ML18275A362
Jump to navigation
Jump to search
| ML18275A362 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 09/13/2018 |
| From: | David Silk Operations Branch I |
| To: | David Silk Operations Branch I |
| Shared Package | |
| ML17312A957 | List: |
| References | |
| 000500 | |
| Download: ML18275A362 (1) | |
Text
Beaver Valley Written Examination Handouts (List)
Q52 Steam Tables Q69 OP Manual Fig 21-2, Rev 20 Q77 1 OM-53A.1.5-D lss 1 C Rev 0 Q84 1 OM-56C.5.A.1 Rev 5 10M-56C.4.F-1 Rev 22 pg 13 filled out with plant parameters Q90 Y2-0DC-3.03, Rev 14 Q92 U1 EAL Wallboard (with Mode definitions removed)
Q96 NOP-OP-1007, Rev 27 (Procedure body and Attachment 1, 2, & 3 only)