 PM Attachments: LaSal!e Region III Communication Plan - DRAFT A docx As discussed today, 1drafted an initial comm plan for moving forward with the intent that the site will be shutting down on Thursday. Prema, 1 took an initial cut at the questions and 1 am still putting together the answers, but I wanted to get the initial draft to everyone as requested. Please Iet me know if anyone has any initial comments, questions, or concerns.

    Karla/Jamie, could you please Iet me know that you receive this. We are currently in a building power outage. So texting is probably the better way to contact the Region right now.

    Thank You ,

    Mark Jeffers Branch Chief I RIII DRS EB2 1x9798

    From: Kozak Laura To: Hanna lobn Subj ect: FW: RE: LaSa lle letter regarding Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues.

    Date: Tuesday,June 20, 2017 8:01:00 AM Attachments: image001.jpg NRC RA17-056.pdf From: Benjamin, Jamie Sent: Thursday, June 08, 2017 9:45 AM To: Kazak, Lau ra <Laura.Kozak@nrc.gov>

    Subject:

    FW: RE: LaSa ll e letter regarding Commitments for Resolution of Anchor Darling Double Disc Gate Va lve Part 21 lssues.

    (b)(5) Deliberative Privilege From: Kusu mawati murray, Putri :( GenCo-N uc) [ma i lto :Putri .Kusumawati m u rray@exeloncorp.com]

    Sent: Friday, Ju ne 02, 2017 3:08 PM To: Benjamin, Jamie <Jam ie.Ben jamin@n rc.gov>

    Subject:

    [Externa l_Sender] RE: LaSalle letter regarding Comm itments for Resolution of Anchor Darling Double Disc Gate Va lve Part 21 lssues.

    Jamie, Thank you for the feedback. Please see the attached letter that was submitted to the NRC electronically today for your copy.

    Thank you, Dwi Murray Pri ncipa! Regulatory Engineer Regulatory Assurance - LaSalle County Station 815-415-2814 Put ri.Kusumawatim urray@exeloncoro.com From: Benjamin, J amie [ma ilto: amie.Be nj amjn@nrc.gov)

    Sent: Friday, J une 02, 2017 1 :20 PM To: Kusumawatimurray, Putri:{GenCo-Nuc)

    Subject:

    RE: LaSalle letter regarding Commitments for Resolution of Ahchor Darllng Double Disc Gate Valve Part 21 Issues.

    1spoke with Ken O'Brien. The letter is consistent with his corwersation with Exelon Senior Management.

    From: Kusu mawat i murray, Put ri :( GenCo* N uc) [ma i lto :Putri .Kusumawati mu rray@exeloncorp.com]

    Sent: Friday, June 02, 2017 8:51 AM To: Benjami n, Jamle <Jamje.Benjamin@nrc.gov>

    Subject:

    [Externa l_Sender] LaSa ll e letter regarding Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 lssues.

    lmportance: High

    Jamie, Please see the attached letter t hat has been reviewed by LaSa lle's management regard ing commitments for resolution of Anchor Darling Double Disc Gate Valve Part 21 issues based on May 25, 2017 discussion. We intend to subm it the lett er today pending any feedba ck from the NRC.

    Please Iet me know if any quest1ons or concerns.

    Thank you, Dwi Murray Principa! Regulatory Engineer Regulatory Assurance - LaSalle County Station 815-415-2814 eutrj.Kusumawatjmurrav@exe1oncoro.com

    From: Stoedter Karla To: 1effers Mark Cc: Ben jamin. lamie

    Subject:

    RE: LaSalle Talking Po ints Date: Tuesday, June 20, 2017 7:09:00 AM meeting you have th is morning? The number here is (b)(6) .________

    1'11 try to get that intormation today while l'm here. ls th,..e__r__

    e__a._

    n......................

    o....,

    u can tie me into any From: Jeffers, Mark Sent: Tuesday, June 20, 2017 7:07 AM To: Stoedter, Karla <Karla.Stoedter@nrc.gov>

    Cc: Benjamin, Jamie <Jamie.Benjamin@nrc.gov>

    Subject:

    FW: LaSal le Talking Points lmportance: High

    Karla, You and Cindy are emailing at the same time. Cindy and Enright talked last night and again this morning. The plan is to shut down Thursday night like you mentioned. We are going to have a quick meeting this morning to "regroup" and discuss how to handle this going forward.

    However, this puts us into a difficult position regarding inspection of the valve. Assuming they shutdown Thursday night, 1would guess they would do disassembly of the valve early Friday. Do we have any idea what the licensee has for a timetable for inspecting the valve

    / replacing wedge assembly?

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: Pederson, Cynth ia Sent: Tuesday, June 20, 2017 7:02 AM To: Johnson, Michael <Michael.Johnson@n rc.gov>; Shuaibi, Mohammed

    <Mohammed.Shu aibi@ nrc.gov>; Dea n, Bi ll <Bil l.Dea n@nrc.gov>; Bowen, Jeremy

    <Jeremy.Bowen@nrc.gov>; Clark, Theresa <Theresa .Clark@nrc.gov>; McCree, Victor

    <Victor.McCree@nrc.gov>; Brown, Frederick <Frederick.Brown@nrc.gov>

    Cc: Roberts, Darre ll <Darrell.Roberts@nrc.gov>; McDermott, Brian <Brian .McDermott@nrc.gov>;

    Lubinski, John <John.Lubi nski@nrc. gov>; O'Brien, Kenneth <Kennet h.O' Brien@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>; La ra, Jul io <Jul io.La ra@nrc.gov>; Jeffers, Mark

    <M ark.Jeffers@ nrc.gov>; Al ley, David <David.Alley@ nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc gov>

    Subject:

    RE: LaSa lle Talking Points lmportance: High

    Mike, l suggest a pause to re-group on your call with Bryan. 1just got off the phone with Dan Enright again. They are willing to put their com mitment to shut down th is week in writing to us . (Reverse GAL). We will update you later today.

    From: Johnson, Michael Sent: Tu esday, Jun e 20, 2017 5:57 AM To: Shuaibi, Moha mmed <Mohammed .Shuaibi@nrc.gov>; Pederson, Cynthia

    <Cynthia,Pederson@ nrc,gov>; Dean, Bill <Bill. Dean@nrc.gov>; Bowen, Jeremy

    <Jeremy,Bowen@nrc.gov>; Cla rk, Theresa <Theresa.Clark@nrc.gov>

    Cc: Roberts, Darrell <Darrell. Roberts@nrc,gov>; McDermot t, Brian <Brian .McDermott@nrc.gov>;

    Lubinski, John <John. Lubinski@nrc.gov>; O'Brien, Kenneth <Kennet h.O'Bri en@n rc.gov>; Louden, Patrick <Patrick Louden@nrc.gov>; Lara, Ju lio <Julio.Lara@nrc.gov>; Jeffers, Mark

    ; Al ley, David <David,Alley@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>

    Subject:

    RE: LaSa lle Tal king Points Tha nks Mo.

    1 am having trouble arranging a conversation with Bryan. ln light of Bil l and Cindy's conversations, 1 t hi nk we are in a good place. Thus, 1 don't bel ieve our conversation is critical at this point. lf I am unsuccessful today, 1 wi ll wa it until we see what unfolds in planned activities over the next few weeks.

    Mike From: Sh uaibi, M ohammed Sent: Monday, Jun e 19, 2017 3:14 PM To: Johnson, Michael <M ichael.Johnson@nrc.gov>; Pederson, Cynt hia <Cyntha.Pederson@nrc.gov>;

    Dean, Bill <Bill.Dean@nrc.gov>; Bowen, Jeremy <Jeremy.Bowen@nrc.gov>; Clark, Theresa

    <Theresa ,Cla rk@n rc,gov>

    Cc: Roberts, Darrel l <Darrell.Roberts@nrc.gov>; McDermot t, Brian <Brian.McDermott@nrc.gov>;

    Lubinski, John <John .Lubi nski@nrc.gov>; O'Brien, Kenneth <Kennet h.O'Bri en@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>; Lara, Jul io <Julio.Lara@nrc.gov>; Jeffers, Mark

    <Mark.Jeffers@nrc.gov>; Al ley, David <Davjd.Alley@nrc.gov>; Coyne, Kevin <Kevin .Coyne@nrc.gov>

    Subject:

    LaSal le Talking Points AII ,

    Attached for your use are the final set of talking points for LaSalle's HPCS valve issue.

    This set incorporates the latest info from Exelon, regarding their intent to shut down Unit 1 to perform an inspection of the valve in question.

    Please Iet me know if you have any questions.

    Thanks, Mohammed

    From: Stoedter Karla To: O"Brien. Kenneth: Shualbi. Mohammed; Louden Patrick; Lara. lv!io: leffers. Mark

    Subject:

    LaSalle Unit 1 Date: Tuesday, J une 20, 2017 7:02:26 AM l'm at the plant today and heard that Unit 1 may start shutting down at 10 pm on Thursday night. 1 wlll Iet you know if I hear more.

    Karla

    Heck, Jared From: Stoedter, Karla Sent: Tuesday, June 20, 2017 12:37 PM To: Pederson, Cynth ia; Lara, Julio; Louden, Patrick; O'Brien, Kennet h; Shuaibi, Mohammed Cc: Roberts, Darrell

    Subject:

    RE: Discussions with LaSalle We don't have a duration yet. They are working on a schedule today. They will work the HPCS valve , but this is the only valve to be worked since they do not have parts. They also plan to do some other items that are not anchor/darling related.

    From: Pederson, Cynthia Sent: Tuesday, June 20, 2017 10:53 AM To: Lara, Julio <Julio.Lara@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>; O'Brien, Kenneth

    <Kenneth.O'Brien@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; Stoedter, Karla

    <Karla.Stoedter@nrc.gov>

    Cc: Roberts, Darrell <Darrell.Roberts@nrc.gov>

    Subject:

    RE: Discussions with LaSalle Thanks Karla. Do we know anything about the scope/duration of the planned outage?

    From: Lara, Julio Sent: Tuesday, June 20, 2017 10:46 AM To: Pederson, Cynthia <Cynthia.Pederson@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>; O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>

    Subject:

    FW: Discussions with LaSalle FYI From: Stoedter, Karla Sent: Tuesday, June 20, 2017 9:41 AM To: Lara, Julio <Julio.Lara@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Kozak, Laura

    <Laura.Kozak@nrc.gov>; Hanna, John <John.Hanna@nrc.gov>

    Subject:

    Discussions with LaSalle 1 spoke with reg affairs regarding the items we discussed th is morning. They plan to consider our suggestions and Iet us see the draft letter prior to issuance. It also sounds like they are attempting to have the letter final ized by the end of the day today. They were not sure about a press release. They indicated that they normally issue one for maintenance outages, but they are checking with their communications folkds.

    1'11 keep you posted when I hear more, Karla

    From: Benjam i lamie To: Corujo-Sandin lorge; Rodriguez Lionel

    Subject:

    RE: 2E22-F004 pictu res Date: Wednesday, J une 21, 2017 12:46:29 PM Thanks guys.

    From: Corujo-Sandi n, Jorge Sent: Wednesday, June 21, 2017 12:27 PM To: Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Benja min, Jam1e <Jamie.Benjam in @nrc.gov>

    Subject:

    RE: 2E22-F004 pictu res G:\DRSll!\Engineerlng Branch 2\LaSalle SIT Reference_!!:!!ormation\Plctur§§ From: Rod riguez, Lionel Sent: Wednesday, June 21, 2017 12:21 PM To: Benjami n, Jam ie <Jamje.Benja min@n rc.gov>; Corujo-Sand in, Jorge <Jorge.Corujo-Sa ndin@ nrc.gov>

    Subject:

    RE: 2E22-F004 pictures Hello Jamie, 1have them saved on my desktop. lf it can wait till next week, 1can put them on the G:

    Drive. There's too many to try to email them ali right now.

    Lienei R.

    From: Benjamin, Jamie Sent: Wednesday, June 21, 2017 12:16 PM To: Corujo-Sandin, Jorge <Jorge.Coruio -Sandin@ nrc.gov>; Rodriguez, Lionel

    <Lionel.Rodriguez@ nrc.gov>

    Subject:

    2E22- F004 pictures Hi guys, 1can't find the pictures that we took of 2E22-F004.

    Are they located somewhere? 1want to add a few to the report.

    Thanks - Jamie

    From: Pelke Patrida To:

    Subject:

    Da ily News Wednesday J une 21st Date: Wednesday, June 21, 2017 12:31:05 PM Attachments: Oaily Mornin g: Meeting: News un e 21 2017.docx The Da1ly Morning Meeting News for Wednesday June 21 , 2017 Regional Duty Officer: Pattv Pelke Teleconference Number: (300) 779-9565: Passcode :,_<b_)C6_l_ ___.

    tJetc. TI ,is , ,eooslettc, , 1t&J co, aun 1µ, e acc1s101 1a111 no. au , 10EJ1sli ibate outside lf 1e f4RC.

    Behaviors That Matter - Value of the Week is EXCELLENCE - We achieve excellence through being a self-critical and learning organization that continuously improves and adds value.

    Support lssues:

    RA: Cindy announced temporary reassignments; Darrell will be the acting NSIR Deputy Director and Jim Trapp (currently RI DNMS OD) will be coming to RIII as our acting DRA (effective 7/10) - congratulations!

    DRP: Rem inder to sign-up for June 25th Japanese Gourmet Wagon event and to share any insight or motto with our fellow Japanese regulators (sign-ups in each division).

    DRS: Thanks to all our folks that participated in Eagle Horizon exercise.

    DNMS: Staff attending two day ISFSI counterpart meeting this week in HQ.

    DRMA:

    EICS: Clinton SERP tomorrow at 10 STATES:

    PAO: ltems of interest - Entergy & NRC discussed decommissioning plans; Davis Besse, Perry, NEI, participated in Ohio Energy Summit which included discussions on how plan closures impact communities; Missouri- Sinclair Farms decommissioned property may be used to build new middle school; southern lllinois/STL area - old issue in the news re: med waste disposed at Roxana landfill; Wisconsin - SHINE is seeking additional funding for research; See NB.Q in the News Today Materials Events/lssues:

    Reactor Events: Monticello: https://www.nrc.gov/reading-rm/doc-collections/event~

    status/event/2017/20170621 en.html#en52814 Braidwood Update: https://www. nrc.gov/reading-rm/doc-collections/event-status/eyent/en.html#en52802 Part 21:

    Plant Status BRANCH 1-Clinton: 8d remaining in shutdown LCO for Division 3 service water pump Duane Arnold:

    Quad Cities: Unit 1 :

    Unit 2:

    LaSalle: Unit 1: Shutdown later this week to evaluate HPCUS injection valve Unit 2:

    BRANCH 2 Fermi: On 6/19, Fermi informed us that the Division 2 RHR subsystem was potentially inoperable from May 3-24 due to a misaligned anti-rotation pin on the associated heat exchanger service water outlet valve. During this period, the licensee also identified that the Division 1 RHR subsystem was

    inoperable on May 9 and 11 due to planned maintenance/testing, constituting a loss of safety function . The licensee is developing an LER for the loss of safety function (due July 21) and investigating the cause of the misaligned pin. The Divi i n 2 RHR n returned to service on May 24, (b)(5) Delibera!ive Privilege DC Cook: U nit 1 : Declared leadi""'ng,,,,,...,.e--ge-"""owm"'""""""e""'e""'r,..,,=n=op=e""'r""'a..,,....,e,_,,,,.u.,..e-o..,c"""o=m=p=u~e'r issues.

    The cause is unknown and is currently being investigated. The flowmeter measures feed water flow and is one of the inputs into the thermal power calculation . lf the flowmeter is not returned to service by Friday, then Unit 1 will have to reduce power to about 98%.

    Unit 2:

    Prairie lsland: Unit 1:

    Unit 2:

    Monticello: On 6/20, Monticello made 50. 72 report (EN 52814) due to the failure of the HPCI turbine stop valve to open during post~maintenance testing. The system had entered a 14 day LCO on June 19, to support planned maintenance. The cause of the stop valve issue is currently being investigated.

    BRANCH 3 Byron: Unit 1:

    Unit 2:

    Braidwood: Unit 1:

    Unit 2:

    Paliades: Cindy will be onsite tomorrow 6/22 BRANCH 4 AII plants are quiet Po~tBeach : Untt1 :

    Unit 2:

    Davis Besse:

    Perry:

    Dresden: Unit 1:

    Unit 2:

    NRR:

    Additional Support lssues -

    Other lssues - Op E: Browns Ferry - Adverse Trenci in HPCI Performance ADAMS ML17165A182.

    Personnel News -

    Daily Notes/Preliminary Notification -

    One Week Look Ahead -

    Post 8:15 Meeting Topies -

    From: Lara. u lio To: leffers Mark: Stoedter. Karla: Chandrathil. Pcema; Mit!vn~. Yiktorla Cc: Ben jam i . !amie; O"Brien. Kennerh; Shuaibj. Mohammed: Louden Parrick s ubj ect: RE: laSalle Communication Plan Date: Wednesday, J une 21, 2017 8:12:59 AM

    Mark, Tthanks for sharing the plan. It is very comprehensive and contains important milestones and prelim decisions and actions.

    With respect to the Comm Plan for the LaSa shutdown. 1think it is best to break out key points and messages. 1 reco111mend the following 1 page format BACKGROUND

    • January 4, 2013. TVA initiates a Part 21 notification asa result of a defect discovered in the HPCI inboard containment isolation valve, which is a 1O" Anchor Darling Oouble Oisc Gate Valve (OOGV).
    • February 25, 2013. Flowserve submits Part 21 notlfication to identify that Anchor Darl!ng DDGVs" stems were potentially never completely torqued lnto the upper wedge prior to installation. This condition in conjunctfon with high operating torque/thrust on the stem-to-disc connection could lead to wedge pin failure and eventual stem-to-disc separation.
    • February 11, 2017. LaSalle Unit 2 HPCS injection valve fails during outage testing.
    • April 12, 2017. LaSalle submits LER 50-374/2017-003-00, "High Pressure Core Spray System lnoperable due to lnjection Valve Stem-Disc Separation. "
    • April 24, 2017. SIT begins at LaSalle.

    o June 9, 2017. SIT exits with LaSalle with one apparent violation for the Unit 2 HPCS valve failure and one URI for the remaining outstanding Part 21 valves .

    • June 15, 20 17. NRR/DPR issues IN 2017-03, "Anchor Darling Double Disc Gate Valve Wedge Pin and Stem-Disc Separation Failures. "

    Key Messages

    • The Special lnspection Team exited the Special lnspection on June 9 and communicated that the team has serious concerns with Exelon's operability evaluation for the LaSalle Unit 1 HPCS valve.

    o Exelon has verbally committed to shutting down Untt 1 at LaSalle on Thursday June 22nd _

    • The Agency is striving to be deliberate and timely in our decision-making and open and transparent in our communications with Exelon relative to our underfying questions and concerns, while remaining focused on our regulatory mission of ensuring public health and safety.
    • The Agency is handling the generic implications of this issue using the LIC 504 process. Key messages from the LIC-504 process include:

    o This is not a new issue. Following a similar valve failure at Browns Ferry in 2012, the industry took steps to address the issue. ln light of recent operating experience, including the LaSalle valve failure, both the NRC and industry are taking additlonal actions to resolve the concern .

    o These valves are widely used in systems of varying safety significance. However, not all Anchor Darling valves are used in a way that makes them susceptible to this type of failure.

    o The NRC has no imrnediate safety concerns because other diverse and redundant systerns could be used to protect the plant if a valve were to fail.

    o The NRC plans on holdinga public meeting *in early July to further discuss the operating experience and lndustry actions wlth stakeholders. The NRC will use the informatlon obtained from the public meeting as part of its assessment of the need for additional regulatory actions.

    INTERNAL AND External COmms Daily Nate Q&As:

    Background

    Key rnessage From: Jeffers, Mark Se nt: Tuesday, June 20, 2017 3:34 PM To: Stoedter, Karla <Karla .Stoedter@nrc.gov>; Chandrathil, Prema <Pretna.Cha11drathil@nrc.gov>;

    Mitlyng, Viktoria <Viktoria.Mitlyng@nrc.gov>

    Cc: Benjamin, Jamie <Jamie.Benjamin@nrc.gov>; Lara, Julio <Ju lio.Lara@nrc.gov>; O'Brien, Kenneth

    <Kenneth.O'Brien@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; Louden, Patrick

    < Patrick.Louden@nrc.gov>

    Subject:

    LaSalle Comm unication Plan As discussed today, 1drafted an initial comm plan for moving forward with the intent that the site will be shutting down on Thu rsday. Prema, 1 took an initial cut at the questions and 1am still putting together the answers, but I wanted to get the initial draft to everyone as requested . Please Iet me know it anyone has any initial comments, questions, or concerns.

    Karla/Jamie, could you please Iet me know that you receive this. We are currently in a building power outage. So texting is probably the better way to contact the Region right now.

    Tha nk You, Mark Jeffers eranch Chief I RIII DRS EB2 I x9798

    From: PhiUips Charles To: Farnan. Michael Cc: Beniamin. lamie; Dunlop. Andrew; Rodriguez. Lionel subject: LaSalle HPCS valves Date: Wednesday, June 21 , 2017 2:31:45 PM

    Mike, They are going to do as found diagnostics on the Unit 1 injection valve. ls there anything specific that I should ask for that you might want to look at.

    Chuck

    From: Kozak Laura To: Hanna. loba

    Subject:

    FW: LaSalle NRC Correspondence RA17-059 - Amendment to Commitments fo r Resolution of Anchor Darling Double Disc Gate Va lve Part 21 Issues Date: Wednesday,June 21, 2017 7:46:03 AM Attachments: image002.jpg NRC RAJ7-059.pdf From: Benney, Brian Sent: Wednesday, June 21, 2017 8:40 AM To: Gavrilas, Mi rela <Mi rela.Gavri las@ nrc.gov>; Oesterle, Eric <Eric.Oesterle@nrc.gov>; Helton, Shana <Shana.Helton@nrc.gov>; Hickey, James <James.Hickey @nrc.gov>; All ey, David

    <David.Alley@nrc.gov>; Farnan, Mfchael <M fchael. Fa rn an@nrc.gov>; Thompson, John

    <John .Thompson@nrc.gov>; Miller, Chris <Chris.Miller@nrc.gov>; King, M ichael

    <Michael.King2@nrc.gov>; Weerakkody, Sun il <Su rlil.Weerakkody@nrc.gov>; Giitter, Joseph

    <Joseph.Giitter@nrc.gov>; Bowen, Jeremy <Jeremy.Bowen@ nrc.gov>; Jeffers, Ma rk

    <MarkJeffers@nrc.gov>; Stoedter, Karla <Karla.Stoedter@ nrc.gov>; O'Brien, Kenneth

    <Kenneth .O'Brien@nrc.gov>; Casto, Greg <Greg.Cast o@nrc.gov>; Circle, Jeff <Jeff.Ci rcl e@nrc.gov>;

    Benjam in, Jamie <Jam ie.Benjam in @nrc.gov>; Leech, Matthew <Matthew.Leech@nrc.gov>; Shua ibi, M ohammed <Mohammed.Shuaibi@nrc.gov>; Lara, Julio <Julio. Lara@nrc.gov>; McGinty, Tim

    <Tim.McGinty@nrc .gov>; Krohn, Paul <Paul.Krohn@nrc.gov>; Burke, John <John.Burke@nrc.gov>;

    Kavanagh, Kerri <Kerri.Kavanagh@nrc.gov>; Herrity, homas <Thomas.Herrity@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Corujo-Sandin, Jorge <Jorge.Corujo-Sandi n@nrc.gov>; Louden, Patrick <Patrick. Loud en@nrc.gov>; Kozak, La ura <Laura .Kozak@ nrc.gov>; Ng, Ching

    <Ch ing.Ng@nrc.gov>; M il ler, Ed <Ed.Mi ller@nrc.gov>; Wi lkins, Lynnea <Lynnea.Wil kins@nrc.gov>;

    Lubinski, John <John .Lub inski@nrc.gov>; Hsueh, Kevin <Kevin.Hsueh@nrc.gov>; Stuchell, Sheldon

    <Sheldon.Stuchell@nrc.gov>; Garmoe, Alex <Alex.Garmoe@ nrc.gov>; Bowman, Gregory

    <G regory.Bowma n@nrc.gov>; Lund, Louise <Louise. Lund @nrc.gov>; Chern off, Harald

    <Harold.Chernoff@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>; Gascot Lozada, Ramon <Ramon .GascotLozada@nrc.gov>; Purnell, Blake <Blake.Purnell@n rc.gov>; Clark, Theresa

    <Theresa.Clark@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>; Vaidya, Bhalcha ndra

    <Bha lchandra.Vaidya@nrc.gov>; Wrona, David <David.W rona@ nrc.gov>; Whit man, Jennifer

    <Jennifer.Whitman@nrc.gov>; Ti lton, Caroline <Caroline.Tilton@nrc.gov>; Mclntyre, David

    <David.Mclntyre@nrc.gov>; Burnel l, Scott <Scott.Burnel l@hrc.gov>; Morey, Denn is

    <Dennis.Morey@nrc.gov>; Martinez, Nancy <Nancy. Martinez@nrc.gov>; Thomas, Eric

    <Eric.Thomas@ nrc.gov>; Vegel, Anton <Anton.Vege l@nrc.gov>; Pruett, Troy

    <T roy.Pruett@nrc.gov>; Clark, Jeff <Jeff.Clark@nrc.gov>; Lantz, Ryan <Ryan.La ntz@nrc.gov>;

    Farn holtz, Thomas <Thomas.Farn holtz@ nrc.gov>; Stott, Chad <Chad .Stott@nrc.gov>; Felts, Russe ll

    <Russell .Felts@ nrc.gov>

    Subject:

    FW: LaSal le NRC Correspondence RA17-059 - Amendment to Commitments for Resolut ion of Anchor Darling Double Disc Gate Valve Pa rt 21 lssues Please note that information is proprietary. Some of you may already have this information. This e-mail is to ensure that the entire LaSalle 504 team has the same information.

    Brian From: Lubinski, John Sent: Wednesday, June 21, 2017 8:19 AM To: Dean, Bill <Bill.Dean@nrc.gov>; McDermott, Brian <Brian.McDermott@ nrc.gov>; Evans, Michele

    < M ichele.Evans@nrc.gov>; Benney, Brian <Brian .Benney@nrc.gov>

    Cc: Coyne, Kevin <Keyin .Coyne@n rc.gov>; Miller, Chris <Chris .Miller@nrc.gov>; King, Michael

    <Michael,King2@n rc.gov>; Gavri las, M irela <M ire la .Gavrjlas@nrc.gov>; Giitter, Joseph

    <Joseph.Gjitter@nrc.gov>; Ross-Lee, MaryJa ne <MaryJane.Ross-Lee@nrc.gov>; Alley, David

    <David.Alley@nrc.gov>; Fa rnan, Michael <M ichael. Farna n@nrc.gov>

    Subject:

    FW; LaSalle NRC Correspondence RA17-059-Amendment to Comm.itments for Resolution of Anchor Darl ing Double Disc Gate Valve Pa rt 21 lssues

    Brian, Please note that information is proprietary. Please distribute to the appropriate folks working this issue from HQ.

    From: Shua ibi, Mohammed Sent: Wednesday, June 21, 2017 8:12 AM To: Lubinski, John <John.Lubinski@nrc.gov>; Coyne, Kevin <Kevin .Coyne@nrc.gov>

    Subject:

    FW: LaSal le NRC Correspondence RA17-059 -Amendment to Comm itments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 lssues FYl. .. and appropriate distribution in HQ. Note that this is proprietary.

    From: Stoedter, Karla Sent: Wednesday, June 21, 2017 5:45 AM To: O'Brien, Kenn eth <Kenneth.O'Brien@nrc.gov>; Shuaibi, M ohammed

    <Mohammed.Shvaibi@nrc.gov>; Jeffers, Ma rk <Ma rk.Jeffers@n rc.gov>; Louden, Patrick

    <Patrick.Louden@nrc.gov>

    Subject:

    FW: LaSalle NRC Correspondence RA17-059 -Amendment to Comm itments for Resolution of Anchor Darl ing Double Disc Gate Valve Pa rt 21 lssues Here is the updated commitment letter from LaSalle. The letter is proprietary until June 24th.

    Thanks, Karla Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch ;

    630-829-9731 (office)

    From: Kusu mawatl mu rray, Put ri :( GenCo-N uc) [majlto: Putri. Kusumawati mu rray@exeloncorp.com]

    Sent: Tuesday, June 20, 2017 6:33 PM To: Stoedter, Ka rl a <Karia .Stoedter@nrq~ov>; La ra, Julo <Julio.Lara@nrc goy>

    Subject:

    [Ext erna l_Sender] LaSa ll e NRC Correspondence RA17-059 - Amendment to Commit ment s for Resol ution of Anchor Darling Double Disc Gate Valve Part 21 lssues Karla and Ju lio, For your infor mation . The attached letter was submitted electronically through EIE to the NRC on June 20, 2017.

    Please Iet me know of any questions.

    Thank you, Dwl Murray Principal Regulatory Engineer Regutatory Assurance - LaSalle County Station 815-415-2814 Putri. Kusuma watimurray@exeloncorp.com

    From: J effers, Mark To: Shuaibj Mohammed <Mohammed Shualbi@nrc gov>

    Subject:

    LaSalle Operability Discussions Date: Wednesday, June 21, 2017 9:03:00 AM Attachments: LaSalle SIT Brefin g Sh eet - ORAFT C.docx As just discussed, attached is the most recent summary paper regarding the licensee's bases of operability and the team's disposition of the evaluation. lf you have any questions, please let me know .

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798

    From: oean Bill To: Pederson Cynthia: lohnson Michael; Shuaibi Mohammed: Bowen leremy; Clark Theresa: McCree Yictor; Brown, Frederick Cc: Roberts, Darrell; McDermott, Brian; Lubinski oh n; O"Brien, Kenneth; Louden, Patrick: Lara, u lio; effers, Mark; Alley *. David; Coyne. Kevin

    Subject:

    RE: La Salle Talking Points Da te: Wednesday, June 21, 2017 12:00:1 7 PM 1would agree and conveyed that to mike earlier this week.

    81!!

    From: Pederson, Cynthia Sent: Wednesday, June 21, 20 17 12:40 PM To: Johnson, M ichae l <Michael.Johnson@nrc.gov>; Shuaibi, Mohammed

    <Mohammed.Sh uaibi@nrc.gov>; Dean, Bi ll <Bi ll.Dean@nrc.gov>; Bowen, Jeremy

    <Jeremy.Bowen@nrc.gov>; Clark, Theresa ; McCree, Victor

    <Victor.McCree@nrc.gov>; Brown, Frederick <Frederick.Brown@nrc.gov>

    Cc: Roberts, Darrell <Darrell. Roberts@nrc.gov>; McDermot t, Bria n <Brian.McDermott@nrc.gov>;

    Lubinski, John <John.Lubinski@nrc.gov>; O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Louden, Patrick <Patrick.Louden@n rc.gov>; Lara, Juli o <Ju lio.La ra@ nrc.gov>; Jeffers, Mark

    <Ma rk.J effers@nrc.gov>; Alley, David <David.Al ley@ nrc.gov>; Coyne, Kevin <Kevin.Coyne@n rc.gov>

    Subject:

    RE: LaSa lle Talking Points 1suggest we no longer need Bryan Hansen call or additional calls with Enright now that we have their letter in hand and they are shutting down this week.

    From: Johnson, Michael Sent: Tuesday, June 20, 2017 7: 18 AM To: Pederson, Cynthia <Cynthia.Pederson@nrc.gov>; Shuaibi, Moha mmed

    <Mohammed.Shua ibi@nrc.gov>; Dean, Bil l <Bill,Dean@ nrc.gov>; Bowen, Jeremy

    <Jeremy.Bowen@nrc.gov>; Clark, Theresa <Theresa .Clark @nrc. gov>; McCree, Victor

    <Victor.McCree@nrc.gov>; Brown, Frederick <Frederick.Brown@nrc.gov>

    Cc: Roberts, Darrell <DarrelLRobert s@nrc.gov>; McDermott, Brian <Brian.McDermott@nrc.gov>;

    Lubi nski, John <John.Lubinski@nrcgov>; O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Louden, Patrick <Pat rick.Louden @nrc.gov>; Lara, Jul io <Julio.La ra@ nrc.gov>; Jeffers, Ma rk

    <Mark.Jeffers@nrc.gov>; Alley, David <David .Alley@nrc.gov>; Coyne, Kevin <Kevin.Coyn e@nrc.gov>

    Subject:

    Re: LaSalle Ta lking Point s Ok.

    Mike On: 20 June 2017 08:01, "Pederson, Cynthia" <Cynthia.Pederson @nrc.gov> wrote:

    Mike, 1suggest a pause to re-group on you r call with Bryan. 1just got off th e phone with Dan Enright again. They are willing to put thei r commitment to shut down this week in writing to us . (Reversa CAL). We will update you later today.

    From: Johnson, Michael Sent: Tu esday, Jun e 20, 2017 5:57 AM To: Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; Pederson, Cynthia

    <Cynth ia.Pederson@nrc.gov>; Dean, Bil l <BilLPean@nrqrnv>; Bowen, Jeremy

    <Jeremy.Bowen@nrc.gov>; Clark, Theresa <Theresa .Clark@nrc.gov>

    Cc: Roberts, Darrell <Darrell. Robert s@nrc.gov>; McDermott, Brian <Brian.McDermott @nrc.gov>;

    Lubinski, John <John.Lubinski@nrc.gov>; O'Brien, Ken neth <Kenneth.O'Brien@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>; Lara, Jul io <Julio.Lara@nrc.gov>; Jeffers, Ma rk

    <Mark.Jeffers@nrc.gov>; Alley, David <David.Al!ey@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>

    Subject:

    RE: LaSa lle Talking Points 1hanks Mo.

    (b)(5) Deliberative Privilege Mikt From: Sh uaibi, M ohammed Sent: Mond ay, Ju ne 19, 2017 3:14 PM To: Johnson, Michael <Michael.Joh nson@nrc.gov>; Pederson, Cynth ia <Cynthia .Pederson@nrc.gov>;

    Dean, Bill <Bill.Dean@nrc.gov>; Bowe n, Je remy <Jeremy.Bowen@nrc.gov>; Clark, Theresa

    <Theresa.Clark@nrc.gov>

    Cc: Roberts, Darrell <Darrell.Robert s@nrc.gov>; McDermott, Brian <Brian.McDermott@nrc.gov>;

    Lub inski, John <John.Lubinsk j@nrc.gov>; O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Louden, Patrick <Patrick. Louden@nrc.gov>; Lara, Julio <Ju lio.La ra@nrc.gov>; Jeffers, Mark

    <Mark.Jeffers@nrc.gov>; Alley, David <David.Alley@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>

    Subject:

    LaSal le Talki ng Points AII, Attached for your use are the final set of talking points for LaSalle's HPCS valve issue.

    This set incorporates the latest info from Exelon, regarding their intent to shut down Unit 1 to perform an inspection of the valve in question.

    Please Iet me know if you have any questions.

    Thanks ,

    Mohammed

    From: Pederson. Cynthla To: lohnson Mjchael: Shuajbi Mohammed; Dean. Willlam; Bowen. leremy; Clark. Jheresa; Mccree, Yictor; ~

    Frederick Cc: Roberts. Darrell; McDermott. Brian; Lubinski, l ohn; O"Brien. Kenneth ; Louden. Patrrck: Lara. l ulio; l eff ers. Mark; Alley, David; Coyne, KeVin

    Subject:

    RE: LaSalle Talking Points Date: Wednesday, J une 21, 2017 11 :39:54 AM 1 suggest we no longer need Bryan Hansen caU or additional caUs with Earight now lhal we have their Jetter in hand

    ,md they are shutting down this week.

    From: Johnson, Michael Seal: Tuesday,June 20, 2017 7:18 AM To: Pederson. Cynthia <Cynthia.Pederson@nrc.gov>: Shuaibi., Mohammed <Mohamrned.Shuaibi@nrc.gov>; Dean, Bill <Bill.Dcan@nrc.gov>; Bowen, Jeremy <leremy.Bowen@nrc.gov>; Clark, Thercsa <Theresa.Clark@nrc.gov>;

    McCree, Victor <Victor.McCree@nrc.gov>; Brown, Frederick <Frcderick.Brown@nrc.gov>

    Cc: Roberts, Darrell <DarreU.Roberts@nrc.gov>; McDerrnott, Brian <BrianMcDermott@nrc.gov>; Lubinsk:i, Joha

    <lohn.Lubinski@nrc.gov>; O"Brien, Kenneth <Kenneth.O"Brien@nrc.gov>; Louden, Patrick

    <.Panick.Loudcn@nrc.gov>; Lu*a, Jutio <Jutio.Lara@mc.gov>; Jeffcrs, Mark <Mark.Jeffers@nrc.gov>; Alley, Oavid <David.Alley@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>

    Subject:

    Re: LaSalle Talking Pofots Ok.

    Mike On: 20 June 20l708:01, "Pederson, Cynthia <Cynthia.Pederson@nrc.gov> wrote~

    Mi.ke, I suggest a pause to re-group on your caJJ with Bryan. 1j ust got off the phone with Dan Enright again. Thoy are willing to put their commitment to simt down this week in writing to us . (Reverse CAL). We will update you later today.

    From: Johnson, Michael Sent: Tuesday,June 20, 2017 5:57 AM To: Shuaibi.Mohammed<Mohammed.Shuaibi@nrc.gov>; Pederson, Cynlhia <Cynthia.Pederson@ru*c.gov>; Dcan, Bill <Bill.Dean@nrc.gov>; Bowen, Jeremy <Jeremy.Bowen@nrc.gov>; Clark, Theresa <Theresa.Clark@urc.gov>

    Cc: Roberts, DruTell <Darrcll.Roberts@nrc.gov>; McDermott, Biian <Brian.McDermott.@nrc.gov>; Lubinski, John

    <John.Lubinski@nrc.gov>; O"Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Louden, Patrick

    <.Pat1ick.Louden@nrc.gov>; Lara, Julio <Julio.Lara@nrc.gov>; Je.ffers, Mark <Mark.Jeffers@nrc.gov>; Alley, David <David.Alley@nrc.gov>; Coyne. Kevin <Kevin.Coyne@nrc.gov>

    Subject:

    RE: LaSallc Talking Points Thanks Mo.

    1am having trouble ammging a conversation with Bryan. In Jight of Bill and Cindy's conversatiom, 1 think we .u-e in a good place. Thus, I don' t believe our conversation is critjcaJ al this point. If I am unsuccessful today, I will wait unlil we see what tmfolds in planned activities over the next few weeks.

    Mike From: Sbuaibi, Moharnmed Sent: Monday. June 19, 2017 3:14 PM To: Johnson, Michael <Micbacl.Johnson@nrc.gov>; Pederson, Cyuthia <Cynthia.Pcderson@nrc.gov>; Dean, Bill

    <Bill.Dean@nrc.gov>; Bowen, Jeremy <Jeremy.Bowen@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>

    Cc; Roberts, DruTell <Darrell.Roherts@nrc.gov>; McDermott, Bnan <Brian.McDermott@nrc.gov>; Lubinski, Jo]m 1

    <.lohn.Lubinski@nrc.gov>; O'Brien, Kenneth <Kenned1.0 Brien@nrc.gov>; Louden, Patrick

    <Patrick.Louden@nrc.gov>; Lara, Julio <Julio.Lara@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Alley, David <David.Alley@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>

    Subject:

    LaSalle Talking Points

    Ali, Attached for your use are the final set of talking points for LaSalle's HPCS valve issue. This set incorporates the latest info from Exelon, regarding their intent to shut down Unit I to perform an inspection of the valve in question.

    Please Iet me know if you have any questions.

    Thanks, Mohammed

    From: Feljz-Adorno Nestor To: Pbillips Charles: 1etters Mark* Benjami 1amje; Rodriguez Uonel Cc: Stoedter Karla

    Subject:

    RE: LaSalle Outage Schedule Date: Thursday, June 22, 2017 11 :03:53 AM Ken O'Brien suggested that we document what we observe during all the diagnostics checks and inspections, including taking pictures as they disassemble and inspect the valve.

    From: Phi llips, Cha rles Sent: Thursday, June 22, 2017 10:49 AM To: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Benjamin, Jamie <Jam ie .Benjamin@nrc.gov>; Rodriguez, Lionel <Lione l. Rodriguez@nrc.gov>

    Cc: Feli z-Adorno, Nestor <Nestor.Feli z-Adorno@n rc.gov>; Stoedter, Karla <Ka rla.Stoedte r@nrc.gov>

    Subject:

    RE: LaSa lle Outage Sched ule 0600 1 don't plan on watching them disassemble the valve.

    From: Jeffers, M ark Sent: Thursday, June 22, 201710:44 AM To: Philli ps, Charles <Cha rl es .Phi ll ips@nrc.gov>; Benjamin, Jamie <Jam ie.Be nj amin@nrc.gov>;

    Rodriguez, Lionel <UoneLRodrjguez@nrc.gov>

    Cc: Feliz-Adorno, Nestor <Nestor. Feliz-Adorno@nrc.gov>; Stoedter, Ka rla <Karla.St oedter@nrc.gov>

    Subject:

    RE: LaSa lle Outage Schedu le So when is the valve disassembly now scheduled for?

    Tha nk You, Mark Jeffers Branch Chief I RIII DRS EB2 I x9798 From: Phi ll ips, Cha rl es Sent: Thursday, June 22, 201710:43 AM To: Jeffers, Mark <Ma rk.Jeffers@ nrc.gov>; Benjarnin, Jam ie <Jamie.Benjamin@n rc gov>; Rodriguez, Lionel < Lo n eLRodriguez@nrc.gov>

    Cc: Feliz-Adorno, Nestor <Nestor.Feliz-Adorno@nrc.gov>; Stoedt er, Ka rla <Ka rla.St oedter@nrc.gov>

    Subject:

    RE: LaSa lle Outage Schedu le The valve inspection and measurement has been moved to 1500 on Saturday. 1 had planned to watch the diagnostic and rotation checks and internais inspection. 1 really have no idea what l'm looking at as far as the diagnostics go. Any help wou ld be appreciated but 1 need to know in advance so I can coordinate with the licensee. Jackie is watching the HPCS min-flow valve rotation check as l'm writing this.

    From: Jeffers, Mark Sent: Thursday, June 22, 2017 10:34 AM To: Benjami n, Jam ie <Jamie.Benjamin@nrc.gov>; Rodriguez, Lionel <UoneLRodrig:uez@nrc.gov>

    Cc: Feli z-Adorno, Nestor <Nestor.Feli z-Adorno@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>;

    Phill ips, Charles <Charles.Phi llips@nrc.gov>

    Subject:

    FW: LaSalle Outage Schedule Please see attached schedule for LaSalle. Some specific milestones include:

    Friday 1400 As-found diagnostic checks Friday 1500 As-found valve Rotation Check Satu rday 0400 Disassemble va lve Saturday 0900 lnspect & Measu re va lve internais We need to have setup who is going to be observing what. Thoughts?

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1 x9798 From: St oedter, Karla Sent: Wednesday, June 21, 2017 7:35 AM To: Jeffers, Mark <Mark.Jeffers@ nrc.gov>

    Subject:

    FW: LaSal le Outage Schedule fyi Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Wojewoda, Jacquelyn Sent: Wednesday, June 21, 2017 7:05 AM To: Stoedter, Karla <Karla.Stoedter@nrc.gov>; Philli ps, Charles <Charles.Phil lips@ nrc.gov>

    Subject:

    LaSal le Outage Schedu le Hi Karla, The attached is the schedule for the outage. Mode 4 Friday afternoon around 1400, valve diagnostics Friday at 1700 , valve disassembly Saturday morning beginning at 0400, and the HPCS run on Monday at 1300. The licensee is planning to be back to full power Wednesday at 1400.

    Thank you,

    Jackie From: HP U soo MFPgov

    Sent: Wednesday, June 21, 2017 7:05 AM To: Wojewoda, Jacquelyn <Jacauelvn .Wojewoda@nrc.gov>

    Subject:

    From: Benjami 1amie To: terrers Mark* Ph ilips Charles* Rodriguez Lionel Cc: Feliz-Adorno. Nestor; Stoedter. Karla Subj ect: RE: LaSalle Outage Schedule Date: Thursday, June 22, 2017 11 :45:45 AM Good plan. Lienei, please give me a caHsometime ~uring your shift and Iets do a quick turnover. My celi phone number is!cb_ ... lC_6l _ _ _ __,

    From: Jeffers, Mark Sent: Thursday, June 22, 2017 11:34 AM To: Phillips, Charles <Charles.Phill ips@nrc.gov>; Benjamin, Jamie <Jamie.Benjamin@nrc.gev>;

    Redriguez, Lionel <Lienei. Redriguez@nrc.gov>

    Cc: Feli z-Aderne, Nester <Nester.Feli z-Aderne@nrc.gev>; Steedt er, Karla <Karla.Steedter@nrc.gev>

    Subject:

    RE: LaSa lle Outage Schedule So does the below schedule seem reasonable and do we capture all appropriate events?

    Stem Rotation Checks: Friday -1500 Chuck Valve Disassembly: Saturday -0600 Lienei lnspect Valve Internais: Saturday -1500 Jamie Thank Yeu, Mark Jeffers Branch Ch ef I RIII DRS EB2 1x9798 From: Phillips, Cha rl es Sent: Thursday, June 22, 2017 10:49 AM To: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Benjamin, Jamie <Jamie.Benjamin@nrc.gev>; Redriguez, Lienei <Lionel.Rodriguez@nrc.gov>

    Cc: Feliz-Aderne, Nester <Nester.Feliz-Adorno@nrc.gov>; Steedt er, Karla <Ka rl a.St oedter@nrc.gev>

    Subject:

    RE: LaSa lle Outage Schedule 0600 1 don't plan on watching them disassemble the valve .

    From: Jeffers, Mark Sent: Th ursday, June 22, 2017 10:44 AM To: Philli ps, Charles <Charles .Phillips@nrc.gev>; Benjamin, Jamie <Jam ie.Benjam in @nrc.gev>;

    Redriguez, Lienei <Lionel.Rodriguez@nrc.gov>

    Cc: Feliz-Aderne, Nester <Nestor.Feliz-Adorno@nrc.gov>; Steedter, Karla <Karla.Stoedter@nrc.gov>

    Subject:

    RE: LaSa lle Outage Schedule

    So when is the valve disassembly now scheduled tor?

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 x9798 From: Philli ps, Charles Sent: Thursday, Ju ne 22, 2017 10:43 AM To: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Benjam in, Jamie <Jamie.Benjamin@nrc.gov>; Rodriguez, Lionel <UoneLRodriguez@nrc.gov>

    Cc: Feliz-Adorno, Nestor <Nestor.Feliz-Adorno@n rc.gov>; Stoedter, Ka rla <Ka rl a.Stoedter@nrc.gov>

    Subject:

    RE: LaSa lle Outage Schedule The valve inspection and measurement has been moved to 1500 on Saturday. 1 had planned to watch the diagnostic and rotation checks and internais inspection. 1 really have no idea what l'm looking at as taras the diagnostics go. Any help would be appreciated but 1 need to know in advance so I can coordinate with the licensee. Jackie is watching the HPCS min-tlow valve rotation check as l'm writing this.

    From: Jeffers, Mark Sent: Thursday, June 22, 20 17 10:34 AM To: Benjamin, Jam ie <Jamie;Beojamin@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>

    Cc: Feliz-Adorno, Nestor <Nestor.Feliz-Adorno@nrc.gov>; Stoedt er, Karla <Ka rl a.Stoedter@nrc.gov>;

    Phil lips, Charles <Charles.Phi llips@nrc.gov>

    Subject:

    FW: LaSa lle Outage Schedule Please see attached schedu le tor LaSalle. Some specitic milestones include:

    Friday 1400 As-found diagnostic checks Friday 1500 As-found valve Rotation Check Saturday 0400 Disassemble valve Saturday 0900 lnspect & Measure va lve internais We need to have setup who is going to be observing what. Thoughts?

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 x9798 From: Stoedter, Karla Sent: Wednesday, June 21, 2017 7:35 AM To: Jeffers, Mark <Mark.Jeffers@nrc.gov>

    Subject:

    FW: LaSalle Outage Schedule fyi Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Wojewoda, Jacquelyn Sent: Wednesday, June 21, 2017 7:05 AM To: Stoedt er, Ka rl a <Ka rla.St oedter@n rc.gov>; Phillips, Charles <Charles .Phil lips@nrc.gov>

    Subject:

    LaSal le Outage Schedu le Hi Karla, The attached is the schedule for the outage. Mode 4 Friday afternoon around 1400, valve diagnostics Friday at 1700 , valve disassembly Saturday morning beginning at 0400, and the HPCS run on Monday at 1300. The licensee is planning to be back to full power Wednesday at 1400.

    Thank you, Jackie From: HP U 500 M FP [mailt o:Mary.Grzywa@nrc.gov)

    Sent: Wednesday, June 21, 2017 7:05 AM To: Wojewoda, Jacquelyn <Jacquelyn.Wojewoda@nrc.gov>

    Subject:

    From: 1effers Mark To: Pbillips Charles: Benjam i lamle: Rodriguez Lionel Cc: Feliz-Adorno. Nestor: Stoedter. Karla

    Subject:

    RE: La Sa lle Outage Schedule Date: Thursday, June 22, 2017 11 :06:00 AM 0600 Sunday?

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1 x9798 From: Philli ps, Cha rl es Sent: Thursday, June 22, 2017 10:49 AM To: Jeffers, Mark <Mark.Jeffers@ nrc.gov>; Benjamin, Jamie <Jam ie.Benjamin@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>

    Cc: Feliz-Adorno, Nestor <Nestor.Feli z-Adorno@n rc.gov>; Stoedter, Ka rla <Ka rla.Stoedt er@nrc.gov>

    Subject:

    RE: LaSa lle Outage Schedu le 0600 1don't plan on watching them disassemble the valve.

    From: Jeffers, M ark Sent: Th ursday, June 22, 2017 10:44 AM To: Philli ps, Charles <Charles .Phillips@nrc.gov>; Benjamin, Jamie <Jam ie.Benjam in @nrc.gov>;

    Rodriguez, Lione l <Lionel.Rodriguez@nrc.gov>

    Cc: Feliz-Adorno, Nestor <Nestor.Feliz-Adorno@nrc.gov>; Stoedter, Ka rla <Karla.Stoedter@orc.gov>

    Subject:

    RE: LaSa lle Outage Sched ule So when is the valve disassembly now scheduled fo r?

    Thank You, Mark Jeffers Branch Chief I Rlll DRS EB2 1 x9798 From: Phillips, Cha rles Sent: Thursday, Ju ne 22, 2017 10:43 AM To: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Benjamin, Jam ie <Jamie.Benjamin@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>

    Cc: Feliz-Adorno, Nestor <Nestor. Feliz-Adorno@nrc.gov>; Stoedter, Ka rla <Ka rla.Stoedter@nrc.gov>

    Subject:

    RE: LaSa lle Outage Schedule The valve inspection and measurement has been moved to 1500 on Saturday. 1 had planned to watch the diagnostic and rotation checks and internais inspection. 1really have

    no idea what l'm looking at as far as the diagnostics go. Any help would be appreciated but 1need to know in advance so I can coordinate with the licensee. Jackie is watching the HPCS min-flow valve rotation check as l'm writing this.

    From: Jeffers, M ark Sent: Thursday, June 22, 2017 10:34 AM To: Benjami n, Jam ie <Jamie . Benjam j n@nrq:v>; Rod riguez, Uonel <Lionel Rodriguez@nrc.gov>

    Cc: Feliz-Adorno, Nest or <Nestor.Feliz-Adorno@n rc.gov>; Stoedt er, Ka rla <Ka rl a.Stoedter@nrc.gov>;

    Phill ips, Cha rles <Charles.Phi ll ips@nrc.gov>

    Subject:

    FW: LaSalle Out age Schedule Please see attached schedule for LaSalle. Some specific milestones include:

    Friday 1400 As-found diagnostic checks Friday 1500 As-found valve Rotation Check Saturday 0400 Disassemble valve Saturday 0900 lnspect & Measure va lve internais We need to have setup who is going to be observing what . Thoughts?

    Thank You, Mark Jeffers Bra nch Chief I RIII DRS EB2 1 x9798 From: Stoedter, Karla Sent: Wednesday, June 21, 2017 7:35 AM To: Jeffers, Ma rk <Mark.Jeffers@ nrc.gov>

    Subject:

    FW: LaSalle Outage Schedule tyi Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Wojewoda, Jacquelyn Sent: Wednesday, June 21, 2017 7:05 AM To: Stoedt er, Ka rla <Karla .St oedt er@n rc.gov>; Phill ips, Charles <Charles .Phill ips@nrc.gov>

    Subject:

    LaSalle Outage Schedu le Hi Karla, The attached is the schedule for the outage. Mode 4 Friday atternoon around 1400, valve diagnostics Friday at 1700 , valve disassembly Saturday morning beginning at 0400, and the HPCS run on Monday at 1300. The licensee is planning to be back to full power

    Wednesday at 1400.

    Thank you, Jackie From: HP U 500 M FP [2]

    Sent: Wednesday, June 21, 2017 7:05 AM To: Wojewoda, Jacquelyn <Jacguelyn.Woiewoda@nrc.gov>

    Subject:

    From: J effers, Mark To: O"Bcieo Kenneth; Shuaibi Mohammed IMohammed Shuaibi@nrc gov>

    Cc: Feliz-Adorno. Nestor CNestor.Feliz-Adorno@nrc govl

    Subject:

    FW: La Sa lle Out age Schedule Date: Thursday, June 22, 2017 11 :45:00 AM Ken ,

    1heard you were asking about inspection for the LaSalle disassembly. There are three specific aspects that we plan on observing. Below is the approximate times (updated from Chuck this morning) and who will be observing. lf you have any questions, please Iet me know.

    Stem Rotation Checks: Friday -1500 Chuck Valve Disassembly: Saturday -0600 Lienei lnspect Valve Internais: Saturday -1500 Jamie Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: Jeffers, Mark Sent: Thursday, June 22, 2017 11:34 AM To: Phillips, Charles <Charles. Ph ill ips@nrc.gov>; Benjamin, Jam ie <Jamie.Benjam in @nrc.gov>;

    Rodriguez, Lionel <Lienei. Rodriguez@nrc.gov>

    Cc: Feli z-Adorno, Nestor <Nestor.Feliz-Adorno@nrc.gov>; Stoedter, Ka rla <Karla.Stoedter@n rc.gov>

    Subject:

    RE: LaSa lle Outage Schedule So does the below schedule seem reasonable and do we capture ali appropriate events?

    Stem Rotation Checks: Friday -1500 Chuck Valve Disassembly: Saturday - 0600 Lienei lnspect Valve Internais: Saturday -1500 Jamie Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: Phi ll ips, Cha rles Sent: Thursday, June 22, 2017 10:49 AM To: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Benja mi n, Jam ie <Jamie.Benjamin@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>

    Cc: Feli z-Adorno, Nestor <Nestor.Feliz-Adorno@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>

    Subject:

    RE: LaSa lle Outage Schedule 0600 1 don't plan on watching them disassemble the valve.

    From: Jeffers, Mark Sent: Thursday, June 22, 2017 10:44 AM To: Philli ps, Charles <Cha rles Pbi 11 ips@nrc.gov>; Benjamin, Jamie <Jamie,Beniam in@nrc.gov>;

    Rodriguez, Lionel <LioneL Rodriguez@n rc.gov>

    Cc: Feliz-Adorno, Nestor <Nestor.Feliz-Adorno@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>

    Subject:

    RE: LaSa lle Outage Schedu le So when is the valve disassembly now scheduled for?

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 x9798 From: Ph ill ips, Charles Sent: Thursday, June 22, 2017 10:43 AM To: Jeffers, Ma rk <Mark,Jeffers@nrc.gov>; Benjamin, Jam ie <Jamie,Benjamin@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>

    Cc: Feli z-Adorno, Nestor <Nestor.Feliz-Adorno@nrc.gov>; St oedter, Ka rla <Karla.Stoedter@nrc.gov>

    Subject:

    RE: LaSa lle Outage Schedule The valve inspection and measurement has been moved to 1500 on Saturday. 1 had planned to watch the diagnostic and rotation checks and internais inspection. 1 really have no idea what l'm looking at as far as the diagnostics go. Any help would be appreciated but 1 need to know in advance so I can coordinate with the licensee. Jackie is watching the HPCS min-flow valve rotation check as l'm writing this.

    From: Jeffers, M ark Sent: Th ursday, June 22, 2017 10:34 AM To: Benja min, Jam ie <Jamie.Benjamin@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>

    Cc: Feliz-Adorno, Nestor <Nestor.Feliz-Adorno@nrc.gov>; Stoedter, Ka rla <Karla.Stoedter@nrc.gov>;

    Phil li ps, Charles <Charles.Phi ll ips@nrc.gov>

    Subject:

    FW: LaSalle Outage Schedule Please see attached schedule for LaSalle. Some specific milestones include:

    Friday 1400 As-found diagnostic checks Friday 1500 As-found valve Rotation Check Saturday 0400 Disassemble va lve Saturday 0900 lnspect & Measure va lve internais

    We need to have setup w ho is going to be observi ng what. Thoughts?

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 I x9798 From: St oedter, Karla Sent: Wednesday, June 21, 2017 7:35 AM To: Jeffers, Mark <Ma rk.Jeffers@ nrc.gov>

    Subject:

    FW: LaSal le Outage Schedule fyi Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Wojewoda, Jacquelyn Sent: Wednesday, June 21, 2017 7:05 AM To: Stoedter, Karla <Ka rla.Stoedter@nrc.gov>; Phillips, Charles <Charles.Phil li ps@nrc.gov>

    Subject:

    LaSal le Outage Schedule Hi Karla, T he attached is the schedule for the outage. Mode 4 Friday afternoon around 1400, valve diagnostics Friday at 1700 , valve disassembly Saturday morning beginn ing at 0400, and the HPCS run on Monday at 1300. The licensee is planning to be back to full power Wednesday at 1400.

    Thank you, Jackie From: HP lJ 500 MFP [3]

    Sent: Wednesday, June 21, 2017 7:05 AM To: Wojewoda, Jacq uelyn <Jacquelyn.Wo jewoda@nrcgov>

    Subject:

    From: Jeffers, Mark To: Skokowskj ~~r~

    Subject:

    RE: Lasa11e ( (~;iioe,auve Date: Thursda , J une 22, 20171 2:51:00 PM Attachments: (b)(5) Deliberative Privilege Any issues from OE? 1 do not believe that this is too uncommon (or to not use a double-negative, we have done this before . But I do want to ensure we are consistent in our roach

    ('tl):.15

    ~D;;:,:;e;!.1ib

    ~e~ra~tiv~e~P~riv

    ~ir.i.l e~ -- --""!"!"'!'!"--=~ =r--l liked the initial draft. 1 filled in some o Xs you had in the document. When do you think we can get this out?

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: Skokowski, Richard Sent: Th ursday, June 22, 20 17 12:39 PM To: Jeffers, Mark <Mark.Jeffers@ nrc.gov>

    Subject:

    RE: LaSalle (b)(5) Deliberative Privilege (b)(5) Deriberative Privilege As for precedents, 1 would say we sen rep y etters routrne y w,t out o press re eases, am not sure if commitment letter replies get a press release , but 1'11 do some research with NRR since they are more likely to receive the commitment letters.

    Attach is the direction we were taking, stili very draft.

    From: Jeffers, Mark Sent: Th ursday, June 22, 2017 11:35 AM To: Stoedter, Ka rla <Karla.Stoedter@nrc.gov>; Skokowski, Richard <Richard.Skokowski@nrc.gov>;

    Lambert, Kenn eth <Kenneth. Lambert@nrc.gov>

    Subject:

    RE: LaSa l le(b)(5) Deliberative Privilege Do we have any OpE Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: Jeffers, Mark Sent: Thursday, June 22, 2017 7:08 AM

    To: Stoedter, Ka rla <Karla.Stoedter@nrc.gov>; Skokowski, Richa rd (Richard.Skokowski@nrc.gov)

    <Richa rd.Skokowski@nrc.gov>; Lambert, Kenneth (Kenneth.Lambert@nrc.gov)

    <Kenneth.Lambert@nrc.gov>

    Subject:

    RE: LaSa lle (b)(5) Deliberative Privilege How is the letter going for Lasalle?

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: Stoedter, Karla Sent: Wednesday, June 21, 2017 2:04 PM To: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Chandrathil, Prema <Prema.Chandrathil@nrc.gov>

    Subject:

    LaSall~(b)(5) Deliberative Privilege After add 1 *t*1ona1rev1ew. performed by R'1ck (b)(5)

    PrivileDeliberative e .tndy has made th e dec1s1on that we will issue an acknowledgement letter in response to the licensee's letter Privile : 1 erative

    ~~~~te~:uoerauve As discussed, the acknowledgement letter should not be issued unti l a er une 24, 2017, due to the proprietary nature of the licensee's letter. Rick and his group are working on the letter as we speak.

    l(b)(5) Deliberative Privilege 1, am in the process of revising the com munications plan based on feedback from divisional management.

    We will continue working the Q and As since the licensee plans to issue a press release on the shutdown in the near future.

    1 will be at Clinton tomorrow, but plan to work the communications plan on Friday.

    Thanks, Karla Karla Stoedter, Chief Region 11 1Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: corujo-Sandln lonie To: Benjamin 1amie: Phlllips Charles; Stoedter Karla; lefrers. Mark: Rodriguez. Lionel: farnan Michael: ~

    Andrew Cc: Wojewoda. acquelyn; Ruiz. Robert

    Subject:

    RE: LaSaile Unit 1 HPCS min flow stem rotation check video Date: Thursday, June 22, 2017 4:10:35 PM M:\LaSalle HPCS Min flow stem rotation check.MOV From: Benjamin, Jamie Sent: Th ursday, June 22, 2017 4 :07 PM To: Phil lips, Charles <Charles. Phi ll ips@n rc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>; Jeffe rs, Mark <Mark.Jeffers@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@ nrc.gov>; Farna n, Michael

    <Michael.Farnan@nrc.gov>; Dun lop, Andrew <Andrew.Dunlop@nrc.gov>

    Cc: Wojewoda, Jacquelyn <Jacquelyn.WoJewoda@nrc.gov>; Corujo-Sandln, Jorge <Jorge .Corujo-Sandin@nrc.gov>; Ru iz, Robert <Robert.Ruiz@ nrc.gov>

    Subject:

    RE: LaSa lle Unit 1 HPCS min f low stem rotation check video Where on the M drive?

    From: Phillips, Charles Sent: Th ursday, June 22, 2017 4:06 PM To: Stoedter, Karla <Karla.Stoedter@nrc.gov>; Jeffers, Mark <Ma rk .Jeffers@nrc.gov>; Benjamin, Jamie <Jamie.Ben iamin@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Farnan, Michael

    <Michae l. Farnan@nrc.gov>; Dunlop, Andrew <Andrew.Dun!op@nrc.gov>

    Cc: Wojewoda, Jacquelyn <Jacquelyn .Wojewoda@nrc.gov>; Corujo-Sandin, Jorge <Jorge.Corujo Sandin@nrc.gov>; Ruiz, Robert <Robert.Ruiz@nrc.gov>

    Subject:

    LaSal le Unit 1 HPCS m in flow stem rotation check video We gota copy. 1put it on the M drive. lts notina folder the name of the file is similar to the title of this email. The licensee thinks the valve is fine. You should fast forward to about 2 minutes and 5 seconds or you will suffer severe boredom.

    From: Shuaibi. Mohammect To: Roberts Darrell; Lara. lvlio; Louden Parrlck: Q"Brien Kenneth Subj ect: RE: LaSalle Unit 1 Shutdown/ HPCS Valve Jnspection Coverage 6/22-26/17 Date: Thursday,June 22, 2017 4:51:46 PM Nota problem. We

    • U make sure to provi de the requested update on Saturday.

    From: Roberts, Darrell Sent: Thursday, Juoe 22, 2017 4 :46 PM To: Lara.Julio<Jolio.Lara@nrc.gov>; Louden, Patrick <Patrick.Louden@orc.gov>: Shuaibi. Mohammed

    <Mohammed.Sbuaibi@nrc.gov>; O'Brien, Kenneth <Ken.neth.O'Brien@n.re.goV>

    Subjecr: FW: LaSaJle Unit 1 Shutdown/ HPCS Valve lnspection Coverage 6/22-26/17 Goys.

    See Cindy's request below. She'd like an upclate Saturday on the vaJve's condition. J'd like ro be in the loop as well.

    Thanks, DJR From: Pederson. Cynthia Sent: Thursday, Juoe 22, 2017 3:34 PM To: Roberts, Dimell <DatTell.Roberts@nrc.gov>

    Subject:

    Re, LaSalle Unit 1 Shutdowll/ l:lPCS Valve Inspection Coverage 6/22-26/17 We don't owe inspectfon plaos.

    I would .üke feedback over the weekencl after th.ey open up valve. 1 want to hear co.ndition of valve. Many (OEDO and NRR) will want to bear condition. So maybe a call/text to me and an email to broader audience on condilion.

    Thanks On: 22 June 2017 16:30. "Roberts, Danell <Darrell.Roberrs@orc.gov> wrote:

    Cindy, The following coverage is planned for the LaSalle Unit I Shntdown aud HPCS VaJve [nspection:
    1. Jackie W . will cover the shutdown tonight
    2. Chuck Pb. wiJI cover ini!ial valve activities (xotation checks, disassembly)
    3. Lionel R. will come iu Saturday and cover any additional inspecrions/testing
    4. Jautie B. wiJl come in late Saturday and observe shop acti vities Karla and Mark J. will get updates reguJarly each day . Division management wilJ get updated as information warrants.

    I asked Julio to consider brieling me ancl you over wknd, panicu.larly U' the licensee expeccs to be starting up. The current plan is a 4-day shut.down, which places them into lale Monday.

    Do we owe any of tb.is info to OEDO?

    Danell

    From: PhiUips Charles To: Stoedter. Karla; leffers. Mark; Ben j ami, 1amte; Dunlop Andrew; Rodrjguez Llonel; Farnan. Michaet Cc: Wolewoda lacouelyn

    Subject:

    FW: U1 HPCS Min Flow Va lve Stem Rotation Check Date: Thursday, June 22, 2017 3:19:49 PM Attachments: HPCS Min Flow Valve Stem Rotation.potx (b)(5) Deliberative Pri vilege From: Wojewoda, Jacquelyn Sent: Th ursday, June 22, 2017 3 :06 PM To: Phil lips, Charles <Cha rles. Phill ips@nrc.gov>

    Subject:

    Ul HPCS M in Flow Valve Stem Rotation Check AII, 1 would like to provide some information on the U1 HPCS min flow valve stem rotation check that I observed today. This was the first rotation check performed using the "new" methodology (i.e. the metallic measuring device). Please see the first slide of the attached PowerPoint. The longer marks are every 5°, and the others denote 1 °. The pietu re in slide 1 shows additional hardware that was not used during the rotation check.

    Slide 2 shows the limited amount of space the licensee had to work with. The valve is approximately 7' up in the air and the stem is almost fully enclosed. The picture on slide 2 shows the small gap the licensee used to install the measuring device, and to mark and observe the stem. There was another small gap on the other side of the valve.

    Slide 3 is the best picture I could take of how the measuring device was set up. The licensee marked the stem when the valve was full open, and then again when the valve was full closed.

    Slide 4 shows the general space/set up. There was an individual on each side of the valve attempting to assess stem rotation .

    This was a full HPCS run, so the min flow valve fully cycled twice - when the pump was started, before the test line valve was opened, and then after the test when the test line valve was closed . The licensee had an individual observing on either side of the valve during the pump start, and then the two individuals swapped positions for the test line valve closure. Neither saw stem rotation.

    There was not a lat of room in the area, so I did not have eyes on the stem during the valve movement. The licensee videotaped the rotational checks and we are looking to get a copy.

    (b)(5) Deliberative Privilege Thanks, Jackie and Chuck

    From: J effers, Mark To: Stoedter. Karla

    Subject:

    RE: comm plan Date: Friday, J une 23, 2017 7:41:00 AM Attachments: Communication Plan Rev 1.docx 1started just putting some thoughts on paper with respect to the questions. 1have no strong feel ings on the responses, so it you want to change/revise, please do. Let me know if you have any questions.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: Stoedter, Karla Sent: Friday, June 23, 2017 6:59 AM To: Jeffers, Ma rk <M arkJeffers@ nrc .gov>

    Subject : RE: comm plan No problem. 1 thought you weren't working today.

    Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Jeffers, Mark Sent: Friday, June 23, 2017 6:58 AM To: Stoedt er, Ka rla <Karla.Stoedter@nrc.gov>

    Subje ct: Re : comm plan Yes ... I thought I would be able to get through security faster. That was not the case this morning .... still at the main access facility. Will send when I am through.

    On: 23 June 2017 07:50, "Stoedter, Karla" <Karla.Stoedter@nrc.gov> wrote:

    Did you make any changes to the version I sent to you earlier? lf so, can you send it back to me.

    T hanks, Karla Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Stoedter, Karla To: Robeas Darrell Cc: w.Jim

    Subject:

    FW: Co mmu nication Plan Rev 2.docx Date: Friday, June 23, 2017 2:32:00 PM Attachments: Comrnunica tion Plan Rey 2.docx Attached is the document for Darrell's review.

    Karla Stoedter, Chief Region 11 1 Divlsion of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Stoedter, Karla Sent: Friday, June 23, 2017 10:53 AM To: Shuaibi, Mohammed <Mohammed .Shua1bi@nrc.gov>; Roberts, Da rrell

    < Darrell .Roberts@nrc.gov>

    Subject:

    Comm unicat ion Plan Rev 2.d ocx Darrell and Mo, Attached is the draft internai communications plan Mark Jeffers and I put together for LaSalle. Please take a look at it and provide any comments to me. My goal would be to send it out today. 1anticipate it will get wider distribution at HQ once we send it to John Lubinski and Kevin Coyne.

    Thanks ,

    Karla

    From: Stoedter, l<arla To: Shuaibi, Mohammed

    Subject:

    RE: Communication Plan Rev 2.docx Date: Friday. J une 23, 20171 1:12:00 AM Good comments . 1will revise it Karla Stoedter, Chlef Region 111 Divlsion of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Shua ibi, Mohammed Sent: Friday, June 23, 2017 11:06 AM To: Stoedt er, Karl a <Ka rla.Stoedter@nrc.gov>

    Subject:

    Comm unication Plan Rev 2.docx Looks good to me.

    Should we include someth ing on initiation of the LIC 504 process in the background section?

    Could you check with two dates I highlighted, are these two different meetings or did we mean for them to be consistent on date?

    For the info notice, 1would use issued instead of subm itted Lastly, 1would include OEDO and the other regions as stakeholders for communication since they will continue to need updates on status of the LaSalle valve.

    Thanks ,

    Mohammed

    From : Stoedter, Karla To: Lara. lulio

    Subject:

    FW: Communicat ion Plan Rev 2 .docx Date: Friday, J une 23, 2017 11 :57:00 AM At tachments: Communication Pla n Rev 2 docx Mo's comments Karla Stoedter, Chlef Region 11 1 Division of Reactor Proj ects - Branch 1 630-829-9731 (offlce)

    From: Sh uaibi, M ohammed Sent: Friday, June 23, 2017 11:06 AM To: Stoedt er, Ka rla <Ka rla. Stoedt er@nrc.gov>

    Subject:

    Commu nicat io n Plan Rev 2.docx Looks good to me.

    Should we include someth ing on initiation of the LIC 504 process in the background section?

    Could you check with two dates I highlighted, are these two different meetings or did we mean for them to be consistent on date?

    For the info notice, 1 wou ld use issued instead of submitted Lastly, 1would include OEDO and the other regions as stakeholders for communication since they will continue to need updates on status of the LaSalle valve.

    Thanks, Mohammed

    From: Pelke Patricia To: Al.L...8l

    Subject:

    Daily Meeting News Friday J une 23rd Date: Friday, J une 23, 2017 10:25:1 1 AM Attachments: Daily Morning Meeting News un e 23 2017.docx The Daily Morning Meeting News for Friday June 23, 2017 Regional Duty Officer: Pattv Pelke Teleconference Number: [800) 779-9565: Pa~!o;r.nde : _<b_J(6_l_ _ __.

    f\toffi" Ibis ne1os l etter roa)tCootaio pre-dec1s1ona1 ,ore 1>o rat distrib, rte ot rtti'ito tR2 ~IRC Behaviors That Matter - Value of the Week is EXCELLENCE - We achieve excellence through being a self-critical and learning organ ization that continuously improves and adds value.

    Support lssues:

    RA: Darrell shared his last few days in RIII (until further notice) will be today and next Thursday & Friday (6/29&30); he has leave scheduled and then reports to HQ as the acting NSIR Deputy Director; Jim Trapp (currently RI DNMS OD) will be coming to RIII as our acting DRA until further notice.

    DRP: Reminder to share any insights or motto with our fellow Japanese regulators -

    complete a 3x5 card and drap it off in the box outside of lzumi's office (Rm 4032)

    DRS:

    DNMS:

    DRMA:

    EICS:

    STATES:

    PAO: ltems of interest: Senate on Thursday voted 89-10 to advance Svinicki's renomination to be NRC chair; Senate slated to vote on her confirmation Monday 6/26; her term expires on 6/30; two other nominees to NRC, David Wright and Annie Caputo, need the EPW Committee's approval and anticipate vote on the pair before end of June. On the local front, Crain's Chicago Business reported $40.6 million foreclosure lawsuit against Westwood of Lisle, a 296,500-square-foot office complex at 2441 and 2443 Warrenville Road -

    which will have no impact on RIII. See NRC in the News Today Materials Events/lssues:

    Reactor Events: LaSalle Unit 1 50.72 for LPCS b.ttp://cio8.nrc.gov/nrr-office/rps/dyn/en-internal .cfm#en52821 Part 21 :

    Plant Status BRANCH 1-Clinton: New motor installed on Division 3 service water pump Duane Arnold:

    Quad Cities: Unit 1:

    Unit 2:

    LaSalle: Unit 1: Shutdown to evaluate HPCUS injection valve; currently Mode 3 and transition to Mode 4 later today. See EN 52821 for LPCS.

    Unit 2:

    BRANCH 2 Ferrni:

    DC Cook: Unit 1: Leading edge flowrneter returned to service - computer glitch resolved by restarting computer.

    Unit 2:

    Prairie lsland: Unit 1:

    Unit 2:

    Monticello: Determined shuttle valve (which distributes oil) was binding and caused HPCI turbine stop valve from opening during post-maintenance testing .

    After full PMT is completed licensee will exit LCO.

    BRANCH 3 AII plants are quiet Byron: Unit 1:

    Unit 2:

    Braidwood: Unit 1:

    Unit 2:

    Palisades:

    BRANCH 4 Point Beach: Unit 1:

    Unit 2:

    Davis Besse: Currently at 48% power and green risk; last night at 1709, safety rod 2-2 unexpectedly dropped and fully inserted into the core with no operator action and no associated maintenance in progress; Plant entered abnormal operating procedure for Control Rod Drive System Malfunctions; power was rapidly reduced as required per technical specifications (less than or equal to 60%) and stabilized around 48% power [Main Feedwater Pump 1 was taken offl ine due to high vibrations (not an unexpected condition given low flow rates)] ; both redundant single rod power supplies for safety rod 2-2 were found de-energized locally with AC power input fuses blown; problem solving decision making team is investigating the issue w ith consultation by AREVA.

    Perry: At 0300, the licensee reported a fire in grassy area inside owner control led area and outside protected area; local fire department responded ; fire was extinguished using hand held fire extinguishers; fire was caused by down power line Dresden: Unit 1:

    Unit 2:

    NRR:

    Additional Support lssues -

    Other lssues - Two events on Thursday June 29th; EWRA hosting 4th of July bake sale in DRP conference room ; LGBT Pride Month Lunch from 11-12 in MCR with guest speaker "Pride & Prejudices: Modeling lnclusive Behavior" sponsored by ACLGBT - bring your lunch and snacks and sweets wi ll be shared Personnel News -

    Daily Notes/Preliminary Notification - LaSalle Unit 1 Shutdown One Week Look Ahead -

    Post 8:15 Meeting Topi

    From: Stoedter, Karla To: Roberts Darrell

    Subject:

    RE: draft daily note on LaSalle Date: Friday. J une 23, 2017 1:27:00 PM Nope. 1 spoke to soon. The only other thing I sent you was a draft communication plan to look at for LaSalle.

    Karla Stoedter, Chief Region 111 Div1sion of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Roberts, Darrell Se nt: Friday, June 23, 2017 1:03 PM To: Stoedt er, Ka rl a <Ka rla.Stoedt er@n rc.gov>

    Cc: Clay, Jim <J im .Clay@nrc.gov>

    Subje ct: RE: draft da ily note on LaSalle

    Karla, Jim says you sent me something more; is this not the latest?

    DJR From: Roberts, Darrell Se nt: Friday, June 23, 2017 12:07 PM To: Stoedter, Karla <Ka rla .St oedter@n rc.gov>

    Subject:

    RE: draft daily note on LaSalle

    Karla, See changes below. Thanks ,

    DJR From: Stoedter, Karla Sent: Friday, June 23, 2017 11:11 AM To: Roberts, Darrell <DarrelLRoberts@nrc.gov>

    Subject:

    RE: draft da ily note on LaSalle Darrell:

    ls this better?

    On June 22, 2017, LaSalle Unit 1 shut down to inspect and repair, as needed, the Pa.Ft 21 applicable parts ar,d thc dc sign 1ssue *ela.tcd to the Unit 1 high pressure core spray (HPCS) injection isolation valve. An NRC special inspection team (SIT) recently completed a special inspection at LaSalle and expressed concerns with the operability of

    the Unit 1 HPCS injection isolation valve since it had a similar operating history and environmental conditions to the same failed valve on Unit 2. the failed Unit 2 I IPGS r,jsetioA isolatioA .rsh1e. Multiple Region 3 inspectors will be onsite to observe the diagnostic testing, valve disassembly and the inspection of the valve's components. The NRC plans to use insights from these observations as part of th:: ongoing UC 50-4 activities fti'1fr to determine the need for additional generic communications with the industry.

    Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Roberts, Darrell Sent: Fr iday, June 23, 2017 10:51 AM To: Stoedter, Karla <Ka rla.St oedter@nrc.gov>

    Cc: Clay, Jim <Jim.Clay@nrq~ov>; Lara, Jul io <Julio Lara@nrc.gov>

    Subject:

    RE: draft daily note on LaSa lle

    Karla, There needs to be a little more context about the broader issue, i.e., connection to SIT, why our interest in this valve issue, and how insights might be used for generic implications.

    Make it less tech nical (i.e., the reference to collar slippage is too specific and technical).

    Thanks, DJR From: Stoedter, Karla Sent: Friday, June 23, 2017 10:42 AM To: Roberts, Darrell <Darrell.Roberts@nrc.gov>

    Cc: Clay, Jim <Jim.Clay@nrc.gov>

    Subject:

    draft dai ly note on LaSa lle

    Darrell, Please review the draft daily note below and Iet me know of what changes you would like to make. 1 would like to provide this to HQ by 1pm today.

    On June 22, 2017, LaSalle Unit 1 shut down to repair the Part 21 applicable parts and the design issue related to collar slippage for the Unit 1 high pressure core spray (HPCS) injection isolation valve. During this four day outage, the licensee will perform as-tound diagnostic valve testing and required surveillance testing in addition to repairing the valve. Multiple Region 3 inspectors will be onsite to observe the diagnostic testing, valve disassembly and the inspection of the valve's components.

    Thanks ,

    Karla

    Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Benjam i lamie To: Rodricuez. Llonel; Farnan. Michael: Dunlop Andrew; Phillips. Charles Cc: leffers. Mark; Beniamin. lamie

    Subject:

    draft report

    • need comments by COB Tuesday 6/27 Date: Friday,June 23, 2017 11 :31 :49 AM Attachments: LaSalle SIT o,aft report.docx Please review the report. lts draft and somewhat rough. Things may get modified a little based on what they find this weekend with 1E22-F004.

    What do you like?

    What don't you like?

    What do you want added?

    Thanks everyone.

    Our team goal is to give this to Mark by COB next week.

    Home stretch !

    Jamie

    From: Skokowski Richard To: ~

    Cc: P ul* L

    s ubject: (b)(5) Deliberative Privilege Date: Friday,June 23, 2017 9:26:25 AM Attachments:  !(b)(5) Deliberative Privilege Jim (b)(5) Deliberative Pri vilege

    From: Stoedter, Karla To:

    Cc:

    • s ubiect Date:

    l'm fine with Rick's revision.

    Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Skokowski, Richard Sent: Friday, June 23, 2017 9:26 AM To: Clay, Jim <J im .Clay@nrc.go v>

    Cc: Pelke, Paul <Paul. Pelke@ nrc.gov>; Lambert , Kenneth <Kenneth.Lam bert@nrc.gov>; Jeffe rs, Mark

    < Ma rk.Jeffers@ nrc .gov>; Stoedt er, Karla <Karla.St oedter@nrc.gov>

    f;ubiect(b)(5) Deliberative Privllege

    Jim, Attached please find the latest version of the letter, 1 made the corrects or addressed (and discussed with Karla) her comments. 1also saved the file to the G drive with the new name. Please work with Mark and Karla to check the distribution, which should be the standard distribution for our correspondence with the licensee with the addition of the following talks from OE, Trish, Francis P. Juan and Niek Hilton. Also, please don't hesitate and call if there are questions, and leave a message if I don 't answer since 1'11 be outside and may not hear the phone if I am cutting the grass.

    From: Stoedter, Karla To:

    Cc:

    ISub ject:

    Date:

    l'm talking to Rick right now. He is working on the letter as we speak. He will senci a revised letter for final soon.

    Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Pelke, Paul Sent: Friday, June 23, 2017 9:09 AM Tn: ~tnedter, Karla <Karla.Stoedter@nrc.gov>

    Subiect(b)(5) Deliberative Privilege Also, we need to change the maintenance shutdown to past tense. 1questioned Rick yesterday about the retuel outage dates and he said it was ok because they apparently listed them in their public letters to us??

    From: St oedter, Karla Sent: Friday, June 23, 2017 6:13 AM To: Clay, Jim <.Jim .Clay@nrc.gov>; Skokowski, Richard <Richard.Skokowski@nrc.gov>; Jeffers, Mark Comments are attached for consideration.

    From: Stoedter, Karla To: Lara u lio

    Subject:

    {b){5.) Deliberative Privilege Date: Fri ay, J une 23, 2017 9:05:00 AM Attachments: EA-17-XXX LaSa lle CAL ready for final.doc The draft letter is attached.

    Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Stoedter, Karla Sent: Friday, June 23, 2017 6:13 AM To: Clay, Jim <J im.Clay@nrc.gov>; Skokowski, Richard <Richard.Skokowski@nrc.gov>; Jeffers, Mark

    <Mark.Jeffers@nrc.gov>; Lambert, Kenneth <Kenneth.Lambert@nrc.gov>; Pelke, Pau l

    <Paul.Pelke nrc. ov>

    • Chandrathil Prema <Prema.Chandrathil@nrc.gov>

    Subject:

    (b)(5) Deliberative Privilege Comments are attached for consideration.

    From: Stoedter, Karla To: Skokowski Richard; leffers Mark Cc: Pelk Paul* Lamb rt K nn h; la im

    Subject:

    (b)(5) Deliberative Privilege Date: Fri ay, J une 23, 2017 6:01:00 AM Dan Enright is the Senior Vice President, Midwest Operations Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Skokowski, Richard Sent: Thursday, June 22, 2017 4:44 PM To: Jeffers, Ma rk <Mark.Jeffers@ nrc.gov>; Stoedter, Ka rla <Karla.Stoedter@nrc.gov>

    Cc: Pelke, Pa ul <Paul. Pelke@ nrc.gov>; Lambert , Kenneth <Kenneth.Lambert@nrc.gov>; Clay, Jim nrc. ov>

    ~ubject: (b)(5) Deliberative Pri vilege Mark, thanks - no I dropped that. Karla can you verify Dan Enright's position?

    Rick From: Jeffers, M ark Sent: Th ursday, June 22, 2017 3:03 PM To: Skokowski Richard <R' a >

    5 ubiect: (b)(5) Deliberati ve Privilege Did you confirm Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 x9798 From: Skokowski, Richard Sent: Th ursday, Ju ne 22, 2017 3:00 PM To: Clay, Jim <Ji m.Clay@nrc.gov>

    Cc: Lambert, Kennet h <Kenneth .Lambert@nrc.gov>; Stoedter, Karla <Karla .Stoed ter@nrc.gov>;

    Jeffers, Mark <Mark.Jeffers@nrc.gov>; Pelke, Paul <PauLPelke@nrc gov>; Chandrathil, Prema

    <Prema.Chandrat hil nrc. ov>

    )

    Subject:

    (b)(5) Deliberative Privilege Jim l(b)(S)Deliberati,e PH, Hege

    l(b)(5) Deliberative Priv ilege VR Rick

    From : Stoedter Karla To: leffers Mark* Lara lullo; Louden Patrjck; Shuajbt. Mohammed: O"Brjen Kenneth; Pederson. Cynthja; Rol2eru..

    Darrell; Coyne. Kevin; Lubinski. ohn : Chandrat hil. Prema: Mitlyng Viktoria; Wolf. Carolyn; Barker. Alla n; Logaras Harral Cc: Wojewoda. lacquelyn; Benjamin. amie; Phillips. Cha rles; Rodriguez Lienei: Vaidya. Bhalchandra

    Subject:

    I nternai Commu nica tion Plan for LaSalle HPCS valve Date: Friday, June 23, 2017 3:30: 51 PM Attachments: communjca1ion Pian Rev 2 docx AII -

    Attached is the internai communications plan for the LaSalle HPCS valve issue. Please feel free to forward this information to anyone that may need it.

    Thanks, Karla Stoedter, Chief Region 111 - Branch 1 (Quad, Clinton, LaSalle and DAEC)

    From: Pederson. Cynthla To: Stoedter. Karla

    Subject:

    RE: Internai Communication Plan for LaSalle HPCS va lve Date: Friday, J une 23, 2017 3:34:53 PM 1did not see Jeremy Bowen on dist so I sent it to him . Did you senci to other regions? lf not please do so From: Stoedter, Karla Sent: Friday, June 23, 2017 3:31 PM To: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Lara, Ju lto <.Julio .lara@nrc.gov>; Louden, Patrlck

    <Patrick.Louden@nrc.gov>; Shua ibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; O'Brien, Kenneth

    <Ke nneth.O'Brien@nrc.gov>; Pederson, Cynthia <Cynthia.Pederson@nrc.gov>; Roberts, Da rrell

    <Darrell.Roberts@n rc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>; Lubinski, John

    <John.Lubinski@nrc.gov>; Chandrath il, Prema <Prema.Chandrathil@nrc.gov>; Mitlyng, Viktoria

    <Viktoria.Mitlyng@nrc.gov>; Wolf, Carolyn <Carolyn.Wolf@nrc.gov>; Barker, Allan

    <Al lan.Barker@nrc.gov>; Logaras, Ha rral <Ha rral. Loga ras@nrc.gov>

    Cc: Wojewoda, Jacq uelyn <Jacquelyn.Wojewoda@nrc.gov>; Benjamin, Jamie

    <Jamie.Benjamin@nrc.gov>; Phillips, Charles <Charles.Phillips@nrc.gov>; Rodriguez, Lione l

    <Lionel.Rodriguez@nrc.gov>; Vaidya, Bhalchandra <Bha lchandra .Vaidya@ nrc.gov>

    Subject:

    Internai Communicat ion Plan for LaSa ll e HPCS valve AII-Attached is the internai communications plan for the LaSalle HPCS valve issue. Please feel free to forward this information to anyone that may need it.

    Thanks, Karla Stoedter, Chief Region 111- Branch 1 (Quad, Clinton, LaSalle and DAEC)

    From: PhiUips Charles To: Stoedter. Karla; leffers. Mark; Ben j ami, 1amle: Rodriguez Lionel; ounlop. Andtew; Farnan. Michae!

    Cc: Wolewoda lacguelyn; Ruiz. Robert 8cc: Phillips. Charles

    Subject:

    LaSalle 1E22 F004 valve diagnostic and stem rot atton check Date: Friday, J une 23, 2017 7 :29:00 PM l've created a new folder on the M drive called LaSalle U1 HPCS valve video. 1 moved the stem rotation check video from the U1 HPCS min flow valve to this folder and l've down loaded two more videos of the 1E22 F004 stem rotation check.

    (b)(5) Deliberative Privilege 1 have not seen the diagnostic traces yet since I was up on the platform when they were done. l've heard they were similar to the previous traces but that' s second or third hand.

    l've asked them for traces when they are available tonight.

    Mike, 1asked them for the pullout torque. 1'11 forward it to you when I get it. It was not truly an as found test. They had to partially stroke open the valve in order to get the OSS sensor on the stem.

    From: Jeffers, Mark To: O"Brien Kenneth; Shualbi. Mohammed IMohammed Shualbi@nrc govt Louden. Patrlck (pat rick.Louden@nrc.gov} ; Lara ul io ((ulio.Lara@n rc.gov); Robe rts. Darrell (Darrell.Roberts@ nrc. gov);

    Pederson. cynthia 1c ynthia.Pederson@nrc.gov)

    Cc: Scoedter. Karla IKarla.Stoe,dter@nrc.gov); Chandrathil. Prema IPrema.Chandrathil@nrc.gov}; Mitlyng Vjkt oria

    /Viktoria Mitiyng@nrc.goyl; Logaras Harral CHarral Logaras@nrc goy); Barker Allan /Allan Barker@nrc goy}

    8cc: Benjam i 1amie o amie Benjamio@occ goy); Rodriguez uooel cuonel Rodnguez@nrc goV}

    Subject:

    LaSalle Update Date: Friday, June 23, 2017 8:41:00 AM 1understand that there wil l be a lot of attention on the Unit 1 HPCS injection valve over the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Three specitic milestones have been selected to ensure we have inspector oversight and awareness:

    1. lnitial stem rotation checks will be observed by Chuck and are currently scheduled to be performed at 1500 this afternoon.
    2. lnitial valve disassembly will be observed by Lionel and is scheduled to begin at 0600 Saturday morning (scheduled to be completed by 1100) .
    3. Valve internai inspection will be observed by Jamie and is scheduled to begin at 1500 Saturday afternoon.

    As with mast outage schedules , 1expect delays to occur and these times to shift; however, Karla and I have discussed with the team to communicate early and often. Asa result, we will be ensuring that the Regional leadership team is kept informed as the outage progresses (1 will also be reaching out to the LIC 504 team at headquarters). lf anyone has any questions, comments, or concerns , please Iet p:1e know, 1wjH be yhecking my email often and will also be accessible via my celi phone(b)(6) 1 Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798

    From: Hilton Niek To: O"Brien. Kenneth

    Subject:

    RE: La Salle Valve Jssue Da te: Friday, J une 23, 2017 3:28:33 PM Agree .. ... will do.

    From : O'Brien, Kenneth Sent: Friday, June 23, 2017 4:23 PM To: Hilton, Niek <N iek.Hilton@nre.gov>

    Subject:

    Re: LaSalle Valve lssue Tagree. Not happy to have to push and fight alJ along the way. Worries rne greatly how many other issues fail by the wayside when others aren't willing to stand up to strong inclividuals like bill.

    Have a great weekend!

    Say hi to Mauri Kenneth G . O'Brien, Director Division of Reaetor Safety Region Ill Kenneth.OBrien@NRC.Gov 630-829-9700 On: 23 June 2017 15:20, "Hilton, Niek" <Nit.:k.Hilton @nre.gov> wrote:

    lt"s been a wild ride, but it appears the right thing will be done © Another win for public health and safety .....

    From: O'Brien, Kenneth Sent: Friday, June 23, 2017 4:18 PM To: Hilton, Niek <Nick.Hilton@nrc.gov>

    Subject:

    Re: LaSalle Valve lssue Thx Niek Kenneth G. O'Brien, Director Divisiou of Reaetor Safety Region III Kennelh.OBrien@NRC,Gov 630-829-9700 On: 23 June 20 17 09:06, "Hilton, Niek <Nick.Hilton@nrc.gov> wrote:

    1like the plan, no need for a GAL at this point, in my opinion.

    From: Skokowski, Richard Sent: Thursday, Ju ne 22, 2017 6:22 PM To: Peralta, Juan <Juan.Peralta@nrc.gov>; Hi lton, Niek <Nick.Hilton@nrc.gov>; Holahan, Patricia

    <Patricia.Holahan@nrc.gov>; Peduzzi, Fra ncis <Francis.Peduzzi@nrc.gov>

    Cc: Lam be rt, Kenneth <Kenneth. Lambert@ nrc.gov>; Pelke, Paul <Paul.Pelke@nrc.gov>; Jeffers, M ark

    <Mark.Jeffers@nrc.gov>; Chandrathil, Prema <Prema.Chandrathil@orc.gov>; Stoedter, Karla

    <Karla.Stoedter@nrc.gov>; Orth, Steven <Steven.Ortb@nrc.gov>; O'B r en, Kenneth

    <Kenneth.O'Brien@nrc.gov>

    Subject:

    LaSal le Va lve lssue Good afternoon, Just trying to keep folks up to date on the LaSalle Valve issue. The licensee has agreed to shut down and look at the valve in question, we should have the results early next week.

    (b)(5) Deliberati ve Privilege Having said that, 1just wanted to give a check to see it there were any concerns with this approach as we go forward, and to see if anyone is aware of any precedents for using this approach or contrary to using this approach?

    VR Rick

    From: Stoedter, Karla To: ~

    Cc: Skokowski, Richard Subj ect: FW: LaSalle Valve Issue Date: Friday, J une 23, 2017 10:34:00 AM

    Jim, Looks like OE does not need to concur based on Nick's response below. They just need a copy .

    Karla Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (oftice)

    From: Hilton, Niek Sent: Friday, June 23, 2017 10:33 AM To: Stoedter, Karla <Karla.Stoedter@nrc.gov>

    Subject:

    RE: LaSalle Valve lssue Copy is fine, thanks.

    From: Stoedter, Karla Sent: Friday, June 23, 2017 11:25 AM To: Hi lton, Niek <Nick.Hilton@nrc.gov>

    Subject:

    RE: LaSa lle Valve lssue Do you all need to be on concurrence or just want a copy when it is issued.

    Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Hi lton, Niek Sent: Friday, June 23, 2017 9:07 AM To: Skokowski, Richard <Richard.Skokowski @nrc.gov>; Pera lta, Juan <Juan.Peralta@nrc gov>;

    Holahan, Patricia <Patricia.Holahan@orqNv>; Peduzzi, Francis <Frands.Peduzzi@nrc.gov>

    Cc: Lambert, Ken neth <Kenneth .Lambert@nrc.gov>; Pelke, Pau l <Paul.Pelke@nrc.gov>; Jeffers, Mark

    <Mark.Jeffers@nrc.gov>; Chandrathi l, Prema <Prema.Chandrathil@nrc.gov>; Stoedter, Karla

    <Karla.Stoedter@nrc.gov>; Orth, Steven <Steven .Orth@nrc.gov>; O'Brien, Kenneth

    <Ken neth .O' Brien@nrc.gov>

    Subject:

    RE: LaSa lle Valve lssue l like the plan, l (b)(5) Deliberative Privilege

    From: Skokowski, Richard Sent: Th ursday, June 22, 20 17 6:22 PM To: Peralta, Juan <Juan.Pera lta@nrc.gov>; Hi lt on, Niek <Nick.Hilton@nrc.gov>; Holaha n, Patricia

    < Patricia.Holahan@ nrc.gov>; Peduzzi, Francis <Francis.Peduzzi@nrc.gov>

    Cc: Lam bert , Kenneth <Kenneth .Lambert@nrc.gov>; Pelke, Paul <Pau l. Pelke@nrqwv>; Jeffers, M ark

    <Mark,Jeffers@nrc gov>; Ch andrathi l, Prema <Prema.Chandrathjl@nrc gov>; Stoedter, Karla

    <Karla .Stoedter@orc.gov>; Orth, St even <Steven.Ortb@orc.gov>; O'Brien, Kennet h

    <Kenn eth.O' Brien @nrc.gov>

    Subject:

    LaSal le Va lve lssue Good afternoon, Just trying to keep folks up to date on the LaSalle Valve issue. The licensee has agreed to shut down and look at the valve in question, we should have the results early next week.

    (b)(5) Deliberative Pri vilege Having said that, 1just wanted to give a check to see if there were any concerns with this approach as we go forward, and to see if anyone is aware of any precedents for using this approach or contrary to using th is approach?

    VR Rick

    From: Hjlls Dayid To: Bozga lohn: Domke Matthew: f ernandez Edjson: Holmbern, Mel: Meghani Yiiw Neuraucer 1ames: ffilk..

    oon; Sanchez Santiago, Elba; Shalkh, Atif ; Smith, Laura

    Subject:

    FW: NRC Dai ly Nat es for June 23, 2017 Date: Friday, June 23, 2017 3:07: 12 PM FYI From: NRC Daily Nates [mal lto:EDO.GroupAccou nt@nrc.gov]

    Sent: Friday, June 23, 2017 3:00 PM To: EDO GroupAccount <EDO.GroupAccoun t@nrc.gov>

    Cc: Pe na, Alex <Alex.Pena@nrc.gov>

    Subject:

    NRC Da ily Nates for June 23, 2017 Daily Notes for June 23, 2017 NMSS Non-Responsive Record NSIR (OUQ i~

    Non-Responsi ve Record RIII

    -()UO ~11)

    On June 22, 2017, LaSalle Unit 1 shut down to inspect and repair, as needed, tbe Unit 1 high pressure core spray (HPCS) injection isolation valve. An NRC special inspection team (SIT) recently completed its inspectio11 at LaSalle and expressed concerns with the operability of the Unit 1 HPCS injection isolation valve since it bada sirnilar operating history and environmental conditions to the same failed valve on Unit 2. Multiple Region 3 inspectors wiU be onsite to observe the diagnostic testing, valve disassembly and the inspection of the valve's components. The NRC plans to use insights from these observations as part of ongoing activities to determine the need for additional generic communications witb the industry.

    From: Roberts Darrell To: teffers Mark* OBrien. Kenneth; Shuaibi Mohammed: Louden Patrick; Lara. l vlio; Pederson. Cynthia Cc: Stoedter Karla; Chandrathil, Prema; Mitlyng. Viktoria; Logaras. Harral; Barker. Allan subject: RE: laSalle Upda te Date: Friday, J une 23, 2017 8:46:00 AM Thanks, Mark We appreciate the team's tlexibility to provide- tbis oversight over the weekend. r know how uncertain tbese schedules can be with delays, so the team's willingness to cover thjs is higbly appreciated.

    For Cindy's awareness, given tbe bigh Jevel of iJ1terest, we are also planniog to issue a Daily Note today regarding the sbutdown, and will likely update it with more info as appropriate on Monday.

    DarrelJ From: Jeffers, Mark Sent: Fdday, June 23, 2017 8:4 l AM To; O"Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shualbi, Mohamrned <Moharomed.Shuaibi@nrc.gov>;

    Louden, Patrick <Patrick.Louden@nrc.gov>; Lara, Julio <Jul.io.Lara@nrc.gov>; Roberts, Darrell

    <D arre11.Roberts@nrc.gov>; Pederson, Cynthia <Cynthia.Pederson@nrc.gov>

    Cc: Stoedter, Karla <Karla.Stoedter@nrc.gov>; CbandrathjJ, Prema <Prema.Chandrathü@nrc.gov>; Mitlyng, Viktoria <ViktoJia.M.itlyog@nrc.gov>: Logaras, Harral <Ha1rnl.Logaras@nrc.gov>; Barker, Allan

    <A11an.Barker@nrc.gov>

    Subj ect: LaSalle Update Tunderstand that tbere will be a Jot of atteotion on tbe Unit I HPCS injection vaJve over the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Three specific m.i lestones have been selected to ensure we have tnspector oversight and awareness:

    I. lnitial stem rotation checks wm be observed by Chuck and are cu1Tentl.y scheduled to be performed at 1500 this afternoon.

    2. Iuüial valve disassembly will be observed by Lionel and is scheduled to begin at 0600 Saturday morning (schedoled to be completed by 1100).
    3. VaJve interna] iJ1spection will be observed by .Tamie and is scheduled to begin at 1500 Saturday afternooo.

    As witb most outage scbeduJes, l ex.pect. delays to occur and these times to shift; bowever, Karla and 1 have discussed wilh the team to communicate early and often. As a result, we will be ensnring that the Regional leadership team is kept informed as lhe outage. progresses (1 will also be reach.ing out to the LlC 504 team at headquarters). If anyone has any questions, comments, a r cancerns o)ease Iet me know. I wi!J be checking my email often and will also be accessible via my cell phon~ (b)(6) j ThankY011, Mark Jeffers Branch Chief I RIJI DRS EB2 1x9798

    Fr om: Wo jewoda lacauelyn To: Benjamio, lamie; Rodrieuez. Liooel Subj ect: RE: Schedule for Tomorrow Date: Friday, J une 23, 2017 11:59:37 AM 1just spoke with Chad Lanphierd and he should be calling you this atternoon to coordinate.

    From: Benjamin, Jam ie Sent: Friday, June 23, 2017 9:23 AM To: Wojewoda, Jacquelyn <Jacquelyn.Woj ewoda@nrc.gov>; Rodriguez, Lionel

    <Lionel.Rod riguez@ nrc.gov>

    Subject:

    RE : Schedule for Tomorrow 1 want to see the stem threads, wedge threads, wedge pin layed out so I can take pictures.

    ldeally, already in the hot shop. My cell phone number i9(b)(6)

    From: Wojewoda, Jacquelyn Sent: Friday, June 23, 2017 7:24 AM To: Benja mi n, Jamie <Jamie.Benjamin@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>

    Subject:

    Schedu le for Tomorrow The maintenance supervisor for t he 4 valve stopped by and would like to know what we'd like to see so he can make sure we are on site. Chuck told me yesterday that Lienei, you'd be in tomorrow morning for valve disassembly (Chad said there wasn't much to see until the bonnet is off), and Jaime, you 'd be in tomorrow afternoon.

    What are you two looking to see exactly? 1wou ld like to give Chad an idea and your contact information so he can make sure you're given a heads up 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or so before the activity starts.

    Thanks, Jackie

    From: 1effers Mark To: Wojewoda 1acquelyn

    Subject:

    Re: U1 HPCS Min Flow Valve Stem Rot ation Check Date: Friday. J une 23, 2017 8:54: 12 AM Thanks!

    Thanks, Mark Sent from my iPhone. Please forgive any typos.

    On: 23 June2017 09:51, "Wojewoda, Jacquelyn" <Jacquelyn.Woj ewoda@nrc.gov> wrote:

    Mark, Chuck said he was told +2 esterda and I haven't seen a condition report documenting +5 or greater (b)(5) Deliberative Pri vilege I am working on getting the paperwork o verr y e ina num er.

    1will keep you posted.

    -Jackie From: Jeffers, M ark Sent: Friday, Jun e 23, 2017 8:33 AM To: Wojewoda, Jacquelyn <Jacquelyn.Wojewoda@nrc.gov>

    Subject:

    RE: Ul HPCS Min Flow Va lve Stem Rotation Check

    Jackie, So what was the result of the rotational checks for the min flow valves? l.e., dld they declare them "no deflection", "+ 1 degree" ... etc?

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 x9798 From: Philli ps, Cha rles Sent: Thursday, June 22, 2017 3:20 PM To: St oedter, Ka rla <Kar!a .Stoedter@nrc.gov>; Jeffers, Mark ; Benjamin, Jamie <Jamie.Benjamin@nrc.gov>; Du nlop, Andrew <Andrew.Dun!op@nrc.gov>; Rodriguez, Lionel

    <L1onel.Rodriguez@nrc.gov>; Farnan, M ichae l <M1chael. Farnan@nrc.gov>

    Cc: Wojewoda, Jacquelyn <Jacquelyn .Woiewoda@nrc.gov>

    Subject:

    FW: Ul HPCS M in Flow Valve Stem Rotation Check

    ln addition, to Jackie's comments below l've seen the video and we are working o;- n......_=...._,

    a co . The stem ver clearl moves sli htl . The licensee is sa in 2 de rees.

    b)(5) Deliberative Privilege From: Wojewoda, Jacquelyn Sent: Thursday, June 22, 2017 3:06 PM To: Phillips, Charles <Charle,s.Phillips@nrcgov>

    Subject:

    Ul HPCS M in Flow Valve St em Rotation Check AII ,

    1would like to provide some information on the U1 HPCS min flow valve stem rotation check that I observed today. This was the first rotation check performed using the "new" methodology (i.e. the metallic measuring device). Please see the first slide of the attached PowerPoint. The longer marks are every 5°, and the others denote 1°. The pietu re in slide 1 shows additional hardware that was not used during the rotation check.

    Slide 2 shows the limited amount of space the licensee had to work with. The valve is approximately 7' up in the air and the stem is almost fully enclosed. The pictu re on slide 2 shows the small gap the licensee used to install the measuring device, and to mark and observe the stem. There was another small gap on the other side of the valve.

    Slide 3 is the best picture I could take of how the measuring device was set up. The licensee marked the stem wheh the valve was full open, and then again when the valve was full closed.

    Slide 4 shows the general space/ set up. There was an individual on each side of the valve attempting to assess stem rotation.

    This was a full HPCS run, so the min flow valve fully cycled twice - when the pump was started, before the test line valve was opened, and then after the test when the test line valve was closed . The licensee had an individual observing on either side of the valve during the pump start, and then the two individuals swapped positions for the test line valve closure. Neither saw stem rotation.

    There was not a lat of room in the area, so I did not have eyes on the stem during the valve movement. The licensee videotaped the rotational checks and we are looking to get a copy .

    (b)(5) Deliberative Privilege

    (b)(5) Deliberative Privilege Thanks, Jackie and Chuck

    From: Stoedter. arl a To: teffers Mark: Pbillips, Charles: Benjami tamie; Dun:lop Andrew: Rodriguez. Lionel Cc: Wolewoda, tacguelyn s ubject: RE: U1 HPCS Min Flow Valve Stem Rotation Check Date: Friday, J une 23, 2017 8:05:49 AM 1would echo what Mark said. We don't care when you call us, just be sure to call at least one of us. lf you don't reach the person (Mark or rnP.) vou are trvin to communicate with, please leave a message and call the other persor My number is (b)(6) alling or texting will work best. As Mark indicated, we are alreaay gemng a o o ,meres on how we are planning to communicate information this weekend.

    T hanks to everyone for their support, Karla Karla Stoedter, Chief Region 111 Oivision of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Jeffers, Mark Sent: Friday, June 23, 2017 7:09 AM To: Phillips, Charles <Charles.Phi ll ips@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>;

    Benjamin, Jam1e <Jamie.Benjamin@n rc.gov>; Dun lop, Andrew <Andrew.Dun lop@nrc.gov>;

    Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>

    Cc: Wojewoda, Jacquelyn <Jacquelyn.Wojewoda@nrc.gov>

    Subject:

    Re: Ul HPCS M in Flow Va lve Stem Rotation Check Thank you Chuck and Jackie for the good info. As you can probably imagine, there is a lot of interest from the entire agency on this valve and what will happen in the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. With that being said, please, please communicate early and often on all things related to the LaSalle shutdown and Unit I HPCS valve. Good, bad, delays, anything.

    - if there are delays in the stem rotation check, let us know.

    - if stem rotation checks are ali SAT, Ietus know.

    - if the valve disassembly goes as planned, let us know.

    - if the cafeteria switches from French fries to tater tots, especially let me know.

    Pictures are great. But the sooner we can get the information, the sooner we can pass it on to all levels of management. I respond just as well to textin so if you just have a quick update, please text me. As a reminder, my number i. (b)(6) I do not care if it is at 10 PM or 2 AM, feel free to text/caU. Everyone is is very mtereste 111 the work that y'all are doing and look forward to heaiing what is going 011 . If you have any questions.... call/text/email me. Thanks!

    Thanks, Mark Sent from my iPhone. Please forgive any typos.

    On: 22 June 2017 16:19, "Phillips, Charles" <Charles.Philiips@ nrc.gov> wrote:

    ln addition, to Jackie's comments below l've seen the video and we are working on a co . The stem ver clearl moves sli htl . The licensee is sa in 2 de rees. ~==-- --,

    (b)(S} Deliberative Privilege From: Wojewoda, Jacquelyn Sent: Thursday, June 22, 20 17 3:06 PM To: Phil lips, Charles <Charles.Phill1ps@nrq(ov>

    Subject:

    Ul HPCS M in Flow Valve St em Rotation Check Ali, 1would like to provide some information on the U1 HPCS min flow valve stem rotation check that I observed today. This was the first rotation check performed using the "new" methodology (i.e. the metallic measuring device). Please see the first slide of the attached PowerPoint. The longer marks are every 5°, and the others denote 1°. The picture in slide 1 shows additional hardware that was not used during the rotation check.

    Slide 2 shows the limited amount of space the licensee had to work with. The valve is approximately 7' up in the air and the stem is almost fully enclosed. The picture on slide 2 shows the small gap the licensee used to install the measuring device, and to mark and observe the stem. There was another small gap on the other side of the valve.

    Slide 3 is the best prcture I could take of how the measuring device was set up. The licensee marked the stem when the valve was full open, and then again when the valve was full closed.

    Slide 4 shows the general space/set up. There was an individual on each side of the valve attempting to assess stem rotation.

    This was a full HPCS run, so the min flow valve fully cycled twice - when the pump was started, before the test line valve was opened, and then after the test when the test line valve was closed. The licensee had an individual observing on either side of the valve during the pump start, and then the two individuals swapped positions for the test line valve closure. Neither saw stem rotation.

    There was not a lot of room in the area, so I did not have eyes on the stem during the valve movement. The licensee videotaped the rotational checks and we are looking to get a copy.

    (b)(5) Deliberative Privilege

    l(b)(S) Deliberati,e Pri, Hege Thanks, Jackie and Chuck

    From: sroedter. Karla To: Louden. Patrick: Lara lulio; Shirnibi, Mohammed: Pederson. cynthia: Roberts Darreu: O"Brjen Kenneth

    Subject:

    FW: LaSalle 1E22 F004 va lve diagnost ic and stem rotation check Date: Saturday, June 24, 2017 7:18:15 AM Attachments: 1E_22::.F004 VaJve_DissambL~-2~ -1L ~.

    M y apologles if you aJ ready received tbis from Mark Jeffers, bul here are tbe initial disassembly res ults.

    From: Rodriguez, Lionel Sent: Saturday, June 24, 20 17 5:59 AM To: PhiWps, Charles; Stoedter, Karla; Jeffers, Mark; Benjamin, Jamie; Dunlop, Andrew; Faman, Michael Cc: Wojewoda, Jacquelyn; Ruiz;, Robert; Rodriguez, Ljonel

    Subject:

    RE: LaSalle 1E22 F004 valve diagnostic and stem rotation check Hello Tearu, 1 observed the valve disassemblythis moroing. Due to the tight working conditions, l only got to observe the stem/wedge subassembly inside the valve body aft.er tbe bonnet was removed, but before the subassembly was lifted out of the valve body, r did observe tbe rerno val of the subassembly from a djstance. Overall:

    1. The connection appeared tigbt. As seen in the pictures, the coJlar appeared flusb to the wedge. T did not have tbe greatest view, but tbe collar did not appear tilted or cocked like what we saw wüb the U2 HPCS 004 valve.
    2. I observed the CMO try to put a feeler gauge between the wedge and collar. He went to tl1e smallest one avai lable which was .0015 (according to what he told me), and could not work itin between. He did attempt to work around the circumference in different locations. From what J could see, and what 1 heard from him, he could not work itin alJ the way. It appears the feeler gauge only (it on the very outside edge between tbe collar and the wedge. This is another iodication that the connection appeared tight.
    3. During the removal of the subassembly, the workers usedband chai_nfal\s to remove the subassembly.

    Therefore, unlik:e the U2 HPCS 004 valve, the stem/wedge/disc s ubassembly came out of the valve body easily.

    Ali of the pictures I took are on the M: Drive. The liok. is below:

    M:\LaSalle U1 HPCS Valve Video\UI HPCS 1E22-F004 VaJve Disassembly<fiJd//\\(\km04\MEDIA\I aSaHe9'n20U 1%20HPCS%JOVaive%20Vjdeo\U1 %20HPCS%201 E22-F004%20Ya)ve%20Disassemb1y>

    l apologize for the quaUty of the pictures. Since most of the pi.ctures were taken from a distance, there's not much to see. Attached to this email however, are the pictures I thought would provide the best information. T pointecl out on tl1e 7th slide that it looks like the stem is not coucentric with the wedge. However, I recognize tbis may just be how the subassembly was manufactured_

    The liceosee's oext steps are the following :

    l. Decontaminatioo of tbe Subassembly (expect to be done around 7:00am this morning)
    2. lnspection and Measuremeuts (expect between 7:00am and 9:00am this morning)
    a. The licensee plans on reusing the discs, therefore they will be measuring tbe <liscs_ From what I garhered, tbey would also do a visual of the stem/wedge connection and possibJy try to do the feele.r gauge test again with more room to work wirh.

    3_ Sbip to offsitelaboratory (ETA unknown)

    a. Sounds like they will be sending the subassembly to Powerlabs. They do not plan on touching tbe threaded and pinned connection at the site, Jf you have any questions, lec me know.

    Thanks, Lionel Rodriguez NRClRTJT(DR S/EB2 l(b)(6) (<celi)

    From: Phillips, Charles Sent: Fdday, June 23, 2017 7:29 PM To: Stoedter, Karla <Karla.Stoedter@nrc.gov>; Jeffers. Mark <Mark.Jeffers@nrc.gov>: Benjamin, Jamje

    <Jamie, 8enja1nin @nrc.gov>; Rodr(guez, Lonel <Lionel.Rodriguez@nrc.gov>; Dunlop, Andrew

    <Andrew.Dun1op@nrc.gov>; Farnan, Mjchael <Michael.Farnan@nrc.gov>

    Cc Wojewoda, Jacquelyo <Jacquelyo .Wojewoda@nrc.gov>; Ruiz, Robert <Robert.Ruiz @nrc.gov>

    Subject:

    LaSalle lE22 F004 valve diagnostic and stem rotation check J' ve created a oew folder on the M drive caUed LaSalle U l HPCS valve video. 1 moved tlle stem rntation check video from tbe U l HPCS niin flowvalve to this folder and J' ve down loaded two more videos ofthe IE22 F004 stem rntation cbeck.

    1 gave them some inpur and recommeoded that tbey make a .scribe mark on the measuring device and theo count over five degrees and make a Iong line on the stem. If the Iines cross than you know it was uosat Tb.is is what I saw on tbe closed rotation check. The initial movemeot o.o the open rotatioo check was about three degrees but it may have gone to five by tbe end of the stroke. l'd have to watch it a few more times.

    I have not seen rhe diagnostic traces yet since I was up on the platform when they were done. f' ve heard they were similar to tbe previous traces but that's secood or thi:rd band. l' ve askecl lhem for traces when lhey are available to.night.

    Mike, I usked them for the pullout torque. l'll forward it to you when I get it. It was not tru Jy an as found test. T bey had to partially stroke open the valve io order to get the OSS sensor on the stem.

    From: Rodriguez lionel To: Pbillips Charles: Stoedter Karla: l effers Mark: Beniamin. 1amie: Dunlop Andrew* Farnan Mjchael Cc: Woiewoda. acguelyn; Ruiz. Robert: Rodriguez. Lionel

    Subject:

    RE: LaSalle 1E22 F004 valve diagnostic and stem rotation check Date: Saturday, June 24, 2017 5:59:50 AM Attachments: 1E22-F004 Valve Dissambly 6-24-17.pptx Hello Team, 1 observed the valve disassembly this morning. Due to the tight working conditions, 1 only got to observe the stem/wedge subassembly inside the valve body after the bonnet was removed , but before the subassembly was lifted out of the valve body. 1 did observe the removal of the subassembly from a distance. Overall:

    1.

    (b)(5) Deliberative Privilege

    2. o serve e ry o pu a ee er gauge e ween e we ge an co ar. e went to the smallest one available which was .0015" (according to what he told me),

    and could not work it in between. He did attempt to work around the circumference in different locations. From what I could see, and what I heard from him, he could not work itin all the way. It appears the feeler am1ae aolv fit ao tbe vecv rn1tsid, ed e between the collar and the wedge. (b)(5) Deliberative Pri vilege _

    (b)(5) Deliberative Pri vilege ,___ _ _ _ _ _ _ _ _ _ _ __ .

    3. unng the removal o the subassembly, the workers used hand chainfalls to remove the subassembly. Therefore, unlike the U2 HPCS 004 valve, the stem/wedge/disc subassembly came out of the valve body easily.

    Ali of the pictures I took are on the M: Drive. The link is below:

    M:\LaSalle U1 HPCS Valve Video\U1 HPCS 1E22-F004 Valve Disassembly 1 apologize for the quality of the pictures. Since mast of the pictures were taken from a distance, there's not much to see. Attached to this email however, are the pictures 1 thought would provide the best information. 1 pointed out on the J1h slide that it looks like the stem is not concentric with the wedge. However, 1 recognize this may just be how the subassembly was manufactured.

    The licensee's next steps are the following:

    1. Decontamination of the Subassembly (expect to be done around 7:00am this morning)
    2. lnspection and Measurements (expect between 7:00am and 9:00am this morning)
    a. The licensee plans on reusing the discs, therefore they will be measuring the discs. From what I gathered, they would also do a visual of the stem/wedge connection and possibly try to do the feeler gauge test again with more room to work with.
    3. Ship to offsite laboratory (ETA unknown)
    a. Sounds like they will be sending the subassembly to Powerlabs. They do not plan on touching the threaded and pinned connection at the site.

    lf you have any questions, Iet me know.

    Thanks, Lienei Rodriguez NRC/RIII/DRS/FR~

    !<bl(6l  !(celi' From: Philli ps, Cha rles Sent: Friday, June 23, 2017 7:29 PM To: Stoedter, Ka rl a <Ka rla.Stoedter@nrc.gov>; Jeffers, Mark <Mark.Jeffers@ nrc.gov>; Benjam in, Jamie <Jam ie.Benj am in@nrc.gov>; Rodriguez, Lienei <Lionel.Rodrigue z@ nrc.gov>; Du nl op, Andrew

    <Andrew.Dunlop@n rc.gov>; Fa rna n, M ichael < M ichael. Farna n@nrc.gov>

    Cc: Wojewoda, Jacquelyn <Jacquelyn.Wojewoda@nrc.gov>; Ruiz, Robe rt <Robert.Ru1 z@nrc.gov>

    Subject:

    LaSal le 1E22 F004 valve diagnostic and stem rotation check l've created a new folder on the M drive called LaSalle U1 HPCS valve video. 1 moved the stem rotation check video from the U1 HPCS min flow valve to this folder and l've down loaded two more videos of t he 1 E22 F004 stem rotation check.

    {b)(5) Deliberative Pri vilege 1 have not seen the diagnostic traces yet since I was up on the platform when they were done. l've heard they were similar to the previous traces but that's second or th ird hand.

    l've asked them for traces when they are available tonight.

    Mike, 1asked them for the pullout torque. 1'11 forward it to you when I get it. It was not truly an as tound test. They had to partially stroke open the valve in order to get the OSS sensor on the stem.

    From: Rodrieuez. Uonel To: Pbillips Charles: Stoedter Karla: leffers Mark; Beniamin. 1amie: Dunlop Andrew* Farnan Michael Cc: Woiewoda. acguelyn; Ruiz. Robert

    Subject:

    RE: LaSalle 1E22 F004 valve diagnostic and stem rot ation check Date: Saturday, June 24, 2017 7:06:43 AM

    Hello, 1 added the licensee's pictures to the M : Drive location linked below.

    Lionel R.

    From: Rodriguez, Lionel Sent: Saturday, June 24, 2017 6:00 AM To: Phillips, Charles <Cha rl es. Phi ll ips@n rc.gov>; Stoedt er, Karla <Ka rl a.Stoedter@nrc.gov>; Jeffers, Mark <M ark.Jeffers@nrc.gov>; Benjamin, Jamie <Jam ie.Benj am in @nrc.gov>; Dunlop, Andrew

    <Andrew. Dunl op@nrc.gov>; Fa rn an, M ichael <Michael.Fa rna n@nrc.gov>

    Cc: Wojewoda, Jacquelyn <Jacquelyn.Wojewoda@nrc.gov>; Ruiz, Robert <Robert.Ruiz@nrc.gov>;

    Rodriguez, Lionel <Lionel. Rodriguez@n rc.gov>

    Subject:

    RE: LaSa lle 1E22 F004 va lve diagnostic and stem rot ation check Hello Team, 1 observed the valve disassembly this morning. Due to the tight working conditions, 1 only got to observe the stem/wedge subassembly inside the valve body after the bonnet was removed, but before the subassembly was lifted out of the valve body. 1 did observe the removal of the subassembly from a distance. Overall:

    1. The connection appeared tight. As seen in the pictures, the collar appeared flush to the wedge. 1 did not have the greatest view, but the collar did not appear tilted or cocked like what we saw with the U2 HPCS 004 valve.
    2. 1 observed the CMO try to put a feeler gauge between the wedge and collar. He went to the smallest one available which was .0015" (according to what he told me),

    and could not work it in between. He did attempt to work around the circumference in different locations. From what I could see, and what I heard from him, he could not work itin all the way. It appears the feeler gauge only fit on the very outside edge between the collar and the wedge. This is another indication that the connection appeared tight.

    3. During the removal of the subassembly, the workers used hand chainfalls to remove the subassembly. Therefore, unlike the U2 HPCS 004 valve, the stem/wedge/disc subassembly came out of the valve body easily.

    AII of the pictures I took are on the M: Drive. The link is below:

    M :\ LaSalle U1 HPCS Valve Video\U1 HPCS 1 E22-F004 Valve Disassembly 1 apologize for the quality of the pictures. Since most of the pictures were taken from a distance, there's not much to see. Attached to this email however, are the pictures 1 thought would provide the best information. 1 pointed out on the ?1h slide that it looks like

    the stem is not concentric with the wedge. However, t recognize this rnay just be how the subassembly was manufactured.

    The licensee's next steps are the following :

    1. Decontarnination ot the Subassembly (expect to be done around 7 :00am th is morning)
    2. lnspection and Measurements (expect between 7:00am and 9 :00am this morning)
    a. The licensee plans on reusing the discs, therefore they will be measuring the discs. From what I gathered, they would also do a vlsual of the stem/wedge connection and posslbly try to do the feeler gauge test agaln with more room to work with.
    3. Ship to offsite laboratory (ETA unknown) a . Sounds like they will be sending the subassernbly to Powerlabs. They do not plan on touching the threaded and pinned connection at the site.

    lf you have any questions, Iet me know.

    Thanks ,

    Uonel Rodriguez NRC/RI II/DRS/ EB2 cb)(6) ce 11; From: Phillips, Cha rl es Sent: Friday, June 23, 2017 7:29 PM To: Stoedter, Karla < Kar a . Stoedter@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Benjamin, Jamie <Jam ie.Ben jam 1n@nrc.gov>; Rodriguez, Liene i < LiooeJ.Rodrguez@nrc . gov>; Dun lop, Andrew

    <Andrew.Du n op@n rc . gov>; Fa rna n, Michael <M ichael. Fa rnan@nrc.gov>

    Cc: Wojewoda, Jacquelyn <Jacquelyn .Wo iewoda@nrc.gov>; Ruiz, Robert <Robert.Ru iz@ nrc.gov>

    Subject:

    LaSa lle 1E22 F004 valve diagnostic and stem rotation check l've created a new folder on the M drive called LaSalle U1 HPCS valve video. 1 rnoved the stem rotation check video from the U1 HPCS min flow valve to this folder and l've down loaded two more videos of the 1 E22 F004 stem rotation check.

    1 gave them some input and recommended that they make a scribe mark on the measuring device and then count over five degrees and make a long line on the stem. lf the lines cross than you know it was unsat. This is what I saw on the closed rotation check. The initial movement on the open rotation check was about three degrees but it may have gane to five by the end of the stroke. l'd have to watch it a few rnore times .

    1 have not seen the diagnostic traces yet since I was up on the platform when they were done. l've heard they were similar to the previous traces but that's second or third hand.

    l've asked them for traces when they are available tonight.

    Mike, l asked thern for the pullout torque. 1'11 forward it to you when I get it. It was not truly an as found test. They had to partially stroke open the valve in order to get the OSS sensor on the stem.

    From: Sreedter. Karla To: O"Brien. Kenneth Subj ect: RE: laSalle 1E22 F004 valve dlagnostic and stem rotation check Date: SatlJrday, June 24, 2017 8:36:43 AM Don't know yet. We may not know until the assembly gets to power labs.

    From: O'Brien, Kenneth Sent: Saturday, June 24, 2017 7:49 AM To: Stoedter, Karla

    Subject:

    Re: LaSaJle I E22 F004 valve diagnostic and stem rotation cbeck Karla Pin intact?

    Tbx Ken Kenneth G. O'Brien, Director Division of Reactor Safety Region lli Kenneth.OBtien@NRC.Gov 630~829-9700 On: 24 June 20 l7 07 :l 8. "S toedter, Karla" <Karla,Stoedter@nrc.gov> wrote:

    My apologies if you already received tbis from Mark Jeffers, but here are the initial disassembly results.

    From: Rodriguez, Lionel Sent: Saturday, June 24, 20J7 5:59 AM To: Ph.iJlips, Charles; Stoedter, Karla; Jefiers, Mark; Benjamin, Jamie; Dunlop, Andrew; Farnao, Micbael Cc: Wojewoda, Jacquelyn: Ruiz, Robert; Rodriguez, Lionel

    Subject:

    RE: LaSalle l.E22 F004 valve dia~ostic and stem rotation check Hello Team, l observed the valve disassembly tb.is morning. Due to the ti.ght working conditions. l on.ly got to observe the stem/wedge subassembly inside the valve body after the bonnet was rernoved, but before the subassernbly was liJted out of the valve body. I djd observe tbe removal o.f rhe subassembly from a disrance. Overall:

    l. The connection appeared tight. As seen in the picrures, the collar appeared flush to the wedge. I did not have the greatest vi_ew, bul the collar did not appear tilted or coc.ked like what we saw with the U2 HPCS 004 valve.
    2. I observed the CMO try to put a feeler gauge between the wedge aod coUar. He went to tbe smallest one available which was .0015" (according to what he tolcl me), aud could nol work itin between. H e <li<l attempt to work around the circumfereuce in differenl locations. From what I could see, and wha! l beard from h.im. he could noL work it i.n all the way. It appears the feeler gauge ouly fil on the very outsi<le edge between the collar and the wedge. This is another in<lication that the connection a ppeared tight.
    3. During tbe removal of the subassembly, tbe workers used band chainfalls to remove the subassembly.

    Therefore, unlike the U2 HPCS 004 valve. the stem/wedge/disc s ubassembly came oul of tbe valve body easily.

    Ali of the pictures I took are on the M: Drive. The (ink is below:

    M:\LaSalle U I HPCS Valve Video\U I HPCS I E22-F004 Valve Disassembly<file:///\\r3km04\MED1A\LaSalle%20U 1%20H PCS%20Yalve%20Yideo\U 1%20H PCS%20 l E22-F004%,20Valve%20Disassemblv>

    J apologize for the quality of the pictures. Since most of the pictures were taken from a distance, there's not much to see. Attached to this email however, are the pictmes I thought would provide the best information. l pointed out on the 7th slide that it looks like the stem is not concentric with the wedge. However, I recognize this may just be how the subassembly was manufactured.

    The licensee*s next steps are the following ;

    l. Decontamination ofthe Subassembly (expect to be done around 7:00am this morning)
    2. lnspection and Measurements (expect between 7:00am and 9:00am this morning)
    a. The licensee plans on reusing the discs, therefore they will be measuring the discs. Prom what I gathered, they would nlso do a visual of the stem/wedge connection and possibly try to do the foeler gauge test again with more room to work with.
    3. Ship to offsite laboratory (ETA unknown)
    a. Smmds like they will be sending the suba<;semhly to Powerlabs. They do not plan on touching the threaded and pinned connection at the site.

    lf you have any questions, Iet me know.

    Thanks, Lionel Rodriguez NRC/Rlll/DRS/EB2 (b )(6) fcelC From: Phillips, Charles Sent: Friday, June 23, 2017 7:29 PM To: Stoedter, Karla <Karla.Stoedter@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Benjamin, Jamie

    <.Jamje.Benjamin@nrc.gov>; Rodriguez, Ljonel <Lionel.Rodrignez@nrc.gov>; Dunlop, Andrew

    <Andrew.Dunlop@n.rc.gov>; Farnan, Michael <MichaeJ.Farnan@nrc.gov>

    Cc: Wojewoda, .Tacquelyn <.lacquelyn. Wojewoda@nrc.gov>; Ruiz, Robert <Robert.Ruiz@nrc.gov>

    Subject:

    LaSalle I E22 F004 vaJve ctiagnostic and stem rotation check J've created a new folder on the M drive called LaSalle Ul HPCS valve video. l moved the stem rotation check video frorn the U 1 HPCS mfo tlow valve to tllis foJder and l' ve down loaded two more videos of the LE22 F004

    -tem rotation check.

    J gave them some input and recommended that they make a scribe mark on the measuring device and then count over five degrees and make a long tine on the stem. lf the lines cross than you know it was unsat. This is what 1 saw on theclosed rotation check. The initial movement on t.he opeo rotation check was about three degrees but it may have gone to five by the end of the stroke. J' d bave to watch it a few more times.

    1 bave not seen tbe djagnostic traces yet siJ1ce J was up on the platform when they were done. l've heard they were similar to the previous traces but that's second orthird hancL l've asked thern for traces when they are available tooigbt.

    Mike, J asked tbem for tbe pullout torque. J'll forward it to you when l get it. It was not truly an as found test. They had to partially stroke open the va)ve in order to get the OSS sensor on the stem.

    From: Pederson. Cynthla To: Stoedter Karla; Louden. Patrkk: Lara. lulio; Shuaibi Mohamrned: Roberts, Darrel; OBrien. Kenneth

    Subject:

    Re: LaSalle 1E22 F004 valve diagnostic and stem rotation check Date: Saturday, June 24, 2017 7:53:49 AM Thanks Katla.

    On : 24 June 2017 07: 18, "Stoedter, Karla <Kar1a.Stoedter@mc.gov> wrote; My apologies if you a)ready received th.is from Mark .Jeffers, but bere are the i nitial disassembly results.

    From: Rodriguez, Lionel Sent: Saturday, June 24, 20 17 5:59 AM To: Phifüps, Charles; Stoedter, Karla; Jeffers, Mark; Benjamin, .Jamie; DunJop, Andrew; Farnan, Micbael Cc: Wojewoda, Jacquelyn; Rui z, Robert; Rodriguez, Lionel

    Subject:

    RE: LaSalle 1E22 F004 valve diagoostic and stem rotation check HeJJo Team, 1 observed the valve disassembly this morning. Due to the ti.gbt working conditions, I on.ly got to observe the stem/wedge subassembly inside the valve body after the bonnet was removed, but before the subassembly was lifted out of the valve body. I did observe füe removal of rhe subassembly from a distance. Overall:

    1. The connecrion appeared tight. As seen in 1he pictures, the collar appeared flush to the wedge. I did not have the greatest view, bul the collar did not appear ti.lted or cocked like what we saw with the U2 HPCS 004 valve.
    2. I observed the CMO try to put a feeler gauge between the wedge aod collar. He went to tbe smallest one available which was .0015" (according to what he told me), and could not work itin between. He did attempt to work around the circumference in differen.t Jocatio.ns. From what I could see, aod what 1. beard from rum, he could not work it in all the way. It appears the fee ler gauge only fit on the very outside edge between the collar and the wedge. Tbis is another indication that the connection appeared tight.
    3. During the removal of the subassembly, the workers used hand chainfalls to remove the subassembly.

    Therefore. unlike the U2 HPCS 004 valve, the stem/wedge/disc subassembly came out of the valve body easily.

    AJI of the pictures I took are on the M: Drive. The link is below; M:\LaSalle Ul HPCS Y-alve Video\UI HPCS IE22-F004 Valve Disassembly<fiJe-L/J\\t1km04\MEDIA\I ,aSalJe%2QU 1%20HPCS%JOValve%20Video\lJl %20HPCS%201 E22-F004%20Va)ve%20Dlsassembly>

    1 apologize for the quality of the pictures. Sioce most of the pictures were taken from a distance, tltere' s not much to see. Attached to this email however, are the pictures 1 thought would provide füe best information. T pointed out on the 7th slide tJ1at it looks \ike the steni is not concentric with the wedge. However, J ecognize this may just be bow the subassembly was manufactured.

    The licensee's next s teps are tbe followi.ng :

    1. DecoJ1tamination of the Subassembly (expect to be done arouncl 7:00am this moming)
    2. Inspection and Measnrements (expect between 7:00ai11and 9,00am this morning)
    a. The licensee plans on reusing t.he discs, therefore they will be measuting the discs. From what I gat.hered, tbey would also do a visual of the stem/wedge connection and possibly try to do the feeler gm1ge test again with more

    room to work with.

    3. Ship to offsife laboratory (ET A unknown)
    a. Sounds Jike they will be sending the subassembly to Powerlabs. They do not plan on touching the threaded and pinned connection at the site.

    lf you have any questions, let me know.

    Thanks, Lionel Rodriguez NRC/R 11 ltPRrF.R?.

    l(b)(6) _celi' From: Phillips, Charles Sent: Friday, June 23, 2017 7:29 PM To: Stoedter, Karla <Karla.Stoedter@nrc.gov>; .Jeffers, Mark <Mark.Jeffers@nrc.gov>; Benjamin, Jamie

    <Jarnie.Benjarnin@nrc.gov>; Rodrig11ez, LioneJ <Lionel.Rodriguez@nrc.gov>; Dunlop, Andrew

    <Andrew.Dunlop@nrc.gov>; Faman, Michael <Michael.Farnan@nrc.gov>

    Cc: Wojewoda, Jacquelyn <Jacque1yn,Wojewoda@nrc.gov>; Ruiz, Robe1t <Robert.Ruiz@nrc.gov>

    Subject:

    LaSalle J E22 F004 valve diagnostic and stem rotati:on check J've created a new folder 011 the M drive calted LaSalle U I HPCS valve video. 1 moved the stem rotation check video from the U I HPCS min flow valve to this folder and l've down loaded two more videos of the 1E22 F004 stem rotation check.

    1gave them some input and recommended that they ma.ke a scribe mark on the measuring device and then count over five degrees and make a long line on the stem. lf the lines cross than you know it was unsat. This is what 1 saw on the closed rotation check. The i11itial movement on the open rotation check was about three degrees but it may have gone to five by the end ofthe stroke. l' d have to watch it a few more times.

    1have not seen the diag11ostic traces yet since} was up 011 the platform when they were done, t' ve heard they were similar to the previous traces but that' s second or third hand. l've asked them for traces when tbey are available tonighl Mike, I asked them for the pullout torque. I'll forward it to you when I get it. It was not tru.ly an as found tesr. They had to partiaJJy stroke opeu the valve i11 order to get the OSS sensor on the stem.

    From: Jeffers, Mark To: Roberts Darreu: O"Brjen Kenneth: Shuaibi Mohammed; Louden Patrjck: Lara l vlio* Pederson Cynthja Cc: Stoedter Karla: Chandrathil. Prema: Mitlyng. Viktoria; Logaras. Harral; Barker. Allan 8cc: Benjamin a m ie (amie Benjamin@nrc.gov); Rodriguez Lionel (lionel,Rodriguez@nrc.gov)

    Subject:

    RE: laSalle Update Date: Saturday, June 24, 2017 8:46:00 AM Attachments: 1E22-F004 Valve Dissambly 6-24-1 7.pptx To provide an update from this morning and summarize Karla's report from last night:

    1. Stem rotation checks and diagnostics were completed late Friday afternoon. Chuck was onsite for the rotations and observed about 6 and 3 degrees of rotation on the close and open strokes, respectively (the BWROG Topic Report recommends less than 5 degree rotation). lnitial reports from the traces did not identify any type of abnormalities. They have sent us the traces and will also be sending to their vendor (Kalsi Engineering) for further analysis.
    2. Valve disassembly was completed this morning and Lionel was onsite to observe (pictures are attached). From the initial reports, the subassembly remained connected . l.e., the stem-to-wedge connection remained threaded. The condition of the threads and the wedge pin itself is still unknown. Since everything was still intact, they will be sending it to their Powerlabs as they found it for further evaluation (i.e., they are not going to try and disassemble the valve any further on site). This means that there is very little more that we are going to learn this weekend.

    Additional pictures can be found here: M:\LaSalle U1 HPCS Valve Video\U1 HPCS 1E22-F004 Valve Disassembly.

    The site VP did have a quick discussion with Lionel before he left this morning.

    Specifically, he wanted to ensure that we (the NRC) have received all of the appropriate information / documentation needed. His initial take on the condition of the valve was that it passed ali diagnostic checks (i.e., the rotation checks and traces) and that it was fully intact. He was also curious to know what we would be discussing in the upcoming Public Meeting (currently scheduled at Headquarters for Thursday). Karla and I will coordinate with the site and ensure we provide a clear message for the Public Meeting.

    lf anyone has any questions, comments , or concerns, please Iet me know.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: Jeffers, Mark Sent: Friday, June 23, 2017 8:41 AM To: O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shuaibi, Mohammed

    <M ohammed.Shuaibi@nrc.gov>; Louden, Patrick <Patrick. Louden@ nrc.gov>; Lara, Julio

    <Julio.Lara@ nrc.gov>; Roberts, Darrell <Darrell.Robert s@ nrc.gov>; Pederson, Cynthia

    <Cynth ia.Pedersoo@nrc.gov>

    Cc: Stoedter, Ka rla <Karla.Stoedter@nrc.gov>; Chandrathil, Prema <Prema.Chandra t hil@nrc.gov>;

    Mitlyng, Viktoria <Yiktorfa.MJt lyng@nrc.gov>; Logaras, Harral <Harra LLogaras@nrc.gov>; Barker, Al lan <Allan .Barker@nrq~ov>

    Subject:

    LaSal le Update 1understand that there will be a lot of attention on the Unit 1 HPCS injection valve over the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Three specific milestones have been selected to ensure we have inspector oversight and awareness:

    1 . lnitial stem rotation checks will be observed by Chuck and are currently scheduled to be performed at 1500 this afternoon.

    2. lnitial valve disassembly will be observed by Lienei and is scheduled to begin at 0600 Saturday morning (scheduled to be completed by 1100).
    3. Valve internai inspection will be observed by Jamie and is scheduled to begin at 1500 Saturday afternoon.

    As with most outage schedules, 1expect delays to occur and these times to shift; however, Karla and I have discussed with the team to communicate early and often. As a result, we will be ensuring that the Regional leadership team is kept informed as the outage progresses (1will also be reaching out to the LIC 504 team at headquarters). lf anyone has any questions, comments, or concerns, please Iet m kn w . 1will checking my ernail often and will also be accessible via my celi phone (b)(6)

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798

    From: Phillips, Charles To: farnao Michael: Dunlop Andrew: Rodriguez Llonel Subj ect: FW: TODI- SEAG 17-000074: As found diagnostic data for LaSalle station 1E22-F004 HPCS lnjection Valve Date: Saturday, June 24, 2017 8:26:00 AM Attachments: SEAG 17-000074.pdf For your review.

    From: Plumey, Norha Z:{GenCo-Nuc) [mai lto:Norha.Plumey@exeloncorp.com)

    Sent: Friday, June 23, 2017 10:38 PM To: #LAS Plant Status Update <#LASPlantStatusUpdate@exeloncorp.com>

    Cc: Ford Jr, Guy V:(GenCo-Nuc) <guyJord@exeloncorp.com>; Phillips, Charles

    <Char1es.Ph1 lli ps@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>; Jeffers, Mark

    <Mark.Jeffers@ nrc.gov>

    Subject:

    [Externa l_Sender] TODI- SEAG 17-000074: As found diagnostic data for LaSalle station 1E22-F004 H PCS Injection Valve The attached (SEAG 17-000074) file is a combined PDF of 1E22-F004 MOV trace information that is being analyzed.

    Aftvt&i z. 9'lumeij Senio4 .Atat~ - 9'fant ÜUJinwtiluJ l!aSalle ~ Statüm 2601 AI 2r1 !JU / ~eitk,,, .'11!. 6/341 815-415-3801 Pager(b)(6) norha. plu mey@exelo_n _c_o_r_p_

    .c_o_m___

    From: PhiUips Charles To: Stoedter Karla: Be n j ami 1amie: leffers. Mark: Punlop Andrew: Rodrjguez Lionel: Farnan Michael Cc: Woiewoda. acguelyn; Coru jo-Sandjn. o rge

    Subject:

    FW: Informational IR on As-Found Conditions Identifed with Valve 1 E22- F004 Date: Sunday, June 25, 2017 7:16:16 PM Again this says rotational check was three degrees. 1witnessed a closed rotational check in excess of 5 degrees.

    Outside of Scope

    From: Philips Charles To: leffers. Mark: Be njami 1amie: Dunlop. Andrew; Farnan Michael; Stoedter Karla Cc: Wojewoda, lacguelyn; Rodriguez lionel: Ruiz, Robert: Corujo-Sandih lorge

    Subject:

    FW: review of as found 1E22-F004 diagnostic test Date: Sunday, June 25, 2017 7:10:4t PM Attachments: KEI-1 E22-F004 Iune23AsFo und-RO.pdf Attached is the Kalsi Analysis of the diagnostic testing performed yesterday. The letter says that the station reported that the rotation check was three degrees. 1saw and had verified by the MM tech there with me that a closed rotation check was greater than 5 degrees. ln addition I have it on video.

    From: Ford Jr, Guy V:(GenCo-Nuc) [mailto :guy.ford@exeloncorp.com]

    Sent: Sunday, June 25, 201712:35 PM To: Phil lips, Charles <Charles.Phil lips@nrc.gov>

    Cc: Shah, Vikram R:(GenCo-Nuc) <vikram.shah@exeloncorp .com>; Tanton, Sean :(GenCo-Nuc)

    <Sean.Tanton@exeloncorp.com>; Gullott, David M. :(GenCo-Nuc) <David .Gullott@exeloncorp.com>

    Subject:

    [External_Sender] review of as foun d 1E22-F004 diagnostic test

    Chuck, Please see attacned document for Kalsi review of as foun d 1E22~F004 diagnostic test.
    Thanks, Guy Ford Jr.

    Regulatory Assurance Manager

    ~ Exelon Generation.

    LaSalle Nuclear Power Station 2601 N. 21st Road, Marseilles, IL 61341 Offlce:815 415 2800 1 Mobile: 815 252 5001 guy.ford@exel oncor com

    From: Hilton Niek To: Q"Brien Kenneth; Skokowskl Richard Cc: LemonceUi. Mauri; Gulta, Geratd

    Subject:

    FW: ACKNOWLEDGEMENT OF COMMITMENTS IN LETIER DATEDJUNE 20, 2017. FOR RESO LUTION OF ANCHOR DARLING DOUBLE DISC GATE VALVE PART 21 ISSUES

    • LASALLE COUNTY STATION
    • UNITS 1 AND 2 Date: Monday. J une 26. 2017 4:23:54 PM l(b)(SJ Deliberab,e Pil,ilege From: Clay, Jim Sent: Monday, Jun e 26, 2017 5:15 PM To: Peduzzi, Francis <Francis.Peduzzi@nrc.gov>; Pe ral ta, Juan <J uan. Peralta@nrc.gov>; Hi lton, Niek

    <Nlck.Hl lton@nrc.gov>; Bowen, Jeremy <Jeremy.Bowen@nrc.gov>; RldsNrrDorllpl3 Resource

    <RidsN rrDorl Lpl3. Resou rce@nrc.gov>; RidsN rrPM LaSal le Resource

    <RidsN rrPM LaSalle. Resource@ nrc.gov>; RidsNrrDi rsl rib Resou rce

    <RidsN rrDirsl rib. Resou rce@n rc.gov>; Joh nson, M ichael <M ichael.J oh nson@nrc.gov>; Hola han, Patricia <Patricia .Holahan@nrc.gov>; Pederson, Cynthia <Cynthia.Pederson@nrc.gov>; Roberts, Darrell <Da rrell.Robert s@ nrc.gov>; Shualbi, Mohammed <Mohammed.Shua lbi@n rc.gov>;

    Marshfield, Mark <Ma rk.Marshfield@nrc.gov>; Casey, Lauren <Lauren.Casey@ nrc.gov>; Skokowski, Richard <Richard.Skokowski@nrc.gov>; Lamber( Kenneth <Kenneth.Lambert@nrc.gov>; Barker, Al lan <Alla n.Ba rker@nrc.gov>; Logaras, Harra l <Harral.Logaras@nrc.gov>; Chandrathi l, Prema

    <Prema .Chandrathil@nrc.gov>; Holahan, Patricia <Patricia .Holahan@nrc.gov>; Dean, Bill

    <Bi ll. Dean@nrc.gov>; O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; M it lyng, Viktoria

    <Viktoria. M itlyng@nrc.gov>

    Subject:

    ACKNOWLEDGEMENT OF COMMITMENTS IN LETIER DATED JUNE 20, 2017, FOR RESOLUTION OF ANCHOR DARLING DOUBLE DISC GATE VALVE PART 21 ISSUES - LASALLE COUNTY STATION - UNITS 1 AND 2 The subject docurnent has been signed and sent to ADAMS DPC for final profiling. Please use link below to revjew this document.

    View ADAMS Properties ML17177A697 Open ADAMS Document (ACKNOWLEDGEMENT OF COMMITMENTS IN LETTER DATED JUNE 20, 2017. FORRESOLUTION OF ANCHOR DARLING DOUBLE DISC GATE YAL VE PART 21 ISSUES - LASALLE COUNTY STATION - UNITS 1 AND 2)

    Jim Clay, WCA Certlfled Administrative Assistant to Cynthia Pederson Regional Administrator, Region 111 Phone: 630-829-9657 Email: jim.c/ay@nrc.gov

    From: Mancuso loseph To: Pelke. Patricja; AlJ....fil

    Subject:

    RE: Daily Not es Monday June 26th Date: Monday. J une 26, 2017 4:09:37 PM Just a small correction : that should be a down power by 2%-3% for Monticello for their roa pattern adjustment. 1 apologize for the confusion .

    From: Pelke, Pat ricia Sent : M onday, June 26, 2017 11:32 AM To: ALL_ R3 <A11_R3@nrc.gov>

    Subject:

    Daily Nates Monday June 26t h The Da1ly Morning Meeting News for Monday June 26, 2017 Regional Duty Officer: Eric D11n~::1n Teleconference Number: .(800) 779-9565: Passcode (b)(6)

    Note: T~*~l"!'9'11"!'ffl'!'+~'ffl'.l"~ll"l'l"lllJm~~~~Ftfflrr.=Brrm~mBm!"!'ffl'~~~:ff!n."~

    Behaviors That Matter -

    Organizational Value of the Week is RESPECT - We treat everyone professionally and with respect. We promote diversity and recognize the importance of everyone's contributions.

    Support lssues:

    RA: Cindy expressed her thanks and appreciation to everyone involved with the work at LaSalle over the weekend.

    DRP: Reminder - noon today in the MCR - Japanese Gourmet Food Wagon celebration - and it's not too late to share any insights or motto with our fellow Japanese regu lators - bring a completed 3x5 card with you to the luncheon.

    DRS: Semi-annual blast dial call-out testing this week DNMS:

    DRMA:

    EICS: No ARB's today STATES:

    PAO: ltems of interest: Senate slated to vote on Commissioner Svinicki's confirmation for a third term of five years today, Monday 6/26; federal district court blocked EnergySolutions lnc's $367 million acquisition of Waste Control Specialists LLC (WCS)," ruling in favor of a DOJ antitrust filing against the merger; Col umbia MO Public Schools expected to evaluate property in south Columbia before closing on the land's sale. The Columbia Board of Education approved a $2.9 million land purchase agreement for 63 acres of decommissioned Sinclair Farm, owned by the U of MO and used for radwaste disposal between 1972 and 1981 from MURR research. See NRC in the News Today Materials Events/lssues:

    Reactor Events: Update to EN 52821 re: LPCS LaSalle Unit 1 50.72 for LPCS http ://cio8.nrc.gov/nrr-off ice/rps/dyn/en-i nternal .cfm#en52821 Part 21 :

    Plant Status BRANCH 1-Clinton:

    Duane Arnold:

    Quad Cities: Unit 1:

    Unit 2:

    LaSalle: Unit 1: Shutdown to evaluate HPCUS injection valve; diagnostic testing completed (valve stem was connected to wedge based on visual examination) and sent off for further analysis; valve was replaced ; Mode 4 and transition to Mode 2 later today; See updated EN 52821 for LPCS (inoperable).

    Unit 2:

    BRANCH 2 Fermi:

    DC Cook: Unit 1:

    Unit 2:

    Prairie lsland: Unit 1:

    Unit 2:

    Monticello: Down power 23% for rod pattern adjustments; HPCI restored to operable.

    BRANCH 3 Byron: Unit 1:

    Unit 2:

    Braidwood: Unit 1:

    Unit 2:

    Palisades: Tritium detected (4133 pCi/1 and <M DA gamma) on 6/22 onsite well; weekly monitoring will be conducted ; DRS will evaluate when onsite next month BRANCH 4 Point Beach: Unit 1:

    Unit 2:

    Davis Besse: 90% power; control rod drap reported last week due to failed diode.

    Perry:

    Dresden: Unit 1: 95-001 starts today Unit 2:

    NRR:

    Additional Support lssues -

    Other lssues - Two events on Thursday June 29th; EWRA hosting 4th of July bake sale in DRP conference room; LGBT Pride Month Lunch from 11 -12 in MCR with guest speaker "Pride & Prejudices: Modeling lnclusive Behavior" sponsored by ACLGBT - bring your lunch and snacks and sweets will be shared Personnel News -

    Daily Notes/Preliminary Notification -

    One Week Look Ahead -

    Post 8:15 Meeting Topies -

    From: Chandrathil. Prema To: Stoedter. Karla

    Subject:

    DRAFT laSalle Date: Monday, J une 26, 2017 1:23:44 PM Attachments: LaSalle Va lve Comm Plan.docx Here is a DRAFT Prema Chandrathil Public Affairs Officer U.S. NRC Region 111 630-829-9663

    From: Farnan. Mir.hael To: Benam i n lamie; Rodri~uez Lionel; Dunlop Andrew; Pblllios Charles Cc: 1effers. Mark

    Subject:

    RE: draft report

    • need comments by COB Tuesday 6/27 Date: Monday, J une 26, 2017 12:58:01 PM Attachments: LaSalle SIT Draft report
    • Farnan Comrnents.docx (b)(5) Deliberatfve Privilege Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Comrnission 301-415-1486 From: Benjamin, Jamie Sent: Friday, Ju ne 23, 2017 12:32 PM To: Rodriguez, Uone l <Lionel.Rodriguez@n rc.gov>; Farnan, M ichael <Michael.Fa rn an@nrc.gov>;

    Dun lop, Andrew <And rew. Dunlop@nrc.gov>; Phil lips, Charles <Charles.Phi lli ps@nrc.gov>

    Cc: Jeffers, Mark <Mark.Jeffers@ nrc.gov>; Benjamin, Jamie <Jamie .Benja min@nrc.gov>

    Subject:

    draft report - need comment s by COB Tuesday 6/27 Please review the report. lts draft and somewhat rough. Th ings may get modified a little based on what they find this weekend with 1E22-F004.

    What do you like?

    What don"t you like?

    What do you want added?

    Thanks everyone.

    Our team goal is to give this to Mark by COB next week.

    Home stretch !

    Jamie

    From: Stoedter, l<arla To: Scott Mjchael; Lorson Raymond; Pelton Davld; Yerokun limi; Pruett Troy; Lantz Ryan; Ve~el Anton; ~

    eff; Munday oel ; Franke. Mark; Gody. Tony; Miller Mark

    Subject:

    FW: Internai Commu nication Plan for LaSalle HPCS valve Date: Monday, J une 26, 2017 7:05:00 AM Attachments: Cornmu oication Plan Rev 2.docx Attached is the internai communication plan for the LaSalle, Unit 1 Anchor Darling double disk gate valve issue. Unit 1 shut down late last week to inspect the valve. No abnormalities were seen during the diagnostic testing, and the stem and wedge were still connected. The licensee plans to ship the stem and wedge to Exelon Power Labs for additional inspection and testing.

    Please Iet me know if you have additional questions or need more information, Karla Karla Stoedter, Chief Region 111 Oivision of Reactor Projects - Branch 1 630-829-9731 (office)

    From: St oedter, Karla Sent: Friday, June 23, 2017 3:31 PM To: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Lara, Julio <J ulio.Lara@nrc.gov>; Louden, Patrick

    <Patrick.Louden @nrc.gov>; Shua ibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; 0 1Brien1 Kenneth 1

    <Kenneth.0 Brien @nrc.gov>; Pederson, Cynthia <Cynth ia.Pederson@nrc.gov>; Roberts, Darrell

    <Da rrell.Roberts@ nrc.gov>; Coyne, Kevin <Kevin.Coyne@ nrc.gov>; Lubinski, John

    <John.Lubinski@nrc.gov>; Chandrath il, Prema <Prema .Chan drathil @nrc.gov>; Mitlyng, Vikt oria

    <Viktoria.Mitlyng@nrc.gov>; Wol( Carolyn <Carolyn .Wolf@n rc.gov>; Ba rker, Allan

    <Al lan.Barker@nrc.gov>; Logaras, Ha rral <Ha rral. Loga ras@nrc.gov>

    Cc: Wojewoda, Jacquelyn <Jacquelyn.Woj ewoda@nrc.gov>; Benjamin, Jamie

    <Jamie.Benjam in@nrc.gov>; Phillips, Charles <Charles.Phill ips@nrc.gov>; Rodriguez, Lienei

    <Lienei.Rod riguez@nrc.gov>; Va idya, Bhalchand r-a <Bha lchand ra. Va idya@ n rc.gov>

    Subject:

    Internai Comm unicat ion Plan for LaSa lle HPCS valve AII -

    Attached is the internai communications plan for the LaSalle HPCS valve issue. Please feel free to forward this information to anyone that may need it.

    Thanks, Karla Stoedter, Chief Region 11 1- Branch 1 (Quad, Clinton, LaSalle and DAEC)

    From: chardrath il Prema To: Stoedter Karla: leffers Mark Cc: Mityng, Viktoria

    Subject:

    LaSalle DRAFT Talking Points and updated Q"s Date: Monday, J une 26, 2017 5:26:02 PM Attachments: LaSaUe Va lve Comm Plan Key Messa ges and O"s. docx Hey Karla, Appreciate the discussion earlier to help with the Key Messages. Attached is a DRAFT of everything I have for your comm plan. There are some places where I have marked questions via the XXXX. Please feel free to call me 1 1'11 stili be in town and available for you guys. Vika is also in if needed.

    Oh the fun never stops. © Prema l(b)(6)

    Prema Chandrathil Public Affairs Officer U.S. NRC Region 111 630-829-9663

    From : Bowen. e remy To: scoedter Karla

    Subject:

    RE: laSalle Unit 1 status Date: Monday, June 26, 2017 6:19: 06 AM Thanks, Karla. Cindy sent me the updates over the weekend, so l'm up to speed. Thanks for double checking though.

    Jeremy From: Stoedter, Karla Sent: M onday, June 26, 2017 7;12 AM To: Bowen, Jerem y <Jeremy. Bowen@ nrc.gov>

    Subject:

    LaSalle Unit 1 status Good morning Jeremy, 1just received a skype message from Theresa Clark so I wanted to update you on the status of LaSalle Unit 1. Over the weekend we had several inspectors at the site monitoring the HPCS injection valve activities. During the stem rotation checks , we observed the stem rotating between 3 and a little over 5 degrees. The BWROG wants five degrees or less.

    Last night, we received the licensee's formai review of the valve diagnostic traces. 1believe these traces will be reviewed within Region 111 and NRR this week.

    Once the valve was opened up, the disk and wedge were still connected . Since they were connected , there wasn't much we could observe regarding actual thread condition. The licensee is shipping the stem and wedge to Exelon Powerlabs for additional review. The shipping should occur today. The new stem installed in the HPCS injection valve has a collar that is integral to the stem so the new stem/wedge are not susceptible to the design issue identified during the SIT.

    Let me know it you need anything else, Karla Karla Stoedter, Chief Region 11 1Division of Reactor Projects - Branch 1 630-829-9731 (office)

    From: Benney Brian To: Gavrjlas Mirela; Oesterle Eric: Helton Shana; Hjckey 1ames; Alley Dayjd; Farnan. Mjchael: Thomps:oo lohn; Miller. Chris; King. Michael; Weerakkody Sunil; Giitter. oseph ; Bowen. eremy; effers Mark; Stoedter Karla ;

    O"Brien. Kenneth; Casto. Greg; Circle. eff* Benjamin. am i e; Leech Matthew; Shuaibi Mohammed; Lara. u lio; McGintv. Jim; Krohn Paul; Burke. lohn; Kavanagh. Kerri: Herrity. Thomas: Rodriguez. Uonel; Corujo-sandjn*

    .J.QJ:ge; Louden. Patrick; Kozak. Laura; Ng. Ching; Miller. Ed: Wilkios Lynnea; Lubinski lohn; Hsueh Kevjn; Stuchell Sheldon; Garmoe Alex; Bowman regory

    • Lund Louise; Chernoff. Harold; Scarbrough Thomas; Gascot Lozada. Ramon: Purnell. Blake: Clark. Theresa; Coyne. Kevin; Vaidya. Bhalchandra; Wrona. David; Whitman. enn ifer; Jilton. caroljne; Mcintyre. David; BurnelL Scott; Morey. Dennis; Martinez. Nancy: J.tlQJnfil..

    .Eric; Yegel Anton; Pruett troy: Clark leff; Lantz Ryan; farnho!tz Thomas: Stott Chad; felts Russell; .R.u.ffio.

    Steve; Talbot. Frank

    Subject:

    FW: LaSalle Updat e Date: Monday, J une 26, 2017 11:32:37 AM Attachments: LE22-f004 Valve J)js.samblv 6.c,2g- 1'Z.Pntx.

    Crunm.u.n.ka~ .

    FYI -

    Region 3 appears to have created a 2nd comms plan specific to LaSalle, including the shutdown of Unit 1 last week. This does not replace the Comms Plan on the sharepoint site. ln addition, please find the photos of the Unit 1 valve disassembly.

    Brian From: Lubinski, John Sent: Monday, June 26, 2017 11:46 AM To: Al ley, David <David .Alley@nrc.gov>; Benney, Brian <Brian.Benney@nrc.gov>

    Subject:

    FW: LaSalle Update For distribution as appropriate.

    From: Dean, Bil l Sent: Monday, June 26, 2017 10:09 AM To: Lubinski, John <John.Lubinskf@nrc.gov>; Coyne, Kevin <Keyin.Coyne@nrc gov>; King, Michael

    <Micha el. King2@nrc.gov>; Miller, Chris <Chris.M il ler@nrc.gov>

    Subject:

    FW: LaSal le Update fyi 8/LL From: Pederson, Cynthia Sent: Monday, June 26, 2017 10:04 AM To: Dean, Bill <Bill.Dean@nrc.gov>; McDermott, Brian <Bdan .McDermott@nrqNY>

    Cc: Roberts, Da rrell <Darrell.Robert s@nrc.gov>

    Subject:

    FW: LaSal le Update Bill, sorry I will miss your party today . Have a great send off.

    From: Jeffers, Mark Sent: Sat urday, June 24, 2017 8:48 AM To: Roberts, Darrell <Darrell. Roberts@nrc.gov>; O"Brien, Kenneth <Kenneth.O'Brien@nrc.gov>;

    Shuaibi, Mohammed <Mohammed.Shua ibi@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>;

    La ra, Jul io <Julio.Lara@nrc.gov>; Pederson, Cynt hia <Cynthia.Pedersoo@orc.gov>

    Cc: Stoedter, Ka rl a <Karla .Stoedter@nrc.gov>; Chandrat hil, Prema <Prema.Chandrathi l@n rc.gov>;

    Mitlyng, Viktoria <Viktoria .Mitlyng@nrc.gov>; Logaras, Harral <Harral. Loga ras@nrc.gov>; Barker, Allan <Allan .Barker@nrc.gov>

    Subject:

    RE: LaSa lle Updat e To provide an update from this morning and summarize Karla's report from last night:

    1. Stem rotation checks and diagnostics were completed late Friday afternoon. Chuck was onsite for the rotations and observed about 6 and 3 degrees of rotation on the close and open strokes, respectively (the BWROG Topic Report recommends less than 5 degree rotation). lnitial reports from the traces did not identify any type of abnormalities. They have sent us the traces and will also be sending to their vendor (Kalsi Engineering) for further analysis.
    2. Valve disassembly was completed this morning and Lionel was onsite to observe (pictures are attached). From the initial reports, the subassembly remained connected. l.e., the stem-to-wedge connection remained threaded. The condition of the threads and the wedge pin itself is stili unknown. Since everything was stili intact, they will be sending it to their Powerlabs as they found it for further evaluation (i.e., they are not going to try and disassemble the valve any further on site). This means that there is very little more that we are going to learn this weekend.

    Additional pictures can be found here: M:\LaSalle U1 HPCS Valve Vjdeo\U1 HPCS 1E22-F004 Valve Disassembly.

    The site VP did have a quick discussion with Lionel before he left th is morning.

    Specifically, he wanted to ensure that we (the NRC) have received ali of the appropriate information / documentation needed. His initial take on the condition of the valve was that it passed ali diagnostic checks (i.e., the rotation checks and traces) and that it was fully intact. He was also curious to know what we would be discussing in the upcoming Public Meeting (currently scheduled at Headquarters for Thursday). Karla and I will coordinate with the site and ensure we provide a clear message for the Public Meeting.

    lf anyone has any questions, comments , or concerns, please Iet me know.

    Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798 From: Jeffers, Mark Sent: Friday, June 23, 2017 8:41 AM To: O'Brien, Ken neth <Kenneth.O'Brien@nrc.gov>; Shua ibi, M ohammed

    <Mohammed.Shuaibi@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>; Lara, Julio

    <Ju lio.Lara@nrc.gov>; Roberts, Darrell <Da rrell.Roberts@ nrc.gov>; Pederson, Cynthia

    <Cynth ia .Pederson@nrc.gov>

    Cc: Stoedter, Ka rla <Karla.Stoedter@nrc.gov>; Chandrathil, Prema <Prema.Chandra t hil@nrc.gov>;

    Mitlyng, Viktoria <Yiktorfa.MJt lyng@nrc.gov>; Logaras, Harral <Harra LLogaras@nrc.gov>; Barker, Al lan <Allan .Barker@nrq~ov>

    Subject:

    LaSal le Update 1understand that there will be a lot of attention on the Unit 1 HPCS injection valve over the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Three specific milestones have been selected to ensure we have inspector oversight and awareness:

    1 . lnitial stem rotation checks will be observed by Chuck and are currently scheduled to be performed at 1500 this afternoon.

    2. lnitial valve disassembly will be observed by Lienei and is scheduled to begin at 0600 Saturday morning (scheduled to be completed by 1100).

    3 . Valve internai inspection will be observed by Jamie and is scheduled to beg in at 1500 Saturday afternoon.

    As with most outage schedules, 1expect delays to occur and these times to shift; however, Karla and I have discussed with the team to communicate early and often. As a result, we will be ensuring that the Regional leadership team is kept informed as the outage progresses (1will also be reaching out to the LIC 504 team at headquarters). lf anyone has any questions, comments, or concerns, please Iet me know. 1will be checking my ernail often and will also be accessible via my cell phone (b)(6l Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 1x9798

    From : Peduzzi Francis To: Hilton Niek* Skokowskl. Bichard: Peralta. 1uan: Holahan. Patrjcja Cc: Lambert. Kenneth; PeJke. Paul; leffers. Mark; Chandrathil. Prema; Stoedter. arl a ; Orth. Steven:~

    Kenneth

    Subject:

    RE: LaSa lle Valve I ssue Date: Monday, J une 26, 2017 6:34: l S AM 1agree with Niek, thanks.

    Paul From: Hilton, Niek Sent: Friday, June 23, 2017 10 :07 AM To: Sko kow ski, Riehard <Riehard .Skokowski@n re.gov>; Pera lta, Juan <J uan. Peralta@nre.gov>;

    Holaha n, Patrieia <Patricia.Ho!ahan@nre.gov>; Peduzzi, Francis <Franeis. Peduzzi@nre.gov>

    Cc: Lam bert , Kenn eth <Kenneth. Lambert@nre.gov>; Pel ke, Pau l <Pa ul.Pelke @nre.gov>; Jeffers, M ark

    <M ark.Jeffers@ nrc.gov>; Chand rath i1, Prema
    ; Stoedt er, Ka rla
    
    < Karla.Stoedt er@nre.gov>; Orth, St even <Steven.Orth@ nre.gov>; O' Brien, Ken neth
    
    <Kenneth.O'Brien @nrc.gov>
    
    Subje ct: RE: LaSa lle Valve !ssue 1like the plan+b)(5) Deliberative Pri vilege From: Skokowski, Riehard Sent: Thursday, Ju ne 22, 2017 6:22 PM To: Peralta, Juan <.Juan.Pera lta@nrc.gov>; Hi lt on, Niek <Nick.Hilton@nrq~ov>; Holahan, Patricia
    
    < Patricia .Holahan@nrc.gov>; Peduzzi, Francis <Francis.Peduzzi@nrc.gov>
    
    Cc: Lam be rt, Kenneth <Kenneth. Lambert@nrq:ov>; Pelke, Paul <Pau l. Pelke@nrc.gov>; Jeffers, M ark
    
    < Mark.Jeffers@nrc.gov>; Chandrathi l, Pre ma <Prema.Chandrathil@nrc.gov>; Stoedter, Karla
    
    <Karla.Stoedter@nrc.gov>; Orth, Steven <Steven .Orth@nrc.gov>; O'Brien, Kennet h
    
    <Kenn eth .O' Brien @nrc.gov>
    
    

    Subject:

    LaSal le Va lve lssue Good afternoon, Just trying to keep folks up to date on the LaSalle Valve issue. The licensee has ag reed to shut down and look at the valve in question, we should have the results early next week. (b)(5) Deliberative Privilege the decisinn was ade to simole provide a response to the licensee's - letter, ..._nv._1__ e .... I P .. e era ive e_ _ _ ___. 1 Having said that, 1just wanted to give a check to see it there were any concerns with this approach as we go forward , and to see it anyone is aware of any precedents for using this approach or contrary to using this approach? VR Rick From: Chandrathil. Prema To: Stoedter. Karla: leffers Mark

    Subject:

    one more Q!! fo r laSalle Date: Monday,June 26, 2017 5:30:16 PM Attachments: l aSalle Va lve Comm Plan Key Messages and O"s.docx One more question--- 1just added it in and attached it above NRC de you know why the valve was not working properly? Prema Chandrath ll Public Affairs Officer U.S. NRC Region 111 630-829-9663 Benjamin, Jamie From: Thompson, John Sent: Monday, June 26, 2017 6:13 AM To: Benjamin, Jamie

    Subject:

    status of Unit 1 HPCS valve Hi Jamie. 1didn't hear anything over the weekend on the teardown of the valve. Do you have any information? Thanks john From: Rodriguez Lienei To: Benjam i lamie: Farnan Michae1* Pvoloo Andrew: Pbil\ios Charles

    Subject:

    RE: draft report - need comments by COB Tuesday 6/27 Date: Tuesday,June 27, 2017 6:19:44 PM Attachments: LaSalle SIT Draft report LR review.do cx Hello Jamie, Attached are my comments. 1 used track changes on the report to try to capture everything. 1 apologize for not having more time to review the report, given that l'm also working on another inspection report right now. 1 added a few documents to the list of documents rev1ewed, which I reviewed. lf you need anything else from me, Iet me know. 1 can maybe dedicate a few more hours next week to it, if you need me to. : Thanks, Lionel Rodriguez N RC/R I II/ DRS/EB2 630-829-9609 From: Benjamin, Jamie Sent: Friday, Ju ne 23, 2017 11:32 AM To: Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Farnan, Michael <Michael.Farnan@nrc.gov>; Dun lop, A.ndrew <Andrew.Dunlop@nrc.gov>; Phil lips, Charles <Charles.Phi lli ps@nrc.gov> Cc: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Be njamin, Jamie <Jamie.Benjamin@nrc.gov>

    Subject:

    draft report - need comments by COB Tuesday 6/27 Please review the report. lts draft and somewhat rough. Things may get modified a little based on what they find this weekend with 1 E22-F004. What do you like? What don't you like? What do you want added? Thanks everyone. Our team goal is to give this to Mark by COB next week. Home stretch ! Jamie From: lones Michael To: Rodri&uez uooel

    Subject:

    RE: laSalle U1 HPCS Valve Pictures an d Videos Date: Tuesday,June 27, 201711:12:03 AM Couple interesting things . Pin looks angled and it looks like there are shiny shavings on the lip around the valve stem collar but not on top of the collar (indicating that these may originate from under the collar; if this isn't just water); speculation at its finest. From: Rod riguez, Lionel Sent: Tuesday, Ju ne 27, 2017 10:05 AM To: Dun lop, And rew <And rew.Dunlop@nrc.gov>; Jones, M ichael <M ichael.Jones@n rc.gov>; Petrella, Vance <Vance. Petrella@ nrc.gov>; O'Dwyer, Gera rd <Gerard .ODwyer@nrc.gov>

    Subject:

    LaSalle Ul HPCS Va lve Pictures and Videos Hello Folks, As discussed during today's Tech Tuesday, below is the link to the LaSalle U1 valve pictures and videos: M:\LaSalle U1 HPCS Valve Video : Enjoy, Lienei Rodriguez NRC/RIII/DRS/EB2 630-829-9609 From : Stoedter, l<arla To: Chandrathil Prema; leffers. MMk Cc: Mitlyng. Viktor;a

    Subject:

    LaSalle Valve External Comm Plan Key Messages and Q"s rev 1.docx Date: Tuesday, June 27, 2017 12:03: 00 PM Attachments: LaSalle Va lve External Comm Plan Key Messages and O"s rev 1.docx Prema and Mark, Here's my attempt at answering all 25+ questions. 1know some answers will need revision . Karla Fr om : farnan Michael To: Benjami lamie; Rodrii:uez Lionel; Dunlop Andrew

    Subject:

    RE: PB Pa rt 21 - You will f ind t his interesti ng... Date: Tuesday, J une 27, 2017 6: 56:30 AM (b)(S) Deliberative Pri vilege 1am not surprised that Poi nt Beach missed the guidance instructions. The guida nce as well as the Part 21 does not discuss t he two piece collar design and how applied force coul d move it from init ial instal led position. Michael F. Farnan Mechan ical Engineer U.S. Nuclear Regulatory Comm ission 301-415-1486 From: Benjamin, Ja mie Sent: M onday, June 26, 2017 5:05 PM To: Rodriguez, Lionel <Lionel. Rodr iguez@n rc.gov>; Dunlop, Andrew <Andrew.Dunl op @nrc.gov>; Fa rnan, M ichael <M ichael.Farnan @nrc.gov>

    Subject:

    PB Part 21 - You will find t his interesting . . . So Point Beach MOV engineer thinks that the recommended torque values provided in the flow serve table is what pre-torque should be. They add that pre-torque value to the wedge pin structural value and as long as it is less t han the operational max value they said they are ok. They totally missed it and had the BWR owner's group guidance. lnteresting enough. PB torque values are significant lower than LaSalle. For a 1O pressure class 1500, they maximum allowable torque in the closed direction was 657 ft-lbs. From: coyne. Kevjn To: Q"Brieo Kenneth Cc: Lubjnski. loba

    Subject:

    Fwd: Request for presentation at Quarterly Strategic Alignment meeting Date: Tuesday, June 27, 2017 10:34:29 AM Attachments: 7.5.17 quarterly stra tegic meet ing agend a.docx Safety Spotlight - AD DDGV l uly 5 2017,pptx Hi Ken-Know things have been pretty dynamic in the Region over the last few days, but wanted to tag up with you on the Strategic Alignment meeting slides for the LaSalle MOV effort. It's a quick presentation, so Ijust put down some general background - and I didn't want to put a lot detail for the going forward plan since that will likely change and thought -it would be better to just speak to it during sUde 8. However, we probably need to update slide 6 to reflect the LaSaUe unit 1 shutdown last week. Any other comments/revisions? Kevin From: "Coyne, Kevin" <Kevin.Coyne@nrc.gov>

    Subject:

    FW: Request for presentatjon at Quarterly Strategic Alignment meeting Date: 17 June 2017 14:40 To: "O'Brien, Kenneth" <l<enneth.O'Brien@nrc.gov> Cc: "Lubinski, John" <John .Lubinski@nrc.gov> Ken - Here's a first cut at the safety spotlight briefing on anchor darling valves/laSalle . The tota l time is 20 minutes, with about half dedicated to Q&A's. So the slides are pretty high Ievel and graphic heavy. 1 left the status as just high Ievel bul Iets for laSal le and LIC-504 since they are both fast movi ng targets. let me know what comments, revisions, questlons you have. Tha nks for supporting the ta lk Kevin From: Cai, June Sent: Wednesday, June 07, 2017 1:03 PM To: Coyne, Kevin <Kevin.Coyne@nrc.gov> Cc: Clark, Theresa <Theresa.Clark@nrc.gov>

    Subject:

    Request for presentation at Quarterly Strategic Alignment meeting : Kevin, ln developing the agenda for the next Quarterly Strategic Alignment Meeting, the topic of LaSalle SIT / Anchor-Darling double disc gate valves has been requested by the EDO/DEDOs, with NRR lead and RIII support. The meeting is on July 5th - see attached agenda for location and presentation time. The audience will be EDO/DEDOs/AO and ODs/RAs. We have 20 minutes slotted for this topic, including Qs and As. Given the length of time and the audience, suggest the presentati.on be fairly focused and high Ievel. Please Iet me know if you would be able to support and who to work with on the logistic details. Thanks so much in advance. June Cai Executive Technica l Assistant Office of the Executive Director for Operations U.S. Nuclear Regulat ory Commlssion 301-415-1771 june.cai@nrc.e:ov 6/27/17 Quarterly Strategic Alignment Meeting Weds, July 5, 2017, 1:30 - 4:00 p.m. Room T-6A1 VTC to Regions

    Participants:

    EDO (direct report) Offices, OCIO, OCFO, OGC, OIP

    Purpose:

    Collaborative discussion of strategic challenges of agency-wide importance and interest, including follow-up on issues identified in the most recent Quarterly Performance Review (QPR) meeting and Strategic Leadership Meeting (SLM). Objective : : 1. Shared understanding of NRC Senior Leadership Team of issues affecting the agency in the next one to two year timeframe. : 2. NRC Senior Leadership Team have had an opportun ity to participate in the development of strategic direction setting and problem solving for items that cut across business lines and organizational units. : 3. Clear messaging on strategic issues is developed and all sen ior leaders use this messaging in communicating with their organizations and staff. Process: : 1. Opening Remarks - Victor McCree, EDO 1:30 - 1:35 : 2. Safety Spotliqht 1:35 - 1:55 a . LaSalle SIT/ Anchor-Darling double disc gate valves - NRR/RIII : 3. Special Discussion Topies : a. Strategic Workforce Planning - OEDO & OCHCO 1 :55 - 2:25 : b. Backfit - CRGR 2:25 - 2:55 : c. FY 2018-2022 Strategic Plan development - OEDO 2:55 - 3:25 d . SLS Project - OEDO 3:25 - 3:55 From: Smjth Laura To: Skoowski Richard Cc: Lambert. Kenneth; leffers. Mark; Benjami. a mie subject: RE: 2E22-F004 fa ilure PD.docx Date: Wednesday, June 28, 2017 3:20:02 PM 1willl l am going to review these files to ensure I understand. Thank you From: Skokowski, Richard Sent: Wednesday, June 28, 20 17 3:10 PM To: Sm ith, Laura <Lau ra.Sm it h@nrc.gov> Cc: Lambert , Kenn eth <Kenneth .Lambert@nrc.gov>; Jeffers, M ark <Ma rk.Jeffers @nrc.gov>; Benja m in, Jamfe <Jamie.Benj amin@n rc.gov>

    Subject:

    2E22- F004 failu re PD.docx : Laura, Please take the lead on working with Jamie Benjamin and Mark Jeffers to develop the enforcement panei work sheet and apparent violation, which I believe they now want to be a design control issue, giving discretion similarly to the concept used for the other LaSalle case I just sent you. We will need an EA number. Don't hesitate to ask if you have questions. VR Rick From: circle teff To: Hanna, tohn

    Subject:

    A-0 Valves Date: Wednesday, June 28, 20,7 9:46:06 AM http ://fusion .nrc.gov/nrr/team/dirs/ioeb/anchor_dari ing_valve_issue/defau It. aspx Jeft A. Circle Team Leader- PRA Modei Development PRA Operations and Human Facfors Branch NRR/Division of Risk Assessment (30 1) 415- 1152 From: oun!op Andrew To: Ben jam i lam je: Rodrieuez Lione!; farnan. Mjchael: Phi!ljos Char!es Cc: 1effers. Mark

    Subject:

    RE: draft report * need comments by COB Tuesday 6/27 Date: Wednesday, June 28, 2017 7:32:33 AM Attachments: LaSal!e SIT Draft report * Farnan Cornrnents and Dunlop.docx Here are my comrnents that I added to Mike's. Andy From: Benjamin, Jamie Sent: Friday, June 23, 2017 11:32 AM To: Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Farnan. M ichael <Michael.Farnan@nrc.gov>; Dun lop, Andrew <Andrew.Dunlop@nrc.gov>; Phil lfps, Charles <Charles.Phi lli ps@nrc.gov> Cc: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Benjamln, Jamie <Jamle .Benjamin@nrc.gov>

    Subject:

    draft report - need comments by COB Tuesday 6/27 Please review the report. lts draft and somewhat rough. Things may get modified a little based on what they find this weekend with 1E22-F004. What do you like? What don't you like? What do you want added? Thanks everyone. Our team goal is to give this to Mark by COB next week. Home stretch ! Jamie From: farnan Michael To: Pbillips Charles: Stoedter Karla: Beniamin 1amie: leffers Mark: Rodriguez, Lionel: Dunlop Andrew Cc: Woiewoda, lacguelyn: Coru jo-Sandin. lorge

    Subject:

    RE: Kalsi Analysis Date: Wednesday, June 28, 2017 7:44:49 AM Thanks Chuck. 1 find it interesting that the reworked valve doesn't exhibit a smooth stem decompression region in the thrust and torque traces and that Kalsi Engineering making the statement that "The criteria for evaluating the stem thrust decompression region as an indication of possible loss of stem-to-upper wedge connection integrity will need to be refined based on the 1E22-F004 diagnostic data." The stem decompression region was where the 2E22-F004 valve had the anomalies in 2015 which led LaSalle to believe that this was the smoking gun pointing to an issue with the valve internais integrity. 1 always thought that the 2015 2E22-F004 anomalies were due to changes in the friction factors and did not point to valve problems. The as-left traces on the reworked valve I would consider normai. The less than smooth transition in the stem decompression region is most likely due to the new packing set and new stem to stem nut interface. Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Commission 301-415-1486 From: Phillips, Charles Sent: Wednesday, June 28, 2017 8:14 AM To: Stoedter, Karla <Ka rla.Stoedter@nrc.gov>; Benjamin, Jamie <Jam ie.Benjamin@nrc.gov>; Jeffers, Mark <M ark.Jeffers@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Farna n, Michael <M ichae l.Farnan@nrc.gov>; Dun lop, Andrew <Andrew.Dunlop@nrc.gov> Cc: Wojewoda, Jacquelyn <Jacquelyn.Wojewoda@nrc.gov>; Corujo-Sand in, Jorge <Jorge.Corujo-Sandin@nrc.gov>

    Subject:

    FW: Ka lsi Ana lysis Got this from the licensee this morning. From: HP u 500 MFP [4] Sent: Wednesday, June 28, 2017 7:21 AM To: Phill ips, Charles <Charles.Phi lli ps@nrc.gov>

    Subject:

    Ka lsi Analysis From: Lara. lulio To: Kozak Laura * Hanna lohn Cc: Va os Nicholas

    Subject:

    RE: Lab nfo on LaSal le HPCS valve Date: Wednesday,June 28, 2017 4:2 2:32 PM M:\LaSalle U1 HPCS Valve Video\HPCS 1E22-F004 radiography and pics from contractor disassembly From: Lara, Julio Sent: Wednesday, June 28, 2017 4:22 PM To: Kazak, La ura <La ura .Kozak@n rc.gov>; Ha nn a, John <John.Hanna@nrc.gov> Cc: Valos, Nicholas <Nicholas.Valos@nrc.gov>

    Subject:

    FW: Lab info on LaSalle HPCS va lve Pics on M drive From: Pederson, Cynth ia Sent: Wednesday, June 28, 2017 4:01 PM To: Dean, Bill <BilLDean@nrc.gov>; Evans, Miche le <Michele.Evans@ nrc.gov>; McDermott, Brian <Brian .McDermott@nrc.gov>; Holian, Brian <Brian .Holiao@nrc.gov>; Bowen, Jeremy <Jeremy.Bowen@nrc.gov>; Johnson, Michael <Michael.Johnson @nrc.gov>; Clark, Theresa <Theresa. Cla rk@nrc.gov> Cc: Roberts, Darre ll <Darrell,Roberts@orqNv>; Trapp, James <James.Trapp@nrc.gov>; O'Brie n, Kenneth <Kenneth.O'Brien@nrc.gov>; Shuaibi, Moham med <Mohammed.Shuajbj@nrc.gov>; Loud en, Patrick <Patrick.Louden @nrc.gov>; Lara, Julio <J ulio.Lara@nrcgov>

    Subject:

    Lab info on LaSal le HPCS va lve Just got early info regarding examination of LaSalle Unit 1 HPCS valve. The lab has cut open the valve. Pin was sheared and there is damage on the threads near the pin . Wanted to share before tomorrow's public meeting. There will be more to come. From: Rodriguez. Uonel To: Q"Brien. Kenneth Cc: leffers. Mark: Shuaibi. Mohammed subject: LaSalle U1 HPCS Va lve Update - Additional Pictures of Sheared Pin Available on the M: Drive Date: Wednesday,June 28, 2017 4:38:51 PM Hello Ken, Mo suggested sending you this information so you could have it sooner rather than later. Chuck added a few pictures on the M: Drive of the valve subassembly inspections from BWXT so far. The pin was found sheared and some of the threads damaged. The pictures can be found on the M: Drive with the following link: M:\LaSalle U1 HPCS Valve Video Let me know if you have any questions. We'II be sure to keep you informed. Thanks , Lionel Rodriguez NRC/RIII/ DRS/ EB2 630-829-9609 From: Jeffers, Mark To: Lublnski fohn: Coyne Keyjn; Kinr;:. Michael Cc: O" Brien. Kenneth

    Subject:

    LaSalle Unit 1 HPCS Valve I nitial Pictures Date: Wednesday, June 28, 2017 4:42:00 PM Attachments: OSC 0449 . PG DSC 0446.f PG osc 0442 f PG For everyone's awareness, the lab that LaSalle sent the Unit 1 HPCS valve to just provided some preliminary results. Specifically, the wedge pin had been previously sheared and degradation on the threads near the pin was evident. 1 attached some of the initial pictures provided by the lab. 1 wanted to share and ensure everyone was informed prior to the Public Meeting tomorrow. lf anyone has any questions, please Iet me know. Thank You, Mark Jeffers Branch Chief I RIII DRS EB2 X9798 From: O"Brien. Kenneth To: Pederson Cynthla; OBrien Kenneth; Shuaibi. Mohammed: Louden. Patrick: Lara I\Jlio Cc: Roberts Darrell; effers. Mark subject: Re: LIC 504 public meeting 6/29 Date: Wednesday, June 28, 2017 4:38:24 PM Cindy Mark will be representing the Region, will discuss tbe SIT findings wüh regards to the Unit 2 valve, may provide some preliminary information consistent witb the new Unit 1 valve assessment, and answer questions that may arise in support of the LIC 504 efforts. He has been involved with the efforts from the start and thus has been an integral part of the workings aud our goals. Thx Ken Kennetb. G . O'Brien, Director Di vision of Reactor Safety Region III Kenneth.0Brien@NRC.Gov 630-829-9700 On: 28 June 2017 14: 18, "Pederson, Cynthia" <Cynthia.Pederson@nrc.gov> wrote: Who/how is RIII participating in tomorrow's meeting? thanks From: 1effers Mark To: Lara lulio; Q"Brlen. Kenneth; Shualhi. Mohamrned; Loucten Pat!lck Cc: Stoedter. Karla subject: Fwd: Radiography and pictures fro m the Hcensee"s contractors on the 1E22-F004 valve Date: Wednesday,June 28, 2017 4:05:27 PM Please see below to the link for the pictmes of the LaSalle unit 1 HPCS valve Karla just texted about. : Thanks, Mark Sent frorn rny iPbone. Please forgive any typos. Begin Forwarded Message: From: "Phillips, Charles" <Charles.Phillips@nrc.gov>

    Subject:

    Radiography and pictures from the licensee's contractors on the lE22-F004 valve Date: 28 June 2017 16:39 To: "Stoedter, Karla" <Karla.Stoedter@nrc.gov>, "Jeffers, Mark" <Mark.Jeffers@nrc.gov>, "Benjamfo, Jamj e <Jamie.Benjamin@nrc.gov>. "Dunlop, Andrew" <Andrew.DunJop@nrc.gov>, "Rodriguez, Lionel" <Lionel.Rodriguez@nrc.gov> Cc: "Wojewoda, Jacquelyn" <Jacquelyn.Wojewoda@nrc.gov>, "Corujo-Sandin, Jorge" <Jorge.Corujo-Sandin@nrc.gov> Find them at this link M:\LaSalle U1 HPCS Valve Video\HPCS 1E22-F004 radiography and pics from contractor disassembly From: farnan Michael To: Pbillips Charles: Stoedter. Karla: leffers. Mark: Benjamin. 1amje; Dunlop Andrew: Rodriguez Llonel Cc: Wojewoda. 1acouelyn: Ruiz. Robert

    Subject:

    RE: Rad iography of 1 E22- F004 Removed Stem to Wedge Assembly Date: Wednesday,June 28, 2017 3:02:18 PM Thanks Chuck. Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Commission 301-415-1486 From: Phillips, Cha rles Sent: Wednesday, June 28, 2017 3:58 PM To: Stoedter, Karla <Ka rla.Stoedte r@nrc.gov>; Jeffe rs, Mark <Ma rk.Jeffe rs@ nrc.gov>; Benjam i n, Jamie <Jamie.Benjamin@nrc.gov>; Dunlop, Andrew <Andrew.Dunlop@n rc.gov>; Rodriguez, Lionel <Lionel. Rodriguez@ nrc.gov>; Farnan, M ichael <Michael. Farnan@ nrc.gov> Cc: Wojewoda, Jacquelyn <Jacquelyn.Wojewoda@nrc.gov>; Ruiz, Robert <Robert.Ruiz@nrc.gov>

    Subject:

    FW: Rad iography of 1E22-F004 Removed Stem to Wedge Assemb ly There appears to be damage to the thread above the pin. 1was told the contractor found that the Pin is sheared and that their biggest torque wrench could not undo the stem from the wedge. From: Ford Jr, Guy V:(GenCo-Nuc) [ma11to:guy.ford@exeloncorp.com] Sent: Wednesday, June 28, 2017 1:29 PM To: Phil lips, Charles <Charles Phillips@nrc.gov> Cc: Keenan, John P:(GenCo-Nuc) < john.keenan @exeloncorp.com>

    Subject:

    [Externa l_Sender) Rad iography of 1E22-F004 Removed Stem to Wedge Assembly : Chuck, Here are t he pict ures from our rad iogra phy of 1E22-F004 Removed Stem to Wedge Assembly. These were taken at LaSa lle prior to sh ipment to BWXT t his week. : Thanks, Guy Ford Jr. Regulatory Assurance Manager ,=:- Exelon Generation. LaSalle Nuclear Power Station 2601 N. 21st Road. Marsellles, IL 61341 Offlce:815 415 2800 1 Mobile:(b)(6) guy.ford@exeloncorp.com .___ _ _~ From: 1effers Mark To: Coyne. Kevin

    Subject:

    RE: Slides for QSAM on AD valves Date: Wednesday, J une 28, 2017 11 :05:00 AM Attachments: Saf e~ Spotlight - AD DDGV u ly S 2017 <Ml Comments}.pptx Attached is the presentation with a few updates on Slide 4 and 8. Additionally, some other comments includa: 1updatad Slide 4 to amphasiza that tha failura machanism is dua to a dasign flaw. Wa can discuss that Flowserve is expacting to updata their Part 21. Slida 5 seams out of placa. ls this somathing that wa can just discuss on Slide 2 and just daleta Slide 5? (l.a. , Background is in Fabruary 2013 Flowserve initiatad Part 21 , in April 2013 BWROG initiated Topic Report, and then in February 2017 LaSalle axperianced HPCS injection valve failura.) 1am a little confused by Slide 7 regarding tha Risk Assessment. 1know you are going to discuss in detail ; howevar, 1am unsure how you were able to detarmine these numbers if wa do not know all of the details of the specific valves (a.g., system that it is in , safety function, etc.). 1added soma high Ievel points to Slida 8 to provide a status update of tha SIT and tha most racent Unit 1 shutdown. 1also added soma point to Slida 8 on tha ganaric status updata. o For your awaraness. It looks lika getting the lnformation Notice out early was beneficial just to get the issua aut for everyone's awareness. The Point Beach DBAI team (currently in its first waak onsita this weak) salectad the Flowsarve Part 21 notification as one of their OpE samples and identifiad that the licensaa had misinterpreted the original Flowserve Part 21 notification and are only now undarstanding the issua. Furthar convarsations from the DBAI team and the licansae indicate that NextERA and FPL may have generically misinterpreted the original Part 21 across their fleet. Currently, the team has not identified any operability concerns, but the licensee is taking actions and are now putting all of the identified components into their CAP as non-conforming. : Thanks, Mark From: Coyne, Kevin Sent: W ednesday, Jun e 28, 2017 10;36 AM To: McDermott, Brian <Brian.M cDe rmott@nrc.gov> Cc: Lubinski, John <John.Lubinski@n rc.gov>; Jeffers, M ark <Mark.Jeffers@n rc.gov>; O' Brien, Kenneth <Kenneth.O'Brien@nrc.gov>

    Subject:

    Re: Slides for QSAM on AD va lves Brian - I pulled together a draft that is with Region 3 for review and comment (Mark Jeffers, Reg 3 BC responsible for the LaSalle SI, will also be supporting the presentation). Mark is making a couple of updates and I will send you and Brian H the latest draft once we have the Region 3 revisions. Kevin On: 28 June 2017 09:03, "McDermott, Brian" <Brian.McDermott@nrc.gov> wrote: Brian H would like to see the slides in advance of the meeting. He and I are both out next week. When do you think you will have a draft available? From: Coyne Kevin To: McDermott Brian: Hoian Brian Cc: Lubinski. iohn; Evans. Mjchele; O"Brjen. Kenneth; ieffers. Mark

    Subject:

    RE: Slides for QSAM on AD va lves Date: Wednesday, J une 28, 2017 7:04:30 PM Attachments: Safety Spotlight - AD DDGV uly s 2017 Rev 1 u ne 28 2017.pptx 7.5.17 quarterly scrategic meeting aeenda.docx Brian M & Brian H - Here's t he current draf t presentation for t he safety spotlight on anchor darling va lves for the qua rterly strategic meeting next week. Also attached the meet ing agenda June Cai had sent a few weeks ago. Kevin From: McDermott, Brian Sent: Wednesday, Ju ne 28, 2017 9:04 AM To: Coyne, Kevin <Kevin .Coyne@nrc.gov> Cc: Lubinski, John <John. Lubinski@nrc.gov>

    Subject:

    Slides for QSAM on AD valves Brian H would like to see the slides in advance of the meeting. He and I are both out next week. Wben do you think you will have a draft available? From: Duncan. Erjc To: Ali 83 users Subj ect: The Oaily Morning Meeti ng News for Wed nesday, J une 28, 2017 Date: Wednesday,June 28, 2017 9:40:52 AM Attachments: D_aily Morning__Meeting_News Jun_e_28 20J.l.doc).(. The Daily Mornii\g Meetlng News for Wednesday, June 28, 2017 Regfonal Duty Officer: Bric Duncan Teleconf erence Number: (800) 779-9565 ; Passcode: (b)(6) Not.e: T+t~!!'!"lll'""""lft'!l'"'!'l'l'!""!l'll'l"""l"'l"Jl"""'~l\'ft"lllffl'l"M~ijijljjfflfiFafffl'!ffll"ftM'lffl'l'!"fflffl~lffl!'ffl"""'- Behaviors T bat Matter - Orgauizational Value of the Week is RESPECT - We treat everyoJle professionally and with respect. We promote clivers ity and recognize the importaooe of every.one's cootributioos. Support lssues: RA: Darrell is only available tomorrow and Friday before leavüig for a temporary-ass ignment in NSJR; Jim Trapp arrives on July LOth to backfül for Da1Tell. DRP: DRS: DNMS: DRMA: Partnership meeting tomorrow. EICS: Two materials enforcement pauels tomorrow. STATES: Government- to-Govemment meeting tomonow with Minnes ota Departmentof Commerce; Allan Barker attending. PAO: Chairman Svinicki confirmed for an additional 5 year term; Confirmation vote scheduled for two oew NRC Commissioner nominees; See NRC in the News Today Materfals Events/Issues: Reactor Eveots: Part 21 : lTI En.idine reported a potential transducer fai lui-e due to a defective solder joint at a coiJ Jead termina! on a printed circuit board. No Regioo m plants reported to be affected. Plant Status BRANCH I Cfu,ton: Duane Arnold: Quad Cities: Unit 1: Un.it 2: LaSalle: Un.it 1: Back at full power following shutde>wn to remove HPCS injection valve internais; Internais shipped to vendor fot laboratory anal.ysis; Special lnspection Team reviewing as-found diaghostic testing data. Unit 2 : BRANGI. 2 Fe1mi: DCCook: Unit 1: Un.it 2: Prairie Island: Government-to-Government meeting tomorrow with Minnesota Depa11ment of Commerce. Unit 1: Unit 2: Monticello: Government-to-Government meeting tomorrow with Minnesota Department of Commerce. BRANCH 3 Byron: Unit 1: Unit2: Braidwood: lllinois Environmental Protection Agency (JEPA) issued a violation without a fine associated with the recent identification of the release of circulating water containing tritium through an unauthorized release pathway. Unit 1: Unit 2: Palisades: BRANCH4 Point Beach: Unit 1: Unit 2: Davis Besse: PeITy: Dresden: Unit 1: Unit2: NRR: Additional Support lssues - Other Issues - Two events tomoITow; EWRA hosting 4th of .luly bake sale in DRP conference room; LGBT Pride Month Lunch from 11-12 in MCR with guest speaker "Pride & Prejudices: Modeling lnclusive Behavior" sponsored by ACLGBT- bring your lunch and snacks and sweets will be shared. Personnel News - None. Daily Notes/Preliminary Notification - None. One Week Look Ahead - None. Post 8: 15 Meeting Topies - HPCS injection valve removal at LaSalle; See M:\LaSalle U 1 HPCS Valve Video for additional information including videos and photos from last weekend's activities that were observed by NRC inspectors. The Daily Morning Meeting News for Wednesday June 28, 2017 Regional Duty Officer: Eric Duncan Teleconference Number: (800) 779-9565; Passcode:~ Note: TI tis 11evoslette1 111ay co1 ilail I p;e-decisiot 1al il 1fo. E>o ;rat distr ibate oatside t1 1e f4f\6. Behaviors That Matter - Organizational Value of the Week is RESPECT - We treat everyone professionally and with respect. We promote diversity and recognize the importance of everyone's contributions. Support lssues: RA: Darrell is only available tomorrow and Friday before leaving for a temporary assignment in NSIR; Jim Trapp arrives on July 101h to backfill for Darrell. DRP: DRS: DNMS: DRMA: Partnership meeting tomorrow. EICS: Two materials enforcement panels tomorrow. STATES: Government-to-Government meeting tomorrow with Minnesota Department of Commerce; Allan Barker attending. PAO: Chairman Svinicki confirmed for an additional 5 year term; Confirmation vote scheduled for two new NRC Commissioner nominees; See NRC in the News Today Materials Events/lssues: Reactor Events: Part 21 : ITT Enidine reported a potential transducer failu re due to a defective solder joint at a coil lead termina! on the printed circuit board. No Region 111 plants reported to be affected. Plant Status BRANCH 1- Clinton: Duane Arnold: Quad Cities: Unit 1: Unit 2: LaSalle: Unit 1: Back at full power following shutdown to remove HPCS injection valve internais; Internais shipped to vendor for laboratory analysis; Special lnspection Team reviewing as-found diagnostic testing data. Unit 2: BRANCH 2 Fermi: DC Cook: Unit 1: Unit 2: Prairie lsland: Government-to-Government meeting tomorrow with Minnesota Department of Commerce. Unit 1: Unit 2: Monticello: Government-to-Government meeting tomorrow with Minnesota Department of Commerce. BRANCH 3 Byron: Unit 1: Unit 2: Braidwood: lllinois Environmental Protection Agency (IEPA) issued a violation without a fine associated with the recent identification of the release of circulating water containing tritium through an unauthorized release pathway. Unit 1: Unit 2: Palisades: BRANCH 4 Point Beach: Unit 1: Unit 2: Davis Besse: Perry: Dresden: Unit 1: Unit 2: NRR: Additional Support lssues - Other lssues - Two events tomorrow; EWRA hosting 4 th of July bake sale in DRP conference room; LGBT Pride Month Lunch from 11-12 in MCR with guest speaker "Pride & Prejudices: Modeling lnclusive Behavior" sponsored by ACLGBT - bring your lunch and snacks and sweets will be shared. Personnel News - None. Daily Notes/Preliminary Notification - None. One Week Look Ahead - None. Post 8:15 Meeting Topies - HPCS injection valve removal at LaSalle; See M:\LaSalle U1 HPCS Valve Video for additional information including videos and photos from last weekend's activities that were observed by NRC inspectors. From: Morris Scott To: Shuaibi Mohammed; O"Brlen enneth

    Subject:

    FW: [OU0-511] FYI - Agency Mission Meeting Summary 06/28/201 7 Date: Thursday, J une 29, 2017 2:11 :11 PM Attachments: 6-28-17 summary OUO-Sll.docx Importance: High Attached summary is nebulous. What was the outcome of the LaSalle U1 HPCS valve inspection? From: Kennedy, Kriss Sent: Wednesday, June 28, 2017 4:27 PM To: Shaffer, Ma rk <Mark.Shaffer@nrc.gov>; Howell, Linda <Linda .Howell@nrc.gov>; Vegel, Anton <Anton .Vegel@nrc.gov>; Clark, Jeff <Jeff.Clark@nrc.gov>; Pruett, Troy <Troy.Pruett@nrc.gov>; Lantz, Ryan <Ryan.Lantz@nrc.gov>; Murphy, Jerome <Jerome.Mu rphy@nrc.gov>; Morris, Scott <Scott.Morris@ nrc.gov>; Warn ick, Greg <Greg.Warn ick@nrc.gov>; Hay, Michael <M ichael. Hay@nrc.gov>; Dricks, Victor <Victor. Dricks@n rc.gov>; Ma ier, Bi 11 <Bi 11.Ma ier@nrc.gov>; Fuller, Karla <Karla.Fuller@nrc.gov>

    Subject:

    FW: [OUO-SII] FYI - Agency Mission Meeting Summary 06/28/2017 FYI From: Clark, Theresa Sent: Wednesday, June 28, 2017 3:38 PM To: NRC_ODs_ DODs <NRC ODs DODs@nrc.gov> Cc: EDO Distribution <EDODistribution@nrc.gov>

    Subject:

    [OUO-Sll] FYI -Agency M ission Meeting Summary 06/28/2017 QFF lelAL leE( QPJL" HPJSITl':'E IPJCfiERWtL IP JFSRrM.fl SPJ Hf all! Please see attached for notes from today's Agency Mission Meeting. Please Iet me know if you have any questions or concern s. Thanks ! Theresa Valentine Clark Executive Technica l Assistant (Reactors) U.S. Nuclear Regulatory Commission Theresa.Cla rk @nrc.gov 1 301-415-4048 1 0 -16C33 OFFIGl;PcL l!:JSE OPJLY SEPJSITPe'E IPJTEJ,qtJ:Atb IPJFQPIMAf lQPJ -0FFl81AL tJ!! er*t t - SEIQSI I IVE INI ERNA[ iNFORMAtioN Agency Mission Meeting June 28, 201 7 OEDO * SRM was just issued on the reform report due to 0MB on Friday. See ML17179A303 - sensitive - limited to NRC only. * Quarterly Strategic Alignment Meeting (QSAM) will be next Wednesday, 1 :30-4pm (no Agency Mission Meeting). * One topic at the QSAM will be the CRGR's 6/27/17 report to the EDO on backfitting (ML17174A625 - currently non-public). CRGR was recognized for high quality report. * EDO will issue memo to RES/OCFO/Region II in the near term on the pi lot for Strategic Workforce Planning. * Cognizant SES managers are requested to attend both end of fieldwork and exit meetings for OIG audits. * An employee was recently subject to a "virtual kidnapping scam. Staff should be aware NRC has resources to help if this happens at work-contact the Centra! Alarm Station. See some tips from the FBI here. ADM * Demolition on 5th floor of TWFN is ongoing; 7th floor may start early. * Announcement was recently sent out on Federal Register notice (FRN) process changes; reminder from SECY to ensure FRNs match Commission direction in SRM. * Some offices have recently had active shooter presentations; others encouraged to. NRO * Construction continues actively at both Vogtle and Summer sites. NRR * Public meeting tomorrow on Anchor-Darling valve operating experience. * Bill Dean's last day is tomorrow (leaving around 2pm). NSIR * E&E News article on cyber incident has received interest. OCFO * Changes to Performance Budget process underway to give offices more time to review, with quick update after SRM direction. Budget is due to 0MB September 12. * Movement on apportionment is expected shortly. * Salaries and benefits status was provided. OCIO * Changes are coming to the Service Catalog. * GUNDA status was provided. * A new tool should make encryption of sensitive emails easier-stay tuned . err1e1At tJ!E et*tY !Ef4817fl't1E IPHEfU4JltL lt4F8RMJltTl8f4 OFFICIAL OSE ONLY - SENSI i lVE INI ERNAL INFORIOIA I ION OE * The assessment of the allegations center of expertise after the first year will be sent to OEDO next week. * Draft guidance on relaxation of adequate protection orders for "good cause" was sent to offices for comment. OGC * Today's Senate EPW business meeting to consider the two NRC nominees was postponed (no new date set). RES * lntegrated University Program grants ($15M to 35 institutions) to be awarded this week. * Requlatory Guide 1.164 on commercial-grade dedication was issued. RI * Public meeting notice issued for 7/13 regulatory conference on Pilgrim's diesel issue. * Severity Level IV violation issued today for a security-related issue at Pilgrim. RII I * LaSalle Uhit 1 status was provided. * lllinois EPA citation for Braidwood tritium release expected soon. RIV * EDO is at Palo Verde (where it is 108 degrees!). * Washington state budget needs to be finalized by Friday; preliminary agreement may have been reached. * Comanche Peak Unit 2 is stili shut down-generator repairs ongoing. SBCR * Pride Month luncheon is tomorrow at noon in the auditorium. * SBCR is sponsoring a training session August 16-17 for EEO counselors and EEO advisory committees. AII supervisors will be invited to a session on civility at 11 am on August 16. ACRS * Northwest Medical lsotopes subcommittee meeting on 7/11 . * June ACRS letters have been sent. No items were reported by OCHCO, OI, OIP, OPA, Region 11, or SECY. At the end of the meeting, Barbara Sanford provided background on a staffing-related network announcement that is expected tomorrow. 8FFl81,tcl 1:18[ 8UL>/ 8Et481lll.'E ltfJ'ERUAL ltff8RMAfl8U From: Benjamin lamie To: farnan Michael: Rodriguez Lionel: Pbillips Charles: Dunloo Andrew: Kozak Laura: Corujo-Sandin 1orge Subj ect : RE: 1E22F004 Stem pics Date: Thursday, June 29, 2017 9:52:35 PM 1 don't remember the 2E22-F004 having that lip were the collar would go. 1 guess they cut the collar off the get the stem separated from the wedge. From: Benjamin, Jamie Sent: Thursday, June 29, 2017 9:45 PM To: Farna n, Michael <M ichael. Farnan@n rc.gov>; Rodriguez, Lionel <Lionel. Rodriguez@nrc.gov>; Phill ips, Charles <Cha rl es.Phi ll ips@nrc.gov>; Dun lop, And rew <Andrew.Du nl op@nrc.gov>; Kozak, Laura <Laura.Koza k@nrc.gov>; Coruj o-Sa ndin, Jorge <Jorge.Coruj o-Sandi n@nrc.gov> Cc: Jeffers, Ma rk <M ark.Jeffers@ nrc.gov>; Stoedter, Karla <Karla .Stoedt er@nrc.gov>

    Subject:

    FW: 1E22F004 Stem pics (b)(5) Deliberative Privilege Outstanding work to you guys. There was no way to predict how good or bad it was going to be. 1 am comfortable with the recommendation we made to management and would still * * * gh it took time, (b)(5) Deliberative Privilege it is my opinion we a e - s--,..,.. g.,..n,....,-c-- - a-n...v_a...,"""'u"""'e....... o-s--a""'e ....,...y-. ...........,......,..-_.,........,..--,..,.,.......,..--.......,e""'s--e,....p .....,ctu res in ou r report. We should think about sharing these pictures with the Regional staff. Maybe a post 0815? From: Philli ps, Cha rles Sent: Thursday, June 29, 2017 3:13 PM To: Benjami n, Jam ie <Jamie.Benjamin@nrc.gov>; Stoedter, Karla <Karla .Stoedter@orc.gov>; Jeffers, Mark <Mark.Jeffers@nrc,gov>; Dunlop, Andrew <Andrew.Dunlop@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov> Cc: Corujo-Sandin, Jorge <Jorge.Corujo-Sandin@nrc.gov>; Wojewoda, Jacquelyn <Jacauelyn.Wojewoda@nrc.gov>

    Subject:

    1 E22F004 St em pics 1 added stem pictures to M:/LaSalle U1 HPCS Valve Video/U1 HPCS 1E22-F004 Valve Disassembly Look for Stem at O deg.jpg, etc. From: Benjam i lamie To: Pbillips Charles; Stoedter. Karla; 1effers. Mark; Dunlop. Andrew; Rodriguez Llonel Cc: Corujo-Sandin. lon~e; Wojewoda lacQuelyn subject: RE: 1 E22F004 St em pics Date: Thursday, June 29, 2017 9:27:39 PM Any pictures of the wedge threads? They are a softer material. From: Phillips, Cha rles Sent: Th ursday, June 29, 2017 3:13 PM To: Benjamin, Jamie <Jamie.Benjamin@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Dunlop, Andrew <Andrew.Dunlop@nrc.gov>; Rodriguez, Lienei <Lionel. Rodrf guez@nrc.gov> Cc: Corujo-Sandin, Jorge <Jorge.Corujo-Sandin@ nrc.gov>; Wojewoda, Jacquelyn <Jacquelyn .Wojewoda@ nrc.gov>

    Subject:

    1E22F004 Stem pics 1 added stem pictures to M:/LaSalle U1 HPCS Valve Video/U1 HPCS 1E22-F004 Valve Disassembly Look for Stem at O deg.jpg, etc. From: Wilkins Lynnea To: Benney Bnan: Gavcilas. Mjrela: oesterle Erlc- Helton Shana; Hickey. 1ames; AUey David: Farnao Michael: Thompson oh n: Miller. Chris: King Michael: Weerakkody. Suni!; Giitter. oseph; Bowen. eremy; effers. Mark; Stoedter. Karla; O"Brien Kenneth; Casto Greg: Circle eff: Benjamin. am ie: Leech Matthew: Shuaibi Mohammed; Lara. (ulio: McGinty. Jim: Krohn. Paul: Burke. l ohn: Kavanagh. Kerri: Herrit,y. Jhomas: Rodriguez. ~  ; Coru jo-Sandin. lorge; Louden Patrick: Kozak Laura: Ng. Ching: ~  : Lubinski !oho; Hsueh Keyin: St uchell Sheldon; Garmoe. Alex: Bowman regory: Lund Lou ise; Chernoff. Harold: Scarbrough. Thoma s: Gascot Lozada. Ramon : Purnell. Blake: Clark. Theresa; Coyne. Kevin; Vaidya. Bhalchandra; Wrona. David; Wh itman . 1ennjfer: Tilton. carol ine; Mclntyre.* Davld: Burneu. Scott; Morey. Dennis; Martinez. Nancy: ~ ...f.J:k.; Yegel. Anton: Pruett. Troy; Clark leff; Lantz Ryan- farnholtz Jhomas: stott Chad: Felts RusseH: DE Calen dar Resource: Cullison. David: Brown. Theron Cc: NRR DIRS CAL Resource; Ross-Lee. May a ne: Snyder. Pete: DORLCAL Resource: Brock. Kat hryn : Elliott. Robert: OPA Resource; Chernoff. Margaret: Hamm. Matthew; Razzague Muhammad: Sun sum mer; Speer. ~ ; Hanna (ohn: Mitman. leffrey: Mclntyre Richard; McKown Loujs:(b)(6)

    Subject:

    FYI: Public Meeting on Anchor/Darling Va lve Issue Attendees Date: Thursday,June 29, 2017 9:26:37 AM FYI Here's the list of expected external attendees: : 1. Scot Greenlee - Exelon : 2. Tom Basso - Exelon : 3. Ted Neckowicz - Exelon : 4. Mark DiRado - Exelon : 5. Tom Walker - EPRI : 6. Lesa Hill - BWROG : 7. Brian Kibler - BWROG : 8. Kenny Christian - INPO : 9. Stephen Benesole - Duke Energy : 10. Greg Cullen - Energy Northwest 11 . Neal Estep - Kalsi Engineering : 12. Nimish Jagtap - Kalsi Engineering : 13. Wade Shephard - Flowserve : 14. Ron Farrell - Flowserve : 15. Mark Cowell - Flowserve : 16. Floyd Bensinger - Flowserve : 17. Pam Cowan - NEI : 18. Joe Pollock - NEI : 19. Greg Krueger - NEI : 20. Steve Geier - NEI : 21. Steve Vaughn - NEI : 22. Frankie Pimentel - NEI : 23. Paul Knittle - MPR : 24. Gary Peters - AREV A : 25. Jana Bergman - Scientech --Original Appointment---- From: Wilkins, Lynnea Sent: Monday, June 19, 2017 8:32 AM To: Wilkfns, Lynnea; Benney, Brian; Gavri las, Mirela; Oesterle, Erlc; Helton, Shana; Hickey, James; Alley, David; Farnan, Michael; Thompson, John; M iller, Chris; King, Michael; Weerakkody, Sunil; Giitter, Joseph; Bowen, Jeremy; Jeffers, Mark; Stoedter, Karla; O'Brien, Kenneth; Casto, Greg; Circle, Jeff; Benjamin, Jamie; Leech, Matthew; Shuaibi, Mohammed; Lara, Julf o; McGinty, Tim; Krohn, Paul; Burke, John; Kavanagh, Kerri; Herrity, Thomas; Rodriguez, Lionel; Corujo-Sand in, Jorge; Louden, Patrick; Koza k, Laura; Ng, Chng; Miller, Ed; Lubinski, John; Hsueh, Kevin; Stuche11, Sheldon; Garmoe, Alex; Bowman, Gregory; Lund, Louise; Chernoff, Harold; Scarbrough, Thornas; Gascot Lozada, Ramon; Purnell, Blakei Clark, Theresa; Coyne, Kevin; Vaidya, Bhalchandra; Wrona, David; Whitman, Jennifer; Ti lton, Caroline; Mclntyre, David; Burnel l, Scott; Morey, Dennis; Martinez, Nancy; Thomas, Eric; Vegel, Anton; Pruett, Troy; Clark, Jeff; Lantz, Ryan; Farnholtz, Thomas; Stott, Chad; Felts, Russell; DE_Calendar Resource; Cu llison , David; Brown, Theron Cc: NRR_DIRS_CAL Resource; Ross-Lee, MaryJane; Snyder, Pete; DORLCAL Resource; Brock, Kathryn; Elliott, Robert; OPA Resource (OPA.Resource@nrc.gov); Chernoff, Margaret; Hamm, Matthew; Raz.zaque, Muhammad; Sun, Summer; Speer, Chris; Hanna, John; Mitman, Jeffrey; Mclntyre, Richard; McKown, Louis;(b)(6)

    Subject:

    Public Meeting on Anchor/Darling Valve lssue When: Thursday, June 29, 2017 12:30 PM-5:00 PM (UTC-05 :00) Eastern Time (US & Canada) . Where: ACRS Room T283 *Updated to include webinar information" Bridge lnformation: 'Number: 800-857-51 SS f articipant passcode: 9464650 https://attend§e.gotowebinar.com/register/827754942855174169 From: O"Brien Kenneth To: McDermott Brian: Pederson. Cynthia: Dean Bill: Eyans Michele: Hollan Brian: Bowen leremy: lohnson Michael: Clark, Theresa Cc: Roberts. Darrell: Trapp. james; Shuaibi. Mohammed; Louden. Patrick: Lara u lio

    Subject:

    RE: Lab info on LaSalle HPCS va lve Date: Thursday, June 29, 2017 9:28:55 AM Brian You are correct, the lab could not separate the stem from the wedge and thus had to cut the components apart. This would tend to be consistent with the licensee's stroking of the valve just prior to its disassembly. The licensee completing its stroking of the valve in the closed direction, thus the closed the valve with some 240 kips of force in the closed direction with nothing to stop the stem from rotating into the wedge to the maximum extent possible until the cut out switch would stop it. Thanks Ken From: McDermott, Brian Sent: Thursday, Ju ne 29, 2017 6:23 AM To: Pederson, Cynthia <Cynthia.Pederson@nrc.gov>; Dean, Bill <Bill.Dean@nrc.gov>; Evans, Michele <Michele.Evans@nrc.gov>; Holian, Brian <Brian.Holian@nrc.gov>; Bowen, Jeremy <Jeremy.Bowen@ nrc.gov>; Johnson, Michael <Michael.Johnson@nrc.gov>; Clark, Theresa <Theresa.C!ark@nrc.gov> Cc: Roberts, Darrell <Darrell.Roberts@nrc.gov>; Trapp, Ja mes <James.Trapp@nrc.gov>; O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>; Lara, Julio <Ju lio.Lara@nrc.gov>

    Subject:

    RE: Lab info on LaSa lle HPCS valve Thanks Cindy. Can you confirm or discount the report that the lab could not separate the stem trom the wedge and had to cut the components appart? From: Pederson, Cynthia Sent: Wednesday, June 28, 2017 5:01 PM To: Dean, Bill <Bill.Dean@nrc.gov>; Evans, Michele <M ichele.Evans@nrc.gov>; McDermott, Brian <Brian.McDermott@nrc.gov>; Holi an, Brian <Brian.Holian@nrc.gov>; Bowen, Jeremy <Jeremy.Bowen@nrc.gov>; Johnson, Michael <MichaeUohnson@ nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov> Cc: Roberts, Darre ll <DarrelLRoberts@nrc.gov>; Trapp, James <J ames.Trapp@nrc.gov>; 0°Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibl@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>; Lara, Ju lio <Ju lio.Lara@nrc.gov>

    Subject:

    La b info on LaSal le HPCS va !ve Just got early info regarding examination of LaSalle Unit 1 HPCS valve. The lab has cut open the valve. Pin was sheared and there is damage on the threads near the pin. Wanted to share before tomorrow's public meeting. There will be more to come. From: Morris Scott To: Q"Brien, Kenneth Subj ect: RE: La Salle Unit 1 HPCS Va l1Je Initial Pictures Date: Thursday, June 29, 2017 2:33:34 PM 1nteresting ! From: O'Brien, Kenneth Sent: Thursday, June 29, 2017 2:29 PM To: Morris, Scott <Scott.Morris@nrc.gov>

    Subject:

    FW: LaSalle Un it 1 HPCS Valve lnitial Pictures Scott Fyi Ken From: Jeffers, Mark Sent: Wednesday, June 28, 2017 4:43 PM To: Lubinski, John <Joh n.Lubinski@nrc.gov>; Coyne, Kevin < Kevin .Coyne@ nrc.gov>; King, Michael <MichaeLKing2@n rc.gov> Cc: O'Brien, Kenneth <Kenneth .O'Brien@nrc.gov>

    Subject:

    LaSal le Unit 1 HPCS Valve lnitial Plctures For everyone's awareness, the lab that LaSalle sent the Unit 1 HPCS valve to just provided some prelim inary results. Specifically, the wedge pin had been previously sheared and degradation on the th reads near the pin was evident. 1 attached some of the initial pictures provided by the lab. 1 wanted to share and ensure everyone was informed prior to the PubHc Meeting tomorrow. It anyone has any questions, please Iet me know. Tha nk You, Mark Jeffers Branch Chief I RIII DRS EB2 I x9798 From: O"Brien Kenneth To: Coyne. Kevio

    Subject:

    Re: Slides for QSAM on AD valves Date: Thursday, June 29, 2017 7:14:10 PM Kevin May I suggest you put the NRC actions in chronology Jogical order. I tbink it se.nds a clearer message and indication of our measured but expanding efforts. Thanks Ken Kenneth G. O'B1ien, Director Division of Reactor Safety Region Til Kenneth.0Brien@NRC.Gov 630-829-9700 On: 29 June 2017 17:50, "Coyne, Kevin" <Kevin.Coyne@nrc.gov> wrote: Brian - Thanks very much for the quick review and comments - 1made a few changes to the slides: * Slide 5 - added a little more context to capture the "how many valves, in how many applications" but also note that we don't have complete information on this yet. Also added a few sub-bullets that the diagnostics recommended by the BWROG cannot reliably detect wedge pin breakage and MOV traces are tough to interpret. * Split up Slide 8 on current status to add a couple of pictures from the Unit 1 HPCS valve failure evaluation. * Will speak to what we learned at the public meeting today Kevin From: Hollan, Brian Sent: Thursday, June 29, 2017 6:54 AM To: Coyne, Kevin <Kevin.Coyne@nrc.gov>; McDermott, Brian <Brian.McDermott@nrc.gov> Cc: Lubinski, John <John.Lubinski@nrc.gov>; Evans, Michele <Michele.Evans@nrc.gov>; O' Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>

    Subject:

    RE: Slides for QSAM on AD valves Great slides. This will be the highlight of the 4 items we will be hearing about. 1am in Jul 5 thru 7th at noon. So look forward to this presentation. Add a slide on latest valve Add or talk to Thurs public meeting thoughts Only skimmed the slides, but wasn't sure I saw "how many valves, in how many applications" are out there. Also - the difficulty we have in "recognizing this condition" without getting into the valve (e.g. that diagnostics and traces may not teli the story) Just my thoughts thx From: Coyne, Kevin Sent: Wednesday, June 28, 2017 8:04 PM To: McDermott, Brian <Brian,McDermott@nrc.gov>; Holian, Brian <Briao.Hoiiao@nrc.gov> Cc: Lubi nski, John <John.Lubinski@nrc.gov>; Evans, M ichele <M ichele.Evans@nrc.gov>; O'Brien, Ken neth <Kenneth .O'Brien@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>

    Subject:

    RE: Slides for QSAM on AD valves Brian M & Brian H - Here's the current draft presentation for the safety spotlight on anchor darling va lves for the quarterly strategic meeting next week. Also attached the meeting agenda June Cai had sent a few weeks ago. Kevin From: McDermott, Brian Sent: Wednesday, June 28, 2017 9:04 AM To: Coyne, Kevin <Keyin.Coyne@orc.iNv> Cc: Lubi nski, John <John.Lubinski@nrc.gov>

    Subject:

    Slides for QSAM on AD valves Brian H would like to see the slides in advance of the meeting. He and I are both out next week. When do you think you will have a draft available? From: O"Dwyer Gerard To: Rodriguez. uooel Cc: iones, Michael; Petrella. Vance: effers, Mark; Robbins, iohn subject: stem collar Date: Thu rsday, June 29, 2017 7 :01 :06 PM Hi Lio, 1think it should be cleared up whether the collar on the stem is shrunk fit or press fit since 1 remember shrunk flt but it was also asserted to be a pressfit. 1wasn 't on the conference call today so I don't know if it was called a press fit on the conference call today. Could you please confirm for me what kind a fit it is. Unfortunately, 1will not be in on Friday so I have to send this email. 1think it is shrunk fit because I thought I remembered seeing shrunkfit in the MPR report and so I checked the MPR report, and it says it's a shrunk fit in many places, e.g., section 1.2.1., Valve Description, states: "For this configuration, the stem collar had been shrunk fit onto the stem. And "Bearing of the shrunk fit stem collar against the upper wedge maintains pre-load in the threaded connection". Also the MPR report, states in section 6.0 Engineering Evaluations: "The valve design includes a shrunk fit stem collar. Also the Conclusions on page 66 state: "all the rudai closing forces were directly applied to the shrunk fit collar. Please Iet me know it you confirm if it is a shrunk fit. : Thanks, Gerry. From: Rodrieuez Uonel To: Benjamin amie; Phillips Charles; Farnan Michael* Dunlop, Andrew Cc: Robblns iohn- lones MkhaeJ* O"Dwyer Gera,g

    Subject:

    RE: 1E22F004 Stem pics - stem lip above collar Date : Friday, J une 30, 2017 9:58:01 AM Attachments: imaeeoo1 one VJ HPCS Valye Dlsasssembly Stem Collar Slto ootx Hello Again, Lionel R. From: Benjam in, Jamie Sent: Friday, June 30, 2017 8:55 AM To: Phillips, Char les <Charles.Phillips@nrc.gov>; Farnan, M ichael <Michael.Farnan@nrc.gov>; Rodriguez, Lienei <Lionel.Rodriguez@nrc.gov>; Dunlop, And rew <Andrew.Dunlop @nrc.gov>

    Subject:

    RE: 1E22F004 Stem pics - stem lip above collar l(b){S) Deliberab,e Pri-rege From: Phillips, Charles Sent: Friday, June 30, 2017 8:39 AM To: Benjam in, Jamie <Jamie Benamin@nrc gov>; Farnan, M ichael <Michael f-arnan@nrc.gov>; Rodriguez, Lienei <lionel Rodriguez@nrc gov>; Dun lop, And rew <Andrew Dunlop@nrc gov>; Kazak, Laura <Laura Kozak@nrc gov>; Corujo-Sandin, Jorge <Jorge Coru jo-Sandjn@orc gov> Cc: Stoedter, Ka rla <Kacla,Stoedter@nrc gov>; Jeffers, Mar k <Mark.Jeffers@nrc goV>; Woj ewoda, Jacquelyn <Jacquelyn.Woiewoda@nrc.gov>; Ruiz, Robert <Robert.Rujz@nrc.gov>

    Subject:

    RE: 1E22F004 Stem pics - stem lip above collar l(b)(5) Deliberative Privilege From: Benjamin, Jamie Sent: Friday, June 30, 2017 8:17 AM To: Phillips, Charles <Charles.Phillips@nrc.gov>; Farnan, Michael <Michael Farnan@nrc.gov>; Rod riguez, Lienei <jonel Rodriguez@nrc goy>; Dunlop, And rew <Andrew Dunlop@nrc gov>; Kozak, Laura <Laura Koza@nrc gov>; Corujo-Sandin, Jorge <Jorge Coru jo-Sandjn@nrc gov> Cc: Stoedter, Karla <Karla Stoedter@nrc goy>; Jeffers, Mark ; Woj ewoda, Jacquelyn <Jacouelyn,WOlewoda@nrc.gov>; Ruiz, Robert <Robert.Ruiz@nrc.gov>

    Subject:

    RE: 1E22F004 Stem pics - stem lip above co llar l{b){S) Deliberab,e Pri*t,ge From: Phillips, Charl es Sent: Friday, June 30, 2017 7 :33 AM To: Farnan, M ichael <Michael.Farnan@nrc.gov>; Benjamin, Jamie <Jam1e.Benjamin@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Dunlop, Andrew <And i ew.Dunlop@nrc.gov>; Kazak, Laura <Laura.Kozak@nrc.gov>; Corujo-Sandin, Jorge <Jorge.Coruio-Sandin@nrc gov> Cc: Stoedter, Karla <Karla Stoedter@nrr. goy>; Jeffers, Mark <Mark.leffers@nrc gov>; Wojewoda, Jacquelyn <Jacqueyn.Wojewoda@nrc gov>; Ruiz, Robert <Robert Rujz@nrc gov>

    Subject:

    RE: 1E22F004 Stem pics - stem lip above collar Vou can see the lip Just above the collar in the picture below. This may be a dlfferent design? Maybe from when they changed it out in 1987? .. l(b_J_ <5_) _ o e_,_ ib_er_a_ ti v_e_P_n_v,_,e_g_ e- - - - - - - - - - - - ' ln the second pie down thal is the collar looking at the top. There is no lip on It. (b)(4) From: Farnan, Michael Sent : Friday, June 30, 2017 6:57 AM To: Benjamin, Jamie <Jamie.Benjamin@nrc.gav>; Rodriguez, Lionel <Lianel.Rodriguez@nrc.gov>; Phillips, Charles <Charles.Ph illips@ nrc.gav>; Dunlap, An drew <Andrew.Dunlop@n rc.gav>; Kazak, Laura <Laura .Kazak@nrc.gav>; Carujo-Sandin, Jarge <Jorge.Coru jo-S;mdin@nrcrwv>

    Subject:

    RE: 1E22F004 Stem pics Thanks Jamie, 1agree w it h the lip abservation. That wauld be a goad question for Flawserve. ls the collar installed below or above the Jip? Or was the lip made when remaving the collar? M lchael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Commission 301-415-1486 From: Benjamin, Jamie Sent: Thursday, June 29, 2017 10:53 PM To: Farnan, M ichael <Mjchael Farnan@nrc gov>; Rodriguez, Lionel <jonel Rodrjguez@nrc gov>; Phillips, Charles <Char!es Pbil[jps@nrc gov>; Dunlap, An drew <Andrew Dunlop@nrc.gov>; Kazak, Laura <Laura.Kozak@nrc gov>; Corujo-Sandin, Jarge <Jarge.Caruja-Sandin@nrc.gav>

    Subject:

    RE: 1E22 F004 Stem pics 1 don't remember the 2E22-F004 having that lip were the collar would go. 1 guess they cut the collar off the get the stem separated from the wedge. From: Benjamin, Jamie Sent: Thursday, June 29, 2017 9:45 PM To: Farnan, M ichael <Michael.Farnan@nrc.gov>; Radriguez, Lianel <Ljonel.Rodriguez.@nrc.gov>; Phillips, Charles <Charles.Phillips@ nrc.gav>; Dunlap, Andrew <And rew.Dunlop@nrc.av>; Kazak, Laura <Laura.Kozak@nrc.gov>; Corujo-Sandin, Jorge <Jorge.Corujo-Sandin@nrc.gov> Cc: Jeffe rs, Mark ; Stoedter, Ka rla <Karla Stoedter@nrc gov> Subject : FW: 1E22F004 Stem pics Outstanding work to you guys. There was no way to predict how good or bad 1t was going to be. 1am comfortable with the recommendation we made to m~aq~ment ad won ld stjl stad bv jt es~ecially after seejq thes; pictures. Although it took time,l{b)(5) Deli~erati~ Privilege , ,. _ _it is my opinion we added significant vatue to sa ety. am going to mctude these p1ctures n our report. We should think about sharing these pictures with the Regional staff. Maybe a post 0815? From: Phillips, Charl es Sent: Thursday, June 29, 2017 3:13 PM To: Benjamin, Jamie <Jamie.Benjamin@nrc.gav>; Stoedter, Karla <Ka rla.Stoedter@nrc.gav>; Jeffers, Mark <M ark.Jeffers@ nrc.gov>; Dunlap, An drew <Andrew.Dunlop@nrqav>; Rodriguez, Lionel <Lianel.Radritiuez@nrc.gov> Cc: Corujo-Sandin, Jorge <Jorge.Corujo-Sandm@nrc eov>; Wojewoda, Jacquelyn <Jacquelyn.Wojewoda@nrc.gov>

    Subject:

    1E22F004 Stem pics 1 added stem pictures to M :/LaSalle U1 HPCS Valve Video/ U1 HPCS 1 E22-F004 Valve Disassembly Look for Stem at O deg.jpg, etc. From: Bodrguez l ionef To: B;enjamin lamie* Phili05 Cbules * Eaman Michael* Pun'nn Aodrew Cc: nnes- Mtchae;I* Ro.bb*n,; ghn * WDwyer gra rd

    Subject:

    RE: 1E22f004 Stem p,cs * stem llp above collar Date: Frlday, June 30, 20 17 9:51 :04 AM Attachments: 1mageQOJ ong UJ HPCS Yalve Pisas(.semblY Stem CoUac S1il2JU11l QS(FOQZO jpg 1mageQ04.pg mage008 one Hello Team, Michael, John, Gerry, and I reviewed the pictures yesterday and came up with the following theory: (b)(5) Deliberative Pri vilege COLLAR IS SHRUNK FIT ON STEM BEFORE FINAL MACHINING BASIC STEM DIAMETER BASIC STEM DIAMETER ..____,CCLLA R 1 1 't 1 ' 1 1 1' - UNIFIED STEM- 1 WEDGE THREADS COLLAR DIAMETER MACHINI rnR MACHININ<i TljRCAD~ IHREAOS ANO COLLAI\ BEfOnE tNSrALUIIIC F INAL MACt11NINC COLLAI\ (b)(4) (b)(5) Deliberative Privilege At some point, when we get the analysis from the licensee, we should get together and compare notes to ma~e sure we agree witl1 their conclusions. Lionel Rodriguez NRC/Rlll/DRS/EB2 630-829-9609 From: Benamn. Jamie Sent: Frid ay, June 30, 2017 8:55 AM To: Phillips, Cha rles <Charles.Phillips@nrc.gov>; farnan, Micha el <Michael.Farnan@nrc.gov>; Rodriguez, lionel <Lionel.Rodriguez@nrc.gov>; Dunlop, Andrew <Andrew.Dunlop@nrc.gov>

    Subject:

    RE: 1E22F004 Stem pics - stem lip above collar l(b)(5) Deliberative Privilege From: Philllps, Charles Sent: Friday, June 30, 2017 8:39 AM To: Benjamin, Jamie <Jamje Beniamjn@nrc gov>; Farnan, Michael <Michael (drnan@nrr gqy>: Rod riguez, Lionet <Uonel Rodrjguez@nrc go11>: Du nlop, Andrew <Andrew.Dunop@nrc.gov>; Kozak, Laura <Laura.Kozak@nrc.gov>; Corujo-Sandin, Jorge <.loq;e. Coruio-Sandin@nrc.gov> Cc: Stoedter, Karla <Karla.Stoeate.r@ nrc.gov>; Jeffers, Mark <M~rk.Jeffers@nrc.gov>; Wo)ewoda, Jaequelyn <.Jacauelyn. Wmewoda@nrc.gov>; Ruiz, Robert <Robert R11iz@or" goy>

    Subject:

    RE: 1E22F004 Stem pics - stem lip above collar l(b)(5) Deliberative Privilege From: Benjarnin, Jamie Sent: Frid ay, June 30, 2017 8:17 AM To: Phillips, Charles <Charles.Phillips@nrr. gov>; Farnan, Michael <Michael.Farnan@nrc.gov>; Rodriguez, Lionel <Lionel.Rodngue2@nrc.gov>; Dun lop, Andrew <Andrew Dunop@nrq~ov>; Kozak, Laura <l aura K02ak@nrc sov>; Corujo-Sandin, Jorge <lorge ConJ10-~and1n@nrqov> Cc: Stoedter, Karla <Karfa S1oedter@orc gov>; Jeffers, Mark ; Wojewoda, Jacquelyn <Jacouelvo Woiewoda@occ sov>; Ruiz, Robert <Robert Ruiz@nrc riov>

    Subject:

    RE: 1E22F004 Stem pics - stem lip above collar From: Phillips, Charles Sent: Friday, June 30, 2017 7:33 AM To: Farnan, Michael <M,chael.Farnan@nrc gov>; Benjamin, Jamie < lamie.Bernaminr>nrc.,gov>; Rodriguez, Lionel <Liooel Rodrlguez@nrc.gov>; Dunlop, Andrew <Andrew Dunioo@nrc eov>; Kozak, Laura <Lawa Kozak@nrc eov>; Corujo-sandin, Jorge <JQre Coruio-sandin@nrc ~oy> Cc: Stoed ter, Karla <Karla.Stoedter@nrc gov>; Jeffers, Mark ; Wojewoda, Jacquelyn <lacaueiyn Wojewoda@nrc.gov>; Ruiz, Robert <Bobect.Ruiz@ nrc.gov>

    Subject:

    RE: 1E22f 004 Stem p1cs -stem lip above collar l(b)(SJDeliberali,e P,_1,ge (b)(4) (b)(4) From: Farnan, Michael Sent: Friday, June 30, 2017 6:57 AM To: Benjamin, Jamie <Jamie.Beniamm@nr:.gov>; Rodriguez, Lionel <l 1onel.Rodriguez@nr.gov>; Phillips, Charles <Charles.Phillms@nrc.gov>; Dun lop, Andrew <Andr"'w Dunlop@nrc.gov>; Kozak, Laura <Laura K02ak@nrc gov>; Corujo-Sandin, Jorge <Jorge Coru,o-Sandin@nrc oov>

    Subject:

    RE: 1E22F004 Stem pics ThanksJamie b 5 Deliberative Privilege (b)(5) Deliberati ve Privilege Michael F. Farnan Mechanical Engineer U.S. Nudear Regu latory Commission 301-415-1486 From: Benjamin, Jamie Sent: Thursday, June 29, 2017 10:53 PM To: Farnan, Michael <M,chael.Farnan@nrc gov>; Rodriguez, Lionel <Uonel Rodciewez@nrc gov>; Ph illips, Charles <Charles Pbillips@orc go11>; Dunlop, Andrew <Andrew Dunlop@nrc eov>; Kozak, Laura <Laura Kozak@occ ~ov>; Corujo-Sandin, Jorge <J orge Coru,o-saadm@nrc cov>

    Subject:

    RE: 1E22f004 Stem pics l (b)(5) Deliberative Privilege From: Benjamin, Jamie Sent: Thursday, June 29, 2017 9:45 PM To: Farnan, Michael <M,chael.Farnan@nrc gov>; Rodriguez, Lionel <J1onel Rodrrguez@nrc gov>; Ph illips, Charles <Charles Phillms@nrc gov>; Dunlop, Andrew <Andrew Quoloo@orc gov>; Kozak, Laura <l aura Kozak@nrc gov>; Corujo-Sandin, Jorge <lorgc, Conuo-Sandm@occ eov> Cc: Jeffers, Mark ; Stoedter, Karla <Karla Stoedter@nrc eov>

    Subject:

    FW: 1E22F004 Stem pcs (b)(5) Deliberative Privilege From: Phillips, Cha rles Sent: Thursday, June 29, 2017 3:13 PM To: Benjamin, Jamie <Jam ie.Beniamm(>nrc gov>; Stoedter, Karla <Karla Stoedier@nrc.gov>; Jeffers, Mark ; Dunlop, Andrew <Andrew Dunlon@nrc.gov>; Rodriguez, lionel <L1Qne1Rodnguez@nrc.gov> Cc: Corujo-Sandin, Jorge <Jorse con,io-Sandin@occ eov>; Wojewoda, Jacquelyn <Jacquelvu Woiewoda@orc eov> Subect: 1E22F004 Stem pics 1 added stem pictures to M:/LaSalle U1 HPCS Valve Video/Ui HPCS 1E-22*F004 Valve Disassembly Look for Stem at O deg.jpg, etc. From: Benamn ame To: Stoedter Karla: Phillips Charles* Farnan Michael* Rodriguez. Lionel: Duolop Andrew* Kozak Laura * Corujo-Sandin. jorge Cc: lefu:rs Mark: woewoda 1 acgyeyn- Bviz Robert

    Subject:

    RE: 1E22F004 Stem pics - stem llp above collar Date : Friday, June 30, 2017 8:42 :40 AM Attachments: imageoo1 P"B No, its part of the official agencuecord. IMC 0620. From: Stoedter, Ka rla Sent: Friday, June 30, 2017 8:28 AM To: Phillips, Charles <Charles.Phillips@nrc.gov>; Farnan, M ichael <Michael.Farnan@nrc.gov>; Benjamin, Jamie <Jamie.Benj amin@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Dunlop, Andrew <Andrew.Dunlop@ nrc.gov>; Kozak, Laura <Laura.Kozak@nrc.gov>; Corujo-Sandin, Jorge <Jorge.Corujo -Sandin@nrc.gov> Cc: Jeffers, Mark <Mark.Jeffe rs@nrc.gov>; Woj ewoda, Jacquelyn <Jacqu elyn.Woj ewoda@nrc.gov>; Ruiz, Robert <Robert.Ruiz@nrc.gov>

    Subject:

    RE: 1E22F004 Stem pics - stem lip above collar 1 don't think these pictures belong to us so we should get permission to put them ln a public document prior to including them in the report. Karla Stoedter, Chief Region 111 Division of Reactor Projects - Branch 1 630-829-9731 (office) From: Phillips, Charles Sent: Friday, June 30, 2017 7:33 AM To: Farnan, M ichael <Mlchael farnan@nrc.gov>; Benj amin, Jamie <Jam,e.Benjamio@nrc.gov>; Rodriguez, Lionel <Lionel Rodrieuez@nrc goy>; Dun lop, An drew <Andrew Dunlop@nrc goy>; Kozak, Laura <Laura Kozak@nrc gov>; Corujo-Sandin, Jorge <Jorge Corujo-Sandjn@nrc gov> Cc: Stoedter, Karla <Karla Stoedter@nrc goy>; Jeffers, Mark ; Woj ewoda, Jacquelyn <Jacquelyn.Woiewoda@nrc gov>; Ruiz, Robert <Rober t.Rui z@nrqov> Subje.ct: RE: 1E22F004 Stem pics - stem lip above collar ln the second pie down that is the collar looking at the top. There is no lip on it. (b)(4) From: Farnan, Michael Sent: Friday, June 30, 2017 6:57 AM To: Benjamin, Jamie <Jamie Benjamin@nrc PY>; Rodriguez, Lionel <Lionel.Rodriuez@orc gov>; Phillips, Charles <Charles.Phillios@nrc.gov>; Dunlop, Andrew <Andrew.Duniop@nrc gov>; Kozak, Laura <Laura Kozak@nrc.gov>; Corujo-Sandin, Jorge <Jorge.Corujo-Sandio@nrc.gov>

    Subject:

    RE: 1E22F004 Stem pics Thanks Jamie, 1agree with the lip observation. That would be a good question for Flowserve. ls the collar installed below or above the lip? Or was the lip made when removing the collar? Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Commlssion 301-415-1486 From: Benjamin, Jamie Sent: Thursday, June 29, 2017 10:53 PM To: Farnan, Michael <Michael.Farnan@nrc gov>; Rodriguez, Lienei <lionel.Rodriguez@nrc gov>; Phillips, Charles <Charles.Phillips@nrc.gov>; Dunlop, Andrew <Andrew.Dunl<Ju@nrc.gov>; Kozak, Laura <Laura.Kozak@nrc.gov>; Corujo-Sandin, Jorge <Jorge Coruio-Sandin@nrc gov>

    Subject:

    RE: 1E22F004 Stem pics 1don't remember the 2E22-F004 having that lip were the collar would go. 1guess they cut the collar off the get the stem separated from the wedge. From: Benjamin, Jamie Sent: Thursday, June 29, 2017 9:45 PM To: Farnan, Michael <Michael.Farnan@nrc goy>; Rodriguez, Lionel <lionel Rodriguez@ncc.gov>; Phillips, Charles <Charles Philfips@rc goy>; Dunlop, Andrew <Andrew Dulop@nrc gov>; Kozak, Laura <Laura Kozak@nrc gov>; Corujo* Sandin, Jorge <Jorge Coruio-Sandin@nrc gov> Cc: Jeffers, Mark ; Stoedter, Karla <Karla Stoedter@nrc.gov>

    Subject:

    FW; 1E22F004 Stem pics l(b)(SJ Deliberati,e Po,;1,,, Outstanding work to you guys. There was no way to predict how good or bad it was going to be. 1am comtortable with the recommendation we * 1 pictures. Although it took time (b)(5) Deliberative Privilege it is my opinion we added significant va ue osa e y. am go,ng o inc u e ese pie ures m our repo We should think about sharing these pictures with the Regional staff. Maybe a post 0815? From: Phillips, Charles Sent: Thursday, June 29, 2017 3:13 PM To: Benjamin, Jamie <Jamie.Benjamin@nrqov>; Stoedter, Karla <Karla.Stoedter@nrc gov>; Jeffers, Mark ; Dunlop, Andrew <Andrew Dunlop@nrc gov>; Rodriguez, Lionel <Lionel Rodriguez@nrc gov> Cc: Corujo-Sandin, Jorge <Jorge Corujo-Sandjn@nrc gov>; Wojewoda, Jacquelyn <Jacquelyn.Wojewoda@nrc gov>

    Subject:

    1E22F004 Stem pics 1 added stem pictures to M :/LaSalle U1 HPCS Valve Video/U1 HPCS 1 E22-F004 Valve Disassembly Look tor Stem at odeg.jpg, etc. From: PhiUips Charles To: Stoedter Karla

    Subject:

    FW: 1E22F004 Stem pics Date: Friday. J une 30, 2017 7:22:32 AM FYI From: Farnan, M ichael Sent: Friday, June 30, 2017 7:11 AM To: Benj amin, Jam ie <Jamie.Benjamin@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Phil li ps, Charles <Charles.Phill ips@nrc.gov>; Dun lop, Andrew <Andrew.Dun lop@nrc.gov>; Kozak, Laura <Laura .Kozak@ nrc.gov>; Corujo-Sa ndin, Jorge <Jorge.Corujo-Sandin@nrc.gov>

    Subject:

    RE: 1E22F004 Stem pics (b)(5) Deli berative Privilege Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Commission 301-415-1486 From: Benjamin, Jamie Sent: Thursday, June 29, 2017 10:53 PM To: Farnan, Michael <Mjchael. Farnan@n rq~ov>; Rodriguez, Lionel <Lionel. Rodriguez@nrc.gov>; Phil lips, Charles <Charles.Pbillips@nrc.gov>; Dunlop, Andrew <Andrew.Dunlop@nrc.gov>; Kozak, Laura <Laura.Koz.ak@nrc.gov>; Coruj o -Sa ndin, Jorge <Jorge.Corujo-Sandin@nrc.gov>

    Subject:

    RE: 1E22F004 Stem pics 1don't remember the 2E22-F004 having that lip were the collar would go. 1guess they cut the collar off the get the stem separated from the wedge. From: Benjamin, Jamie Sent: Thursday, June 29, 2017 9:45 PM To: Farnan, Michael <Michael.Farnan@nrc.gov>; Rodriguez, Lionel <Lionel. Rodriguez@nrc.gov>; Phil lips, Charles <Charles.Phi llips@nrc.gov>; Dunlop, Andrew <Andrew .Dunlop@nrc.gov>; Kozak, Laura <Laura .Kozak@nrc.gov>; Corujo-Sandin, Jorge <Jorge.Corujo-Sandin@nrc.gov> Cc: Jeffers, Ma rk <Mark.Jeffers@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc gov>

    Subject:

    FW: 1E22F004 St em p ics {b){5) Deliberative Privilege We should think about sharing these pictures with the Regional staff. Maybe apost 0815? From: Phillips, Charles Sent: Th ursday, June 29, 2017 3:13 PM To: Benjamin, Jamie <Jamie.Benjamin@nrc.gov>; Stoedter, Karla <Karla.St oedter@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Dunlop, Andrew <Andrew.Dunlop@nrc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov> Cc: Corujo-Sandin, Jorge <Jorge.Corujo-Sandin@nrc.gov>; Wojewoda, Jacquelyn <Jacquelyn .Wojewoda@nrc.gov>

    Subject:

    1E22F004 Stem pics 1 added stem pictures to M:/LaSalle U1 HPCS Valve Video/U1 HPCS 1E22-F004 Valve Disassembly Look for Stem at O deg.jpg, etc. From: Kozak Laura To: Hanna. lobo

    Subject:

    FW: Anchor Darling public meeting FOLLOW-UP Date: Friday. J une 30, 2017 7:46:36 AM Attachments: Preliminary Decision Documen t Post Meeting.docx From: Kazak, Laura Sent: Friday, June 30 2017 7:35 AM 1 To: Ng, Ching <Ching.Ng@nrc.gov>; Circle, Jeff <Jeff.Circle@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov> Cc: Jeffers, Mark <Mark.Jeffers@nrc.gov>; Lara, Julio <Julio.Lara@nrc.gov>; O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>

    Subject:

    FW: Anchor Darling public meeting FOLLOW-UP Jeff, Ching, Kevin (b)(5) Deliberative Privil ege 1do think the increased failure probability is an appropriate approach to apply generically to a population of valves that we don't really know if they are susceptible, etc. but not for valves where we actually know the condition. Thanks Laura From: Hickey, James Sent: Friday, June 30, 2017 7:13 AM To: Benney, Brian <Brian.Benney@nrc.gov>; Gavrilas, Mirela <Mirela.Gavrilas@nrc.gov>; Oesterle1 Eric <Eric.Oesterle@nrq~ov>; Helton, Shana <Shana.Helton@nrc.gov>; Alley, David <David.Al ley@nrc.gov>; Farnan, Michael <Michael.Farnan@nrc.gov>; Thompson, John <John .Thompson@nrc.gov>; Miller, Chris <Chris.Miller@nrc.gov>; King, Michael <Mjchael. King2@nrc.gov>; Weerakkody, Sunil <Sun il.Weerakkody@nrc.gov>; Giitter, Joseph <Joseph.Giitter@nrc.gov>; Bowen, Jeremy <Jeremy.Bowen@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>; O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Casto, Greg <Greg.Casto@nrc.gov>; Circle, Jeff <Jeff.Circle@nrc.gov>; Benjam in, Jamie <Jamie.Benjamin@nrc.gov>; Leech, Matthew <Matthew.Leech@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; Lara, Julio <Julio.Lara@nrc.gov>; McGinty, Tim <Tim .McGinty@nrc.gov>; Krohn, Paul <Paul.Krohn@nrc.gov>; Burke, John <John.Burke@nrc.gov>; Kavanagh, Kerri <Kerri.Kavanagh@nrc.gov>; Herrity, Thomas <Thomas.Herrity@n rc.gov>; Rodriguez, Lionel <Lionel.Rodriguez@nrc.gov>; Corujo-Sandin, Jorge <Jorge.Corujo-Sand in@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>; Kazak, Laura <Laura .Kozak@nrc.gov>; Ng, Ch ing <Ching.Ng@nrc.gov>; Miller, Ed <Ed.Miller@nrc.gov>; Wilkins, Lynnea <Lynnea.Wi lkins@nrc.gov>; Lubinski, John <John. Lubinski@nrc.gov>; Hsueh, Kevin <Kevjn.Hsueh@nrc.gov>; Stuchel l, Sheldon <Sheldon.Stuchell@nrc.gov>; Garmoe, Alex <Alex.Garmoe@nrc.gov>; Bowman, Gregory <Gregory.Bowman@nrc.gov>; Lund, Louise <Louise .Lund@nrc.gov>; Chernoff, Harold <Harold.Chernoff@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>; Gascot Lozada, Ramon <Ramon.GascotLozada@nrc.gov>; Purne ll, Blake <Blake.Purne ll@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>; Vaidya, Bhalchandra <Bha lchand ra.Vaidya@nrc.gov>; Wrona, David <David.Wrona@nrc.gov>; Wh itman, Jennifer <Jennifer,Whitman@nrc.gov>; Tilton, Caroline <Caroline.Ti!ton@nrc.gov>; Mclntyre, David <David .Mclntyre@nrc.gov>; Burnell, Scott <Scott.Burnell@nrc.gov>; Morey, Dennis <Dennis.Morey@nrc.gov>; Martinez, Nancy <Nancy.Martinez@nrc.gov>; Thomas, Eric <Eric.Thomas@nrc.gov>; Vegel, Anton <Anton.Vegel@nrc.gov>; Pruett, Troy <Troy.Pruett@nrc.gov>; Clark, Jeff <Jeff.Clark@nrc.gov>; Lantz, Ryan <Ryan .Lantz@nrc.gov>; Farnholtz, Thomas <Thomas.Farnholtz@nrc.gov>; Stott, Chad <Chad .St ott @nrc.gov>; Felts, Russell <Russell.Felts@nrc.gov>; DE_Calendar Resource <DE Ca lendar.Resource@nrc.gov>; Cullison, David <David.Cullison@nrc.gov>; Ruffin, Steve <Steve.Ruffio@nrc.gov>; NRR_ DIRS_CAL Resource <NRR=DIRS_CAL.Resource@nrc.gov>; Elliott, Robert <Robert.El liott@nrc.gov>

    Subject:

    RE: Anchor Darling public meeting FOLLOW-UP To all, here is a draft preliminary decision document for us to discuss at 9:00! Please bring a hard copy with you . Thx Jim
    Original Appointment----- From: Benney, Brian Sent: Monday, June 26, 2017 10:20 AM To: Benney, Brian; Gavri las, Mirela; Oesterle, Eric; Helton, Shana; Hickey, James; Al ley, David; Farnan, Michael; Thompson, John; Miller, Chris; King, Michael; Weerakkody, Suni l; Giitter, Joseph; Bowen, Jeremy; Jeffers, Mark; Stoedter, Karla; O'Brien, Kenneth; Casto, Greg; Circle, Jeff; Benjamin, Jamie; Leech, Matthew; Shuaibi, Mohammed; Lara, Julio; McGinty, Tim; Krohn, Pau l; Burke, John; Kavanagh, Kerri; Herrity, Thomas; Rodriguez, Lione l; Corujo-Sandin, Jorge; Louden, Patrick; Kazak, La ura; Ng, Ching; M iller, Ed; Wilkins, Lynnea; Lubinski, John; Hsueh, Kevin; Stuchel l, She ld on; Garmoe, Alex; Bowman, Gregory; Lund, Louise; Chernoff, Harald; Scarbrough, Thomas; Gascot Lozada, Ramon; Purnel l, Blake; Clark, Theresa; Coyne, Kevin; Vaidya, Bhalchandra; Wrona, David; Whitman, Jennifer; Tilton, Carotine; M clntyre, David; Burnell, Scott; Morey, Dennis; Martinez, Nancy; Thomas, Eric; Vegel, Anton; Pruett, Troy; Clark, Jeff; Lantz, Ryan; Farnholtz, Thomas; Stott, Chad; Fe lts, Russel l; DE_Calendar Resource; Cullison, David; Ruffin, Steve; NRR_DIRS_CAL Resource; Elliott, Robert

    Subject:

    Anchor Darling pub lic meeting FOLLOW-UP When : Friday, June 30, 2017 9:00 AM-10:00 AM (UTC-05:00} Eastern Time (US & Canada). Where: HQ~OWFN-12B04-25P This meeting is moving to earlier to support Michelle Evans and Brian McDermott request for earlier in the day. Following the Anchor Oarling public meeting with industry on Thursday, this meeting will be used to develop recommendations, if needed. These recommendations and any staff actions will be briefed Friday afternoon (1pm tentatively) to Michelle Evans. 8all in number 0 888-455-1 734 IParticipant passcode ...  !(b_)(G_>_ __. From: Burke l ohn To: Lublnski lohn: Farnan. Mjchael: Hjckey. 1ames: Benney Brlan; Gayrilas. Mjrela: Oesterle Eric: Helton Shana: Alley. Davld: Thompson. o hn : Miller. Chris; King MichaeJ; Weerakkody. Sunil; Giitter. oseph : Bowen. eremy: effers. Mark: Stoedter Karla: O"Brlen Kenneth; Casto G,eg: Clrcle. feff: Beniamin amie: Leech. Matthew: Shuaibi. Mohammed; Lara. IYlio: McGint,y. Jim: Krohn. Paul: Kavanagh. Kerri: Herrity. Thomas: Rodrjguez. wrw: corujo-Sandin. locge; Louden Patr;ck; Kozak. Laura; Ng. Chng; Miller Ed; Wilkjns L,ynnea; ~ Kevin; Stuchell Sheldon: Garmoe. Alex; Bowman. regory: Lund. Louise; Chernoff. Harald; Scarbrough, Thomas: Gascot Lozada. Ramon; Purn ell. Blake: Clark. Theresa; Coyne. Kevin; Vaidya. Bhalchandra; Wrona. David; Whitman. iennifer; Jilton. caro!ine; Mcintyre. Dayid: BurnelL Scott; Morey. Dennis; Martinez. Nancy: ~ fric: Yegel Anton: Pruett Troy: Clark leff: Lancz Ryan; farnholtz Thomas: Stott Chad: felts Russell; DE Calendar Resource: Cullison, David; Ruffn. Steve; NRR DIRS CAL Resource: Elliott, Robert

    Subject:

    RE: Anchor Darling public meeting FOLLOW-UP Date: Friday,June 30, 2017 7:39: 11 AM Yes, the Vendor lnspection branch will follow up with Flowserve. John Burke, Branch Chief NRO/OCIP/QV/8 2 301415 2343 From: Lubinski, John Sent: Friday, June 30, 2017 8:26 AM To: Farnan, Michael <Michael.Farnan@nrc.gov>; Hickey, James <James.Hickey@nrc.gov>; Benney, Brian <Brian.Benney@nrc.gov>; Gavrilas, Mirela <M irela.Gavrilas@nrc.gov>; Oesterle, Eric <Eric.Oesterle@nrc.gov>; Helton, Shana <Shana.Helton@nrc.gov>; Al ley, David <David .Alley@nrc.gov>; Thompson, John <John .Thompson@nrc.gov>; Miller, Ch ris <Chris.Mi ller@nrc.gov>; King, M ichael <M ichael.King2@nrc.gov>; Weerakkody, Sun il <Sunil.Weerakkody@nrc.gov>; Giitter, Joseph <Joseph.Giitter@nrc.gov>; Bowen, Jeremy <Jeremy.Bowen@nrc.gov>; Jeffers, Mark <Mark.Jeffe rs@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>; O'Brien, Kenneth <Kenneth.O'Brten@nrc.gov>; Casto, Greg <Greg.Casto@n rc.gov>; Circle, Jeff <Jeff.Circle@nrc.gov>; Benjamin, Jamie <Jamie.Benjamin@nrc.gov>; Leech, Matthew <Matthew.Leech@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; Lara, Ju lio <Ju lio.Lara@nrc.gov>; McGinty, Tim <Tim.McGinty@n rc.gov>; Krohn, Paul <Paul.Krohn@nrc.gov>; Burke, John <John.Burke@nrc.gov>; Kavanagh, Kerri <Kerri.Kavanagh@nrc.gov>; Herrity, Thomas <Thomas.Herrity@nrc.gov>; Rodriguez, Lione l <Lionel.Rodriguez@nrc.gov>; Corujo-Sandfn, Jorge <Jorge.Corujo-Sandin@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>; Kozak, Laura <Laura.Kozak@nrc.gov>; Ng, Ching <Ch ing.Ng@nrc.gov>; Miller, Ed <Ed.Mi ller@nrc.gov>; Wilkins, Lynnea <Lynnea.Wilkins@nrc.gov>; Hsueh, Kevin <Kevin.Hsueh@nrc.gov>; Stuchell, Sheldon <Sheldon.Stuchell@nrc.gov>; Garmoe, Alex <Alex.Garmoe@n rc.gov>; Bowman, Gregory <Gregory.Bowman@nrc.gov>; Lund, Louise <Louise.Lund@nrc.gov>; Chernoff, Harold <Harold.Chernoff@nrc.gov>; Scarbrough, Thomas <Thomas.Scarbrough@nrc.gov>; Gascot Lozada, Ramon <Ramon.GascotLozada@nrc.gov>; Purnell, Blake <Blake.Purnell@nrc.gov>; Clark, The resa <Theresa.Clark@n rc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>; Vaidya, Bhalchandra <Bhalchandra.Vaidya@nrc.gov>; Wrona, David <David.Wrona@nrc.gov>; Whitman, Jennifer <Jennifer.Whitman@nrc.gov>; Ti lton, Caroline <Caroline.Ti lton@nrc.gov>; Mclntyre, David <David .Mclntyre@nrc.gov>; Burnell, Scott <Scott.Burnell@nrc.gov>; Morey, Dennis <Dennis.Morey@nrc.gov>; Martinez, Nancy <Nancy.Martinez@nrc.gov>; Thomas, Eric <Eric.Thomas@n rc.gov>; Vegel, Anton <Anton.Vegel@n rc.gov>; Pruett, Troy <Troy.Pruett@nrc.gov>; Clark, Jeff <Jeff.Clark@nrc.gov>; Lantz, Ryan <Ryan.Lantz@nrc.gov>; Farnholtz, Thomas <Thomas.Farnholtz@nrc.gov>; Stott, Chad <Chad.Stott@nrc.gov>; Felts, Russe ll <Russell.Felts@nrc.gov>; DE_Calendar Resou rce <DE_Calendar.Resource@nrc.gov>; Cullison, David <David.Cullison@nrc.gov>; Ruffin, Steve <Steve.Ruffin@nrc.gov>; NRR_ DIRS_CAL Resource <NRR_DI RS_CAL.Resource@nrc.gov>; Elliott, Robert <Robert.Elliott@nrc.gov>

    Subject:

    RE: Anchor Darling public meeting FOLLOW-UP : Mike, Thanks for providing this information. John Burke - 1believe your branch has the lead for Part 21? lf so, can you please follow up on this information. Thanks From : Farnan, Michael Sent: Friday, June 30, 2017 8:23 AM To: Hickey, Ja mes <James.Hickey@nrc.gov>; Benney, Brian <Brian.Benney@nrc.gov>; Gavrilas, Mirela <Mirela.Gavrilas@nrc.gov>; Oesterle, Eric <Eric.Oesterle@nrc.gov>; Helton, Shana <Shana.Helton@nrc.gov>; Alley, David <David.Alley@nrc.gov>; Thompson, John <John.Thompson@nrc.gov>; Miller, Chris <Chris.Miller@nrc.gov>; King, M ichael <Mjchael.Kjng2@nrc.gov>; Weerakkody, Sunil <Sunil.Weerakkody@nrc.gov>; Giitter, Joseph <Joseph.Giitter@nrc.gov>; Bowen, Jeremy <Jeremy.Bowen@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>; O'Brien, Kenneth 1 <Kenneth .0 Brien@nrc.gov>; Casto, Greg <Greg.Casto@nrc.gov>; Circle, Jeff <Jeff.Circle@nrc.gov>; Benjamin, Jamie <Jamie. Benjam in@nrc.gov>; Leech, Matthew <Matthew.Leech@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibi@nrc.gov>; Lara, Julio <Julio.Lara@nrc.gov>; McGinty, Tim <Tim.McGinty@nrc.gov>; Krohn, Paul <Paul.Krohn@nrc.gov>; Burke, John <John .Burke@nrc.gov>; Kavanagh, Kerri <Ke rri.Kavanagh@nrc.gov>; Herrity, Thomas <Thomas.Herrity@nrc.gov>; Rodriguez, Lionel <LioneLRodriguez@nrc.gov>; Corujo-Sandin, Jorge <Jorge.Corujo-Sandin@nrc.gov>; Louden, Patrick <Patrick.Louden@nrc.gov>; Kozak, Laura <Lau ra .Kozak@nrc.gov>; Ng, Ching <Ching.Ng@nrc.gov>; M iller, Ed <Ed.Miller@nrc.gov>; Wilkins, Lynnea <Lynnea.Wilkins@nrc.gov>; Lubinski, John <John.Lubinski@nrc.gov>; Hsueh, Kevin <Kevin.Hsueh@nrc.gov>; Stuchell, Sheldon <Sheldon.Stuchell@nrc.gov>; Garmoe, Alex <Alex.Garmoe@nrc.gov>; Bowman, Gregory <Gregory.Bowman@nrc.gov>; Lund, Louise <Louise.Lund@nrc.gov>; Chernoff, Harold <Harold.Chernoff@nrc.gov>; Sca rbrough, Thomas <Thomas.Scarbrough@nrc.gov>; Gascot Lozada, Ramon <Ramon .GascotLozada@nrc.gov>; Purnel l, Blake <Blake.Purne ll@nrc.gov>; Clark, Theresa <Theresa .Clark@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>; Vaidya, Bhalchandra <Bh alchandra.Va idya@nrc.gov>; Wrona, David <David.Wrona@nrc.gov>; Whitman, Jennifer <Jennifer.Whitman@nrc.gov>; Tilton, Carol ine <Caroli ne.Tilton@nrc.gov>; Mclntyre, David <David.Mclntyre@nrc.gov>; Burnell, Scot t <Scott.Burnel l@nrc.gov>; Morey, Dennis <Dennis.Morey@nrc.gov>; Martinez, Nancy <Nancy.Martinez.@nrc. gov>; Thomas, Eric <Eric.Thomas@nrc. gov>; Vege l, Anton <Anton .Vege l@nrc.gov>; Pruett, Troy <Troy.Pru ett@nrc.gov>; Clark, Jeff <Jeff.Clark@nrc.gov>; Lantz, Ryan <Ryan .Lantz@nrc.gov>; Farnholtz, Thomas <Thomas.Farnholtz@nrc.gov>; Stott, Chad <Chad .Stott@n rc.gov>; Felts, Russel l <Russell.Felts@nrc.gov>; DE_Calendar Resource <DE Calenda r.Resource@nrc.gov>; Cul lison, David <David.Cullison@nrc.gov>; Ruffin, Steve <Steve.Ruffin@nrc.gov>; NRR_ DIRS_CAL Resource <NRR DIRS CAL.Resource@nrc.gov>; El liott, Robert <Robert.Elliott@nrc.gov>

    Subject:

    RE: Anchor Darling public meeting FOLLOW-UP Thanks Jim. (b)(5) Deliberative Privilege Michael F. Farnan Mechanical Engineer U.S. Nuclear Regulatory Commission 301-415 -1486 From: Hickey, James Sent: Friday, June 30, 2017 8:13 AM To: Benney, Brian <Brian .Benney@nrc.gov>; Gavrilas, Mirela <Mirela.Gavri las@n rc.gov>; Oesterle, Eric <Eric.Oesterle@nrqNv>; Helton, Shana <Shana.Helt on@nrqrnv>; Al ley, David <David .Al!ey@nrc.gov>; Farnan, Michael <Michael .Farnan@nrc.gov>; Thompson, John <John.Thompson@nrc.gov>; Miller, Chris <Chris.Miller@nrc.gov>; King, M ichael <Michael.King2@nrc.gov>; Weerakkody, Sunil <Sunil.Weerakkody@nrc.gov>; Giitter, Joseph <Joseph.Giitter@nrc.gov>; Bowen, Jeremy <Jeremy.Bowen@nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Stoedter, Karla <Karla.Stoedter@nrc.gov>; O'Brien, Kenneth <Kenneth.O'Brien@nrc.gov>; Casto, Greg <Greg.Casto@nrc.gov>; Circle, Jeff <Jeff.Circle@nrc.gov>; Benjamin, Jamie <Jamie.Benjamin@nrc.gov>; Leech, Matthew <Matthew.Leech@nrc.gov>; Shuaibi, Mohammed <Mohammed.Shuaibi@orc.gov>; Lara, Julio <Julio.Lara@nrc.gov>; McGinty, Tim <Tim.McGinty@nrc.gov>; Krohn, Paul <Paul.Krohn@nrc.gov>; Burke, John <John.Burke@nrc.gov>; Kavanagh, Kerri <Ke rri. Kava nagh@nrc.gov>; Herrity, Thomas ; Rod riguez, Lienei <Lionel.Rodriguez@nrq~ov>; Corujo-Sand in, Jorge <Jorge.Corujo-Sandin@nrc.gov>; Louden, Patrick <Patrick. Louden@nrc.gov>; Kazak, Laura <Laura.Kozak@nrc.gov>; Ng, Ching <Ching.Ng@nrc.gov>; Mill er, Ed <Ed.Miller@nrc.gov>; Wi lkins, Lynnea <Lynnea .Wilkins@nrc.gov>; Lubinski, John <John . Lubinsk@nrc.gov>; Hsueh, Kevin <Kevin.Hsueh@nrc.gov>; Stuchell, Sheldon <Sheldon.Stuchell@nrc.gov>; Garmoe, Alex <Alex.Garmoe@nrc.gov>; Bowman, Gregory <Gregory.Bowman@nrc.gov>; Lund, Louise <Louise.Lund@nrc.gov>; Chernoff, Harold <Harold.Chernoff@nrc.gov>; Scarbrough, Thomas <Thomas .Scarbrough@nrc.gov>; Gascot Lozada, Ramon <Ramon.GascotLozada@nrc.gov>; Purnell, Blake <Blake.Purnell@nrc.gov>; Clark, Theresa <Theresa.Clark@nrc.gov>; Coyne, Kevin <Kevin.Coyne@nrc.gov>; Vaidya, Bhalchandra <Bhalchandra.Vaidya@nrc.gov>; Wrona, David <David.Wrona@nrc.gov>; Whitman , Jennifer <Jennifer.Whitman@nrc.gov>; Tilton, Caroline <Caroljne.Jilton@nrc.gov>; Mclntyre, David <David.Mclntyre@nrc.gov>; Burnell, Scott <Scott.BurnelJ@orc.gov>; Morey, Dennis <Deoois.Morey@nrc.gov>; Martinez, Nancy <Nancy.Martinez@nrc.gov>; Thomas, Eric <Eric.Thomas@nrc.gov>; Vege l, Anton <Anton.Vege l@nrc.gov>; Pruett, Troy <Troy.Pruett@nrc.gov>; Clark, Jeff <Jeff.Clark@nrc.gov>; Lantz, Ryan <Ryan .Lantz@nrc.gov>; Farnholtz, Thomas <Thomas.Farnholtz@nrc.gov>; Stott, Chad <Chad .Stott@nrc.gov>; Felts, Russell <Russell.Felts@nrc.gov>; DE_Ca len dar Resource <DE Calenda r.Resource@nrc.gov>; Cullison, David <David.Cullison@nrc.gov>; Ruffin, Steve <Steve.Ruffin@nrc.gov>; NRR_DIRS_CAL Resource <NRR DIRS CAL.Resource@nrc.gov>; Elliott, Robert <Robert.Elliott@nrc.gov>

    Subject:

    RE: Anchor Darling public meeting FOLLOW-UP << Fi le: Prelimina ry Decision Document Post Meeting.docx >> To a ll, here is a draft preliminary decision document for us to discuss at 9:00! Please bring a hard copy with you . Thx Jim
    Original Appointment----- From: Benney, Brian Sent: Monday, June 26, 2017 10:20 AM To: Benney, Brian; Gavri las, Mirela; Oesterle, Eric; Helton, Shana; Hickey, James; Alley, David; Farnan, Michael; Thompson, John; Miller, Chris; King, Michael; Weerakkody, Sunil; Giitter, Joseph; Bowen, Jeremy; Jeffers, Mark; Stoedter, Karla; O'Brien, Kenneth; Casto, Greg; Circle, Jeff; Benjamin, Jamie; Leech, Matthew; Shuaibi, Mohammed; Lara, Ju lio; McGinty, Ti m; Krohn, Pau l; Burke, John; Kavanagh, Kerri; Herrity, Thomas; Rodriguez, Uonel; Corujo-Sandin, Jorge; Louden, Patrick; Kozak, Laura; Ng, Ching; Miller, Ed; Wilkins, Lynnea; Lubinski, John; Hsueh, Kevin; Stuchell, Sheldon; Garmoe, Alex; Bowman, Gregory; Lund, Louise; Chernoff, Harold; Scarbrough, Thomas; Gascot Lozada, Ramon; Purnell, Blake; Clark, Theresa; Coyne, Kevin; Vaidya, Bhalchan dra; Wrona, David; Wh itman, Jennifer; Ti lton, Carol ine; Mclntyre, David; Burnell, Scott; Morey, Denn is; Martinez, Nancy; Thomas, Eric; Vegel, Anton; Pruett, Troy; Clark, Jeff; Lantz, Ryan; Farnholtz, Thomas; Stott, Chad; Felts, Russell; DE_Calendar Resource; Cu llison, DavTd; Ruffin, St eve; NRR_DIRS_CAL Resou rce; Elliot t, Robert

    Subject:

    Anchor Darling publ ic meeting FO LLOW-UP When : Friday, June 30, 2017 9:00 AM-10 :00 AM (UTC-05:00) East ern Time (US & Canada). Where: HQ-OWFN-12B04-25 P This meeting is movi ng to earlier to support Michelle Evans and Brian McDermott request for earlier in the day. Following the Anchor Darling public meeting with industry on Thursday, th is meeting will be used to develop recommendations, if needed. These recommendations and any staff actions will be briefed Friday afternoon (1pm tentatively) to Michelle Evans. Call in number: ,8 88-455-1734 'Participant passcode:!(b_ .... Jc6_l _ ___. From: Stone AnnMarie To: Al.J......Bl

    Subject:

    Daily Morning Meeting News J une 30 2017.docx Date: Friday, J une 30, 2017 3:46:41 PM Attachment s: Daily Morning Meeting News une 30 2017.docx The Daily Morning Meeting News for Friday June 30. 2017 Regional Duty Officer: Eric Duncan Teleconference Number: ( 800) 779-9565 ; Passcode:!C b)(6) Note: TI iis 11eooslcttm II my co11ta11, 151 c elcei@itH'l81 i121te. 88 lil@f @i etFiee1te ewtsiele t'"1@ ~lf4C Behaviors That Matter - Organizational Value of the Week is RESPECT - We treat everyone professionally and with respect. We promote diversity and recognize the importance of everyone's contributions. Support lssues: RA: Today is Darrell's last day in the office for several months as he begins his rotation. Happy 4th of July, Labor Day, Columbus Day .. ... Jim Trapp arrives on July 1oth to backfill for Darrell. Also, on a more serious note, An NAG Headquarters employee was recently subjected to a "virtual kidnapping" scam, in which the employee received a call from the perpetrator claiming to have kidnapped a family member. Staff should be aware NRC has resources to helo if th is happens at work-contact the Centra! Alarm Station at 301-415-2000~ See some tips from the FBI oorn. DRP: DRS: Callout test last Wednesday. Reminder to listen to the entire message before hanging up. Thanks for participating! DNMS: DRMA: EICS: STATES: Thanks to Luke Haeg and Paul Zurawski who supported the Government to Government meeting yesterday. Reactor Outages, General Electric issues, Cyber security, and Yucca Mountain were some topies of interest PAO: Materials Events/lssues: Reactor Events: Part 21 : Plant Status BRANCH 1 - Clinton: Duane Arnold: Quad Cities: Unit 1: Unit 2: LaSalle: Unit 1: Internais shipped to vendor for laboratory analysis - found wedge pin sheared and threads damages. Pubfic meeting was held yesterday. lndustry working together to prioritize repair/replacement of valves across the oountry. Valves with high safety importance will receive a higher priority. Also, Beaver Valley notified the Project Manager that they have valves which were not included in the Part 21 report. NRR is looking into this. Unit 2: BRANCH 2 Fermi: DC Cook: Ambulence on site for idividual with chest pains. No contamination found . Unit 1: Unit 2: Prairie lsland: Unit 1: Unit 2: Monticello: BRANCH 3 Byron: Unit 1: Unit 2: Braidwood: Unit 1: Unit 2: Palisades: BRANCH 4 Point Beach: Unit 1: Unit 2: Davis Besse: (b)(5) Deliberative Privilege Perry: Dresden: 95001 completed . No addititional issues were identified. Unit 2: Unit 3: NRR: Additional Support lssues - Other lssues - Personnel News - None. Daily Notes/Preliminary Notification - None. One Week Look Ahead - None. From: Roberts Darrell To: Pederson Cynthla

    Subject:

    Items Date: Friday, J une 30, 2017 6:32:00 PM Attachments: DRA Turnov~Lf_oi:_TraP.p.d_ocx. * Oavis-Besse spent fuel building craoe issue affecting 1SFSJ loading carnpaign, DB is launching its first loacling campaign since 1996 and has single-fai lure proofed the crane in support of this campaign, hut calcs didn't incorporate. proper load distribution across clasps on crane rail , which couJd lead to fai lure and beavy load clrop into SFP. DNMS i.nspectors have been in cootact w/ licensee managemeot who agree it needs to he addressed .. . however, we initially were not on same page as to wbat solution is (licensee believes reaoalysis supports cask transfer and loading activities). Licensee could be moving fueJ this wknd. Next step was for DNMS mgmt. to engage Site VP to elevate our concems. See Christine's email for insights. They will keep us (and NMSS) i.nfom1ed. * AnchodDarli.tH! DDGV >eneric issue: Public meeti_ng esterdav with iudustrv. (b)(5) Deliberative Privilege Thisw, L.1-s-cL-1s""s_e_ a.....,,..e....,...e...,..o_e_s.,.a_y_,.......,....,...,,.~ff"'!i-e-a ~,-n-g-:t""1-at:-""p_a_r":"t-o'fl":th 'l-e- d"'!'i,...s-cu-s-s""io-n-:)-. - - - - - - - - - - ' * r concurred on the draft Design Verification Engioeering Charter. * DRP is concerned about one of its employees (sensitive issue); give me a call when you can to discuss. * T turned over with Jirn Trapp (see attached). DRA Turnover Vour Regular Meetings (Carmen will populate your calendar}: 1. 2. 3. 4, s. Non- Responsive Record 6. 7. 8. 9. 1C 1 13 14 15 16 17 18 19 Non-Responswe Record 20 21 22 23 24 25 26 27 28 29 30 2 Region-Wide ltems: FY1 8 Staffing Plan: 1, 2. Non-Responsive Record 3. 4. 5. 6. Other ~ laior Activitii::.~: 1 2. 3. Non-Responsive Record 4. 3 Jaoanese Exchanae - Part 2: Non-Responstve Record Enaaaement: 1. 2. 3. Non-Responsive Record 4. 5. 6. 7. lnnovatton/Creativity: 1. Non-Responsi ve Record 2. 3. 4 ORA: Major Differences between R I & R3: 1. Non-Responsive Record 2. Jared Heck (Reg ional Council/Team Lead) : 1. 2. 3. : 4. Non-Responsive Record 5. PAOs: : 1. ----------------------------------- 2. Non-Responsive Record 3. 4. 5 EICS: - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - . 1. : 2. Non-Responsive Record 3. 4. 5. 6. DRP: 1 * INoa-RespoasN, Recoro : 2. LaSalle HPCS valve issue and followup (DRS lead) 3. 4. 5. 6. Non-Responsive Record 7. 8. 9. DRS: : 1. Anchor-Darling double-disc gate valve generic issue. Now that LaSalle Unit 1 HPCS 1ssue is resolved, RIII and NRR are looking at next steps (including potentially issuing an NRC Bulletin) to drive industry actions to gather info about AD valves across fleet. lndustry is already embarking on a voluntary initiative, but we may need agency finaerorint. 2. Non-Responsive Record 3. 6 DNMS: : 1. ---------------------------------------. 2. Non-Responsive Record 3. DRMA: 1. 2. Non-Responsive Record 3. 4. 5. NTEU=- - - - - - - - - - - - - - - - - - - - - - - - - - - 1_ 2. Non-Responsive RecoFd 7 3. Non-Responsrve Record 4. SES: 1 * 1No"'1espoosl,e R,coro DRA: 1. 2. 3. : 4. Non-Responsive Record 5. 6. 8 From: O"Brien Kenneth To: pruett Jroy; Yegel Anton; Munday loel; Gody Tony; scot. Michael: Lorson Raymond; Clark leff; Lantz Ryan; Miller. Mark; Franke. Mark; Yerokun Hmi; PeJton. Davtd

    Subject:

    Quarterly Strategic Alignment meeting Date: Friday, June 30, 2017 12:58:30 PM Attachments: Safety Spotlight - AD DDGV u ly 5 2017 Rev 3 une 30 2017.pptx Gentlemen Please find attached for information and awareness a power point presentation relative to the recent events at LaSalle and the LIC 504 effort on Anchor Darling valves that will be provided as a part of next week's strategic alignment meeting. Thanks Ken From: Coyne, Kevin Sent: Friday, Ju ne 30, 2017 11:08 AM To: Ca i, June <J un e.Ca i@nrc.gov> Cc: Cla rk, Theresa <Theresa.Cla rk @nrc.gov>; O'Brien, Kenneth <Kenneth.O'Bri en@ nrc.gov>; Jeffe rs, Mark <Mar k.Jeffers@nrc.gov>; Lubinski, John <John. Lubinski@nrc.gov>; Holian, Brian <Bria n.Hol ian@nrc.gov>; Evans, M ichele <M ichele.Evans@nrc.gov>; McDermott, Brian <Brian.McDermott@nrc.gov>; M iller, Chris <Chris.M il ler@nrc.gov>; King, M ichael <M ichael.King2@ nrc.gov>; Lund, Louise <Louise.Lund@ nrc.gov>; Bowman, Gregory <Gregory.Bowman@nrc.gov>; Gavrilas, M irela <M irela.Gavrilas@ nrc.gov>; Helton, Shana <Sha na. Helton@nrc.gov>; Giitter, Joseph <Joseph.Giitter@nrc.gov>; Felts, Russell <Russell. Felts@ nrc.gov>

    Subject:

    RE: Req uest for presentation at Quarterly Strategic Alignment meeting June - Please see attached presentation on anchor/darling double dlsc gate valves tor the July 5 Quarterly Strategic Alignment Meeting. Mark Jeffers (Region 3/DRS) and I will be presenting (Mark will tie in through the Region 3 VTC connection) . ls the meeting still scheduled to start at 1 :30 pm (eastern) on July 5 (TWFN T6A 1)? Let me know if you have any questions or need additional information. Hope you have a great weekend! Kevin Kevin Coyne, Ph.D., P.E. Deputy Director, Acting Division of Engineering, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-000 1 {301) 415-2478 (work) From: Cai, June Sent: Wed nesday, June 07, 2017 1:03 PM To: Coyne, Kevin <Kevin.Covne@nrc.gov> Cc: Clark, Theresa <Theresa.Clark@nrc.gov>

    Subject:

    Request for present ation at Quarterly St rat egic Alignment meeting : Kevin, ln developing the agenda for the next Quarterly Strategic Alignment Meeting, the topic of LaSalle SIT / Anchor-Darling double disc gate valves has been requested by the EDO/DEDOs, with NRR lead and RIII support. The meeting is on July 5th - see attached agenda for location and presentation time. The audience will be EDO/DEDOs/AO and ODs/RAs. We have 20 minutes slotted for this topic, including Qs and As. Given the length of time and the audience, suggest the presentation be fairly focused and high Ievel. Please Iet me know if you would be able to support and who to work with on the logistic details. Thanks so much in advance. June Cai Executive Technica l Asslstant Office of the Executive Director for Operatfons U.S. Nuclear Regulatory Commission 301-415-1771 june.cai@nrc.gov From: O"Brien Kenneth To: Pedersoo Cynthla; Roberts Darrell; Trapo I ames Cc: l effers. Mark: Shuaibi. Moha mmed; Louden. Patrick; Lara. 1ullo

    Subject:

    FW: Request for present ation at Quarterly Strategic Alignment meeting Date: Friday, J une 30, 2017 12:54:22 PM Attachments: s Safety Spotlight * AD DDGV l uly 2017 Rev 3 l une 30 2017.pptx Cindy and Ali: Attached please find the slides planned for use as a part of the subject meeting next week. Kevin Coyne and Mark Jeffers will be making the presentation. Please Iet me know if you have any questions. Thanks Ken From: Coyne, Kevin Sent: Friday, Jun e 30, 2017 11:08 AM To: Ca i, June <June.Ca i@nrc.gov> Cc: C!ark, Theresa <The resa.Cla rk@nrc.gov>; O'Bren, Kenneth <Kenneth.O'Brie n@ nrc.gov>; Jeffers, Mark <Mark.Jeffers@nrc.gov>; Lubinski, John <John .Lubin ski@nrc.gov>; Holian, Brian <Brian .H ol ian@nrc.gov>; Evans, Michele <M ichele.Evans@nrc.gov>; McDermott, Brian <Bria n.McDermott@n rc.gov>; M iller, Chris <Chris. M il ler@nrc.gov>; King, Michael <Michael.King2@nrc.gov>; Lund, Louise <Louise. Lund@nrc.gov>; Bowman, Gregory <Gregory.Bowman@nrc.gov>; Gavrilas, Mirela <Mirela.Gavrilas@ nrc.gov>; Helton, Shana <Sha na.Helton@nrc.gov>; Giitter, Joseph <Joseph.Giitter@nrc.gov>; Felts, Russell <Russell.Felts@ nrc.gov>

    Subject:

    RE: Request for presentation at Quarterly Strategic Alignment meeting June - Please see attached presentation on anchor/darling double disc gate valves for the July 5 Quarterly Strategic Alignment Meeting. Mark Jeffers (Region 3/DRS) and l will be presenting (Mark will tie in through the Region 3 VTC connection). ls the meeting still scheduled to start at 1 :30 pm (eastern) on July 5 (TWFN T6A1)? Let me know if you have any questions or need additional information. Hope you have a great weekend ! Kevin Kevin Coyne, Ph.D. 1 P.E. Deputy Director, Acting Division of Engineering, Office of Nuc/eor Reoctor Regulotion U.S. Nuc/ear Regu/atory Commission Washington, DC 20555-0001 (301) 415-24 78 (work) From: Cai, June Sent: Wednesday, June 07, 2017 1:03 PM To: Coyne, Kevin <Kevin.Covne@nrc.gov> Cc: Clark, Theresa <Theresa.Cla rk@nrc.gov>

    Subject:

    Request for presentation at Quarterly Strategic Alignment meeting : Kevin, ln developing the agenda for the next Quarterly Strategic Alignment Meeting, the topic of LaSalle SIT / Anchor-Darling double disc gate valves has been requested by the EDO/DEDOs, with NRR lead and RIII support. The meeting is on July 5th - see attached agenda for location and presentation time. The audience will be EDO/DEDOs/AO and ODs/RAs. We have 20 minutes slotted for th is topic, including Qs and As. Given the length of time and the audience, suggest the presentation be fairly focused and high Ievel. Please Iet me know if you would be able to support and who to work with on the logistic details. Thanks so much in advance. June Cai Executive Technica l Assistant Office of the Executive Director for Operat1ons U.S. Nuclear Regulatory Commission 301-415-1771 June.cai@nrc.gov / U.S.NRC Unhc>d S11ncs Nuc:lc1 r Rcgub rory Co mmiHion Protecti1tg People mul the Env-ironmmt Safety Spotlight: Anchor Darling Double Disc Gate Valves OEDO Quarterly Strategic Alignment Meeting July 5/ 2017 l<evin Coyne Mark Jeffers NRR/DE Region 111/DRS

    Background

    * On February 11, the Unit 2 High LaSalle County Generating Station Pressure Core Spray (HPCS) Discharge Valve experienced a stem-disc separation failure during a system fill and vent. * Although the valve indicated open, there was no air or water flowing through the valve. LaSalle Unit 2 * Post event investigation revealed Location: Marseilles, IL severe degradation and disc Operator: Exelon separation from the stem. Licensed: 12/16/1983 Type: BWR, GES, Mark 11 Power Level MWt: 3,546 U.S.NRC As-Found Condition VDmCAl STEM 'i BACKSEAT (STtM CE'HTrRUNE) STEM STEM TltREAOS BOOY HORfZONTAL 't (PORT Cf NT'ERLINf) "U.S.NRC l,\n*~nl .-,,octn Nl\-cln, lt1ul.'Hl'<1 ('.nl'l,nn,....n Ptotttt11ff; fupk aud lhr &l'ironuunt Fa iIu re Investigation Likely Failure Sequence * Stem collar slippage and loss of stem torque preload (potential valve design flaw) * Wedge pin shear * Joint loosening/rotational movement * Thread wear and degradation * Stem-disc separation MPR Report 2101-0022-RPT-001, Rev. 0 /U.S.NRC \. '"'"' ~,:rn Pl,,'uctn, ft*s.ub1my ( ,....., nn....on P,o1<<t11ff Ptx,pfL auti ll1r &Wt111mmt Other Context * lssue affects over 40 plant sites (BWRs and PWRs) - Valves are used in risk significant applications {ECCS, ESW, CCW) - We currently do not have a complete population inventory of all A/D DDGVs in service * Flowserve Part 21 - # 2013-09-00, Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valve (ADAMS ML13064A012). * BWROG Guidance - BWROG-TP-13-006, "Recommendations to Resolve Flowserve 10 CFR Part 21 Notification Affecting Anchor Darling double Disc Gate Valve Wedge Pin Failures." - Recommended testing cannot reliably detect degraded valve {e.g., failed wedge pin) - MOV diagnostics {traces) difficult to interpret U.S.NRC 1n itia I NRC Actions * Region 111 Special lnspection OpECOMM Scope includes sequences of events, facts, Operati ng Experlence Communlcatlon circumstances, and licensee respon se to valve failure. Additional focus item is role of BWROG guidance document Exit Meeting - June 9 * NRR/DIRS OpE COMM ~f'llil')rft11d.-Qf)f!'ii'!... ~. . -,Qll"M">Ct\FJ\,..'"1flilal *t . ~ , . , . . - f 9i tJQ'WU,W 'f... f0tlt'MC..ol~"'9'*~,a'll'lil10CFI' P:WiW ~ t K L ~ C f * LIC-504 Generic Assessment ~ .... ~to'ir&.1. . ror..1*0ilf\'.l'ltld111JfuMr..,ir.... .,~-~appkWlll*o*~W.... ..... )Ot:r.ll;~.; ~,...,-,...~-.w~ ~y~,_,.,_.,Ul'M:,t 1.,_. C..1l°l',al-1M . . . . . . . . . . b ~ ~ f F l . n ' NRR, NRO, and Region 111 Participation rl'1!,v't,,ulk,,~~~ ,,~,,.~'9~mll,;le,lfll>>--. May 16 meeting with Flowserve, owners ~ r ; ~ e _ ~ ~ ~ C b l t i r , . c ; 1 . ~ d " ' -... ~~ ~ J b o : . - Q l r e ' ~ \ I ~ ll!l'ttft~oa*~dM-~..aS.u-* ecu.,.~~:.,.,,,..09!f~OOo:.,~ e,.e,tlb,l.h,tt,rt,rr"" Nf-S:..."-" groups ~"CI . c l t . c w l ' ~ l ' ~ t r N l . . . . . u l e d " ~ ~ ~ , _ ~ ....."' f"llt"""1'(.lr ........ -.~-*dM*JZ011 ~offtli~t.J,._....,_.,,.,_...00,,,-. ....c,lof'iiffl"fltQtie.Jlll"ld~ ,,..'11"C:~ ."ICIO"S ... ~ . , I r ti:>N>>051f'Nlf';,eomt ......... S l . i ~ ~ ,. . . . ,. Communication Plan ~Nll,.ACIOOH~ h!l.t-'IO t,peof;;.~OI " rttef'trt~~,.._.e4 lssuance of IN 2017-03 ~ ff!PW.-Y 1* %DfT ~*~~ .-wt'*'* ~ $Wba,\ ""',;t 2 1,r........, June 29 Public Meeting ..~::.::.:;~~~;=~ _...... ..,..~n.,.._, ...~.._....,* ...,,.., .. _....,..,,........ . ..;.~=:-~ ' - v,lfl-,.*Wflll""""tl_.,.._, ,.,11,* ;l'h i1,-.Ci1*... Th. . ...,. 'liot~Mcic,.,....114 hWr~NI.Cif ..../ 1 1 ~ , , . ........... ......,.. ..........j~lo,1'1. . . : ** f!ff*'1 lpl ,.,,,.ao~.d-.... -.;rn,,._...**- -...- - Flowserve vendor inspection scheduled for ~ - .\tW,4$1-"" ~Ll! I < ~ l'-~1*'1t.-n--..~.....-Uti>~ - ~ ~ t M - ~ A week of July 17. ~.ar1NW.,. l'Nfi.ldlnot a....,0tro\1111Clf'l"*l"9~*nca!Ttfll~.._..o,,. ~ 1,S}"'rt! Met , F"tftrtt.,._,._. "°"QU-.11 l-a,!~/~W,IMPlt,.,o~ U.S.NRC Risk Assessment Insights Acceptance guidelines for L\CDF in RG 1.174 1.E-02 1.E-03 LL. Region 1- No Ch anges Allowed 1.E-04 0 u Region 1 * Other Sites (AII MOVs) C'O ~ QJ 1.E-05 * * * Cook (AD Valves) -0 *Regi on 11 LS1 (AD Valves) 1.E-06 * Region 11 1 1.E-07 1.E-06 l.E-05 1.E-04 1.E-03 1.E-02 CDF /U.S.NRC Status U pdate * LaSalle Special lnspection - Following the exit, the SIT continued to discuss concerns with operability of the opposite unit's HPCS injection valve. - LaSalle Unit 1 shutdown on June 22nd to replace the HPCS injection valve internais and correct the design flaw. - Exelon sent the as-found Unit 1 valve internais to BWXT for detailed analysis. /U.S.NRC \. '"'"' ~~** Nu,;,n, ft*c.u ~rn,y ( ~,...., nnMA;,n P,o1<<t11ff .Ptt.,pU aud liN &nira11mmt Status U pdate * Generic LIC-504 Assessment - Actions to address the 2013 Flowserve Part 21 may not eliminate degraded condition for A/D DDGVs. - IN 2017-003 appears to have prompted additional industry activity - Currently gathering information and evaluating industry actions - Using LIC-504 process to identify appropriate regulatory response U.S.NRC Questions U.S.NRC