m Pacific Gas and Electric Campany"'
Michael A. Ginn Manager Emergency Planning Diablo Canyon Power Plant P.O. Box 56' Avila Beach, CA 93424 805.545.3446 Internal: 691.3446 Fax: 805.545.6265.
September 26, 2018 PG&E Letter DCL-18-074 PG&E Letter DIL-18-012 U.S. Nuclear Regulatory Commission
)
10 CFR 50.54, 10 CFR 72.32 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 DocRet No. 72-26, Materials License No. SNM-2511 Diablo Canyon Independent Spent Fuel Storage Installation Emergency Plan and Implementing Procedures Update
Dear Commissioners and Staff:
In accordance with 10 CFR 50.54(q)(5) and the requirements of 10 CFR 72.32, Pacific Gas and Electric Company (PG&E) is providing a summary of the analysis of changes to Emergency Plan (E-Plan) and its Implementing Procedures. The revised documents and the associated enclosures *are listed below:
- - Diablo Canyoo Power Plant Emergency Plan Revision Numbers for Emergency Plan Sections and Appendixes
- - Summary of the Analysis of Changes to Em~rgency Plan Section 4, Revision 4.17, "Emergency Conditions"
- - Summary of the Analysis of Changes to Emergency Plan Section 6, Revision 4.19, "Emergency Measures"
- - Summary of the Analysis of Changes to Emergency Plan Appendix D, Revision 5.01, "EAL Technical Basis Manual"
- - Summary of the Analysis of Changes to Emergency Plan Appendix D, Revision 5.02, "EAL Technical Basis Manual"
- - Summary of the Analysis of Changes 'to Emergency Plan Appendix F, Revision 4.06, "ERO On-Shift Staffing Analysis Report" A member of the STARS Alliance Callaway* Diablo Canyon* Palo Verde* Wolf Creek At-45 NJt.-1 ~s z /p fl)lfd-tJH 5 s
Document Control Desk September 26, 2018 Page 2
/
PG&E Letter DCL-18-074 PG&E-Letter DIL-18-012
- - Summary of the Analysis of Changes to Emergency Plan Appendix G, Revision 4.02, "Protective Action Recommendation (PAR)
Strategy Bases"
- - Emergency Plan Section 4, Revision 4.17, "Emergency Conditions"
- - Emergency Plan Section 6, Revision 4.19, "Emergency Measures"
- 0 - Emergency Plan Appendix D, Revision 5.02, "EAL Technical Basis Manual"
- 1 - Emergency Plan Appendix F, Revision 4.06, "ERO On-Shift Staffing Analysis Report"
- 2 - Emergency Plan Appendix G, Revision 4.02, "Protective Action Recommendation (PAR) Strategy Bases"
- 3-Diablo Canyon Power Plant Emergency Plan Implementing Procedures, Revision Numbers for Emergency Plan Implementing Procedures
- 4 - Summary of the Analysis, of Changes to Emergency Plan Implementing Procedure EP G-1, Revision 45, "Emergency Classification and Emergency Plan Activation"
- 5 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP G-2, Revision 51, "Interim Emergency Response Organization"
- 6 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP G-3, Revision 60, "Emergency Notification of Off-Site Agencies"
- 7 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-10, Revision 21, "Protective Action Recommendations"
- 8 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-14A, Revision 3, "Initial Detection of Fuel Cladding Damage" A member of the STARS Alliance Callaway* Diablo Canyon
- Palo Verde* Wolf Creek
Document Control Desk September 26, 2018 Page 3 PG&E Letter DCL-18-074 PG&E Letter DIL-18-012
- 9 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-16, Revision 16, "Operating Instructions for the EARS Computer Program"
\\
- 0 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-17, Revision 1, "Operating Instructions for QuickDose"
- 1 - S,ummary of the Analysis of Changes to Emergency Plan Implementing Procedure EP R-2, Revision 36, "Release of Airborne Radioactive Materials Initial Assessment"
- 2 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP EF-1, Revision 55, "Activation and Operation of the Technical Support Center"
- 3 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP EF-3, Revision 46, "Activation and Operation of the Emergency Operations Facility" PG&E evaluated the changes for a reduction in effectiveness, as defined in 10 CFR 50.54(q), and concluded that the changes do not reduce the effectiveness of the E-Plan. The E-Plan continues to meet the requirements in Appendix E of 10 CFR 50 and the planning standards of 10 CFR 50.47(b).
Therefore, prior NRC approval of the associated changes was not required.
This update does not contain any privacy and proprietary information in accordance with NRC Generic Letter 81-27, "Privacy and Proprietary Material in Emergency Plans."
PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.
If there are questions regarding this update, please contact me at (805) 545-3446.
Sincerely,
~
__;__ A G---.
Michael A. Ginn Emergency Planning Manager A member of the STARS Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek
Document Control Desk September 26, 2018 Page4 armb/4743/50960128 Enclosures cc/enc: William C. Allen, NMSS Project Manager PG&E Letter DCL-18-074 PG&E Letter DIL-18-012 Kriss M. Kennedy, NRG Region IV Administrator Christopher W. Newport, NRG Senior Resident Inspector Balwant K. Singal, NRG Senior Project Manager Senior Emergency Preparedness Inspector (RGN-IV/DR)
A member of the STARS Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek